Risk Mitigation Report

Uploaded by

Joel Marco VR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as ODS, PDF, TXT or read online on Scribd
You are on page 1/ 8

RISK MITIGATION REPORT

PROJECT DETAILS
PROJECT No: MA-015-02
DATE:

FULL PROJECT NAME: Project Orion


PROJECT MANAGER: A Smith

PROJECT SPONSOR: F Dole


RISK MITIGATION REPORT
Risk ID:
Risk Description:
Status:
Impact
Probability Score Mitigating actions:
Scope Quality Schedule Cost

High High High Medium High High

Revised Revised Impact once mitigating actions have been completed


Probability Revised Score Responsible Party
Scope Quality Schedule Cost

Low Medium Low Low Low Low

Secondary
Risks:

Residual Risk:

Contingency
Contingency Funds:
Plan: Contingency
Time:

Next actions
and notes:
RISK MITIGATION REPORT

Mitigating actions:

Responsible Party Actions

Contingency
Funds:
Contingency
Time:
EXAMPLE RISK MITIGATION REPORT [delete this sheet when no longer needed]
Risk ID: R0021 Project design and deliverable definition is incomplete.
Risk Description:
Status: New See more Common Project Risks @ https://www.stakeholdermap.com/risk/register-common-project-risks.htm

Impact
Probability Score Mitigating actions:
Scope Quality Schedule Cost
High chance of budget
High chance of quality issues if High chance of delays due to Define the scope in detail via design w
High High chance of scope creep. overruns due to delays and Critical
purpose is not well-defined. scope creep. experts.
scope creep.

Revised Revised Impact once mitigating actions have been completed


Revised Score Responsible Party
Probability Scope Quality Schedule Cost

Low Low Low Low Low Low P Manager

Secondary There are still risks associated with the assumptions that were made during the design phase. In other words, if some assumptions are not correct then the project could be impacted.
Risks:

Residual Risk: There is a risk that the design will change (scope creep). This risk can be managed through change control.

Contingency
Contingency Funds:
If there are some parts of the design that are not complete or detailed enough the project manager will write an Exception Report describing the issue and
Plan: recommending next steps. For example, moving the incomplete deliverable definitions to a later phase.
Contingency
Time:

Next actions 1. PM to check the assumptions in the design document, and recommend next steps.
and notes:
ON REPORT [delete this sheet when no longer needed]
d deliverable definition is incomplete.

mmon Project Risks @ https://www.stakeholdermap.com/risk/register-common-project-risks.html

Mitigating actions:

Define the scope in detail via design workshops with input from subject matter
experts.

Responsible Party Actions

Check the validity of the assumptions made in the


P Manager
design documents.

esign phase. In other words, if some assumptions are not correct then the project could be impacted.

through change control.

Contingency None. The Exception Report will include estimated costs


Funds: to resolve the issue.

Est. 4 days to write the Exception Report and get a


Contingency decision from the project board.
Time:

eps.
RISK MITIGATION REPORT
Risk ID:
Risk Description:
Status:
Impact
Probability Score Mitigating actions:
Scope Quality Schedule Cost

High High High Medium High High

Revised Revised Impact once mitigating actions have been completed


Probability Revised Score Responsible Party
Scope Quality Schedule Cost

Low Medium Low Low Low Low

Secondary
Risks:

Residual Risk:

Contingency
Contingency Funds:
Plan: Contingency
Time:

Next actions
and notes:
RISK MITIGATION REPORT

Mitigating actions:

Responsible Party Actions

Contingency
Funds:
Contingency
Time:
20 Common Project Risks and how to manage them

Top 50 Business Risks

Checklist of 30 Construction risks

Risk Register Template

Risk Management Plan Template

Risk Assessment Matrix 4 by 4 example

Risk Assessment Matrix 3 by 3 example

Risk Assessment Matrix Aviation example

You might also like