7 Series Clips
Fitting Instructions
These instructions to be read in conjunction with product datasheet, available from www.gantrail.com.
FIGURE 1 FIGURE 2
Insert bolt(s) though hole(s) in rail supporting structure. Place body of clip base over bolt.
FIGURE 3 FIGURE 4
Move clip base into metal-to-metal contact with bottom edge of rail. Place clip top over bolt with rubber ‘nose’ resting on upper surface
of bottom flange of rail.
FIGURE 5 FIGURE 6
Bottom surface of clip top will not be in full metal-to-metal contact Run nut down bolt.
with clip base.
FIGURE 7 FIGURE 8
Nut to make contact with clip top. Tighten nut with spanner.
FIGURE 9 FIGURE 10
Tighten only until rubber ‘nose’ is compressed and bottom surface of With hammer of about 1 kilo, tap clip base towards rail along
clip top is in full metal-to-metal contact with clip base. Do not apply direction of slot in clip.
full torque yet.
FIGURE 11
Tighten nut to required torque given on product datasheet.
A world of crane rail expertise.
www.gantrail.com
Gantry Railing Ltd
Sudmeadow Road
Hempsted
ISO 9001
Gloucester GL2 5HG Registered
ENGLAND Quality
Management 015
Certificate No. 5180
Tel: +44 (0) 1452 300688
E-mail:
[email protected] Fixing Instructions 7 Series/DO/04/21