0% found this document useful (0 votes)
430 views1 page

Estimate For 2 BHK & 3 BHK

Uploaded by

ishucherryblogs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
430 views1 page

Estimate For 2 BHK & 3 BHK

Uploaded by

ishucherryblogs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SHIVAM INTERNATIONAL SHIVAM INTERNATIONAL

MOB.NO:- 9891075835 MOB.NO:- 9891075835

COSTING & ESTIMATION COSTING & ESTIMATION


2 BHK 3BHK
S.no PARTICULAR PIC sqft S.no PARTICULAR PIC sqft
1 WORDROBE 2 1 WORDROBE 3
2 FAN (cromtom) 5 2 FAN (cromtom) 5
PARTICUAR sqft PARTICUAR sqft
MODULAR KITCHEN 24 MODULAR KITCHEN 24
KITCHEN ASSERIOES GTPT KITCHEN ASSERIOES GTPT
ELECTRICIAN LABOUR WORK ELECTRICIAN LABOUR WORK
PARTICUAR PIC PARTICUAR PIC
maine gate iron 1 maine gate iron 1
CARTEN ROAD ALL THE ROOM CARTEN ROAD ALL THE ROOM
TUBE LIGHT 6 TUBE LIGHT 6
BULB with holder 4 BULB with holder 4
MIRROR BATHROOM 2 MIRROR BATHROOM 2
EXHAUST FAN 2 EXHAUST FAN 2
DOOR BELL 1 DOOR BELL 1
TOTAL 1,25,000.00 TOTAL 1,60,000.00
MATERIAL DETAIL MATERIAL DETAIL

All Woodwork material details: Carcass made in 16.75 HDHMR and Shutter MDF (Brand- All Woodwork material details: Carcass made in 16.75 HDHMR and Shutter MDF (Brand-
Century) with high Gloss Laminate. Handles used in fittings are included with Maximum price Century) with high Gloss Laminate. Handles used in fittings are included with Maximum price
of Rs.100/- each and Hinges (Brand-Century). Plumbing, Painting, Electrical and Kitchen of Rs.100/- each and Hinges (Brand-Century). Plumbing, Painting, Electrical and Kitchen
Accessories are not included in Quote. Selling light or cansill light are also not included. The Accessories are not included in Quote. Selling light or cansill light are also not included. The
company will only do that work is written above. company will only do that work is written above.

S.NO DETAIL OF PAYMENT TERMS ETC. S.NO DETAIL OF PAYMENT TERMS ETC.
1 60% ADVANCE AT THE TIME OF ORDER 1 60% ADVANCE AT THE TIME OF ORDER
2 30% AT THE STRUCTURE COMPLETE ORDER OF THE TIME 2 30% AT THE STRUCTURE COMPLETE ORDER OF THE TIME
3 10% AT THE BALANCE AMOUNT AFTER COMPLITED OF THE JOB 3 10% AT THE BALANCE AMOUNT AFTER COMPLITED OF THE JOB
4 TAX & GST EXTRA 4 TAX & GST EXTRA
CILENT APPROVEL SHIVAM INTERNATIONAL
DATE- 26-11-2023 CILENT APPROVEL SHIVAMDATE-
INTERNATIONAL
26-11-2023
MOB NO. MOB NO.

You might also like