0% found this document useful (0 votes)
32 views2 pages

Gantrail Fitting Instructions Series 7 DS 0421

Uploaded by

fbabich
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views2 pages

Gantrail Fitting Instructions Series 7 DS 0421

Uploaded by

fbabich
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

7 Series Clips

Fitting Instructions

These instructions to be read in conjunction with product datasheet, available from www.gantrail.com.

FIGURE 1 FIGURE 2

Insert bolt(s) though hole(s) in rail supporting structure. Place body of clip base over bolt.

FIGURE 3 FIGURE 4

Move clip base into metal-to-metal contact with bottom edge of rail. Place clip top over bolt with rubber ‘nose’ resting on upper surface
of bottom flange of rail.

FIGURE 5 FIGURE 6

Bottom surface of clip top will not be in full metal-to-metal contact Run nut down bolt.
with clip base.
FIGURE 7 FIGURE 8

Nut to make contact with clip top. Tighten nut with spanner.

FIGURE 9 FIGURE 10

Tighten only until rubber ‘nose’ is compressed and bottom surface of With hammer of about 1 kilo, tap clip base towards rail along
clip top is in full metal-to-metal contact with clip base. Do not apply direction of slot in clip.
full torque yet.

FIGURE 11

Tighten nut to required torque given on product datasheet.

A world of crane rail expertise.


www.gantrail.com

Gantry Railing Ltd


Sudmeadow Road
Hempsted
ISO 9001
Gloucester GL2 5HG Registered
ENGLAND Quality
Management 015

Certificate No. 5180

Tel: +44 (0) 1452 300688


E-mail: [email protected]
Fixing Instructions 7 Series/DO/04/21

You might also like