0% found this document useful (0 votes)
9 views2 pages

R20013A

Bid checklist

Uploaded by

jennifer hagins
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views2 pages

R20013A

Bid checklist

Uploaded by

jennifer hagins
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SUBMIT THIS

RENO-TAHOE AIRPORT AUTHORITY FORM WITH BID


2 PAGES
Project Workforce Checklist
For Compliance with the Nevada Apprenticeship Utilization Act, 2019

Taxiway M/B Reconstruction & GA Run-Up Area


Project: _________________________________________________________________PWP#: WA-2022-126
__________
Divine Watersz
Contractor:______________________________
More than 3 Anticipate
Craft/Type of Work Employees Needing
Anticipated? Waiver?‡
Air Balance Technician Yes No N/A Yes No
Alarm Installer Yes No N/A Yes No
Boilermaker Yes No N/A Yes No
Bricklayer, can also include tile setter, terrazzo workers and
Yes No N/A Yes No
marble masons.
Carpenter, can also include cement masons, floor coverer,
millwright and piledriver (non-equipment), plasterers and Yes No N/A Yes No
terrazzo workers.
Cement Mason Yes No N/A Yes No
Electrician, includes communication technician, line, neon
Yes No N/A Yes No
sign and wireman. Can also include alarm installer.
Elevator Constructor Yes No N/A Yes No
Fence Erector Yes No N/A Yes No
Flag Person Yes No N/A Yes No
Floor Coverer Yes No N/A Yes No
Glazier (see also Painters and Allied Trades) Yes No N/A Yes No
Highway Striper Yes No N/A Yes No
Hod Carrier, includes brick-mason tender and plaster tender. Yes No N/A Yes No
Iron Worker, can also include fence erectors (steel/iron) Yes No N/A Yes No
Laborer, can also include fence erector (non-steel/iron), flag
Yes No N/A Yes No
person, highway striper and traffic barrier erector
Lubrication and Service Engineer Yes No N/A Yes No
Mason, can also cement, plasterer, tile setter, terrazzo workers
Yes No N/A Yes No
and marble masons
Mechanical Insulator Yes No N/A Yes No
Millwright Yes No N/A Yes No
Operating Engineer, can also include equipment greaser,
piledriver, soils and material tester, steel fabricator/erector Yes No N/A Yes No
(equipment) and surveyor (non-licensed) and well driller.
Painters and Allied Trades, can also include glaziers, floor
Yes No N/A Yes No
coverers, and tapers.
Pile Driver (non-equipment) Yes No N/A Yes No
More than 3 Anticipate
Craft/Type of Work Employees Needing
Anticipated? Waiver?‡
Plasterer Yes No N/A Yes No
Plumber/Pipefitter Yes No N/A Yes No
Refrigeration Yes No N/A Yes No
Roofer (not sheet metal) Yes No N/A Yes No
Sheet Metal Worker, can also include air balance technician. Yes No N/A Yes No
Soils and Materials Tester, includes certified soil tester Yes No N/A Yes No
Sprinkler Fitter Yes No N/A Yes No
Surveyor (non-licensed) Yes No N/A Yes No
Taper Yes No N/A Yes No
Tile/Terrazzo Worker/Marble Mason Yes No N/A Yes No
Traffic Barrier Erector Yes No N/A Yes No
Truck Driver Yes No N/A Yes No
Well Driller (see also Operating Engineer) Yes No N/A Yes No
Other*: Yes No N/A Yes No
Yes No N/A Yes No
Yes No N/A Yes No
Yes No N/A Yes No

Pursuant to the Labor Commissioner’s Nov. 27, 2019 Advisory Opinion, waivers are not required in
those crafts/types of work where no recognized apprenticeship program exists in the region where
the public work is located. Contractor is responsible for verifying whether recognized
apprenticeship programs exist in the region for each craft/type of work to be performed.
*Contractor is responsible for ensuring all crafts/types of work to be performed on the public work
are accounted for in this checklist. Attach additional pages if needed.

I affirm I am fully authorized to acknowledge, on behalf of the Contractor listed above, the anticipated
workforce, and acknowledge that changes to the anticipated workforce which may have an impact on
compliance with the Nevada Apprenticeship Utilization Act, 2019 will require the submittal of a revised form
within ten (10) working days of such change.

Signed: _______________________________________________________

Jennifer Hagins, Managing Owner


Name and Title: _______________________________________________________

Date: 3/23/2023
_______________________________________________________

Divine Watersz
Contractor Name: _______________________________________________________

You might also like