0-1401-00 / HBNS ENGINEERING SUPPORT SERVICES COD.
No HBNS-01-JGC-CO-COD-
5109
PWT EXPANSION PROJECT JGC N.A
RE-COMMISSIONING–COMMISSIONING DOSSIER SUPPO Rev. A1
FIELD INSPECTION REPORT
SHEET 1 of 1
Report N°: ES2-P21-765-P-001
MECHANICAL RUN-IN RECORD FOR PUMP ( Positive Displacement)
TEST DATE:
EQUIPMENT NO. P21-765 A
MEASURING TIME, START 15 30 45 60 90 120
VIBRATION (RMS / MM/SEC.)
POINT MINUTES
PUMP Discharge Pressure, barG Pump BRG CP ACP
o
Bearing Temp., C.P. C X(hor)
o
ACP C Y(ver)
Z(ax)
o
DRIVER Bearing Temp., C.P. C Motor BRG CP ACP
(MOTOR) ACP o
C X(hor)
Motor Current Amp. Y(ver)
Revolution, RPM Z(ax)
o
Ambient Temperature, C
Calibration Record 25%
REMARKS : 50% Inspected by:
75%
100% :