0% found this document useful (0 votes)
13 views3 pages

Tail Boom - Attachment Bolts - Special Regular Inspection: References

Uploaded by

Vignesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views3 pages

Tail Boom - Attachment Bolts - Special Regular Inspection: References

Uploaded by

Vignesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

A109S/AW109SP IETP 34th Issue Unmaintened Copy Page 1 of 3

AMP

Tail boom - Attachment bolts – Special regular inspection

Table of contents
References
Preliminary requirements
Procedure
Requirements after job completion

List of tables
1 References
2 Required conditions
3 Support equipment
4 Supplies
5 Spares

List of figures
1 Tail boom - Attachment bolts - Special regular inspections

References
Table 1 References
Data module Title

0B-A-00-20-00-00A-120A-A Helicopter safety – Pre-operation


0B-A-06-41-00-00A-010A-A Access doors and panels – General data

Preliminary requirements

Required conditions
Table 2 Required conditions
Required condition Data module
The helicopter must be safe for maintenance 0B-A-00-20-00-00A-120A-A
The access panels/door P68, P70 and D8 must be 0B-A-06-41-00-00A-010A-A
removed/opened

Support equipment
Table 3 Support equipment
Nomenclature Identification No. Qty

None

Supplies

G 2023-09-20
TK
SP
SR
TG
0B-A-53-40-00-00A-283A-A
A109S/AW109SP IETP 34th Issue Unmaintened Copy Page 2 of 3
AMP

Table 4 Supplies
Nomenclature Identification No. Qty

None

Spares
Table 5 Spares
Nomenclature Identification No. Qty
None

Safety conditions
None

Procedure
1 Get access to the tail-boom attachment-bolts (1, Fig 1).
2 Check that the torque of the four bolts (1) is between 44.2 and 49.1 N m (391 and 435 lbf in).

Requirements after job completion


1 Remove all the tools and the other items from the work area. Make sure that the work area is clean.

2 Install/close the access panels/doors P68, P70 and D8. Refer to 0B-A-06-41-00-00A-010A-A.

G 2023-09-20
TK
SP
SR
TG
0B-A-53-40-00-00A-283A-A
A109S/AW109SP IETP 34th Issue Unmaintened Copy Page 3 of 3
AMP

A
TYPICAL IN 4 PLACES

ICN-0B-A-534000-G-00001-00729-A-001-01
Figure 1 Tail boom - Attachment bolts - Special regular inspections
G 2023-09-20
TK
SP
SR
TG
0B-A-53-40-00-00A-283A-A

You might also like