RFI-528 - 5220 - UG FIRE WATER LINE NEW SPOOL FABRICATION WORK FOR LINE No. 150-FW-5220-09034-1C438-N

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views1 page

RFI-528 - 5220 - UG FIRE WATER LINE NEW SPOOL FABRICATION WORK FOR LINE No. 150-FW-5220-09034-1C438-N

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ASSET INTEGRITY MANAGEMENT DEPARTMENT

PENGERANG REFINING & PETROCHEMICAL (PRefChem)


REQUEST FOR INSPECTION (RFI) FORM
RFI Reference No RFI-528/2024
STSEDAC/PRefChem/QAQC/
Approved Repair Procedure# (specify the reference number mentioned in procedure) 2024/033/ITP-001
1.0 PROJECT INFORMATION (to be filled up by Requestor)

Project : 5220 - UG FIRE WATER LINE NEW SPOOL FABRICATION WORK FOR LINE No. 150-FW-5220-09034-1C438-N

PREFCHEM's Person in-charge : SYAHIR Telephone number : 014-293 3274 Department : Mech Static
MWO Number (as reference) : 90534036

2.0 RFI DETAIL (to be filled up by Requestor)

Type of request : 1 Material receiving inspection 2 Fabrication work (Approved ITP to be attached with this RFI )
3 Perform NDT, HT / Witness Pop Test 4 Others : Blasting / Coating
Work category : 1 Routine maintenance 2 Turnaround / Shutdown / CAPEX Project
(please specify detail )
Work priority : PRIORITY 1 PRIORITY 2 PRIORITY 3
(please specify SAP Notification for PRIORITY 1 or 2 ) SAP Notification:
Fabricator/Repairer/Supplier : STS-EDAC ENGINEERING SDN BHD
Fabricator/Repairer/ Supplier's
Badrul Hakim Telephone number : 013 904 5776
Person in-charge :
RFI date & day : 21-Oct-24 Monday RFI time : 09:00am
Please justify if RFI is planned to be conducted during ODD HOUR (overtime / weekend / public holiday)

RFI location (please tick /) : 1 PREFCHEM (please specify area/unit)


2 Outside of PREFCHEM (please specify full address )
Full address:
Temasik Coating Sdn Bhd
Bandar Penawar

Inspection description : Please specify inspection method, equipment / piping tag, quantity of material receiving / weld joint, size of weld joint etc.
Inspection for Final Touch Up Painting

Signature & Stamp:


Request by (PREFCHEM's rep): SYAHIR

Date of request: 20-Oct-24

3.0 ENDORSEMENT IS REQUIRED FROM REQUESTOR'S SUPERIOR FOR PRIORITY 1 / PRIORITY 2 / ODD HOURS REQUEST

Endorse by (PREFCHEM Requestor's


Manager)
Signature & Stamp:

Date of request:

4.0 INSPECTION WORK COMPLETION (to be filled up by AIMD)

1 Completed 2 Partial completed 3 Reschedule


Reason for item 2 and 3

5.0 INSPECTION REPORT (to be filled up by AIMD)


Results/findings
1 Accepted 2 Rejected

Signature & Stamp:


Inspector's name:

Date: