0% found this document useful (0 votes)
78 views1 page

MRT Record Sheet

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views1 page

MRT Record Sheet

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

0-1401-00 / HBNS ENGINEERING SUPPORT SERVICES COD.

No HBNS-01-JGC-CO-COD-
5109
PWT EXPANSION PROJECT JGC N.A
RE-COMMISSIONING–COMMISSIONING DOSSIER SUPPO Rev. A1
FIELD INSPECTION REPORT

SHEET 1 of 1
Report N°: ES2-P21-765-P-001
MECHANICAL RUN-IN RECORD FOR PUMP ( Positive Displacement)
TEST DATE:
EQUIPMENT NO. P21-765 A

MEASURING TIME, START 15 30 45 60 90 120


VIBRATION (RMS / MM/SEC.)
POINT MINUTES
PUMP Discharge Pressure, barG Pump BRG CP ACP
o
Bearing Temp., C.P. C X(hor)
o
ACP C Y(ver)
Z(ax)
o
DRIVER Bearing Temp., C.P. C Motor BRG CP ACP
(MOTOR) ACP o
C X(hor)
Motor Current Amp. Y(ver)
Revolution, RPM Z(ax)
o
Ambient Temperature, C
Calibration Record 25%
REMARKS : 50% Inspected by:
75%
100% :

You might also like