How To Check The Required Version To Use PP-FIO Apps
How To Check The Required Version To Use PP-FIO Apps
Symptom
The user is not able to configure a Fiori App as per the Fiori Library. The ICF or the OData cannot be found in the system, and
it is not clear if the app is available for the current release installed.
Environment
SAP ERP Fiori UI for Production Planning (PP-FIO)
SAP ERP Fiori UI for Material Requirements Planning (PP-FIO-MRP)
SAP ERP Fiori UI for Production Orders (PP-FIO-SFC)
SAP R/3
SAP R/3 Enterprise
SAP ERP Central Component
SAP ERP
SAP Enhancement package for SAP ERP
SAP Enhancement package for SAP ERP, version for SAP HANA
SAP S/4HANA, on-premise
Resolution
1. Make sure that the correct version is installed according to the releases below. In PP-FIO different versions of
UIS4HOP1 and S4CORE components are not supported.
Release 1610: S4CORE 101 | UIS4HOP1 200
Release 1709: S4CORE 102 | UIS4HOP1 300
Release 1809: S4CORE 103 | UIS4HOP1 400
Release 1909: S4CORE 104 | UIS4HOP1 500
Release 2020: S4CORE 105 | UIS4HOP1 600
3. Go to the tab 'Implementation Information' and select a delivery. Two options can be displayed for the apps depending
on the field 'Required Back-End Product':
Example 1: Manage Material Coverage
> Apps available for S/4HANA versions have the required back end as 'SAP S/4HANA' and are displayed with the
version for example 'SAP S/4HANA 2020 FPS01'.
Example 2: Production Order Confirmation
> Apps available for ECC versions have the required back end as 'SAP ERP' and are displayed with the delivery for
example 'Delivery Q1/2018'.
4. Expand the section 'Installation' and check the required components. Make sure that the prerequisites are installed
while using the relevant app.
Example: Manage Material Coverage with delivery 'SAP S/4HANA 2020 FPS01'
See Also
Fiori Library
Fiori Apps in PP-MRP
3031087 - "No Data": Materials are not displayed in MRP Apps
2973470 - How to Access the 'Confirmation Object Page' Apps for Production Planning
2970418 - How to Check if the Search Connector is Correctly Active in Customer Systems
Keywords
Fiori, MRP, SFC, PP, configuration, version, release, components, frontend, backend, support package, OData, ICF, Fiori
Library.
Attributes
Key Value
Other Production Planning and Control > Fiori UI for Production Planning and Control > Fiori UI for Material
Components Requirements Planning (PP-FIO-MRP)
Other Production Planning and Control > Fiori UI for Production Planning and Control > Fiori UI for Production Orders
Components (PP-FIO-SFC)
Products
Products
3031087 PP-FIO-MRP "No Data": Materials are not displayed in MRP Apps
2973470 PP-FIO How to Access the 'Confirmation Object Page' Apps for Production Planning
2970418
https://fioriappslibrary.hana.ondemand.com/sap/fix/externalViewer/
3080769 'Material Coverage' Fiori apps does not show PIR of strategy 52