Daily Work Checklist for Senior Technician (Operator)
Name : Date :
Shift
Machine Name Department :
Yes ( ) /
Section TASK LIST Frequency
No (✗)
Remark
Is the machine area equipped with functional fire extinguishers and safety equipment? Start of Shift
D;k e'khu {ks= esa dk;Z'kky vfxz'kked ;a= vksj lqj{kk midj.k gSa\ f'k¶V dh 'kq:vkr
Health Are all machine safety guards in place and operational? Start of Shift
& D;k lHkh e'khu lqj{kk xkMZ viuh txg ij vksj dk;Z'khy gSa\ f'k¶V dh 'kq:vkr
Safety Is the emergency stop button functional and accessible? Start of Shift
D;k vkikrdkyhu LVkWi cVu dk;Z'khy vkSj lqyHk gSa\ f'k¶V dh 'kq:vkr
LokLF; vkSj Are operators wearing appropriate PPE (gloves, goggles, ear protection, etc.)? Start of Shift
lqj{kk D;k vkWijsVj vfpr PPE ¼gkFk ds nLrku] p'ek] dku dh lqj{kk] vkfn½ igu jgs gSa\ f'k¶V dh 'kq:vkr
Self Hygine Start of Shift
D;k vki viuh O;fDrxr LoPNrk cuk, j[k jgs gSa\ f'k¶V dh 'kq:vkr
Is the machine, Electric Pannel and surrounding area clean and free of debris? Start & End of Shift
D;k e'khu] bysDVªhd iSuy vkSj vkl&ikl dk {ks= lkQ vkSj eycs ls eqDr gSa\ f'k¶V dh 'kq:vkr o var
Cleaning Is the raw material storage area properly organized within designated area and clean? Start & End of Shift
& D;k dPpk eky Hka.Mkj.k {ks= mfpr :i ls O;ofLFkr gS vkSj lkQ gSa\ f'k¶V dh 'kq:vkr o var
Organizing Are tools properly managed and stored in their designated places? Start & End of Shift
D;k midj.kksa dks mudh fu/kkZfjr txgksa ij Bhd ls j[kk vkSj O;ofLFkr fd;k x;k gSa\ f'k¶V dh 'kq:vkr o var
lQkbZ Are dustbins emptied and waste materials cleared from the work area? Daily
D;k dpjk ik= [kkyh fd, x, gS vkSj dk;Z{ks= ls vof'k"V lkexzh gVk nh xbZ gSa\ nSfud
Is the Finished/Semi Finished Goods storage area properly organized within designated area and clean? Start & End of Shift
D;k rS;kj eky dk Hka.Mkj.k {ks= Bhd ls O;ofLFkr vkSj lkQ gSa\ f'k¶V dh 'kq:vkr o var
Is the production plan and work order available and visible? Start of Shift
Job D;k mRiknu ;kstuk vkSj dk;Z vkns'k miyC/k vkSj fn[kkbZ ns jgs gSa\ f'k¶V dh 'kq:vkr
dk;Z Is the raw material (polymer, substrates, Rolls, Ink, Thread. Granuals, Adhesive etc.) available and verified for quality? Start of Shift
D;k dPpk eky ¼ikWyhej] lClVsªV] jksy] L;kgh] /kkxk] xzsU;wYl] fpidus okyk vkfn½ miyC/k gS vkSj xq.koÙkk ds fy, lR;kfir fd;k x;k gSa\ f'k¶V dh 'kq:vkr
Is the machine preheated or calibrated to job specifications? Start of Shift
Machine / D;k e'khu dks iwoZ&fu/kkZfjr dk;Z fofuns'kksa ds vuqlkj çfo"V fd;k x;k gS ;k dSfyczsV fd;k x;k gSa\ f'k¶V dh 'kq:vkr
Repair Are safety mechanisms (interlocks, tension controls) operational? Per Shift
D;k lqj{kk ra= ¼baVjykWd] ruko fu;a=.k½ dk;kZred gSa\ çfr f'k¶V
&
Have all pre-shift & regular maintenance and inspection of the machine been done? Start of Shift
Maintenance D;k e'khu dh iwoZ&f'k¶V vkSj fu;afer j[k&j[kko vkSj fujh{k.k fd;k x;k gSa\ f'k¶V dh 'kq:vkr
Are in-process quality checks (bond strength, thickness) performed at regular intervals? Per Batch
Q.C. D;k çfØ;k esa xq.koÙkk tkap ¼czkUM LVsªFk] eksVkbZ½ fu;fer varjky ij dh tkrh gSa\ çfr cSp
Are test samples collected for QC analysis? Per Batch
xq.koÙkk D;k xq.koÙkk fo'ys"k.k ds fy, ijh{k.k ueus ,d= fd, tkrs gSa\ çfr cSp
fu;a=.k Are finished products free from defects (bubbles, wrinkles, misalignments, etc.)? On going
D;k rS;kj mRiknksa esa nks"k ¼ccYl] >qfj;k] xyr feykus vkfn½ ugha gSa\ fujraj
Are leftover materials (rolls, polymers, Granuals, Threads, Liners, Ink etc.) stored securely to prevent contamination? End of Shift
Wastage D;k cph gqbZ lkexzh ¼jksy] ikWyhej] xzsU;wYl] /kkxs] ykbuj] L;kgh vkfn½ ds lqjf{kr :i ls laxzfgr fd;k x;k gS rkfd lanq"k.k ls cpk tk ldsa\ f'k¶V ds var eas
Management Has the leftover raw material been returned to the warehouse? End of Shift
vif'k"V D;k cpk gqvk dPpk eky okil os;jgkml esa tek djok fn;k x;k gSa\ f'k¶V ds var eas
Is all production waste properly segregated and disposed of? End of Shift
izca/ku D;k lHkh mRiknu dpjs dks Bhd ls vyx&vyx fd;k x;k vkSj u"V fd;k x;k gSa\ f'k¶V ds var eas
Are unused resources documented for inventory updates? End of Shift
D;k mi;ksx ugha fd, x, lalk/kuksa dks lwph viMsV ds fy, nLrkost fd;k x;k gSa\ f'k¶V ds var eas
Has the production log been updated with details of output, defects, and downtime? End of Shift
Post-Shift D;k mRikmu ykWx dks vkmViqV] nks"k vkSj Mkmu Vkbe ds fooj.k ds lkFk miMsV fd;k x;k gSa\ f'k¶V ds var eas
Report Have issues or maintenance needs been reported to the supervisor? End of Shift
f'k¶V D;k leL;k,¡ ;k j[k&j[kko dh vko';drk,¡ i;Zos{kd dks fjiksVZ dh xbZ gS\ f'k¶V ds var eas
Is the maintenance logbook properly updated with all details?
fjiksfVax D;k j[k&j[kko ykWx cqd lHkh fooj.kksa ds lkFk lgh rjhds ls viMsV dh xbZ gSa\
End of Shift
f'k¶V ds var eas
Signature Senior Technician (Operator) Signature Production Specialist
General Instructions for All Departments
1. Ensure personal protective equipment (PPE) is worn (gloves, goggles, hearing protection, etc.). (PPE) ( , , )
2. Ensure work area is clean and organized, free from debris or hazards. ,
3. Check for any emergency shutoff switches or safety equipment to ensure they are accessible.
4. Verify machine manuals are available and up-to-date.
5. Report any malfunctions or damages immediately to the supervisor.
6. Maintain a logbook of daily activities, including any incidents or maintenance performed. ,