Name of the Job Site: GMP Package-3B Project, Gurugram(HR)-IKEA STORE Date:26.10.24
Activity/ Facility/ Equipment/ Substance*: HIRA FOR RACEWAY INSTALLATION -IKEA STORE Ref. No:-LTC /IKEA /JCI /HIRA /RA-14REV-01
I have read and understood the contents (communicated down the line)
Understood and agree to
Hira Team members Prepared by with the involvement of ---- (workmen representatives names/ s/c names, etc.,) Reviewed by (Respective seniors) Approved by
comply
Staff:
Vikram Prajapati ( Sr project Engineer)
Workmen representative (S/C): Soumen Das
Name & role: Sanjay Kumar(Quality Manager) SoumenDas (Project Manager)
Vikram Prajapati
Bitu Tiwari (EHS ) Manager) Bitu Tiwari (EHS Manager )
Soumen das (Project Manager)
Jitesh Yadav (Safety Officer )
Signature
Probabilit
Populatio
Anticipat
Severity
y Rating
/Impact
ed Risk
Rating
at risk
Level
Risk
Sl No Sub activity Hazard Hazardous Event Possible Outcome Existing Control Measure Additional Control Measures Action By
n
Admin:-
1.All required work permit system for the concerned work, safe to start work shall be
issue &followed at work location.
2.All temporary cable shall be routed through insulated electrical stand at height of 7
Admin-
1.Site Driving safety rule should be followed.
2.speed limit should not be more than10KMPH.
3.Trafic Marshal should be available.
4.Competent Driver only to drive the vehicle.
Admin:-
1.Cable /cable drum stored only designated area with signage and tag
2.Materail shall be stack properly.
3.stacking area shall be barricade.
1.Excessive Height 1. Fall of material
1.Personal injury 4.Keep the proper distance between Material.
Helper
Engg
1.Ensure RPM of wheel used more than the RPM of Grinder machine.
2.Expiry date to be ensure in grinding wheel.
3.All power connection Routed through RCCB only
Super Technician ,Helper
Admin
4.Operate according to the manufacture's instruction.
1.Contact with live conductor
1.Physical injury / Burn 5.Loose clothing shall not be allowed.
2.Contact with rotating parts
1.Electricity 2.Property damage 6.Guarding shall be provided
Use of Power Tools and Hand 3.Contact with flying objects 9 6
4 2.Rotating part. 3.Eye Injury 3 3 7.Tools shall be inspected before to use, tag system shall be followed Nil Site In charge/ Site Engineer/HSEO
Tools 4.Exposure to excessive vibration either to hand to whole (M) (M)
3.Defective tools 4.Musculoskeletal problem 8.Deadman switch shall be ensured.
body,
5.Headaches 9.IP rating shall be followed for DB ,connector :- indoor -65,outdoor -67
5.Exposure to excessive noise .
10.Use right tools for the job and never carry the tools by the cord or hose.
11.Adequate supervisor to be taken care.
PPE
12.Ensure usages of appropriate ppes like Helmet ,Jacket ,safety shoes goggles, Nose
mask, .
Page: 1 of 4
Probabilit
Populatio
Anticipat
Severity
y Rating
/Impact
Engg: -
ed Risk
Rating
at risk
Level
Risk
Sl No Sub activity Hazard Hazardous Event Possible Outcome Existing Control Measure Additional Control Measures Action By
n
1.Ensure unauthorized person not allowed to modify the scaffolding and if needed for any
change then must be modified by trained and certified scaffolder.
2.Ensure sufficient illumination in work area.
3.Ensure Full body harness and 100% Tie off above 1.8 m height .
, Technician ,Helper
1.Fall form height
2.Components at edge of the platform. 7.Dont move the scaffold when worker on it
2.Falling objects 1.personal injuries
3. Work at height. 8.Coordinte with other teams working in the same area or near bye.
Raceway Installation on 3.Contact with sharp edge
4.Eletricity 12 9.Working area cleared from obstructions and visible with adequate Lighting. 8
5 celling /Wall using mobile 4.Exsessive noice,Vibration 2.property damage 3 4 Nil Site In charge/ Site Engineer/HSEO
(H) 10.scaffold shall be inspected before to use, tag system shall be followed (M)
scaffold 5.Contact with live conductor 3.Cut injury
5.Poor illumination 11.Use of outriggers when height more than 4 mtr.
6.Toppling of mobile scaffold 4.Discomfort
6.Fire 12.scaffold Scheme drawing should be displayed on scaffold.
7.poor visibility
7.Uninspected scaffold. 13.Barricade the area where work is in progress
14.Ensure the PTW in place and comply the procedure.
15. Ensure safe access to the working platform.
16.Work materials strictly not allowed to be stored on platform except for working tools.
17.Avoid overhead utilities. While working on Height.
18.Conduct work at height training among the worker.
19.Only Trained person allow to work.
20.TBT be conducted before start the work.
21.Safety signage should be displayed on scaffolding.
Engg:-
PPE
Admin:-
1.Applicable PTW shall be obtained.
2.Working platform shall be inspected before to use
3.Hard barricading /catch net shall be provided.
Technician ,Helper
4.Access Control shall be ensured with lock and key.
1.Work at Height 1. Fall of person
5.Arrangement of task light shall be done and lux level shall be maintained.
2.Unprotected shaft 2.Fall of material 1.Personal Injury ,Property Damage
6.Follow safe manual handling techniques.
3.Electricity 3.Low visibility 2.Dizziness,Discomfort 12 6
7 Working in shaft 4 3 7.Interval breaks to workers shall be allowed. Nil Site In charge/ Site Engineer/HSEO
4.Poor Illumination 4.Adpting poor posture 3.slip,trip (H) (M)
8. Multiple levels of work are not allowed.
5.Poor Ergonomics 5.Inadquate space for work 4.Work related upper limb disorder,
9.PTW will be closed after completion of work
6.Unsafe Access 6.Slip,trip
10.Only trained person allowed to work
11.work shall be carried out under continuous supervision.
PPE
12.Ensure usages of appropriate ppes like Helmet ,Jacket ,safety shoes goggles, Nose
mask safety Harness.
personnels
1.Fire 1.Burn injury Supervision.
1.Fire due to combustible Material
General hazards oriented due 2.Poor Housekeeping 2.Property Damage 6 4.Good housekeeping will be maintained at workplace. 3
8 2.Slip /Trip 2 3 Nil Site In charge/ Site Engineer/HSEO
to activity 3.Incompetent operation 3.ill Health (M) 5.All material will be place at designated workplace (L)
3.Unauthorized Activity
4.Excessive working hours 6.Activity shall be performed in day light only.
7.scarpe shall be disposed site through authorized vendor.
PPE
8.Ensure usages of appropriate ppes like Helmet ,Jacket ,safety shoes goggles, Nose
mask.
Op: Opportunity for Elimination & Substitution, Er – Engineering Control, Ad & PPE – Administrative control and Personal Protective Equipment
Page: 2 of 4
Severity
No medical Illness
Illness requiring
treatment or requiring
Medical
measurable hospital
Treatment
physical effects admission
Injury requiring
First aid treatment Medical Lost Time
Only Treatment but not Accident
lost time
Likelihood 1 2 3
Most Never heard of in construction
Unlikely industry 1 1 2 3
4 5
4 5
8 10
12 15
16 20
20 25