0% found this document useful (0 votes)
27 views3 pages

Concept Note

Uploaded by

nyalawe mgunga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views3 pages

Concept Note

Uploaded by

nyalawe mgunga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

CONCEPT NOTE : UNIVERSITY OF DAR ES SALAAM COICT

DIPLOMA FINAL YEAR PROJECT


PROJECT TITTLE: LEARNING MANAGEMENT SYSTEM
MEMBERS OF GROUP NO 2: NYALAWE MGUNGA
TWALIB AMOUR
ALLAN
PROJECT OVERVIEW
This project aims to develop a Learning Management System , a novel approach to
address learning materials insufficient by revolutionizing the way educational
institutions deliver and manage online learning experience. The LMS will provide a
comprehensive platform for educators and learners , offering a seamless and
engaging learning environment

PROBLEM STATEMENT

Traditional LMS often lack flexibility , personalization and innovative features


required to meet the evolving needs of modern education . Many systems are
complex to navigate , limiting effectiveness. Additonally, there is a growing demand
for accessible and inclusively learning experience, which current system may not
fully address.

PROJECT GOALS AND OBJECTIVES

GOAL 1: TO CREATE A USER FRIENDLYAND INTUITIVE LMS INTERFACE


 OBJECTIVE 1.1: Design a clean and visually appealing user interface
 OBJECTIVE1.2: Implement a responsive design to ensure optimal user
experience across devices

GOAL 2: TO PROVIDE ADVANCED FEATURES FOR PERSONALIZED LEARNING


 OBJECTIVE 2.1: Develop intelligent adaptive learning algorithm to tailor content
to individual learner needs.
 OBJECTIVE 2.2: Implement a robust assessment system with automated grading
and feedback mechanisms.

GOAL 3: TO FOSTER COLLABORATION AND COMMUNITY ENGAGEMENET


 OBJECTIVE 3.1: Integrate social learning features, like discussion forums and
group projects
 OBJECTIVE 3.2: Facilitate real-time communication between learners and
instructor.
PROJECT ACTIVITIES

 NEEDS ASSESSMENTS: Conduct an analysis of needs and requirements of


educators and learners.
 PLATFORMS DESIGN; Design the overall architecture and user interface of the
LMS
 FEATURE DEVELOPMENT: Develop core features, including course creation ,
content delivery, assessment tools and communication channels
 INTERGRATE EXISTING SYSTEMS: Integrate the LMS with existing institutional
systems like student information system and single sign-on
 USER TESTING AND FEEDBACK: Conduct rigorous user testing to identify usability
issues and gather feedback
 PILOT IMPLEMENTATION: Deploy the LMS in pilot program to evaluate its
perfomance and effectiveness
 SCALABILITY AND SECURITY: Ensure the LMS is scalable to accommodate a
growing user base and secure against cyber threats

EXPECTED OUTCOMES

 A user friendly and efficient LMS platform


 Enhanced learning experience for students
 Improved teaching effectiveness for educators
 Increased student engagement and retention
 Cost savings through streamlined administrative processes

SUSTAINABILITY
The long term sustainability of the LMS will depend on several factors ;
 CONTINUOUS IMPROVEMENT AND UPDATES OF FEATURES
 TECHNICAL SUPPORT TO USERS
 STRONG PARTNERSHIP WITH EDUCATIONAL INSTITUTES
 FINACIAL SUSTAINALBILITY FROM FUNDINGS MODELS

TOOLS USED AND NEEDED FOR THE PROJECT

 ADOBE XD: For designing and prototyping the structure of the LMS
 BROWSER STACK: For testing and debugging the program before execution and
use
 ADOBE DREAMWAVER: For code editing and programming of CSS, JavaScript and
PHP coding languages
 WORDPRESS: For web designing the front end part of our system , user interface
and user interaction part of the system
BUDGET FOR THE PROJECT

TOOLS AND EQUIPMENTS PRICES * DURATION


1. ADOBE XD SUBSCRIPTION 10,000/= FOR 4 MONTHS = 40,000/=
2. BROWSER STACK 32,500/= FOR 1 MONTH
3. WORDPRESS FREE
4. ADOBE DRAMWAVER 84,474/= FOR 4 MONTH = 337, 896/=
5. INTERNET EST. 20,000/= PER MONTH FOR 4 MONTHS =
80,000/=
6. BUS FARE (DURING RESEARCH AND EST. 30,000/=
DATA COLLECTION)
TOTAL BUDGET EST= 520,396/=

NB: THE BUDGET IS DIVIDED TO 3 MEMBERS OF THE GROUP TOTALLING 174,000/=


PER PERSON UNTILL THE COMPLETION OF PROJECT ON JULY 2025
 THE BUDGET IS NOT PERMANET IT MAY CHANGE IF THE PROJECT WONT BE
APPROVED BY THE HEAD OF DEPARTMENT ON MONDAY 18TH NOVEMBER 2024

You might also like