0% found this document useful (0 votes)
256 views3 pages

Snake Bite Mock Drill September 2024

Uploaded by

Subrat Sahoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
256 views3 pages

Snake Bite Mock Drill September 2024

Uploaded by

Subrat Sahoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Doc. No.

: SPTL/OHEMS/R-015

MOCK DRILL REPORT Rev. No. : 01


Issue / Rev. Date: 01.01.2019

Page 1 of 3

Date & Time of the Drill : 30.07.2024 @ 1300 Hrs.


Location : Main Gate
Scenario : Snake Bite

SR No. PARTICULARS OBSERVATIONS RECOMMENDATIONS

1. Call  The Security Guard of the Main 1300 hrs.


Initiations Gate informed the control room OK, started as planned.
about the Snake found at Main OK
gate. The control room
immediately informed the Site
incident Controller. The site OK
incident controller immediately
informed the Chief Incident
Controller about this.

 Security Post Emergency alarm OK


was blown by supervisor in
Security Control Room.

 All Security Personnel rushed to


the suspected snake point .
2. Response All Security and employees rushed In Five minutes
Time to the main gate.

3. Emergency  Safety In charge acted as Incident OK,


Team Task Controller.
Perfor Force
mance  Emergency Vehicle reached on OK
: time.
OK
 Rescue Team reached in time @
1305
OK
 Incident Controller was capable &
confident enough at co-ordination.
He instructed all emergency team
members.

OK
Evacuation
Team  Security supervisor directed
workers to create a safety circle .
4. Rescue Team  All associates were evacuated on OK
time. There was no injury to anyone.

5. Communicati  Site Controller (ECC) informed


on at Safety Personnel & Main Site OK
Doc. No. : SPTL/OHEMS/R-015

MOCK DRILL REPORT Rev. No. : 01


Issue / Rev. Date: 01.01.2019

Page 2 of 3

Emergency Controller @ 1310


Control
Center  Development in mitigation
Messages were transferred to OK
Main Site Controller by Site Communication was Excellent.
Controller (ECC) time to time and
on each stage of development.

6. Maintenance  Electrical Technician was ready OK


Team for help at the site. Immediately
Power Supply off for rescue the IP.
OK
 Maintenance Persons were ready
for help at the site.

7. Roll Call  Admin personnel were involved in OK


Team Roll call procedure.
 All people were lined in 20 people OK
as rows.

8. Others  Overall, the mock drill was very OK


good. Total Time taken to
complete the mock drill 10 Min.

Total number of employees present in the assembly point at the time of mock drill: 20.
Total Time taken to complete the Mock Drill: 10 Min

Any other Suggestion:


Observer:

Observation Visitor Govt Authority Contractor Local Person Transporter


Immediately crowd trying to enter 1 NIL 2 NIL 1
inside, at that time All Security
personnel handled properly.

Varun Pandey
Security Dept
Doc. No. : SPTL/OHEMS/R-015

MOCK DRILL REPORT Rev. No. : 01


Issue / Rev. Date: 01.01.2019

Page 3 of 3

Snapshot of Mock Drill