0% found this document useful (0 votes)
26 views12 pages

Iki Jet 4

Uploaded by

Mouna Wasef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views12 pages

Iki Jet 4

Uploaded by

Mouna Wasef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

Renewable Heat-

and Power for


Nalaikh
district,Mongolia
Bichura Energy LLC
Erdenedorj Batbayar
Energy Sector in Mongolia
District Heating in Mongolia
Renewable Energy Resources
• The county’s combined
wind and solar power
potential is estimated to
be equivalent to 2,600
gigawatts(GW) of installed
capacity or 5,457 terawatt-
hours of clean electricity
generation per year.
• The county’s energy
demand is 1.2GW
• As of 2023,Mongolia has 3
wind farms, 9 solar
farms,and small
hydropower
plants,accounting for
18.3% of total installed
capacity and only 9.6% of
total electricity production.
Nalaikh District Mongolia
• Population:40,238 (2023)
• Thermal Power Plant installed capacity: 41,8MW
• Current annual heating demand:114,000MWh
• Nalaikh District total area: 687km2

District Plans:
• Industrial Park area: 320 ha
• Logistics Terminal: 140ha Nalaikh Industrial Park
• Renewable Energy: 110ha

• Heat demand of the district by 2030: 180MW


• Expected population growth: 150,000-200,000 households

Source:nalaikhpark.mn
Nalaikh district heating network: Thermal PowerPlant Area:
District Heating in Nalaikh:
Nalaikh Thermal Power Plant(state owned)
• Installed capacity 69,79MW
• Current production 41,8MW(due to the declined efficiency)
• 100% depends on coal import from Baganuur district ( 90km away)
• Currently 70,2% of total expenses are spent on fuel
• Annual government aid for operation: around 600,000$
• Annual coal consumption: 40,000 tonns
• Annual CO2 production: 40,000 tonns
Nalaikh Thermal Power Plant:

Current heat demand:

Date: Total Production Max.Output


15.05-15.09 9750 MWh(8389Gcal) 8-10MW
Annual 114000 MWh(97968Gcal) 22-50MW
Renewable Energy-Heat Storage combined solution for Nalaikh
district.
Heating without burning Solar+Wind+Thermal Storage+Battery Storage
Technology
Options for Nalaikh District
1. Cover hot water demand during non-heating season,remove the need of burning coal during the summer.
7MW Renewable Energy+600MWh thermal Storage(sand battery)
Annual Heat Production: 9750MWh
Annual electricity production: 14,040MWh
2. Replace the coal fired thermal power plant with renewable heating and electricty solution.
70MW Renewable Energy+ 14GWh thermal Storage
Storage solution 1 2
Annual heat produrction: 114,000MWh Capacity 600 14000 MWh
Maximum charging power 10 80 MW
Annual electricity production: 136,000MWh

Heat storage index 1 2 3 total heat demand 9750 114 000 MWh
Maximal average temperature 600 600 600 °C heat produced 9750 114 000 MWh
Minimal average temperature (summer) 130 130 130 °C
Energy capacity 14 000 14 000 26 100 MWh storage efficiency 92 % 92%
Designed resistor power 80 80 60 MW
Designed heat exchanger capacity 26 26 26 MW total electricity production 24 570 258 000 MWh
Discharging time with 26 MW power 15 15 33 days Wind power 18 000 253 000 MWh
Discharging time with 10 MW power 45 45 89 days
Outer height 19 19 19 m Electricity charged from grid 4900 MWh
Outer diameter 97 66 132 m
Volume of the medium 84 700 39 400 157 500 m3 Electricity production left-over 14,040 136000 MWh
Mass of the medium 144 000 131 100 267 700 t left-over % 53 % 53%
Storage medium sand magnetite sand
Thank you for your
attention
Erdenedorj Batbayar
CEO

Bichura Energy LLC


m: +976 95957277
e: [email protected]

www.bichura-energy.mn