A109S/AW109SP IETP 34th Issue Unmaintened Copy Page 1 of 3
AMP
Tail boom - Attachment bolts – Special regular inspection
Table of contents
References
Preliminary requirements
Procedure
Requirements after job completion
List of tables
1 References
2 Required conditions
3 Support equipment
4 Supplies
5 Spares
List of figures
1 Tail boom - Attachment bolts - Special regular inspections
References
Table 1 References
Data module Title
0B-A-00-20-00-00A-120A-A Helicopter safety – Pre-operation
0B-A-06-41-00-00A-010A-A Access doors and panels – General data
Preliminary requirements
Required conditions
Table 2 Required conditions
Required condition Data module
The helicopter must be safe for maintenance 0B-A-00-20-00-00A-120A-A
The access panels/door P68, P70 and D8 must be 0B-A-06-41-00-00A-010A-A
removed/opened
Support equipment
Table 3 Support equipment
Nomenclature Identification No. Qty
None
Supplies
G 2023-09-20
TK
SP
SR
TG
0B-A-53-40-00-00A-283A-A
A109S/AW109SP IETP 34th Issue Unmaintened Copy Page 2 of 3
AMP
Table 4 Supplies
Nomenclature Identification No. Qty
None
Spares
Table 5 Spares
Nomenclature Identification No. Qty
None
Safety conditions
None
Procedure
1 Get access to the tail-boom attachment-bolts (1, Fig 1).
2 Check that the torque of the four bolts (1) is between 44.2 and 49.1 N m (391 and 435 lbf in).
Requirements after job completion
1 Remove all the tools and the other items from the work area. Make sure that the work area is clean.
2 Install/close the access panels/doors P68, P70 and D8. Refer to 0B-A-06-41-00-00A-010A-A.
G 2023-09-20
TK
SP
SR
TG
0B-A-53-40-00-00A-283A-A
A109S/AW109SP IETP 34th Issue Unmaintened Copy Page 3 of 3
AMP
A
TYPICAL IN 4 PLACES
ICN-0B-A-534000-G-00001-00729-A-001-01
Figure 1 Tail boom - Attachment bolts - Special regular inspections
G 2023-09-20
TK
SP
SR
TG
0B-A-53-40-00-00A-283A-A