Hmmi Cye Rfi 005 Rfi Field-Cbr Test

Uploaded by

irfan ugm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views7 pages

Hmmi Cye Rfi 005 Rfi Field-Cbr Test

Uploaded by

irfan ugm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

REQUEST FOR INSPECTION (RFI)

Date Issued Project RFI Number

16/08/2023 HMMI CYE PROJECT CYE-RFI-005

Soil CBR test and ground leveling before limestone layering


(Submitted to the Engineer at Least 24 Hours before the time of the inpection)

Civil ✓ M.E.P
Type of Work
Architecture Other
Date 19-Aug-23

To be Held Time 9:00:00


on / at / with Location Container Yard Project
HMMI PIC

Activities for Which - Checking As built soil elevation


The Inspection is - Specify Soil CBR test point
Requested - CBR Test

Other Information

Submitted by Received by

Inspection Result
Approved Rejected
Inspection Status
Approved with Note

Inspection
Comments
INSPECTION FOR
EXCAVATION RECORD
REPORT
Project : HMMI-Expansion Projects Report No. : …......................................
Site Name : Container Yard Projects Date : …......................................
Location : Engine Shop Subcon : PT. HANJIN KONSTRUKSI
Reff. Document : …...................................... Reff. Drawing :

Inspection Result
No Check Items Acceptance Criteria Design Code
Accept Reject
As per actual field
1 The work site is cleared
inspection
Excavation is performed to the lines, As per approved surveying
2
grades, and slopes drawing report
All excavation are cut true and straight
As per actual field
3 and loos stone and boulders shall be
inspection
removed in area

Excavation is made below the elevation


4 As per approved drawings
level indicates on the design drawing

Protection work of excavated slope area As per actual field


5
for safety inspection
As per approved surveying
6 Condition of compaction bottom survey
report
As per actual field
7 Quality Of Cleaning
inspection
Result Of Compaction test after As per approved soil test
8
Excavation, confirmed (if necessary) report

Note :

Prepared by PT. HKI Approved by HEIFM


QA / QC Site Manager Inspected By Checked By
INSPECTION FOR SURVEYING
RECORD
REPORT
Project : HMMI-Expansion Projects Report No. : …......................................
Site Name : Container Yard Projects Date : …......................................
Location : Engine Shop Subcon : PT. HANJIN KONSTRUKSI
Reff. Document : …...................................... Reff. Drawing :

Inspection Result
No Check Items Acceptance Criteria Design Code
Accept Reject

1 Description & Location As per approved drawings

2 Benchmark Used As per approved drawings

3 Surveying Data As per approved drawings

Note :

Prepared by PT. HKI Approved by HEIFM


QA / QC Site Manager Inspected By Checked By
CBR test will be conducted at one point on every 400 m2 Y14

Y13
In the yellow highlight is the area where the CBR test
will be carried out Y12

Testing point will be specify in random, but priority on the


Y11
soil area that looks down

Y10
CBR test working steps are attached in a separate section
of this method
Y09
C-10 C-7 C-4 C-1
SOIL CBR
TEST Y08
PLAN C-11 C-6 C-5 C-2
Y07

Y06

Y05

Y04

Y03

When penetrating during CBR test, 10 T Vibro will be used


Y02
for additional equipment

X06 X05 X04 X03 X02 X01