0% found this document useful (0 votes)
334 views12 pages

Quote WITH MATERIAL

e
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
334 views12 pages

Quote WITH MATERIAL

e
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

This agreement is executed on this 10-02-2024 between Gokulam Architects & Interiors

having its registered office at Thodupuzha represented by managing Director Mr. Gokul
Jayachandran(herein after referred to as the first party ) And Ms. Manju Radhakrishnan
KIZHAKKEPPARAMBIL(H)Thodupuzha East P.O Kanjiramattom Pin:685584 (herein after
referred to as the Second party )

And whereas the second party intends to entrust the work of his residential building to the
first party as mutually agreed between the parties with the following terms & conditions

The rate for the work of the residential building with all cost of material and labor charges as
per the plan and specification is Rs.9500000.00/-(AMOUNT IN WORDS: NINETY-FIVE
LAKHS ONLY)

The terms, conditions, and specifications are given below.

First party Second party

GOKUL JAYACHANDRAN MANJU RADHAKRISHNAN

Witness

1. 2.
TERMS & CONDITION

1. Required water & electricity at the site at the owner’s own risk and expense.
2. Necessary advance is required on time, as per agreement.
3. Maximum time for the completion of the work is 8 Months from the date of
signing the contract.
4. The client is responsible for solving all union issues that occur at the site
during construction.
5. Settle the final payment within 7 days from the completion of work.
6. Safety of workers is a factor belonging to the contractor in all phases until
completion.
7. Selection and purchase of all materials should be jointly by the owner and the
contractor.
8. If the client's choice is higher than the quoted amount, then pay the additional
amount for the material as the extra amount.
9. Any delay due to the rains/storms/cyclones etc. will not be considered as the
working period as mentioned above in the agreement.
10. If any delay from the second party due to delivery of cash on time or by
other means during work, the second party is liable to compensate for the same
to the first party.
11. If any increase in the cost of construction material occurs within six months,
from the date of signing the agreement, the final Rate may alter accordingly.
The rate may be fixed after a meeting with the First Party & second party in the
presence of a witness.
12. Curing will be done 2 times daily.
13. The below mentioned Rate is without GST

1. Contractor (first party) 2. The building owner (second party)


WORK PATTERN

GROUND FLOOR

1. Set outing & marking.

2. Earthwork excavation for column footing & D.R Foundation as per structural detail.

3. PCC 1:4:8 for column Footing,10cm thick using 40mm broken stone & M-Sand.

4. Column footing as per structural design with 1:1.5:3 mix using quality 20mm broken stone

and m-sand.

5. Column rising to plinth beam bottom level.

6. Plinth footing as per structural design with 1:1.5:3 mix using quality 10 mm broken stone

and m-sand.

7. Random Rubble basement work up to 30 cm in height as per structural detail,

8. R.C.C belt of height 15 cm over Random Rubble Masonry.

9. Brick work with quality (30cmx10cmx10cm size) solid blocks (30cmx10cmx15cm size)

for the main wall in CM 1:6 and the partition wall 10cm thick with quality solid bricks

(40cmx10cmx0cm size) up to Lintel level.

10. RCC Lintel beam concreting as per structural design with 1:1.5:3 mix using quality

10mm broken stone and M sand.

11. Sunshade concreting as per design with 1:1.5:3 mix with quality 10 mm broken stone

&M-sand.

12. Brick work with quality Laterite brick (30cmx10cmx10cm size)or solid blocks

(30cmx10cmx15cm size) for the main wall in CM 1:6 and the partition wall 10cm thick with

quality solid bricks(40cmx10cmx0cm size) up to Ground floor slab level.

13. RCC Slab (10 cm thick) concreting for Ground floor as per structural design with 1:1.5:3

mix using quality 10 mm broken stone and M sand.

14. Floor PCC with 1:4:8 using 10 mm broken stone& m-sand


FIRST FLOOR

1. Brick work with quality Laterite brick (30cmx10cmx10cm size)or solid blocks

(30cmx10cmx15cm size) for main wall in CM 1:6 and partition wall 10cm thick with quality

solid bricks(40cmx10cmx0cm size) upto Lintel level.

2. RCC Lintel beam concreting as per structural design with 1:1.5:3 mix using quality 10mm

broken stone and M sand.

3. Sunshade concreting as per design with 1:1.5:3 mix with quality 10 mm broken stone &M-

sand.

4. Brick work with quality Laterite brick (30cmx10cmx10cm size)or solid blocks

(30cmx10cmx15cm size) for the main wall in CM 1:6 and the partition wall 10cm thick with

quality solid bricks(40cmx10cmx0cm size) upto First-floor slab level.

5. RCC Slab (10 cm thick) concreting for First floor as per structural design with 1:1.5:3 mix

using quality 10 mm broken stone and M sand.

6. Floor PCC with 1:4:8 using 10 mm broken stone& m-sand.

PLASTERING

1. Wall plastering 1:5, 12 mm thick.

2. Ceiling plastering 1:4, 9mm thick.

PAINTING

 White cement washing one coat all area.

 Applying cement washing-based putty to coat all areas.

 Cement primer coats all areas.

 Emulsion two coats all area.

 Teak wood doors & windows MRP/PU or SLEEK polishing.

 BROWN PAINTING IN ANJILI WOOD.


ELECTRICAL

 ISI grade PVC Pipe with metal box.


 Finolex or v-guard electrical cable
 Switches- Legrand,GoldMedal,Elleys
 One way switch-Rs.85.00/-
 Two way switch –Rs.140.00/-
 6 A Socket-Rs.180.00/-
 10 A Switch-Rs.180.00/-
 Fan Regulator –Rs.450.00/-
 MCB & ELCB
 Inverter point.
 Computer network points in all bed rooms & drawing room.
 A C Points in all bed rooms, drawing & hall
 Master control points .(ground floor & first floor separate)
 Two power plug in kitchen &1 in work area.
 Solar points.

ELECTRICAL FITTINGS,

Bed rooms ,drawing room, kitchen 1 LED tube (4 Feet,18w,lucker/Philips, up to


As per electrical drawing Rs.380.00/-)
1 fancy lights(up to Rs.1000.00/-)
1 ceiling fan (Crompton, up to Rs.5000.00/-)
4 No’s of LED round light in top
(8w,lucker,up to Rs,450,00/-)

Dining cum living 1 LED Tube (4 feet,18w,lucker,up to


As per electrical drawing Rs.380.00/-)
1 fancy lights (up to Rs.1150.00/-)
1 ceiling fan (Crompton, up to Rs.5000.00/-)
10 No’s of LED Round light in top
(8w,lucker,up to Rs.450.00/-)
4 toilets 1 No’s of LED round lights in ceiling
As per electrical drawing (8w,lucker,up to Rs.450.00/-)
Exhaust fan (6”, Crompton,Rs.1600.00/-)
1 mirror light (up to Rs.1000.00/-)
Common toilet 1 No of LED round light in ceiling
As per electrical drawing (8w,lucker,up to Rs.450.00/-) exhaust
fan(6”,Crompton,Rs.1600.00/-)
1 mirror light (up to Rs.1000.00/-)
Work area 1 No’s of LED round light in
top(8w,lucker,up to Rs.450.00/-)1 LED
Tube(4 feet ,18w,lucker,up to Rs.380.00/-)

Front veranda 8 Nos of LED round light in top


(8w,lucker,up to Rs.450.00/-)
1ceiling fan (Crompton, up to Rs.5000.00/-)
1 Nos of fancy lights (up to Rs.1500.00/-)
Exterior lights 5 light(exterior light,6w,lucker,Rs.1500.00/-)
Compound wall pillar light 5 Nos.(exterior lights. Up to Rs.1500.00/-)

Common wash basin & wash room 1 No of LED round light in top (8w,lucker,up
to Rs.450.00/-)
1 mirror light (up to (Rs.4000.00/-)

PLUMBING

Supreme, kelachandra or astral-CPVC pipe for water inlet.

Supreme, kelachandra or astral-PVC pipe for drainage & waste water outlet.

Wall mount closet -Rs.11000.00/-(Jaquar,Cera 5 nos)

Rain shower -Rs.4000.00/-(Jaquar,Cera 4 nos)

Health faucet -Rs.2000.00/-(Jaquar/Cera-5 Nos)

Wash basin tap -Rs.1000.00/-(Jaquar/Cera-5 Nos)


Toilet tap -Rs.2500.00/-(Jaquar,Cera 5 Nos)

Diverter with plate –Rs.6500.00/-(Jaquar,Cera 5 Nos)

Wash basin -Rs.4000.00/-(Jaquar,Cera 5 Nos)

Common wash basin - Rs.10000.00/-(Jaquar,Cera counter top)

Kitchen sink - Rs.15000.00/-(jaguar-counter top-1Nos)

Kitchen tap mixer -Rs.3500.00/-(2 Nos)

Spout -Rs.1100.00/-

Angle cock -Rs.800.00/-(Jaquar/Cera)

JOINERY

FRONT SIDE DOORS AND WINDOWS WITH TEAK WOOD

2 SIDES AND BACK SIDE WINDOW FRAME WITH ANJILI WOOD AND WINDOW
SHUTTERS WITH TEAK WOOD.fittings ss

DRAINAGE

1 Tank for toilet, made in DR of inside dimension 1.2 x 1.8 x 1.8

1 Tank with Ferro slab for bathroom water 4ft dia x 6ft ht

1 Tank with Ferro slab for Kitchen waste 3Ft dia x 4ft ht

FLOORING

Branded tile flooring in all bedrooms, Drawings, dining, living, kitchen &other common
areas.....etc -Rs.100.00/-Sq.Ft

Car porch tile -Rs.75.00/-Sq.Ft(Mat finishing)

Cladding tiles as per design -Rs.60.00/-Sq.Ft

Kitchen & work area slab top -Rs.180.00/-Sq.Ft

Kitchen & work area wall tile -Rs.100.00/-Sq.Ft


Toilets

Wall -Rs.50.00/-Sq.Ft

Floor -Rs.75.00/-Sq.Ft

Main wash area

Wall -Rs.50.00/-Sq.Ft

A box with multiwood and top finished with granite 180rs/sq.ft

TRUSSED ROOF WORK

 Trussed frame work.


 Ceramic roof tile laying of Rs 80/sqft
 UPVC drain gutter work of 6” size.

Trussed work material

 4”x2” ISI grade GI pipe (Appolo,bhoosan or RK.)


 3”X1 ½ ISI grade GI pipe (Appolo,bhoosan or RK.)
 1”X1”ISI grade GI pipe (Appolo,bhoosan or RK.)
 One coat epoxy primer on GI pipes.
 One coat enamel painting on GI pipes.(Asian)
 Quality ceramic roof tile.(kajaria-Rs.up to 55.00/No)
 Quality 10mm V-Board.
 UPVC drain gutter.
 Normal roof tile in elevation areas and GI sheet in balance area
 Steel stair will be provided forom open terrace to first floor slab

INTERIOR WORK

Kitchen cupboards

 Approximate cupboard area from plan-104.80 SqFt


 Kitchen accessories,
 Cutlery tray-1 No.
 Plate tray -1 No
 Plain basket -1 No.
 GTPT -1No.
 Oil pull out-2 No.
 Waste basket-1No.
 Broom storage Unit
 Kitchen sink-1No.(up to Rs.15000.00/-)
 One /two open boxes for easy usage of cabinets

Materials used for kitchen cupboards:

 Using 701 grade full gurgaon marine ply wood with two side lamination.
 Front shutter HDF Board with glossy finished lamination .(green or shakthiman)
 Profile handle.
 Accessories-Ebco,sleek or hettiche

Wardrobes in dress room & bed room

Approximate area statement,

Ground floor master bed room-33.4Sq.ft(with2.10m height)

Ground floor second bed room –17.11Sq.Ft(with 2.10m height).

First floor master bed room -33.4Sq.Ft(with 2.10m height).

First Floor second bed room -17.11Sq.Ft(with 2.10m height).

Materials used for Bedroom wardrobes:

 Using particle board or compressed wood wooden finished.


 Front doors with same material and color for box work .(green or shakthiman)
 Profile handle.
 Accessories-Ebco,sleek or hettiche
 MIRROR IN DRESS AREA.

Counter top wash basins counter,

Common wash basin (1.1x0.50)-6.45 Sq.Ft

Toilets wash basin(0.9x0.5x0.6)-19.05 Sq.Ft


Compound wall

Approximate 20 mtr length with quality solid block (40cmx10cmx20cmxsize)with GI pipes.

Gate with 3.60m width & 1.80 m height with GI pipes & funder max.board.(up to
Rs.50000.00/-)

GYPSUM

BEDROOMS,KITCHEN BASIC GYPSUM WORK WITH PRIOR


LIGHTS
LIVING ,DINING WORKS AS PER INTERIOR DESIGN

BATHROOM DOOR

5 NOS BATHROOM WORTH 10000 PER DOOR.

CCTV

PROVISION FOR CCTV CAMERA 8NOS

Handrail

Handrail for stair case and double height will be done with glass and GI PIPE

Land scaping

Approximate 400 Sq.Ft landscaping work.

Paver tile

Approximate 500 Sq.Ft land paver tile work with artificial grass

MATERIALS USED

1.CEMENT-Ramco,Shankar,Dalmia,Ultra tech,ACC

2.Steel-metcon,vizag, JSW, Malabar TMT

3.Sand-quality crusher sand


4.Metal-quality ¾ “&1 ½ “crusher metal.

5.Quality latterate & solid brick.

NOTE

 NO MOVING FURNITURES ARE INCLUDED IN THIS QUOTE


 ADDITIONAL PAYMENT WILL BE CHARGED FOR THE WORKS THAT
ARE NOT MENTIONED IN THE ABOVE QUOTE.
 COST FOR EARTH FILLING IN PLINTH AND YARD INCLUDED IN THIS
QUOTE.

Rate for completing the residential building as per the plan given by the engineer with
the above specification is (PLINTH AREA 2976 SQFT) is 9500000.00/-/-(Ninety Five
Lakhs) without GST.

First party Second party

GOKUL JAYACHANDRAN MANJU RADHAKRISHNAN

PAYMENT SCHEDULE
ADVANCE AMOUNT 1500000.00/-
AFTER PLINTH BEAM 500000.00/-
AFTER G F LINTEL 300000.00/-
ON THE DAY OF GROUND FLOOR 500000.00/-
SLAB CASTING
AFTER FIRST FLOOR LINTEL 200000.00/-
ON THE DAY OF FIRST FLOOR SLAB 400000.00/-
CASTING
AFTER INSIDE PLASTERING 500000.00/-
AFTER OUTSIDE PLASTERING 300000.00/-
WHEN STARTING FLOORING 500000.00/-
WHEN STARTING PAINTING 500000.00/-
WHEN STARTING ELECTRICAL 500000.00/-
WORK
WHEN STARTING PLUMBING 500000.00/-
WHEN STARTING ROOF WORK 500000.00/-
WHEN STARTING INTERIOR 1000000.00/-
WORK(PLYWOOD WORK)
WHEN STARTING LANDSCAPE AND 700000.00/-
OUTSIDE WORKS
AT THE TIME OF PURCHASING 500000.00/-
WOOD FOR DOOR SHUTTERS AND
WINDOWS
WHEN DOING COMPOUND WALL & 300000.00/-
SEPTIC TANK WORK
ON THE DAY OF KEY HANDOVERING 300000.00/-(BALANCE)
First party Second party

GOKUL JAYACHANDRAN MANJU RADHAKRISHNAN