Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area
and production capacity for mineral production, area for mineral exploration, length for linear transport
infrastructure, generation capacity for power generation etc.,)
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause
physical changes in the locality (topography, land use, changes in water bodies, etc.)
Operation Phase:
During operational phase fresh water requirement of
80 KLD will be met by SMC.
1.24 Changes in water bodies or the No Not Applicable
land surface affecting drainage or
run-off?
1.25 Transport of personnel or materials Yes Transport of personnel and materials will be required
for construction, operation or for both construction and operation phases.
decommissioning?
1.26 Long-term dismantling or No Not Applicable
decommissioning or restoration
works?
1.27 Ongoing activity during No Not Applicable
decommissioning which could have
an impact on the environment?
1.28 Influx of people to an area in either Yes During construction phase 40 workers will be
temporarily or permanently? employed temporarily.
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or
energy, especially any resources which are non-renewable or in short supply):
Operation phase
Maximum Quantity: (80 KLD)
Source: SMC
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, Yes Construction materials such as stone, cement, sand,
aggregates, sand / soil (expected bricks, marble, paints, tiles, electric ware, sanitary ware,
source – MT) glass will be used.
All the above materials will be purchased from the local
market and from nearest approved quarries, as and when
required. It will be stored temporarily at the site.
Approximate quantity are as follows:
S. Material Quantity
No.
1. Steel (MT) 1279.36
2. Cement (bags) 8017.14
3. Stone Aggregate (m3) 8424.49
4. Sand (MT) 1025.90
5. Bricks (m3) 509.93
6. Glass (m2) 2275.09
7. Fly Ash Based Products (m 3) 1484.54
8. A.C.C Block (m3) 1573.51
Sr. Information/checklist Yes/ Details thereof (with approximate quantities /rates,
No. confirmation No wherever possible) with source of information data
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and Source: Dakshin Gujarat Vij Company Ltd. (DGVCL)
fuels (source, competing users) Yes Expected Demand : 1000 KW
Unit: fuel (MT), energy (MW)
Back-up Power:
D.G. Set: Total - 1 Nos. (125 KVA )
(D.G. set will be used In case of power failure or
emergency)
Fuel Used : Diesel
Fuel requirement: Total 12 Liter/Hr.
3. Use, storage, transport, handling or production of substances or materials, which could be harmful to
human health or the environment or raise concerns about actual or perceived risks to human health.
Operation Phase:
During the operational phase, sewage will be
disposed into underground drained of SMC.
7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers,
surface waters, groundwater, coastal waters or the sea:
9.Factors which should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with other existing or planned activities
in the locality
Date: 08/10/2018
Place: Surat
Signature of the applicant
With name and full address
Not Applicable.