UNIT QUANTITY
N
A. EIGHT-
CLASSROO
MS
I.
Mobilizatio
n/ l.s 1
Demobilizat
ion
II.
Temporary mo 8
Facilities
III. Safety
and Health
Item SPL-1
Personal
Protective md 21,340.00
Equipment
(PPE)
Item SPL-2
Safety and
md 16
Health
Personnel
Item SPL-3
Signages
sets 7
and
Barricades
IV.
Earthworks
Item 803(1)
Excavation
and Footing m³ 1,219.43
& Wall
Footing
Item
804(1)a
Backfilling
m³ 874.78
of
Excavated
Materials
Item
804(1)b
m³ 87.14
Embankme
nt
Item
8004(3)
Gravel
m³ 60.48
Bedding @
CF, WF, TG,
SOF
V. Termite
Control
Works
Item
1000(1) Soil liter 459.16
Poisoning
VI. Concrete
Works
Item
900(1)c1 m³ 22.91
R.C. for Stair
Item
404(1)a
kg 5,151.64
Rein. Steel
for Stair
Item
900(1)c1
m³ 10.15
R.C. for Sun
Breaker
Item
404(1)a
Rein. Steel kg 1,027.15
for Sun
Breaker
Item
900(1)c2
R.C. for
m³ 331.11
Column
Footing &
WF
Item
404(1)a
Reinforcing
Steel for kg 34,351.67
Column
Footing &
WF
Item
900(1)c2
R.C. for SOF, m³ 58.16
Corridor
and Ramp
Item
404(1)a
Rein. Steel
kg 2,071.52
for SOF,
Corridor
and Ramp
Item
900(1)c2
m³ 2.2
R.C. Stair on
Grade
Item
404(1)a
Rein. Steel kg 153.24
for Stair on
Grade
Item
900(1)c3
R.C. for m³ 37.98
Footing Tie
Beam
Item
404(1)a
Rein. Steel kg 23,266.87
for Footing
Tie Beam
Item
900(1)c4
R.C. for m³ 146.86
Column, PC
& Stiffener
Item
404(1)a
Rein. Steel
kg 49,229.86
for Column,
PC &
Stiffener
Item
900(1)c5
R.C. for m³ 39.3
Second
Floor Slab
Item
404(1)a
Rein. Steel kg 5,697.32
for Second
Floor Slab
Item
900(1)c5
R.C. for m³ 39.34
Third Floor
Slab
Item
404(1)a
Rein. Steel kg 5,697.32
for Third
Floor Slab
Item
900(1)c5
R.C. for m³ 39.34
Fourth Floor
Slab
Item
404(1)a
Rein. Steel kg 5,697.32
for Fourth
Floor Slab
Item
900(1)c5
R.C. for
m³ 6.25
Roof Deck
for Water
Tank
Item
404(1)a
Rein. Steel
kg 621.47
for Roof
Deck for
Water Tank
Item
900(1)c6
R.C. for m³ 42.08
Second
Floor Beam
Item
404(1)a
Rein. Steel kg 8,523.23
for Second
Floor Beam
Item
900(1)c6
R.C. for m³ 42.08
Third Floor
Beam
Item
404(1)a
Rein. Steel kg 7,725.53
for Third
Floor Beam
Item
900(1)c6
R.C. for m³ 42.08
Fourth Floor
Beam
Item
404(1)a
Rein. Steel kg 7,727.18
for Fourth
Floor Beam
Item
900(1)c6
m³ 29.06
R.C. for
Roof Beam
Item
404(1)a
Rein Steel kg 4,976.66
for Roof
Beam
VII.
Masonry
Works
Item
1046(2)a1
Masonry m² 447.5
Units (100m
Wall)
Item
1046(2)a2
Masonry m² 1,558.86
Units (150m
Wall)
VIII.
Fabricated
Materials
and
Hardwares
Item
1010(2)b
(0.90 x
2.40m)
Mahogany
Panel Door
with
m² 86.4
Hardware
and
Accessories
—Cylinder
Type
Lockset (D-
1)
Item
1010(1)b
50x150mm
thk.
Mahogany
set 40
Jamb with
Fixed Clear
Glass
Transom (D-
1)
Item
1010(2)a
(0.90 x
2.10m)
Hollow Core
Flush Type
Swing Door
with Marine
Plywood
Facing
Inside and
m² 3.78
Ordinary
Outside
with
Hardware
and
Accessories
with—
Stainless
Steel
Kicking
Plate (D-2)
Item
1010(1)
50x150mm
thk. set 2
Mahogany
Door Jamb
(D-2)
Item
1010(2)a
(0.80 x
2.10m)
Hollow Core
Flush Type
Swing Door
with Marine
Plywood
m² 16.8
Facing
Inside and
Ordinary
Outside
with
Hardware
and
Accessories
(D-3)
Item
1010(1)
50x150mm
set 10
thk.
Mahogany
Jamb (D-3)
Item
1010(2)a
(0.80 x
2.10m)
Louvre Door
with m² 8.4
Complete
Hardware
and
Accessories
(D-4)
Item
1010(1)
50x100mm
set 5
thk.
Mahogany
Jamb (D-4)
Item
1010(2)a
(0.60 x
2.10m) Bar
Door
complete m² 12.96
with
Hardware
and
Accessories
(BD-1)
Item
1010(1)b
50x100mm
Hollow Core set 18
Flush Type
Door Jamb
(BD-1)
Item
1005(6)
(3.60 x
1.7m) Steel
Casement
l.s 1
Window
6mm thk.
Clear Glass
Above (W-
1)
Item
1009(1)a1
(1.60 x
1.70m)
5mm thk.
Jalousie
Windows
with Clear
Glass Blades
on Standard
Jalousie
Casing and
m² 108.8
50x150mm
Concrete
Door Jamb
complete
with
Hardware
and
Accessories
with 12mm
square
Security
Grills (W-2)
Item
1009(1)a1
(1.9 x
0.635m)
5mm thk.
Jalousie
Windows
with Clear
Glass Blades
on Standard
Jalousie m² 9.65
Casing on
50x150mm
Mahogany
Jamb
complete
with
Hardware
and
Accessories
(W-3)
Item
1009(1)a2
(0.60 x
0.635m)
5mm thk.
Jalousie
Windows
with Clear
Glass Blades
on Standard
Jalousie m² 1.91
Casing on
50x150mm
Mahogany
Jamb
complete
with
Hardware
and
Accessories
(W-4)
Item SPL-4
sets 20
Blackboard
Item SPL-6
l.s 1
Rail Guard
IX. Finishing
Works
Item
1018(1)
200x200m
m² 264.9
m Vitrified
Glazed Tiles
Wall Finish
Item
1018(2)
200x200m
m Vitrified m² 526.9
Unglazed
Tiles Floor
Finish
Item
1021(1)a
Plain
Cement
m² 1,961.17
Finish with
Floor
hardener
non-skid
Item
1021(1)b
Non-skid
Cement m² 243.56
Floor Finish
w/ 6mm
groove lines
Item
1027(1)
Plain
m³ 8,453.29
Cement
Plaster
Finish
X.
Carpentry
Works
Item 1003
Carpentry
for Ceiling m² 570.74
with
Insulation
Item 1013
Pre-Painted
Metal l.s 1
Sheets
(0.50mm)
Item 403(5)
Steel
Trusses and kg 7,223.19
Lateral
Struts
Item 403(5)
Purlins and
kg 7,096.18
Channel
Beam
Item 403(5)
Purlins
kg 1,698.45
(Ceiling
Support)
Item 403(5)
kgs. 266.81
Sag Rod
Item
404(1)a
kgs. 351.96
Cross-
Bracing
SPL 905
each 44
Turn Buckle
XII. Painting
Works
Item
1032(1)a
m² 8,267.71
Masonry
Painting
Item
1032(1)b
m² 373.84
Wooden
Painting
Item
1032(1)c
m² 195.71
Metal
Painting
XIII.
Electrical
Works
Item 1100
Conduits,
l.s. 1
Boxes and
Fitting
Item 1101
Wires and
l.s. 1
Wiring
Devices
Item 1102
Lighting l.s. 1
Fixtures
Item 1103
Panel Board
l.s. 1
and
Cabinets
Item 1208
Fire Alarm l.s. 1
System
XIV.
Plumbing /
Sanitary
Works
Item 1001
Sewer Line l.s. 1
Works
Item 1002
Sanitary l.s. 1
Fixtures
Item
1001(9)
Downspout/ l.s. 1
Storm
Drainage
Item 1002
Cold
l.s. 1
Waterline
Works
Item SPL-7
l.s. 1
Septic Tank
Item SPL-8
units 26
Catch Basin
XV.
Mechanical
Works
Item SPL-9
Fire
l.s. 1
Protection
System