ITP - Inspection & Test Plan
THE CONSTRUCTION MANAGER: THE CONTRACTOR:
Contract No.: Transmittal no.: ITP Ref. No.: Date Issued: ITP Details Inspection & Test Plan for GCP Test or Action Specification and/or Verification Item No. Activity Description Inspection Acceptance Criteria Frequency Verification Document Drawing No. Personnel Method B A C A Visual and Mechanical Inspection Compare equipment nameplate date with NETA ATS 2009 section 1.0 Inspection the same as approved before energization CM/ SBG/ QA/QC H H W Appoved shop drawings drawings and specifications. 7.1.1.1 NETA ATS 2009 section 2.0 Inspect physical and mechanical condition. Inspection no defects before energization CM/ SBG/ QA/QC H H W Appoved shop drawings 7.1.1.2 Inspect anchorage, alignment, grounding, and NETA ATS 2009 section 3.0 Inspection completeness before energization CM/ SBG/ QA/QC H H W Appoved shop drawings required area clearances. 7.1.1.3 Verify the unit is clean and all shipping bracing, NETA ATS 2009 section 4.0 loose parts, and documentation shipped inside Inspection completeness before energization CM/ SBG/ QA/QC H H W Appoved shop drawings 7.1.1.4 cubicles have been removed. Verify that current and voltage transformer NETA ATS 2009 section 5.0 Inspection As per approved design before energization CM/ SBG/ QA/QC H H S Appoved shop drawings ratios correspond to drawings. 7.1.1.6 B Electrical Test NETA ATS 2009 section 1.0 T&C of Ammeters test in accordance with Section 7.11 before energization CM/ SBG/ QA/QC H H W test results 7.11 NETA ATS 2009 section 2.0 T&C of Voltmeters test in accordance with Section 7.11 before energization CM/ SBG/ QA/QC H H W test results 7.11 NETA ATS 2009 section 3.0 T&C of Power Meters test in accordance with Section 7.11 before energization CM/ SBG/ QA/QC H H W test results 7.11 NETA ATS 2009 section 4.0 T&C of Frequency Meter test in accordance with Section 7.11 before energization CM/ SBG/ QA/QC H H W test results 7.11 NETA ATS 2009 section 5.0 T&C of Power Factor Meter test in accordance with Section 7.11 before energization CM/ SBG/ QA/QC H H W test results 7.11 NETA ATS 2009 section 6.0 T&C of Synchroscope Meter test in accordance with Section 7.11 before energization CM/SBG/QA/QC H H W test results 7.11 NETA ATS 2009 section 7.0 T&C of Transducer test in accordance with Section 7.11 before energization CM/ SBG/ QA/QC H H W test results 7.11 NETA ATS 2009 section 8.0 T&C of Generator Management Relay test in accordance with Section 7.9.1 before energization CM/ SBG/ QA/QC H H W test results 7.9.1 Manufacturer's C Test Values – Visual and Mechanical test manufacturer recomendation before energization CM/ SBG/ QA/QC H H W test results recommendation Check the installation, alignment, and NETA ATS 2009, section 1.0 Inspection As per approved drawings before energization CM/ SBG/ QA/QC H R R Appoved shop drawings defectiveness of meters 7.1.1.3 Check the installation, alignment, and NETA ATS 2009, section 2.0 Inspection As per approved drawings before energization CM/ SBG/ QA/QC H R R Appoved shop drawings defectiveness of protection relays 7.1.1.3 D Test Values - Electrical Testing and Commissioning of meters, NETA ATS 2009 section 1.0 test As per FAT reports before energization CM/ SBG/ QA/QC H R R As per FAT report transducer and relays 7.9.1 & 7.11 Legend: H - Hold Point (signature required to proceed) S - Surveillance (random attendance, no signature) B- Subcontractor W - Witness (attendance expected, signature on check sheet) R - Record Review A - Contractor C - Constraction Management