CONTENTS
1. ITP
ITP No. 3000-001 Inspection and Test Plan for Steel Structure Erection
Abbreviation:
H: Subcontractor is not allowed to proceed with the test/inspection unless a written release is issued
by the Employer and/or Contractor. Subcontractor shall submit inspection notification to
Contractor.
W: Subcontractor can proceed with the test/inspection when Employer and/or Contractor’s inspector
is not present at the notified time. Subcontractor shall submit inspection notification to
Contractor.
IW: Subcontractor is requested to notify Contractor of the initial inspection date/time. Subcontractor
can proceed with the test/inspection when Employer and/or Contractor’s inspector is not present
at the notified time. Subsequent test/inspection will not be witnessed unless any deficiencies are
found at the initial inspection.
S: Subcontractor is not requested to notify Contractor. Employer and/or Contractor’s inspector will
monitor manufacturing conditions, workmanship and test/inspection during his visit or periodical
inspection.
R: Subcontractor is not requested to notify Contractor. Subcontractor shall perform the required
test/inspection and provide relevant documents such as certificate, report and Quality Control
record. This documents shall be submitted to Contractor’s inspector for review.
I: Subcontractor shall be responsible for undertaking the inspection or test and generating the
appropriate report and record.
2. ATTACHMENT
2.1 Quality Control Report/Record
Form No. QCR-2000-006 Grouting Inspection Report
Form No. QCR-3000-001 Foundation Pad & Levelness Inspection Report
Form No. QCR-3000-002 Column Plumbness Report
Form No. QCR-3000-003 Bolt Tightening Report
Form No. QCR-3000-004 Final Inspection Report
Form No. QCR-3000-005 Receiving Inspection Report
Form No. QCR-3000-006 Material Inspection Report
Form No. QCR-3000-007 Anchor Bolt & Base Plate Checking Report
Form No. QCR-3000-008 Welding Inspection Report
Form No. QCR-3000-009 Painting Inspection Report
Form No. QCR-3000-010 Anchor Bolts Tightening Report
Form No. QCR-3000-011 Grating Fasteners Installation Report
D R A
IN2-MAR 15
1
- 20
Employer Doc. No.
NSRP Complex Project Rev. 3
1 Advance Inspection
3000-005/006
S-000-1330-1002V
1.1 Receiving Material Check DWG Material I W R
Para. 4 / 9.1 (1)
Certificate
S-000-1330-1002V
1.2 Foundation Check Para. s2mm 3000-001/007 I H S
5.3/7.1/9.1(2)
3000-007
S-000-1330-1002V
1.3 Embedded Plate Check DWG Material I W R
Para. 5.3
Certificate
S-000-1330-1002V 3000-006
1.4 High Strength Bolts/M. Bolts Para.7.2 / 9.1(4) / DWG Material I H S
9.2(2), (3) Certificate
Free from
scale, burrs,
S-000-1330-1002V
2.1 Contact Surface Check dirt, oil, 3000-003 I S S
Para. 7.1 / 9.2 (3)
grease,
loose rust
D R A
IN2-MAR 15
1
- 20
Employer Doc. No.
NSRP Complex Project Rev. 3
S-000-1330-1002V
2.3 Bolt tighteness Inspection I W S
Para. 7.2 & 9.2(3)
D R A
IN2-MAR 15
1
- 20
Employer Doc. No.
NSRP Complex Project Rev. 3
S-000-1330-1002V
Para.6 /9.2(4)
3.2 Inspection during Welding WPS 3000-008 I S S
S-000-1670-0005V
AWS D1.1
D R A
IN2-MAR 15
1
- 20
Employer Doc. No.
NSRP Complex Project Rev. 3
S-000-1330-1002V
3.4 Non Destructive Testing Para 8 AWS D1.1 NDE Report I W S
AWS D1.1
4 Erection Inspection
D R A
IN2-MAR 15
1
- 20
Employer Doc. No.
NSRP Complex Project Rev. 3
D R A
IN2-MAR 15
1
- 20
Employer Doc. No.
NSRP Complex Project Rev. 3
D R A
IN2-MAR 15
1
- 20
Doc. No. S-000-1673-0001V_Rev.3
Contractor Job Code.. Form No.2000-006
NSRP Complex Project 0-6495-20 Page 9 of 20
Date.
Location Drawing No.
Item Subcontractor
7 Grouting Acceptance
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER
Date.
Location Drawing No.
Item Subcontractor
Eleveation Result
No Column No. Remarks
Drawing Actual Deviation Accept Reject
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER
Date.
Location Drawing No.
Item Subcontractor
Measured Dimension
Result
Irregularity (D) Elevation
N Column
(E) Height (B) Remark
o No. Top Bottom
(H) Acc. Rej.
Eӊ5mm D5mm or D+ B s10mm
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER
Date.
Location Drawing No.
Item Subcontractor
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER
Date.
Location Drawing No.
Item Subcontractor
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER
Date.
Location Drawing No.
Item Subcontractor
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER
Date.
Location Drawing No.
Item Subcontractor
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER
Date.
Location Drawing No.
Item Subcontractor
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER
Date.
Location Drawing No.
Item Subcontractor
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER
Date.
Location Drawing No.
Item Subcontractor
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER
Date.
Location Drawing No.
Item Subcontractor
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER
Date.
Location Drawing No.
Item Subcontractor
SIGNATURE
SUBCONTRACTOR CONTRACTOR EMPLOYER