Screenshot 2024-11-27 at 12.22.59 PM

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views132 pages

Screenshot 2024-11-27 at 12.22.59 PM

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 132

NATIONAL ENTERPRISE CORPORATION (NEC)

PLOT 2 MUWESI ROAD BUGOLOBI

P.O. BOX 3145, KAMPALA, UGANDA

PROJECT. CONSTRUCTION OF THE MULTIPURPOSE BUILDING


FOR GULU UNIVERSITY CONSTITUENT COLLEGE
MOROTO
LOCATION: LOPUTIPUT MATHENIKO COUNTY
CLIENT: GULU UNIVERSITY CONSTITUENT COLLEGE
MOROTO
DESIGN CONSULTANT: AIVORY ARCHITECT& ENGINEERS LTD
PROJECT MANAGEMENT GULU UNIVERSITY PROJECT MANAGEMENT TEAM
TEAM:
CONTACTOR: NATIONAL ENTERPRISE CORPORATION (NEC)

Setting out of the multipurpose building columns (1st august ,2024)

Removal of excavated soils (27th august 2024)

1
CONTRACT PARTICULARS

Employer: Gulu university constituent college Moroto (GUCCM)


Construction of the multipurpose building for Gulu university constituent
college Moroto
Time of completion: 36 months from start date
Design consultant: Aivory architects and engineers LTD
Project manager: Gulu university Project management team
Contractor: National Enterprise Cooperation (NEC)
Contract date: 18th April 2024
Site possession date: 7th may 2024
Commencement date: 24th may 2024
Completion date: 23rd may 2027
Contract sum: Ush 39,982,2006,052

Project 3D Drawing

2
CONTRACTOR’S MONTHLY PROGRESS REPORT 03 AUGUST, 2024

(Saturday 31st,2024)

1 PROJECT TIME MANAGEMENT

1.1 Project daily schedule.

Project daily activities are set at the beginning of the week for each working day and communicated to the
supervisors.
Work status for the works executed in the month of August ,2024.

ITEM ON ACTIVITY NOTES %AGE REMARKS


WORK
PROGRAM

20 Excavate for column This activity commenced on 75% Ongoing


bases of the multi- 27th July 2024
purpose building.
21 Load and cart away The activity commenced on 15% Ongoing
of surplus soil. Monday 19th august 2024

3
1.2 Work program progress
Planned activities versus actual activities as of Thursday 1/08/2024 (a detailed work progress with regards to the work programme is attached herein)
Task Name Duration Start Actual Start Actual Finish % Work COMMENT
Finish Complete
CONSTRUCTION PHASE 568 days Thu 13/06/24 Thu 13/06/24 NA Fri 26/12/25 3% DELAYED DUE
DESIGN
REVIEWS
SHOP DRAWINGS, 210 days Mon 08/07/24 Mon 08/07/24 NA Mon 03/02/25 0% DELAYED DUE
SAMPLES, APPROVALS & DESIGN
PROCUREMENT REVIEWS
SUB-STRUCTURE 63 days Thu 13/06/24 Mon 08/07/24 NA Mon 12/08/24 12% DELAYED DUE
DESIGN
REVIEWS

Reduction of levels 15 days Thu 25/07/24 Thu 25/07/24 NA Thu 08/08/24 100% DELAYED DUE
DESIGN
REVIEWS
Setting Out for Excavations 6 days Thu 25/07/24 Thu 25/07/24 NA Wed 14/08/24 75% DELAYED DUE
DESIGN
REVIEWS
Excavate for Strip and 14 days Sat 27/07/24 Sat 27/07/24 NA Wed 28/08/24 75% DELAYED DUE
column bases DESIGN
REVIEWS

Load and Cart Away 16 days Mon 08/07/24 NA NA Tue 23/07/24 15% DELAYED DUE
Surplus Soil DESIGN
REVIEWS
Anti-Termite Treatment to 14 days Fri 02/08/24 NA NA Fri 16/08/24 0% DELAYED DUE
Excavation pits DESIGN
REVIEWS
Concrete Blinding to Strip 26 days Fri 02/08/24 NA NA Wed 28/08/24 0% DELAYED DUE
Foundations and Column DESIGN
REVIEWS
Reinforcement to Columns 22 days Sat 03/08/24 NA NA Mon 26/08/24 0% DELAYED DUE
and Stub Columns DESIGN
REVIEWS

Formwork to Columns 14 days Sat 03/08/24 NA NA Sat 17/08/24 0% DELAYED DUE


DESIGN
REVIEWS
Casting Concrete to 14 days Tue 06/08/24 NA NA Tue 20/08/24 0% DELAYED DUE
Columns DESIGN
REVIEWS
Plinth Walling in Solid 14 days Thu 08/08/24 NA NA Wed 21/08/24 0% DELAYED DUE
Blockwork DESIGN
REVIEWS
Formwork to Stub Columns 10 days Thu 15/08/24 NA NA Sat 24/08/24 0% DELAYED DUE
DESIGN
REVIEWS
Casting of concrete to Stub 10 days Thu 15/08/24 NA NA Mon 26/08/24 0% DELAYED DUE
Columns DESIGN
REVIEWS
Compaction of Murram and 10 days Thu 22/08/24 NA NA Mon 02/09/24 0% DELAYED DUE
laying of Hardcore Base DESIGN
REVIEWS

Sand Blinding to Hardcore 2 days Fri 30/08/24 NA NA Mon 02/09/24 0% DELAYED DUE
Base DESIGN
REVIEWS
Laying of DPM and A142 2 days Mon 02/09/24 NA NA Tue 03/09/24 0% DELAYED DUE
Fabric Mesh Reinforcement DESIGN
REVIEWS
Casting of Ground Floor 2 days Tue 03/09/24 NA NA Thu 05/09/24 0% DELAYED DUE
Slab DESIGN
REVIEWS
SUPER-STRUCTURE - 713.56 days Mon 02/09/24 NA NA Sat 08/08/26 0% DELAYED DUE
RC FRAME DESIGN
REVIEWS
Ground Floor 95 days Mon 02/09/24 NA NA Thu 05/12/24 0% DELAYED DUE
DESIGN
REVIEWS
Setting Out for Columns 1 day Mon 02/09/24 NA NA Mon 02/09/24 0% DELAYED DUE
DESIGN
REVIEWS
Reinforcement for Columns 7 days Mon 02/09/24 NA NA Mon 09/09/24 0% DELAYED DUE
DESIGN
REVIEWS
Formwork to Column 8 days Tue 03/09/24 NA NA Wed 11/09/24 0% DELAYED DUE
DESIGN
REVIEWS
Casting of Columns 7 days Wed 04/09/24 NA NA Wed 11/09/24 0% DELAYED DUE
DESIGN
REVIEWS
Striking off Formwork on 7 days Thu 05/09/24 NA NA Thu 12/09/24 0% DELAYED DUE
Columns DESIGN
REVIEWS
Decking of formwork for 15 days Sat 07/09/24 NA NA Sat 21/09/24 0% DELAYED DUE
First Floor Slab and Beams DESIGN
REVIEWS

Reinforcement Bars and 7 days Mon 09/09/24 NA NA Mon 16/09/24 0% DELAYED DUE
max pans to Slab DESIGN
REVIEWS
MEP First Fixes 3 days Sat 14/09/24 NA NA Wed 18/09/24 0% DELAYED DUE
DESIGN
REVIEWS
Inspection of 1 day Tue 17/09/24 NA NA Wed 18/09/24 0% DELAYED DUE
Reinforcement and MEP DESIGN
REVIEWS
Casting C25 First Floor 1 day Wed 18/09/24 NA NA Thu 19/09/2 0% DELAYED DUE
Slab DESIGN
REVIEWS
19
1.3 Delayed tasks
ITEM ACTIVITY NOTES %AGE REMARKS

ON WORK

PROGRAM
20 Excavation of column Commenced on 27th 75% Pending
bases and strips July 2024 but was
halted on 6th August
2024

21 Load and cart away of Commenced on 30% Ongoing


surplus soil 22/08/2024

23 Concrete blinding to Delayed due to the 0% Pending


strip foundations and halting of works on
column bases 5/08/2024

24 Reinforcement to Delayed due to the 0% Pending


column bases and stub halting of works on
column 5/08/2024
25 Formwork to columns Delayed due to the 0% Pending
halting of works on
5/08/2024

26 Casting of concrete for Delayed due to the 0% Pending


columns halting of works on
5/08/2024

27 Plinth walling in solid Delayed due to the 0% Pending


blockwork halting of works on
5/08/2024

28 Formwork to stub Delayed due to the 0% Pending


columns halting of works on
5/08/2024

29 Casting of stub column Delayed due to the 0% Pending


concrete halting of works on
5/08/2024

30 Compaction of murram Delayed due to the 0% Pending


and laying of hardcore halting of works on
base 5/08/2024

31 Sand blinding to Delayed due to the 0% Pending


hardcore base halting of works on
5/08/2024

8
2 PROJECT INFORMATION MANAGEMENT
2.1 Outstanding information
There was no outstanding information this month.

2.2 Request for Information (RFI)

REQUEST FOR INFORMATION TABLE

No Issue at hand Date of Date of Details of issue at hand Remarks from implication
request reply consultant

019 Issuing of missing 02/08/2024 Request for information to Pending


column marks. issue column marks of columns
located at (A’,1’),(17,E),(A’,7)
on the foundation plan.
020 Issuing the structural 02/08/2024 Request for information to Pending
design for columns issue the structural design for
column C8 located at
(B,1’),(A’,12) and
10,10’,13”,15(at the front of
the library)
021 Issuing off the 02/08/2024 Request for information to issue Pending
column structural the structural design for column
design for C4A C4A located at
(C”,1’),(E,1’),(F,1’),(E’20),
(O’,20),(Q,21),(W,21’),(L,7”)
022 Clarity on column 02/08/2024 Request for information to Pending
size indication clarity on column C6 at (E,7)
and (C,7) as it appears to have
different sizes but similar
mark.

9
023 Clarity on the shape 02/08/2024 Request for information to Pending
representation of clarify on the shape
column C7 representation of column C7
with regards to its design shape
as located at the main entrance.

024 Clarity on the shape 02/08/2024 Request for information to Pending


representation of clarify on the shape
column C6 representation of column C6
with regards to its design shape
as located at (O’,18) and
(Q,18)
025 Issuing of the 02/08/2024 Request for information to Pending
structural design for issue the structural design for
columns C4B. columns C4B at
(U’,21),(C,11),(C,12),(C,13),(C
,14)
026 Issuing of the missing 02/08/2024 Request for information to Pending
columns marks issue missing column marks on
columns at
(M,17),(N,17),(P,13),(P,16),(P,
17) on the foundation plan.
027 Issuing of the missing 02/08/2024 Request for information to Pending
footings and their issue the missing footings and
designs on column their designs on columns C4 at
C4 (P,1),(S,1),(S’,7’)
028 Issuing of column 02/08/2024 Request for information to Pending
marks on column issue a column mark on
located at grid 7 column located at grid 7 behind
behind the staircase the staircase (11,14’) and 13
and between grid S between grids S and Q
and Q

10
030 Issuing of footing 02/08/2024 Request for information to Pending
marks and structural issue footing marks and
design for footings structural design for footings
along 17(U’,W) and along 17(U’,W) and W(17-18)
W(17-18)

2.3 Request for inspection


REQUEST FOR INSPECTION TABLE.

No. Issue at Date of Date of reply Details of the issue at hand Remarks from Implications
hand request Consultant
031 Request for 02/08/2024 Request for inspection of the Instructed for the This instruction has
inspection of the excavated pads on the main immediate halting of both time and cost
excavated pads on the building from grid A to K to any works related to implications as it has
main building determine foundation depth and building of foundation resulted into delay of
pads that require DCP test and until a Good For activities, and
allow to blind Construction redundancy of
structural drawing is mobilised resources
received on site.

2.4 Request for approval


REQUEST FOR APPROVAL
No Issue at Date of Date of Details of the issue at Remarks from Implications
hand request reply hand Consultant
032 Approval of the cement 5/08/2024 Request for review and Pending
test certificate for CEM approval of the cement
11/B-P/32.2N Tororo test certificate for CEM
11/B-P/32.2N Tororo

11
2.5. Site instruction
SITE INSTRUCTION TABLE
Ins. Issue At Hand Date Of Variation Details of the Issue Instruction Status Implication Days
No. Variation Instruction lost
Instruction Given By
01 Review and 05/08/2024 Mr Bayo Godfrey The attached laboratory results do not Implemented
approval of sand C.O.W tally i.e the percentage of passing do not
from lolachat corelate with the percentages retained
test results. for the different sieve sizes.
The request is pending subject to the
contractor’s clarification of the attached
test results.
02 Review and 05/08/2024 Mr Bayo Godfrey For all the constituent concrete Implemented
approval of C.O.W materials, the contractor should submit
concrete mix exhaustive laboratory test reports,
design mixes for whose results from a basis for the
classes C25, design mix i.e. grading, specific gravity,
C20, C15 water absorption, aggregate bulk
densities and cement manufacturer’s test
certificate among others. Futher more,
provide the test for concrete mix design
rat 7 and 28 days for the chosen mix
ratio .
Request is pending subject to
contractor’s submission to the required
documentation.
03 Review and 05/08/2024 Mr Bayo Godfrey Results are ok, however attention should Implemented
approval of slid C.O.W be paid to the block dimension to verify
blocks test result with the architect’s specified thickness.
for 7 dyas
04 Relation to the 05/08/2024 Mr Bayo Godfrey We take note of the intensity of the Implemented This instruction 25 days
missing C.O.W importance of the missing details as for has both time and lost
structural details as the structural integrity of the building cost implications
of the main is concerned. as it has resulted
block. This is thus to instruct you to into delay of
immediately halt any works related to activities, and
building foundation until you receive a redundancy of

12
Good For Construction (GFC) structural mobilised
drawings. resources on site.
In the mean time , please continue to
perform other tasks not affected by this
instruction.
05 Location the 15/08/2024 Mr Bayo Godfrey Locate the exact position of the Implemented
exact position of C.O.W following coordinates in relation to the
the following new building position on site and
coordinates in accordingly provide an updated
relation to the topographical map indicating the
new building coordinates relative to the building.
position on site • (2.4756375,34.5765539)
relative to the • (2.4758381,34.5763852)
building. • (2.4758381,34.5761925)
• (2.4759875,34.5763738)

2.6 Submitted information

SUBMITTED INFORMATION TABLE


No. Item Date of submission Submitted Project manager’s comment
to
01 Superimposed initial and current 14/08/2024 Gulu university Project Management Attached is the CAD file of the original
contour survey for GUCCM team topographic survey done.
Please superimpose the new site layout with
surveys extending up to the existing road on to this
one so that one can analyse the shift and changes in
levels.
Please send back the resultant map/data in dwg
format.
02 Submission of updated 24/08/2024 Gulu university Project Management Well received
topographic map team

13
2.7 Received information

RECEIVED INFORMATION TABLE


No Item Date of Received by Status
reception
01 CAD file of the original 14/08/2024 Contractor Well received
topographic survey

14
3. PROJECT HEALTH AND SAFETY MANAGEMENT.
3.1. Accidents, near miss and other health incidents on site.
There were no injuries on site in the month of august.
3.2. Hygiene management.
The site has two dedicated cleaners who clean the offices and collects rubbish around site for proper disposal.
3.3. Security management.
All visitors are required to inform the site management prior to their visits as the site has restricted access.
Attached herein is the visitors record for august 2024
3.4. Noise control
Noise from the works on site came from operating machines and it was found to be minimal.

3.5. Stakeholder management

All neighbours have no issues this month.

4. PROJECT COMMUNICATION MANAGEMENT


Project communication is by email and physical letters on matters regarding the project. This procedure
has proven fruitful and is ok for the project.
5. PROJECT MACHINERY MANAGEMENT.

No Machine Model Reg. No Status

01 Block making QTJ4-40 N/A operational


machine

02 Concrete Diesel operational


mixer (3) engine
mixer (2)
Electric
mixer
03 Pedestal roller Operational
(2)

04 Steel bending Operational


machine

15
6 PROJECT PERSONNEL MANAGEMENT
6.1 TECHNICAL TEAM

Technical Team

No Name Position

1 Eng. Brian Buhanda Project Manager

2 Eng. Jacob Jabweli Project Engineer

Kato Paul Site Manager/ project manager’s


3
representative
Site Engineer/ Project engineer’s
4 John Ewama Madira
representative

5 Ruhangaatwine Methodius Quantity Surveyor

6 Tugume Arnold Land Surveyor

7 Alemunyang Lokeris Scovia Site Administrator

8 Munguriek Elvis Civil Engineer

9 Karar Bruce Civil Engineer

10 Tayebwa Yokana General Foreman

6.2 SITE LABOUR

No. trade Number of position


personnel
01 Helpers (potters) 25 General works

02 Masons 05 General works

03 carpenter 04 General works

04 cooks 04 kitchen

05 Machine operators 09 General works

06 cleaners 02 General works

07 interns 01 General works

08 Foreman 03 General works

09 security 06 gates

10 Stores personnel 02 General works

11 Health and safety officer 01 Health and Safety

12 Electricians 02 General works

16
7 PROJECT MATERIAL MANAGEMENT

No Date of Material Quantity Supplier / Delivery Truck/


Source delivered by
Delivery
01 05/08/2024 • Cement • 660bags • Tororo • UBJ 770S

02 09/08/2024- • Sand • 3 trips • Lolachat • UAW 814W


16/08/2024

03 07/08/2024 • water • 11,000 litres • Barracks • H4DF 2273


bowser (UPDF)

04 27/08/2024 • Steel bars • 1353 steel bars • Pramukh steel ltd

17
8 PROJECT PHOTOGRAPGHS

Excavation works

Soak pit excavation ()

Excavation of bases (22/08/2024)

18
Load and cart away of surplus soil (22/08/2024)

19
MATERIALS

Stone dust (blocks making) (23/08/2024)

Sand used for block making (23/august/ 2024)

20
Block making (ongoing)

Blocks being transported to curing grounds (23/08/24)

21
Blocks made(ongoing)

22
SITE VISITORS RECORDS

23
24
WORK PROGRAMME TRACKER
%
ID Actual Actual %AS
Task Name Duration Start Finish ACTUAL TARGET
Start Finish PLANNED
DONE
PROPOSED MULTI-
PURPOSEBUILDING TO BE BUILT ON
BLOCK.NO.1,PLOTNO.312,AT
1142.5 Mon Mon Sat
1 KOMARET,NACHUKA, NA 2.3917% 3.2018% 100%
days 25/03/24 25/03/24 24/04/27
NAMATWAE,LOPUTIPUT,MSTHENIKO
COUNTY, FOR GULU UNIVERSITY,
MOROTO DISTRICT
Tue Tue Tue
2 PHASE ONE: RC FRAMING 0 days NA 100%
07/05/2024 02/05/24 07/05/24
PRECONSTRUCTION & 67.44 Tue Mon Wed
3 NA
MOBILISATION STAGE days? 07/05/24 25/03/24 10/07/24

Mon Mon Mon Mon


4 Kick Off Meeting & Site Possession 0 days 100% 100% 100%
06/05/24 06/05/24 06/05/24 06/05/24

Thu Thu Tue


5 Human Resource Mobilisation 14 days NA 15% 10% 100%
06/06/24 06/06/24 18/06/24
9.38 Sat Sat Mon
6 HSE Training for Construction Crew NA 0% 90% 100%
days 06/07/24 06/07/24 15/07/24
Trial Tests (Concrete mixes and Wed Wed Thu
7 31 days NA 5% 4% 100%
Excavation Depths) 19/06/24 19/06/24 18/07/24
Fri Fri Fri
8 Plant and Machinery Mobilisation 30 days NA 50% 100% 100%
24/05/24 24/05/24 21/06/24

Arrangements for Water, Electricity and 64.63 Wed Wed Mon Mon
9 100% 90% 100%
Waste Management days 29/05/24 29/05/24 29/07/24 29/07/24

Reviewing Quality Control Plans and Tue Tue Tue


10 15 days NA 15% 85% 100%
procedures 02/07/24 02/07/24 16/07/24

25
Fabrication and Erection of Project Sign 129.94 Thu Thu Wed Wed
11 100% 100% 100%
Board days 28/03/24 28/03/24 31/07/24 31/07/24

64.06 Mon Mon Sun Sun


12 Site Clearance 100% 100% 100%
days 25/03/24 25/03/24 26/05/24 26/05/24

Erection of onsite temporary


39.75 Mon Mon Tue Tue
13 structures(Blockyard, steel workshop, Site 100% 100% 100%
days 03/06/24 03/06/24 09/07/24 09/07/24
offices

28.06 Sun Sun Thu Thu


14 Installation of chainlink fence 95% 100% 100%
days 16/06/24 16/06/24 11/07/24 11/07/24
568 Thu Thu Fri
15 CONSTRUCTION PHASE NA 0% 0% 100%
days 13/06/24 13/06/24 26/12/25

SHOP DRAWINGS, SAMPLES, 210 Thu Thu Mon


16 NA 0% 0% 100%
APPROVALS & PROCUREMENT days 13/03/25 13/06/24 06/10/25

Thu Mon Mon


17 SUB-STRUCTURE 63 days NA 0% 0% 100%
13/06/24 08/07/24 12/08/24
Wed Mon Wed
18 Reduction of levels 15 days NA 100% 100% 100%
29/05/24 08/07/24 12/06/24
Mon Thu Sat
19 Setting Out Excavations 6 days NA 25% 100% 100%
24/06/24 25/07/24 29/06/24
Sat Thu Fri
20 Excavate for Strip and column bases 14 days NA 1% 0% 100%
29/06/24 25/07/24 12/07/24
Mon Sat Tue
21 Load and Cart Away Surplus Soil 16 days NA 0% 0% 100%
08/07/24 27/07/24 23/07/24
Anti-Termite Treatment to Excavation Wed Tue
22 14 days NA NA 0% 0% 100%
pits 10/07/24 23/07/24

26
Concrete Blinding to Strip Foundations Wed Sat
23 26 days NA NA 0% 0% 100%
and Column 10/07/24 03/08/24
Reinforcement to Columns and Stub Wed Thu
24 22 days NA NA 0% 0% 100%
Columns 10/07/24 01/08/24
Wed Wed
25 Formwork to Columns 14 days NA NA 0% 0% 100%
10/07/24 24/07/24
Fri Fri
26 Casting Concrete to Columns 14 days NA NA 0% 0% 100%
12/07/24 26/07/24
Mon Mon
27 Plinth Walling in Solid Blockwork 14 days NA NA 0% 0% 100%
15/07/24 29/07/24
Mon Wed
28 Formwork to Stub Columns 10 days NA NA 0% 0% 100%
22/07/24 31/07/24
Tue Thu
29 Casting of concrete to Stub Columns 10 days NA NA 0% 0% 100%
23/07/24 01/08/24
Compaction of Murram and laying of Mon Thu
30 10 days NA NA 0% 0% 100%
Hardcore Base 29/07/24 08/08/24
Tue Thu
31 Sand Blinding to Hardcore Base 2 days NA NA 0% 0% 100%
06/08/24 08/08/24
Laying of DPM and A142 Fabric Mesh Thu Fri
32 2 days NA NA 0% 0% 100%
Reinforcement 08/08/24 09/08/24
Sat Mon
33 Casting of Ground Floor Slab 2 days NA NA 0% 0% 100%
10/08/24 12/08/24
713.56 Mon Sat
34 SUPER-STRUCTURE - RC FRAME NA NA 0% 0% 100%
days 02/09/24 08/08/26
Mon Thu
35 Ground Floor 95 days NA NA 0% 0% 100%
02/09/24 05/12/24
Mon Mon
36 Setting Out for Columns 1 day NA NA 0% 0% 100%
02/09/24 02/09/24
Mon Mon
37 Reinforcement for Columns 7 days NA NA 0% 0% 100%
02/09/24 09/09/24
27
Tue Wed
38 Formwork to Column 8 days NA NA 0% 0% 100%
03/09/24 11/09/24
Wed Wed
39 Casting of Columns 7 days NA NA 0% 0% 100%
04/09/24 11/09/24
Thu Thu
40 Striking off Formwork on Columns 7 days NA NA 0% 0% 100%
05/09/24 12/09/24
Decking of formwork for First Floor Sat Sat
41 15 days NA NA 0% 0% 100%
Slab and Beams 07/09/24 21/09/24
Reinforcement Bars and max pans to Mon Mon
42 7 days NA NA 0% 0% 100%
Slab 09/09/24 16/09/24
Sat Wed
43 MEP First Fixes 3 days NA NA 0% 0% 100%
14/09/24 18/09/24
Tue Wed
44 Inspection of Reinforcement and MEP 1 day NA NA 0% 0% 100%
17/09/24 18/09/24
Wed Thu
45 Casting C25 First Floor Slab 1 day NA NA 0% 0% 100%
18/09/24 19/09/24
Thu Thu
46 Striking Off Slab Formwork 14 days NA NA 0% 0% 100%
10/10/24 24/10/24
Formwork to Staircases and ramp- Thu Tue
47 5 days NA NA 0% 0% 100%
Ground to First Floor 24/10/24 29/10/24
Tue Mon
48 Reinforcement for Staircases and ramp 5 days NA NA 0% 0% 100%
29/10/24 04/11/24
Casting of Concrete to Staircasesand Mon Tue
49 2 days NA NA 0% 0% 100%
ramp 04/11/24 05/11/24
Striking down Formwork for Staircase Tue Thu
50 2 days NA NA 0% 0% 100%
and ramp 03/12/24 05/12/24
173 Thu Wed
51 First Floor NA NA 0% 0% 100%
days 05/12/24 28/05/25
Thu Thu
52 Setting Out for Columns 1 day NA NA 0% 0% 100%
05/12/24 05/12/24
28
Thu Thu
53 Reinforcement for Columns 14 days NA NA 0% 0% 100%
05/12/24 19/12/24
Fri Wed
54 Formwork to Column 12 days NA NA 0% 0% 100%
06/12/24 18/12/24
Sat Tue
55 Casting of Columns 10 days NA NA 0% 0% 100%
07/12/24 17/12/24
Mon Tue
56 Striking off Formwork on Columns 15 days NA NA 0% 0% 100%
09/12/24 24/12/24
Decking of formwork for Second Floor Wed Fri
57 15 days NA NA 0% 0% 100%
Slab and Beams 11/12/24 27/12/24
Thu Tue
58 Reinforcement Bars to Slab 12 days NA NA 0% 0% 100%
12/12/24 24/12/24
Tue Sat
59 MEP First Fixes 3 days NA NA 0% 0% 100%
24/12/24 28/12/24
Fri Sat
60 Inspection of Reinforcement and MEP 1 day NA NA 0% 0% 100%
27/12/24 28/12/24
Sat Tue
61 Casting C25 Second Floor Slab 2 days NA NA 0% 0% 100%
28/12/24 31/12/24
Tue Thu
62 Striking Off Slab Formwork 2 days NA NA 0% 0% 100%
21/01/25 23/01/25
Formwork to Staircases and ramp - Thu Thu
63 7 days NA NA 0% 0% 100%
First to Second Floor 23/01/25 30/01/25
Thu Thu
64 Reinforcement for Staircases and ramp 7 days NA NA 0% 0% 100%
30/01/25 06/02/25
Casting of Concrete to Staircases and Thu Sat
65 2 days NA NA 0% 0% 100%
ramp 06/02/25 08/02/25
Striking down Formwork for Staircase Fri Tue
66 2 days NA NA 0% 0% 100%
and ramp 07/03/25 11/03/25
Wed Fri
67 Second Floor 60 days NA NA 0% 0% 100%
12/03/25 09/05/25
29
Setting Out for Columns, staircase and Wed Wed
68 1 day NA NA 0% 0% 100%
ramp 12/03/25 12/03/25
Reinforcement for Columns, staircase Wed Wed
69 21 days NA NA 0% 0% 100%
and ramp 12/03/25 02/04/25
Formwork to Columns, staircase and Thu Fri
70 22 days NA NA 0% 0% 100%
ramp 13/03/25 04/04/25
Fri Fri
71 Casting of Columns 21 days NA NA 0% 0% 100%
14/03/25 04/04/25
Striking off Formwork on Columns Sat Sat
72 14 days NA NA 0% 0% 100%
,ramp and staircase 15/03/25 29/03/25
Tue Tue
73 Decking of formwork for Roof Beams 15 days NA NA 0% 0% 100%
18/03/25 01/04/25
Wed Sat
74 Reinforcement Bars to Slab 10 days NA NA 0% 0% 100%
19/03/25 29/03/25
Fri Mon
75 MEP First Fixes 3 days NA NA 0% 0% 100%
28/03/25 31/03/25
Casting RC Roof Slab,Reinforced Mon Tue
76 1 day NA NA 0% 0% 100%
Concrete Gutter 31/03/25 01/04/25
Tue Tue
77 Striking Off Slab Formwork 14 days NA NA 0% 0% 100%
22/04/25 06/05/25
46.19 Thu Sat
78 Roof and Rainwater Disposal NA NA 0% 0% 100%
days 25/06/26 08/08/26
Thu Fri
79 Assembly of Structural Steel Roof 30 days NA NA 0% 0% 100%
25/06/26 24/07/26
Fri Fri
80 Touch-up primer to steel structure 7 days NA NA 0% 0% 100%
17/07/26 24/07/26
Installation of IT4 Gauge 26 Fri Fri
81 7 days NA NA 0% 0% 100%
prepainted Roof Covering 24/07/26 31/07/26
Mon Mon
82 Installation of underside roof Covering 7 days NA NA 0% 0% 100%
27/07/26 03/08/26
30
Installation of Rain Water Harvesting Mon Mon
83 7 days NA NA 0% 0% 100%
system 27/07/26 03/08/26
Fixing filler blocks to match roofing Mon Sat
84 7 days NA NA 0% 0% 100%
sheet profile 03/08/26 08/08/26
Water Proofing to Gutters and RC Mon Mon
85 7 days NA NA 0% 0% 100%
Roof slabs 27/07/26 03/08/26
278.31 Thu Wed
86 Block Walling & Internal Plastering NA NA 0% 0% 100%
days 24/10/24 30/07/25
Thu Sat
87 Block Walling - Ground Floor 45 days NA NA 0% 0% 100%
24/10/24 07/12/24
Sat Sat
88 MEP Fixes - Ground Floor 21 days NA NA 0% 0% 100%
23/11/24 14/12/24
Fri Tue
89 Plastering - Ground Floor 25 days NA NA 0% 0% 100%
22/11/24 17/12/24
Sat Fri
90 Block Walling - First Floor 45 days NA NA 0% 0% 100%
07/12/24 24/01/25
Fri Fri
91 MEP Fixes - First Floor 14 days NA NA 0% 0% 100%
17/01/25 31/01/25
Tue Mon
92 Plastering - First Floor 14 days NA NA 0% 0% 100%
21/01/25 03/02/25
Fri Tue
93 Block Walling - Second Floor 45 days NA NA 0% 0% 100%
24/01/25 11/03/25
Sat Tue
94 MEP Fixes - Second Floor 15 days NA NA 0% 0% 100%
01/03/25 18/03/25
Sat Thu
95 Plastering - Second Floor 25 days NA NA 0% 0% 100%
22/02/25 20/03/25
Tue Mon
96 Parapet Block Walling 20 days NA NA 0% 0% 100%
11/03/25 31/03/25
Wed Wed
97 PHASE TWO : FINISHES 0 days NA NA 0% 0% 100%
30/07/25 30/07/25
31
849 Tue Mon
98 EXTERNAL FINISHES NA NA 0% 0% 100%
days 30/07/24 16/11/26
381.44 Tue Thu
99 Wall Finishes NA NA 0% 0% 100%
days 30/07/24 14/08/25
Rendering to Walls and Concrete Mon Tue
100 30 days NA NA 0% 0% 100%
Surfaces 16/06/25 15/07/25
Painting external walls and cocrete Mon Thu
101 60 days NA NA 0% 0% 100%
surfaces with three coats of weather guard 16/06/25 14/08/25
Stonework Finish-in c/s mortar 1:3 Tue Wed
102 30 days NA NA 0% 0% 100%
pointed -Ground Floor 15/07/25 13/08/25
Mon Sat
103 Facing bricks- ground floor 21 days NA NA 0% 0% 100%
21/07/25 09/08/25
Tue Fri
104 APP water proofing to slabs and ramp 25 days NA NA 0% 0% 100%
30/07/24 23/08/24
452 Mon Wed
105 Aluminium Windows NA NA 0% 0% 100%
days 20/10/25 06/01/27
Mon Thu
106 Aluminium windows 90 days NA NA 0% 0% 100%
20/10/25 15/01/26
Mon Tue
107 Burglar Proofing to Windows 30 days NA NA 0% 0% 100%
20/10/25 18/11/25
Prepare amd apply Primer and Gloss Mon Sat
108 7 days NA NA 0% 0% 100%
Finish 20/10/25 25/10/25
450 Mon Mon
109 INTERNAL FINISHES NA NA 0% 0% 100%
days 14/07/25 28/09/26
518.75 Mon Fri
110 Ground Floor NA NA 0% 0% 100%
days 14/07/25 04/12/26
102 Thu Sat
111 Floor Finishes NA NA 0% 0% 100%
days 15/01/26 25/04/26
Thu Thu
112 MEP First Fixes 7 days NA NA 0% 0% 100%
15/01/26 22/01/26
32
Mon Sat
113 Screeding to Floors 21 days NA NA 0% 0% 100%
26/01/26 14/02/26
Porcelain Tile Installations to floor Sat Mon
114 36 days NA NA 0% 0% 100%
and Skirtings 28/02/26 06/04/26
Installation of polished Granite Floor Mon Sat
115 21 days NA NA 0% 0% 100%
Tiles 06/04/26 25/04/26
Installation of polished Terrazzo on
Sat Mon
116 floors, staircases ,rampand matching skirtings 36 days NA NA 0% 0% 100%
28/02/26 06/04/26
in water proof mortar
Sat Mon
117 Ramp and Staircase Finishes 9 days NA NA 0% 0% 100%
04/04/26 13/04/26
Polished Terrazo to ramp floor and Sat Tue
118 10 days NA NA 0% 0% 100%
external steps , landing 04/04/26 14/04/26
Cement/Sand Plastering to ramp
Sat Tue
119 slopping soffits , landing soffits ,edges of 9 days NA NA 0% 0% 100%
28/02/26 10/03/26
ramp and landing
Polishhed Terrazo to Landing,treads Tue Thu
120 10 days NA NA 0% 0% 100%
, risers and skirting 10/03/26 19/03/26
302.75 Mon Wed
121 Wall Finishes NA NA 0% 0% 100%
days 14/07/25 06/05/26
Plastering walls and concrete Mon Sat
122 7 days NA NA 0% 0% 100%
surfaces and double curve cornice 06/04/26 11/04/26
Prepare and apply Silk Vinyl Mon Tue
123 30 days NA NA 0% 0% 100%
Emulsion Paint to plastered surfaces 14/07/25 12/08/25
Cement/ Sand backing on masonry Mon Thu
124 11 days NA NA 0% 0% 100%
walls to receive wall tiles 06/04/26 16/04/26
Thu Wed
125 Tile Fixing to Walls 21 days NA NA 0% 0% 100%
16/04/26 06/05/26
Fri Mon
126 Ceiling Finishes 32 days NA NA 0% 0% 100%
02/01/26 02/02/26

33
Plastering to Soffits and Suspended Fri Tue
127 18 days NA NA 0% 0% 100%
Slabs 02/01/26 20/01/26
Application of first grade Ceiling Fri Mon
128 17 days NA NA 0% 0% 100%
Matt Emulsion paint of Soffits and Slabs 16/01/26 02/02/26
Tue Fri
129 Joinery & Fittings 68 days NA NA 0% 0% 100%
29/09/26 04/12/26
Tue Wed
130 Installation of Laboratory worktops 30 days NA NA 0% 0% 100%
29/09/26 28/10/26
Wed Sat
131 Installation of Blackboards 10 days NA NA 0% 0% 100%
28/10/26 07/11/26
Sat Wed
132 Installation of Kitchen Cabinets 11 days NA NA 0% 0% 100%
07/11/26 18/11/26
Wed Fri
133 Cafetria Service Counter and shelves 10 days NA NA 0% 0% 100%
18/11/26 27/11/26
Sat Fri
134 Shelves in Stores 7 days NA NA 0% 0% 100%
28/11/26 04/12/26
261 Tue Fri
135 First Floor NA NA 0% 0% 100%
days 05/05/26 15/01/27
222 Fri Fri
136 Floor Finishes NA NA 0% 0% 100%
days 01/05/26 04/12/26
Fri Thu
137 MEP First Fixes 7 days NA NA 0% 0% 100%
01/05/26 07/05/26
Fri Thu
138 APP water proofing to roof/tank slab 7 days NA NA 0% 0% 100%
01/05/26 07/05/26
Tue Sat
139 Screeding to protect water proofing 5 days NA NA 0% 0% 100%
16/06/26 20/06/26
Fri Tue
140 Cement/ Sand Screeding to Floors 11 days NA NA 0% 0% 100%
01/05/26 12/05/26
Non Slip Porcelain Tile Installations Fri Thu
141 14 days NA NA 0% 0% 100%
to floor and Skirtings 01/05/26 14/05/26
34
Installation of Polished Terrazo and Fri Thu
142 7 days NA NA 0% 0% 100%
matching skirting 01/05/26 07/05/26
Installation of polished Terrazzo on Fri Thu
143 21 days NA NA 0% 0% 100%
floors and skirtings 01/05/26 21/05/26
Tue Wed
144 Wall Finishes 30 days NA NA 0% 0% 100%
05/05/26 03/06/26
Plastering wall and concrete surfaces Thu Thu
145 7 days NA NA 0% 0% 100%
and cove cornice 14/05/26 21/05/26
Prepare and apply Silk Vinyl Tue Wed
146 30 days NA NA 0% 0% 100%
Emulsion Paint 05/05/26 03/06/26
Cement/ Sand backing on masonry Thu Thu
147 7 days NA NA 0% 0% 100%
wall to receive wall tiles 21/05/26 28/05/26
Thu Thu
148 Glazed wall tiling with corner strip 7 days NA NA 0% 0% 100%
14/05/26 21/05/26
Thu Thu
149 Tile Fixing to Walls 7 days NA NA 0% 0% 100%
21/05/26 28/05/26
Tue Mon
150 Ceiling Finishes 14 days NA NA 0% 0% 100%
05/05/26 18/05/26
Tue Mon
151 Metal Lathe Ceiling 14 days NA NA 0% 0% 100%
05/05/26 18/05/26
Plastering Ceiling Soffits and Tue Mon
152 14 days NA NA 0% 0% 100%
suspended slab soffit 05/05/26 18/05/26
Application of first grade Ceiling Mon Mon
153 7 days NA NA 0% 0% 100%
Matt Emulsion 11/05/26 18/05/26
Tue Thu
154 Ramp and Staircase Finishes 3 days NA NA 0% 0% 100%
05/05/26 07/05/26
Polished Terrazo to ramp floor and Tue Wed
155 2 days NA NA 0% 0% 100%
external steps , landing 05/05/26 06/05/26
Internal lime pastering of landing Tue Fri
156 4 days NA NA 0% 0% 100%
,sloping soffits of staircase 05/05/26 08/05/26
35
Application of silk Vynl emulsion Tue Fri
157 4 days NA NA 0% 0% 100%
paint to the above 05/05/26 08/05/26
Polished Terrazo to Landing,treads , Tue Thu
158 3 days NA NA 0% 0% 100%
risers and skirting 05/05/26 07/05/26
Fri Fri
159 Joinery & Fittings 7 days NA NA 0% 0% 100%
04/12/26 11/12/26
Fri Fri
160 Placement of signages 7 days NA NA 0% 0% 100%
04/12/26 11/12/26
618.56 Tue Mon
161 Second Floor NA NA 0% 0% 100%
days 04/03/25 02/11/26
486.19 Tue Thu
162 Floor Finishes NA NA 0% 0% 100%
days 04/03/25 25/06/26
Thu Thu
163 MEP First Fixes 7 days NA NA 0% 0% 100%
07/05/26 14/05/26
Thu Thu
164 Screeding to Floors 7 days NA NA 0% 0% 100%
07/05/26 14/05/26
APP Water proofing to tank and Sat Thu
165 5 days NA NA 0% 0% 100%
ramp slab 20/06/26 25/06/26
Cement/Sand screeding to protect Thu Thu
166 14 days NA NA 0% 0% 100%
waterproofing 14/05/26 28/05/26
Cement/Sand screeding to receive Thu Thu
167 7 days NA NA 0% 0% 100%
floor tiles 04/06/26 11/06/26
Installation of polished Terrazzo on Thu Thu
168 21 days NA NA 0% 0% 100%
floors and skirtings 14/05/26 04/06/26
Tue Tue
169 Installation of non slip porcelain tiles 14 days NA NA 0% 0% 100%
04/03/25 18/03/25
Thu Thu
170 Wall Finishes 14 days NA NA 0% 0% 100%
28/05/26 11/06/26
plastering of wals and concrete Thu Thu
171 7 days NA NA 0% 0% 100%
surfaces and cove cornices 28/05/26 04/06/26
36
Application of Silk Emulsion Paint Thu Thu
172 7 days NA NA 0% 0% 100%
to plastered surfaces 04/06/26 11/06/26
Cement Sand Backing to on Masonry Thu Thu
173 7 days NA NA 0% 0% 100%
wall to receive tile 28/05/26 04/06/26
Thu Thu
174 Tile Fixing to Walls 7 days NA NA 0% 0% 100%
04/06/26 11/06/26
341.5 Fri Thu
175 Ceiling Finishes NA NA 0% 0% 100%
days 27/06/25 28/05/26
Metal Lathe Ceiling on softwood Fri Thu
176 14 days NA NA 0% 0% 100%
ceiling joists 24/04/26 07/05/26
Plastering Ceiling soffits and Wed Wed
177 14 days NA NA 0% 0% 100%
suspended slab soffits 15/04/26 29/04/26
Wed Wed
178 Installation of cement Board Ceiling 7 days NA NA 0% 0% 100%
22/04/26 29/04/26
Application of first grade Ceiling Wed Thu
179 30 days NA NA 0% 0% 100%
Mattt Emulsion paint 29/04/26 28/05/26
Fri Mon
180 Ramp and Staircase Finishes 3 days NA NA 0% 0% 100%
04/07/25 07/07/25
Polished Terrazo to ramp floor and Sat Tue
181 2 days NA NA 0% 0% 100%
external steps , landing 28/02/26 03/03/26
Cement/Sand Plastering to ramp
Sat Mon
182 slopping soffits , landing soffits ,edges of 1 day NA NA 0% 0% 100%
28/02/26 02/03/26
ramp and landing
Polishhed Terrazo to Landing,treads Fri Mon
183 3 days NA NA 0% 0% 100%
, risers and skirting 27/06/25 30/06/25
516.88 Tue Sat
184 Joinery & Fittings NA NA 0% 0% 100%
days 04/03/25 25/07/26
Pantry Worktops and Vanity Tue Tue
185 7 days NA NA 0% 0% 100%
Worktops 04/03/25 11/03/25

37
Installation of Concrete Planter Thu Sat
186 45 days NA NA 0% 0% 100%
Boxes 11/06/26 25/07/26
Mon Tue
187 DOORS & IRONMONGERY 59 days NA NA 0% 0% 100%
05/10/26 01/12/26
Mon Sat
188 Ground Floor 14 days NA NA 0% 0% 100%
05/10/26 17/10/26
Mon Sat
189 Aluminum Doors 14 days NA NA 0% 0% 100%
05/10/26 17/10/26
Installation of Purpose made Mon Sat
190 14 days NA NA 0% 0% 100%
Aluminium door sections for double glazing 05/10/26 17/10/26
137 Mon Tue
191 Timber Framed Hardwood doors NA NA 0% 0% 100%
days 05/10/26 16/02/27
Installation of Door Frames, Shutters Mon Sat
192 14 days NA NA 0% 0% 100%
and Iron Mongery 05/10/26 17/10/26
Application of touch up primer,one Fri Tue
193 3 days NA NA 0% 0% 100%
undercoat;two finishing coatsof varnish 12/02/27 16/02/27
Fixing associated iron mongery to Mon Wed
194 3 days NA NA 0% 0% 100%
hardwood 05/10/26 07/10/26
153 Mon Wed
195 First Floor NA NA 0% 0% 100%
days 05/10/26 03/03/27
Mon Sat
196 Aluminum Doors 14 days NA NA 0% 0% 100%
05/10/26 17/10/26
Installation of Purpose made Mon Sat
197 14 days NA NA 0% 0% 100%
Aluminium door sections for double glazing 05/10/26 17/10/26
153 Mon Wed
198 Timber Framed Hardwood doors NA NA 0% 0% 100%
days 05/10/26 03/03/27
Installation of Door Frames, Shutters Mon Sat
199 14 days NA NA 0% 0% 100%
and Iron Mongery 05/10/26 17/10/26
Application of touch up primer,one Fri Wed
200 19 days NA NA 0% 0% 100%
undercoat;two finishing coatsof varnish 12/02/27 03/03/27
38
Fixing associated iron mongery to Mon Wed
201 3 days NA NA 0% 0% 100%
hardwood 05/10/26 07/10/26
137 Mon Tue
202 Second Floor NA NA 0% 0% 100%
days 05/10/26 16/02/27
Mon Tue
203 Aluminum Doors 52 days NA NA 0% 0% 100%
05/10/26 24/11/26
Installation of Purpose made Mon Tue
204 52 days NA NA 0% 0% 100%
Aluminium door sections for double glazing 05/10/26 24/11/26
137 Mon Tue
205 Timber Framed Hardwood doors NA NA 0% 0% 100%
days 05/10/26 16/02/27
Installation of Door Frames, Shutters Mon Sat
206 14 days NA NA 0% 0% 100%
and Iron Mongery 05/10/26 17/10/26
Application of touch up primer,one Fri Tue
207 3 days NA NA 0% 0% 100%
undercoat;two finishing coatsof varnish 12/02/27 16/02/27
Fixing associated iron mongery to Mon Wed
208 3 days NA NA 0% 0% 100%
hardwood 05/10/26 07/10/26
STAIRCASE BALUSTRADING AND 14.13 Mon Sat
209 NA NA 0% 0% 100%
HANDRAIL days 18/05/26 30/05/26
Mon Sat
210 Ground Floor 7 days NA NA 0% 0% 100%
18/05/26 23/05/26
Sat Sat
211 First Floor 7 days NA NA 0% 0% 100%
23/05/26 30/05/26
180 Wed Mon
212 EXTERNAL WORKS NA NA 0% 0% 100%
days 03/07/24 30/12/24
Wed Wed
213 Site Clearance and Earthworks 15 days NA NA 0% 0% 100%
03/07/24 17/07/24
Wed Tue
214 Cut Down Trees 7 days NA NA 0% 0% 100%
03/07/24 09/07/24
Fri Fri
215 Mass Excavations 7 days NA NA 0% 0% 100%
12/07/24 19/07/24
39
Load and Cart away Surplus Soil Fri Fri
216 14 days NA NA 0% 0% 100%
Heaps 12/07/24 26/07/24
Import and Compact Approved Tue Sat
217 5 days NA NA 0% 0% 100%
marram fill 27/08/24 31/08/24
135 Mon Mon
218 Agromachinery Shed NA NA 0% 0% 100%
days 24/06/24 04/11/24
Mon Sat
219 Substructure 14 days NA NA 0% 0% 100%
24/06/24 06/07/24
Wed Thu
220 Super Structure 30 days NA NA 0% 0% 100%
14/08/24 12/09/24
Thu Mon
221 Roofing 38 days NA NA 0% 0% 100%
12/09/24 21/10/24
Tue Mon
222 Finishes 21 days NA NA 0% 0% 100%
05/11/24 25/11/24
Mon Mon
223 Underground Water Tank 92 days NA NA 0% 0% 100%
15/07/24 14/10/24
Mon Sat
224 Pit excavation 14 days NA NA 0% 0% 100%
15/07/24 27/07/24
Sat Tue
225 RC framing 23 days NA NA 0% 0% 100%
27/07/24 20/08/24
Tue Mon
226 Concrete Casting 35 days NA NA 0% 0% 100%
20/08/24 23/09/24
Mon Mon
227 Finishes 20 days NA NA 0% 0% 100%
23/09/24 14/10/24
Power House ,Solid concrete Mon Fri
228 76 days NA NA 0% 0% 100%
Boundary wall & Gate House 12/10/26 25/12/26
Setting out for Power House and Mon Tue
229 59 days NA NA 0% 0% 100%
Gate House 12/10/26 08/12/26
Mon Tue
230 Installation of Mild Steel Gates 23 days NA NA 0% 0% 100%
12/10/26 03/11/26
40
Construction of Solid concrete Mon Sat
231 35 days NA NA 0% 0% 100%
block boundary wall 12/10/26 14/11/26
Construction of Gate House and Mon Wed
232 53 days NA NA 0% 0% 100%
Power House 12/10/26 02/12/26
Mon Sat
233 Storm Water Drainage 56 days NA NA 0% 0% 100%
12/10/26 05/12/26
Mon Sat
234 Open Storm Water Channels 14 days NA NA 0% 0% 100%
12/10/26 24/10/26
Sat Sat
235 Storm water drainage pipe 14 days NA NA 0% 0% 100%
24/10/26 07/11/26
Sat Sat
236 Inspection Chambers 14 days NA NA 0% 0% 100%
07/11/26 21/11/26
Sat Sat
237 Culvert Crossings 14 days NA NA 0% 0% 100%
21/11/26 05/12/26
1038.56 Wed Sat
238 Landscaping NA NA 0% 0% 100%
days 03/07/24 24/04/27
Remove existing ground weeds, roots, Sat Sat
239 7 days NA NA 0% 0% 100%
spread and level imported soil 17/04/27 24/04/27
Wed Tue
240 Construction of Planters 7 days NA NA 0% 0% 100%
03/07/24 09/07/24
Plant selected and approved shrubs and Thu Wed
241 14 days NA NA 0% 0% 100%
flowering plants 25/06/26 08/07/26
Wed Fri
242 Plant onamental and fruit trees 60 days NA NA 0% 0% 100%
03/07/24 30/08/24
101 Tue Wed
243 Other works NA NA 0% 0% 100%
days 15/09/26 23/12/26
Tue Mon
244 Giraffee Sculpture 7 days NA NA 0% 0% 100%
15/09/26 21/09/26
Tue Thu
245 Incinerator House 60 days NA NA 0% 0% 100%
15/09/26 12/11/26
41
Tue Thu
246 Gas Cages 60 days NA NA 0% 0% 100%
15/09/26 12/11/26
130.06 Tue Wed
247 Paved Walkways NA NA 0% 0% 100%
days 15/09/26 20/01/27
Stabilize murram bed laid into falls Tue Wed
248 30 days NA NA 0% 0% 100%
and camber, roll and compact t0 95%MDD 15/09/26 14/10/26
Mon Tue
249 Laying of Heavy duty paving blocks 30 days NA NA 0% 0% 100%
07/12/26 05/01/27
Laying and Splaying kerbs decorated Tue Wed
250 15 days NA NA 0% 0% 100%
to 200-300mm girth 05/01/27 20/01/27
357 Mon Mon
251 MECHANICAL INSTALLATION NA NA 0% 0% 100%
days? 02/02/26 18/01/27
Mon Thu
252 Cold and Hot water installation 90 days NA NA 0% 0% 100%
02/02/26 30/04/26
Installation of Compact flat plate solar Mon Mon
253 15 days NA NA 0% 0% 100%
water heater 04/01/27 18/01/27
Mon Wed
254 Waste Water drainage installation 31 days NA NA 0% 0% 100%
02/02/26 04/03/26
Main Supply including Excavations to Mon Tue
255 30 days NA NA 0% 0% 100%
all Floors 02/02/26 03/03/26
Mon Tue
256 Manhole and Septic Tank Construction 30 days NA NA 0% 0% 100%
02/02/26 03/03/26
Testing, Inspection and Mon Sat
257 7 days NA NA 0% 0% 100%
Commissioning 02/02/26 07/02/26
Thu Mon
258 Plumbing - Distribution & Drainage 97 days NA NA 0% 0% 100%
07/05/26 10/08/26
Thu Fri
259 Water Supply and Distribution piping 30 days NA NA 0% 0% 100%
07/05/26 05/06/26
Fri Sat
260 Installation and sanitary fittings 30 days NA NA 0% 0% 100%
05/06/26 04/07/26
42
Testing, Inspection and Mon Mon
261 7 days NA NA 0% 0% 100%
Commissioning 03/08/26 10/08/26
150 Wed Wed
262 Fire Fighting NA NA 0% 0% 100%
days? 17/06/26 11/11/26
Installation of Fire Fighting Class B Wed Thu
263 30 days NA NA 0% 0% 100%
Galvanised Iron piping 17/06/26 16/07/26
Wed Thu
264 Installation of Hose Reels 30 days NA NA 0% 0% 100%
17/06/26 16/07/26
Thu Thu
265 Installation of portable extinguishers 7 days NA NA 0% 0% 100%
09/07/26 16/07/26
Installation of fire suppression system Wed Thu
266 30 days NA NA 0% 0% 100%
in the server room 17/06/26 16/07/26
Installation of fire hydrants, fire pumps Wed Fri
267 60 days NA NA 0% 0% 100%
and general fire fighting accessories 17/06/26 14/08/26
Fri Mon
268 installation of fire alarm systems 32 days NA NA 0% 0% 100%
10/07/26 10/08/26
Testing, Inspection and Mon Mon
269 7 days NA NA 0% 0% 100%
Commissioning 03/08/26 10/08/26
Mechanical Ventilation and Air Wed Sat
270 90 days NA NA 0% 0% 100%
Conditioning 17/06/26 12/09/26
Installation of VRF Air Conditioning Wed Wed
271 15 days NA NA 0% 0% 100%
,fittings and pipes 17/06/26 01/07/26
Wed Sat
272 Installation toilet extraction system 90 days NA NA 0% 0% 100%
17/06/26 12/09/26
Installation Kitchen extraction Wed Sat
273 90 days NA NA 0% 0% 100%
system 17/06/26 12/09/26
Explosion proofed gas piping system Wed Fri
274 3 days NA NA 0% 0% 100%
for Laboratories 17/06/26 19/06/26
Installation of Laboratory Extarction Wed Wed
275 8 days NA NA 0% 0% 100%
system 17/06/26 24/06/26
43
Cleaning, testing, balancing and Mon Mon
276 7 days NA NA 0% 0% 100%
commissioning of MVAC System 03/08/26 10/08/26
ELECTRICAL & ICT 120 Mon Sat
277 NA NA 0% 0% 100%
INSTALLATION days? 10/08/26 05/12/26
Mon Tue
278 Main Supply and Reticulation 30 days NA NA 0% 0% 100%
10/08/26 08/09/26
Mains Supply - Service Subscriptions Mon Tue
279 30 days NA NA 0% 0% 100%
for power 10/08/26 08/09/26
Installation of Generator as specified Mon Fri
280 12 days NA NA 0% 0% 100%
in contract,switch gears, stabiliser 10/08/26 21/08/26
Mon Sat
281 Installation of capacitor bank 6 days NA NA 0% 0% 100%
10/08/26 15/08/26
Testing, Inspection and Mon Tue
282 30 days NA NA 0% 0% 100%
Commissioning 10/08/26 08/09/26
218.38 Mon Thu
283 Power Distrubution NA NA 0% 0% 100%
days 05/01/26 06/08/26
150 Fri Fri
284 Installation of Second Fixes NA NA 0% 0% 100%
days 16/01/26 12/06/26
Installation of third fixes - Light
180 Sat Mon
285 Fittings, Switches, Socketcs, Floor NA NA 0% 0% 100%
days 13/06/26 07/12/26
Boxes,hand dryers
Sat Mon
286 Installation of Security lighting 30 days NA NA 0% 0% 100%
07/11/26 07/12/26
Testing, Inspection and Mon Tue
287 30 days NA NA 0% 0% 100%
Commissioning 07/12/26 05/01/27
328 Fri Fri
288 Solar System installation NA NA 0% 0% 100%
days 16/01/26 04/12/26
150 Fri Fri
289 Installation of mounting frame NA NA 0% 0% 100%
days 16/01/26 12/06/26

44
Installation of solar charge 178 Sat Fri
290 NA NA 0% 0% 100%
controllers ,battery bank and inverter days 13/06/26 04/12/26
Thu Fri
291 Installation of solar modules 30 days NA NA 0% 0% 100%
05/11/26 04/12/26
Providing Lockable Battery ruck for Mon Mon
292 8 days NA NA 0% 0% 100%
system 05/01/26 12/01/26
Testing, Inspection and Fri Mon
293 30 days NA NA 0% 0% 100%
Commissioning 04/12/26 04/01/27
151.75 Mon Tue
294 Lightening Protection Scheme NA NA 0% 0% 100%
days 10/08/26 05/01/27
Installation copper tape complete with Mon Wed
295 60 days NA NA 0% 0% 100%
all fixing accessories 10/08/26 07/10/26
Installation of earthing burried in the Mon Sat
296 7 days NA NA 0% 0% 100%
ground 10/08/26 15/08/26
Testing, Inspection and Mon Tue
297 30 days NA NA 0% 0% 100%
Commissioning 07/12/26 05/01/27
180 Mon Tue
298 CCTV NA NA 0% 0% 100%
days 10/08/26 02/02/27
180 Mon Tue
299 Wiring NA NA 0% 0% 100%
days 10/08/26 02/02/27
Tue Tue
300 Installation of control panels 7 days NA NA 0% 0% 100%
26/01/27 02/02/27
Installation of third fixes - Cameras, Sat Mon
301 15 days NA NA 0% 0% 100%
TV Screens 21/11/26 07/12/26
Programming ,Testing, Inspection and Tue Fri
302 25 days NA NA 0% 0% 100%
Commissioning 29/12/26 22/01/27
150 Wed Wed
303 Voice and Data NA NA 0% 0% 100%
days? 17/06/26 11/11/26
Installation of trunking system and 120 Wed Tue
304 NA NA 0% 0% 100%
wiring days 07/10/26 02/02/27
45
Mon Thu
305 Wiring 90 days NA NA 0% 0% 100%
10/08/26 05/11/26
Installation of Acces Control system Wed Fri
306 10 days NA NA 0% 0% 100%
server computer 17/06/26 26/06/26
Installation of Public Address Wed Sat
307 40 days NA NA 0% 0% 100%
Equipment and necessary accessories 17/06/26 25/07/26
Wed Thu
308 Installation of IP Telephones 30 days NA NA 0% 0% 100%
17/06/26 16/07/26
Installation of free standing network Sat Sat
309 14 days NA NA 0% 0% 100%
cabinets, Network Switches ,data outlet points 11/07/26 25/07/26
Sat Mon
310 Installation of Remote Monitoring Unit 30 days NA NA 0% 0% 100%
07/11/26 07/12/26
Labelling,Testing,
Tue Fri
311 Certification,Documentation and 10 days NA NA 0% 0% 100%
12/01/27 22/01/27
Commissioning
Installation of Interactive 240.94 Wed Mon
312 NA NA 0% 0% 100%
Presentation System days 17/06/26 08/02/27
Wed Sat
313 Wiring 18 days NA NA 0% 0% 100%
17/06/26 04/07/26
Installation of Touch Smart Screens Mon Tue
314 37 days NA NA 0% 0% 100%
in laboratories 28/12/26 02/02/27
Installation of atleast 1 GBPS speed Mon Tue
315 30 days NA NA 0% 0% 100%
dedcated Router 19/10/26 17/11/26
Installation of Projector lifts and Tue Thu
316 39 days NA NA 0% 0% 100%
Projectors in lecture rooms 22/12/26 28/01/27
Thu Thu
317 Fixing 100 inch whiteboards 8 days NA NA 0% 0% 100%
21/01/27 28/01/27
Labelling,Testing,
Mon Wed
318 Certification,Documentation and 3 days NA NA 0% 0% 100%
22/02/27 24/02/27
Commissioning

46
Installation of Conference 385.81 Mon Mon
319 NA NA 0% 0% 100%
Microphone System days 10/11/25 23/11/26
Thu Mon
320 Wiring 90 days NA NA 0% 0% 100%
08/10/26 04/01/27
Mon Thu
321 Mounting Speakers 90 days NA NA 0% 0% 100%
10/11/25 05/02/26
Mon Wed
322 Installation of Production Unit 10 days NA NA 0% 0% 100%
10/11/25 19/11/25
Installation of 60W performance Sat Mon
323 30 days NA NA 0% 0% 100%
Digital Mixer power Amplifier 07/11/26 07/12/26
Installation of projector with in built Fri Thu
324 14 days NA NA 0% 0% 100%
speakers 15/01/27 28/01/27
Thu Thu
325 Testing and Commissioning 1 day NA NA 0% 0% 100%
28/01/27 28/01/27
Thu Fri
326 Door Access Control System 16 days NA NA 0% 0% 100%
28/01/27 12/02/27
Sat Fri
327 Wiring 35 days NA NA 0% 0% 100%
07/11/26 11/12/26
Thu Tue
328 Installation of control panel 27 days NA NA 0% 0% 100%
28/01/27 23/02/27
Door Access Control System Stand Thu Sat
329 24 days NA NA 0% 0% 100%
alone 28/01/27 20/02/27
Testing, Inspection and Wed Fri
330 17 days NA NA 0% 0% 100%
Commissioning 10/02/27 26/02/27
Fri Sat
331 SITE HANDOVER 58 days NA NA 0% 0% 100%
26/02/27 24/04/27
Fri Wed
332 Site Inspection and Snagging 19 days NA NA 0% 0% 100%
26/02/27 17/03/27
Mon Wed
333 Desmantling Temporaray Structures 9 days NA NA 0% 0% 100%
01/03/27 10/03/27
47
Wed Sat
334 Site Cleaning and cart away rubbish 18 days NA NA 0% 0% 100%
10/03/27 27/03/27
Sat Tue
335 User Training and Workshops 2 days NA NA 0% 0% 100%
27/03/27 30/03/27
Issuance of operating and maintenace Sat Wed
336 11 days NA NA 0% 0% 100%
Manual 27/03/27 07/04/27
Wed Thu
337 Keys Registry and Handover 8 days NA NA 0% 0% 100%
07/04/27 15/04/27
Thu Sat
338 As Built Drawings 9 days NA NA 0% 0% 100%
15/04/27 24/04/27
START OF DEFECTS LIABILITY Sat Sat
339 0 days NA NA 0% 0% 100%
PERIOD 24/04/27 24/04/27
806% 1079% 33700%

%
A
A
A C
D ct % T
ct T
u u F AS A
u U
I ra Sta al in PL R
Task Name al A
D ti rt F is AN G
S L
o in h NE E
ta D
n is D T
rt O
h
N
E
PROPOSED MULTI- 1 M S
PURPOSEBUILDING 1 o a
TO BE BUILT ON 4 M n t
2. 3.2
BLOCK.NO.1,PLOTN 2. on 2 2 10
N 39 01
1 O.312,AT 5 25/ 5/ 4/ 0
A 17 8
KOMARET,NACHUK d 03/ 0 0 %
% %
A, a 24 3/ 4/
NAMATWAE,LOPUT y 2 2
IPUT,MSTHENIKO s 4 7

48
COUNTY, FOR GULU
UNIVERSITY,
MOROTO DISTRICT

T T
u u
Tu
0 e e
e
d 0 0 10
PHASE ONE: RC 07/ N
2 a 2/ 7/ 0
FRAMING 05/ A
y 0 0 %
20
s 5/ 5/
24
2 2
4 4
6 M W
7. o e
4 Tu n d
4 e 2 1
PRECONSTRUCTIO N
3 d 07/ 5/ 0/
N & MOBILISATION A
a 05/ 0 0
STAGE
y 24 3/ 7/
s 2 2
? 4 4
M M M
o o o
0 M n n n
d on 0 0 0 10 10 10
Kick Off Meeting &
4 a 06/ 6/ 6/ 6/ 0 0 0
Site Possession
y 05/ 0 0 0 % % %
s 24 5/ 5/ 5/
2 2 2
4 4 4
1 T T
Th 10
Human Resource 4 h N u 15 10
5 u 0
Mobilisation d u A e % %
06/ %
a 0 1
49
y 06/ 6/ 8/
s 24 0 0
6/ 6/
2 2
4 4
M
S
9. o
at
3 n
Sat 0
8 1 10
HSE Training for 06/ 6/ N 0 90
6 d 5/ 0
Construction Crew 07/ 0 A % %
a 0 %
24 7/
y 7/
2
s 2
4
4
W T
e h
3
We d u
1
Trial Tests (Concrete d 1 1 10
d N 5
7 mixes and Excavation 19/ 9/ 8/ 4% 0
a A %
Depths) 06/ 0 0 %
y
24 6/ 7/
s
2 2
4 4
F F
3 ri ri
0 Fri 2 2
10
Plant and Machinery d 24/ 4/ N 1/ 50 10
8 0
Mobilisation a 05/ 0 A 0 % 0%
%
y 24 5/ 6/
s 2 2
4 4
6 W M M
We
4. e o o
Arrangements for d 10 10
6 d n n 90
9 Water, Electricity and 29/ 0 0
3 2 2 2 %
Waste Management 05/ % %
d 9/ 9/ 9/
24
a 0 0 0

50
y 5/ 7/ 7/
s 2 2 2
4 4 4

T T
u u
1
Tu e e
5
Reviewing Quality e 0 1 10
1 d N 15 85
Control Plans and 02/ 2/ 6/ 0
0 a A % %
procedures 07/ 0 0 %
y
24 7/ 7/
s
2 2
4 4
1 T W W
2 h e e
9. Th u d d
Fabrication and 9 u 2 3 3 10 10
1 10
Erection of Project Sign 4 28/ 8/ 1/ 1/ 0 0
1 0%
Board d 03/ 0 0 0 % %
a 24 3/ 7/ 7/
y 2 2 2
s 4 4 4
M S S
6
o u u
4.
Mo n n n
0
n 2 2 2 10 10
1 6 10
Site Clearance 25/ 5/ 6/ 6/ 0 0
2 d 0%
03/ 0 0 0 % %
a
24 3/ 5/ 5/
y
2 2 2
s
4 4 4
M T T
3
Erection of onsite Mo o u u
9.
temporary n n e e 10 10
1 7 10
structures(Blockyard, 03/ 0 0 0 0 0
3 5 0%
steel workshop, Site 06/ 3/ 9/ 9/ % %
d
offices 24 0 0 0
a
6/ 7/ 7/
51
y 2 2 2
s 4 4 4

S T T
2
u h h
8.
Su n u u
0
n 1 1 1 10
1 Installation of 6 95 10
16/ 6/ 1/ 1/ 0
4 chainlink fence d % 0%
06/ 0 0 0 %
a
24 6/ 7/ 7/
y
2 2 2
s
4 4 4
T
F
5 h
ri
6 Th u
2
8 u 1 10
1 CONSTRUCTION N 6/ 0 0
d 13/ 3/ 0
5 PHASE A 1 % %
a 06/ 0 %
2/
y 24 6/
2
s 2
5
4
T M
2 h o
SHOP 1 Th u n
DRAWINGS, 0 u 1 0 10
1 N 0 0
SAMPLES, d 13/ 3/ 6/ 0
6 A % %
APPROVALS & a 03/ 0 1 %
PROCUREMENT y 25 6/ 0/
s 2 2
4 5
6 M M
Th
3 o o
u 10
1 d n N n 0 0
SUB-STRUCTURE 13/ 0
7 a 0 A 1 % %
06/ %
y 8/ 2/
24
s 0 0
52
7/ 8/
2 2
4 4
M W
o e
1
We n d
5
d 0 1 10 10 10
1 d N
Reduction of levels 29/ 8/ 2/ 0 0 0
8 a A
05/ 0 0 % % %
y
24 7/ 6/
s
2 2
4 4
T
S
h
at
6 Mo u
2
d n 2 10 10
1 Setting Out N 9/ 25
a 24/ 5/ 0 0
9 Excavations A 0 %
y 06/ 0 % %
6/
s 24 7/
2
2
4
4
T
F
h
1 ri
u
4 Sat 1
2 10
2 Excavate for Strip d 29/ N 2/ 1 0
5/ 0
0 and column bases a 06/ A 0 % %
0 %
y 24 7/
7/
s 2
2
4
4
T
1 S
Mo u
6 at
n e 10
2 Load and Cart d 2 N 0 0
08/ 2 0
1 Away Surplus Soil a 7/ A % %
07/ 3/ %
y 0
24 0
s 7/
7/

53
2 2
4 4
T
u
1
We e
4
Anti-Termite d 2 10
2 d N N 0 0
Treatment to Excavation 10/ 3/ 0
2 a A A % %
pits 07/ 0 %
y
24 7/
s
2
4
S
2 at
We
6 0
Concrete Blinding d 10
2 d N N 3/ 0 0
to Strip Foundations and 10/ 0
3 a A A 0 % %
Column 07/ %
y 8/
24
s 2
4
T
h
2
We u
2
Reinforcement to d 0 10
2 d N N 0 0
Columns and Stub 10/ 1/ 0
4 a A A % %
Columns 07/ 0 %
y
24 8/
s
2
4
W
e
1
We d
4
d 2 10
2 Formwork to d N N 0 0
10/ 4/ 0
5 Columns a A A % %
07/ 0 %
y
24 7/
s
2
4
54
F
1 ri
4 Fri 2
10
2 Casting Concrete d 12/ N N 6/ 0 0
0
6 to Columns a 07/ A A 0 % %
%
y 24 7/
s 2
4
M
o
1
Mo n
4
n 2 10
2 Plinth Walling in d N N 0 0
15/ 9/ 0
7 Solid Blockwork a A A % %
07/ 0 %
y
24 7/
s
2
4
W
e
1
Mo d
0
n 3 10
2 Formwork to Stub d N N 0 0
22/ 1/ 0
8 Columns a A A % %
07/ 0 %
y
24 7/
s
2
4
T
h
1
Tu u
0
e 0 10
2 Casting of concrete d N N 0 0
23/ 1/ 0
9 to Stub Columns a A A % %
07/ 0 %
y
24 8/
s
2
4

55
T
h
1
Mo u
0
Compaction of n 0 10
3 d N N 0 0
Murram and laying of 29/ 8/ 0
0 a A A % %
Hardcore Base 07/ 0 %
y
24 8/
s
2
4
T
h
2 Tu u
d e 0 10
3 Sand Blinding to N N 0 0
a 06/ 8/ 0
1 Hardcore Base A A % %
y 08/ 0 %
s 24 8/
2
4
F
ri
2 Th
0
Laying of DPM d u 10
3 N N 9/ 0 0
and A142 Fabric Mesh a 08/ 0
2 A A 0 % %
Reinforcement y 08/ %
8/
s 24
2
4
M
o
2 n
Sat
d 1 10
3 Casting of Ground 10/ N N 0 0
a 2/ 0
3 Floor Slab 08/ A A % %
y 0 %
24
s 8/
2
4

56
7 S
1 a
3. M t
SUPER- 5 on 0 10
3 N N 0 0
STRUCTURE - RC 6 02/ 8/ 0
4 A A % %
FRAME d 09/ 0 %
a 24 8/
y 2
s 6
T
h
9
M u
5
on 0 10
3 d N N 0 0
Ground Floor 02/ 5/ 0
5 a A A % %
09/ 1 %
y
24 2/
s
2
4
M
o
Mo n
1
n 0 10
3 Setting Out for d N N 0 0
02/ 2/ 0
6 Columns a A A % %
09/ 0 %
y
24 9/
2
4
M
o
7 Mo n
d n 0 10
3 Reinforcement N N 0 0
a 02/ 9/ 0
7 for Columns A A % %
y 09/ 0 %
s 24 9/
2
4

57
W
e
8 Tu d
d e 1 10
3 Formwork to N N 0 0
a 03/ 1/ 0
8 Column A A % %
y 09/ 0 %
s 24 9/
2
4
W
e
7 We d
d d 1 10
3 Casting of N N 0 0
a 04/ 1/ 0
9 Columns A A % %
y 09/ 0 %
s 24 9/
2
4
T
h
7 Th u
d u 1 10
4 Striking off N N 0 0
a 05/ 2/ 0
0 Formwork on Columns A A % %
y 09/ 0 %
s 24 9/
2
4
S
1 at
5 Sat 2
Decking of 10
4 d 07/ N N 1/ 0 0
formwork for First Floor 0
1 a 09/ A A 0 % %
Slab and Beams %
y 24 9/
s 2
4

58
M
o
7 Mo n
Reinforcement d n 1 10
4 N N 0 0
Bars and max pans to a 09/ 6/ 0
2 A A % %
Slab y 09/ 0 %
s 24 9/
2
4
W
e
3 d
Sat
d 1 10
4 14/ N N 0 0
MEP First Fixes a 8/ 0
3 09/ A A % %
y 0 %
24
s 9/
2
4
W
e
Tu d
1
e 1 10
4 Inspection of d N N 0 0
17/ 8/ 0
4 Reinforcement and MEP a A A % %
09/ 0 %
y
24 9/
2
4
T
h
We u
1
d 1 10
4 Casting C25 First d N N 0 0
18/ 9/ 0
5 Floor Slab a A A % %
09/ 0 %
y
24 9/
2
4

59
T
h
1
Th u
4
u 2 10
4 Striking Off Slab d N N 0 0
10/ 4/ 0
6 Formwork a A A % %
10/ 1 %
y
24 0/
s
2
4
T
u
5 Th e
Formwork to d u 2 10
4 N N 0 0
Staircases and ramp- a 24/ 9/ 0
7 A A % %
Ground to First Floor y 10/ 1 %
s 24 0/
2
4
M
o
5 Tu n
d e 0 10
4 Reinforcement N N 0 0
a 29/ 4/ 0
8 for Staircases and ramp A A % %
y 10/ 1 %
s 24 1/
2
4
T
u
2 Mo e
Casting of d n 0 10
4 N N 0 0
Concrete to a 04/ 5/ 0
9 A A % %
Staircasesand ramp y 11/ 1 %
s 24 1/
2
4

60
T
h
2 Tu u
Striking down d e 0 10
5 N N 0 0
Formwork for Staircase a 03/ 5/ 0
0 A A % %
and ramp y 12/ 1 %
s 24 2/
2
4
W
1 e
7 Th d
3 u 2 10
5 N N 0 0
First Floor d 05/ 8/ 0
1 A A % %
a 12/ 0 %
y 24 5/
s 2
5
T
h
Th u
1
u 0 10
5 Setting Out for d N N 0 0
05/ 5/ 0
2 Columns a A A % %
12/ 1 %
y
24 2/
2
4
T
h
1
Th u
4
u 1 10
5 Reinforcement d N N 0 0
05/ 9/ 0
3 for Columns a A A % %
12/ 1 %
y
24 2/
s
2
4

61
W
e
1
d
2 Fri
1 10
5 Formwork to d 06/ N N 0 0
8/ 0
4 Column a 12/ A A % %
1 %
y 24
2/
s
2
4
T
u
1
e
0 Sat
1 10
5 Casting of d 07/ N N 0 0
7/ 0
5 Columns a 12/ A A % %
1 %
y 24
2/
s
2
4
T
u
1
Mo e
5
n 2 10
5 Striking off d N N 0 0
09/ 4/ 0
6 Formwork on Columns a A A % %
12/ 1 %
y
24 2/
s
2
4
F
1 ri
We
5 2
Decking of d 10
5 d N N 7/ 0 0
formwork for Second 11/ 0
7 a A A 1 % %
Floor Slab and Beams 12/ %
y 2/
24
s 2
4

62
T
u
1
Th e
2
u 2 10
5 Reinforcement d N N 0 0
12/ 4/ 0
8 Bars to Slab a A A % %
12/ 1 %
y
24 2/
s
2
4
S
at
3 Tu
2
d e 10
5 N N 8/ 0 0
MEP First Fixes a 24/ 0
9 A A 1 % %
y 12/ %
2/
s 24
2
4
S
at
1 Fri 2
10
6 Inspection of d 27/ N N 8/ 0 0
0
0 Reinforcement and MEP a 12/ A A 1 % %
%
y 24 2/
2
4
T
u
2 e
Sat
d 3 10
6 Casting C25 28/ N N 0 0
a 1/ 0
1 Second Floor Slab 12/ A A % %
y 1 %
24
s 2/
2
4
2 Tu T 10
6 Striking Off Slab N N 0 0
d e h 0
2 Formwork A A % %
a 21/ u %

63
y 01/ 2
s 25 3/
0
1/
2
5
T
h
7 Th u
Formwork to d u 3 10
6 N N 0 0
Staircases and ramp - a 23/ 0/ 0
3 A A % %
First to Second Floor y 01/ 0 %
s 25 1/
2
5
T
h
7 Th u
d u 0 10
6 Reinforcement N N 0 0
a 30/ 6/ 0
4 for Staircases and ramp A A % %
y 01/ 0 %
s 25 2/
2
5
S
at
2 Th
0
Casting of d u 10
6 N N 8/ 0 0
Concrete to Staircases a 06/ 0
5 A A 0 % %
and ramp y 02/ %
2/
s 25
2
5
2 T
Fri
Striking down d u 10
6 07/ N N 0 0
Formwork for Staircase a e 0
6 03/ A A % %
and ramp y 1 %
25
s 1/

64
0
3/
2
5
F
6 ri
W
0 0
ed 10
6 d N N 9/ 0 0
Second Floor 12/ 0
7 a A A 0 % %
03/ %
y 5/
25
s 2
5
W
e
We d
1
Setting Out for d 1 10
6 d N N 0 0
Columns, staircase and 12/ 2/ 0
8 a A A % %
ramp 03/ 0 %
y
25 3/
2
5
W
e
2
We d
1
Reinforcement d 0 10
6 d N N 0 0
for Columns, staircase 12/ 2/ 0
9 a A A % %
and ramp 03/ 0 %
y
25 4/
s
2
5
2 F
Th
2 ri
Formwork to u 10
7 d N N 0 0 0
Columns, staircase and 13/ 0
0 a A A 4/ % %
ramp 03/ %
y 0
25
s 4/

65
2
5
F
2 ri
1 Fri 0
10
7 Casting of d 14/ N N 4/ 0 0
0
1 Columns a 03/ A A 0 % %
%
y 25 4/
s 2
5
S
1 at
4 Sat 2
Striking off 10
7 d 15/ N N 9/ 0 0
Formwork on Columns 0
2 a 03/ A A 0 % %
,ramp and staircase %
y 25 3/
s 2
5
T
u
1
Tu e
5
Decking of e 0 10
7 d N N 0 0
formwork for Roof 18/ 1/ 0
3 a A A % %
Beams 03/ 0 %
y
25 4/
s
2
5
S
1 at
We
0 2
d 10
7 Reinforcement d N N 9/ 0 0
19/ 0
4 Bars to Slab a A A 0 % %
03/ %
y 3/
25
s 2
5

66
M
o
3 n
Fri
d 3 10
7 28/ N N 0 0
MEP First Fixes a 1/ 0
5 03/ A A % %
y 0 %
25
s 3/
2
5
T
u
Mo e
1
Casting RC Roof n 0 10
7 d N N 0 0
Slab,Reinforced 31/ 1/ 0
6 a A A % %
Concrete Gutter 03/ 0 %
y
25 4/
2
5
T
u
1
Tu e
4
e 0 10
7 Striking Off Slab d N N 0 0
22/ 6/ 0
7 Formwork a A A % %
04/ 0 %
y
25 5/
s
2
5
S
4
a
6.
Th t
1
u 0 10
7 Roof and 9 N N 0 0
25/ 8/ 0
8 Rainwater Disposal d A A % %
06/ 0 %
a
26 8/
y
2
s
6

67
F
3 ri
Th
0 2
u 10
7 Assembly of d N N 4/ 0 0
25/ 0
9 Structural Steel Roof a A A 0 % %
06/ %
y 7/
26
s 2
6
F
ri
7
Fri 2
d 10
8 Touch-up primer 17/ N N 4/ 0 0
a 0
0 to steel structure 07/ A A 0 % %
y %
26 7/
s
2
6
F
ri
7
Fri 3
Installation of d 10
8 24/ N N 1/ 0 0
IT4 Gauge 26 prepainted a 0
1 07/ A A 0 % %
Roof Covering y %
26 7/
s
2
6
M
o
7 Mo n
d n 0 10
8 Installation of N N 0 0
a 27/ 3/ 0
2 underside roof Covering A A % %
y 07/ 0 %
s 26 8/
2
6
M
Installation of 7 Mo 10
8 N N o 0 0
Rain Water Harvesting d n 0
3 A A n % %
system a 27/ %
0

68
y 07/ 3/
s 26 0
8/
2
6
S
at
7 Mo
0
Fixing filler d n 10
8 N N 8/ 0 0
blocks to match roofing a 03/ 0
4 A A 0 % %
sheet profile y 08/ %
8/
s 26
2
6
M
o
7 Mo n
Water Proofing d n 0 10
8 N N 0 0
to Gutters and RC Roof a 27/ 3/ 0
5 A A % %
slabs y 07/ 0 %
s 26 8/
2
6
2 W
7 e
8. Th d
3 u 3 10
8 Block Walling & N N 0 0
1 24/ 0/ 0
6 Internal Plastering A A % %
d 10/ 0 %
a 24 7/
y 2
s 5
4 S
Th
5 at
u 10
8 Block Walling - d N N 0 0 0
24/ 0
7 Ground Floor a A A 7/ % %
10/ %
y 1
24
s 2/

69
2
4
S
2 at
1 Sat 1
10
8 MEP Fixes - d 23/ N N 4/ 0 0
0
8 Ground Floor a 11/ A A 1 % %
%
y 24 2/
s 2
4
T
u
2
e
5 Fri
1 10
8 Plastering - d 22/ N N 0 0
7/ 0
9 Ground Floor a 11/ A A % %
1 %
y 24
2/
s
2
4
F
4 ri
5 Sat 2
10
9 Block Walling - d 07/ N N 4/ 0 0
0
0 First Floor a 12/ A A 0 % %
%
y 24 1/
s 2
5
F
1 ri
4 Fri 3
10
9 MEP Fixes - First d 17/ N N 1/ 0 0
0
1 Floor a 01/ A A 0 % %
%
y 25 1/
s 2
5

70
M
o
1
Tu n
4
e 0 10
9 Plastering - First d N N 0 0
21/ 3/ 0
2 Floor a A A % %
01/ 0 %
y
25 2/
s
2
5
T
u
4
e
5 Fri
1 10
9 Block Walling - d 24/ N N 0 0
1/ 0
3 Second Floor a 01/ A A % %
0 %
y 25
3/
s
2
5
T
u
1
e
5 Sat
1 10
9 MEP Fixes - d 01/ N N 0 0
8/ 0
4 Second Floor a 03/ A A % %
0 %
y 25
3/
s
2
5
T
h
2
u
5 Sat
2 10
9 Plastering - d 22/ N N 0 0
0/ 0
5 Second Floor a 02/ A A % %
0 %
y 25
3/
s
2
5

71
M
o
2
Tu n
0
e 3 10
9 Parapet Block d N N 0 0
11/ 1/ 0
6 Walling a A A % %
03/ 0 %
y
25 3/
s
2
5
W
e
0 W d
d ed 3 10
9 PHASE TWO : N N 0 0
a 30/ 0/ 0
7 FINISHES A A % %
y 07/ 0 %
s 25 7/
2
5
M
8 o
4 Tu n
9 e 1 10
9 EXTERNAL N N 0 0
d 30/ 6/ 0
8 FINISHES A A % %
a 07/ 1 %
y 24 1/
s 2
6
3 T
8 h
1. Tu u
4 e 1 10
9 N N 0 0
Wall Finishes 4 30/ 4/ 0
9 A A % %
d 07/ 0 %
a 24 8/
y 2
s 5

72
T
u
3
Mo e
0
1 Rendering to n 1 10
d N N 0 0
0 Walls and Concrete 16/ 5/ 0
a A A % %
0 Surfaces 06/ 0 %
y
25 7/
s
2
5
T
h
6
Mo u
Painting external 0
1 n 1 10
walls and cocrete d N N 0 0
0 16/ 4/ 0
surfaces with three coats a A A % %
1 06/ 0 %
of weather guard y
25 8/
s
2
5
W
e
3
Tu d
0
1 Stonework e 1 10
d N N 0 0
0 Finish-in c/s mortar 1:3 15/ 3/ 0
a A A % %
2 pointed -Ground Floor 07/ 0 %
y
25 8/
s
2
5
S
2 at
Mo
1 0
1 n 10
Facing bricks- d N N 9/ 0 0
0 21/ 0
ground floor a A A 0 % %
3 07/ %
y 8/
25
s 2
5

73
F
2 ri
Tu
5 2
1 APP water e 10
d N N 3/ 0 0
0 proofing to slabs and 30/ 0
a A A 0 % %
4 ramp 07/ %
y 8/
24
s 2
4
W
4 e
5 M d
1 2 on 0 10
Aluminium N N 0 0
0 d 20/ 6/ 0
Windows A A % %
5 a 10/ 0 %
y 25 1/
s 2
7
T
h
9
Mo u
0
1 n 1 10
Aluminium d N N 0 0
0 20/ 5/ 0
windows a A A % %
6 10/ 0 %
y
25 1/
s
2
6
T
u
3
Mo e
0
1 n 1 10
Burglar Proofing d N N 0 0
0 20/ 8/ 0
to Windows a A A % %
7 10/ 1 %
y
25 1/
s
2
5

74
S
at
7 Mo
2
1 Prepare amd d n 10
N N 5/ 0 0
0 apply Primer and Gloss a 20/ 0
A A 1 % %
8 Finish y 10/ %
0/
s 25
2
5
M
4 o
5 M n
1 0 on 2 10
INTERNAL N N 0 0
0 d 14/ 8/ 0
FINISHES A A % %
9 a 07/ 0 %
y 25 9/
s 2
6
5
F
1
ri
8. M
0
1 7 on 10
N N 4/ 0 0
1 Ground Floor 5 14/ 0
A A 1 % %
0 d 07/ %
2/
a 25
2
y
6
s
S
1 a
0 Th t
1 2 u 2 10
N N 0 0
1 Floor Finishes d 15/ 5/ 0
A A % %
1 a 01/ 0 %
y 26 4/
s 2
6

75
T
h
7 Th u
1 d u 2 10
MEP First N N 0 0
1 a 15/ 2/ 0
Fixes A A % %
2 y 01/ 0 %
s 26 1/
2
6
S
2 at
Mo
1 1
1 n 10
Screeding to d N N 4/ 0 0
1 26/ 0
Floors a A A 0 % %
3 01/ %
y 2/
26
s 2
6
M
o
3
n
6 Sat
1 Porcelain Tile 0 10
d 28/ N N 0 0
1 Installations to floor and 6/ 0
a 02/ A A % %
4 Skirtings 0 %
y 26
4/
s
2
6
S
2 at
Mo
1 2
1 Installation of n 10
d N N 5/ 0 0
1 polished Granite Floor 06/ 0
a A A 0 % %
5 Tiles 04/ %
y 4/
26
s 2
6
1 Installation of 3 M 10
Sat N N 0 0
1 polished Terrazzo on 6 o 0
28/ A A % %
6 floors, staircases d n %

76
,rampand matching a 02/ 0
skirtings in water proof y 26 6/
mortar s 0
4/
2
6
M
o
9 n
Sat
1 d 1 10
Ramp and 04/ N N 0 0
1 a 3/ 0
Staircase Finishes 04/ A A % %
7 y 0 %
26
s 4/
2
6
T
u
1
e
Polished 0 Sat
1 1 10
Terrazo to ramp floor d 04/ N N 0 0
1 4/ 0
and external steps , a 04/ A A % %
8 0 %
landing y 26
4/
s
2
6
T
u
Cement/Sand 9 e
Sat
1 Plastering to ramp d 1 10
28/ N N 0 0
1 slopping soffits , landing a 0/ 0
02/ A A % %
9 soffits ,edges of ramp y 0 %
26
and landing s 3/
2
6
Polishhed 1 T
1 Tu 10
Terrazo to 0 N N h 0 0
2 e 0
Landing,treads , risers d A A u % %
0 10/ %
and skirting a 1

77
y 03/ 9/
s 26 0
3/
2
6
3 W
0 e
2. M d
1 7 on 0 10
N N 0 0
2 Wall Finishes 5 14/ 6/ 0
A A % %
1 d 07/ 0 %
a 25 5/
y 2
s 6
S
at
7 Mo
1
1 Plastering walls d n 10
N N 1/ 0 0
2 and concrete surfaces a 06/ 0
A A 0 % %
2 and double curve cornice y 04/ %
4/
s 26
2
6
T
u
3
Mo e
Prepare and 0
1 n 1 10
apply Silk Vinyl d N N 0 0
2 14/ 2/ 0
Emulsion Paint to a A A % %
3 07/ 0 %
plastered surfaces y
25 8/
s
2
5
1 T
Mo
Cement/ Sand 1 h
1 n 10
backing on masonry d N N u 0 0
2 06/ 0
walls to receive wall a A A 1 % %
4 04/ %
tiles y 6/
26
s 0

78
4/
2
6
W
e
2
Th d
1
1 u 0 10
Tile Fixing to d N N 0 0
2 16/ 6/ 0
Walls a A A % %
5 04/ 0 %
y
26 5/
s
2
6
M
o
3
n
2 Fri
1 0 10
d 02/ N N 0 0
2 Ceiling Finishes 2/ 0
a 01/ A A % %
6 0 %
y 26
2/
s
2
6
T
u
1
e
8 Fri
1 Plastering to 2 10
d 02/ N N 0 0
2 Soffits and Suspended 0/ 0
a 01/ A A % %
7 Slabs 0 %
y 26
1/
s
2
6
M
1
o
Application of 7 Fri
1 n 10
first grade Ceiling Matt d 16/ N N 0 0
2 0 0
Emulsion paint of Soffits a 01/ A A % %
8 2/ %
and Slabs y 26
0
s
2/

79
2
6
F
6 ri
Tu
8 0
1 e 10
Joinery & d N N 4/ 0 0
2 29/ 0
Fittings a A A 1 % %
9 09/ %
y 2/
26
s 2
6
W
e
3
Tu d
0
1 e 2 10
Installation of d N N 0 0
3 29/ 8/ 0
Laboratory worktops a A A % %
0 09/ 1 %
y
26 0/
s
2
6
S
1 at
We
0 0
1 d 10
Installation of d N N 7/ 0 0
3 28/ 0
Blackboards a A A 1 % %
1 10/ %
y 1/
26
s 2
6
W
e
1
d
1 Sat
1 1 10
Installation of d 07/ N N 0 0
3 8/ 0
Kitchen Cabinets a 11/ A A % %
2 1 %
y 26
1/
s
2
6

80
F
1 ri
We
0 2
1 Cafetria d 10
d N N 7/ 0 0
3 Service Counter and 18/ 0
a A A 1 % %
3 shelves 11/ %
y 1/
26
s 2
6
F
ri
7
Sat 0
1 d 10
Shelves in 28/ N N 4/ 0 0
3 a 0
Stores 11/ A A 1 % %
4 y %
26 2/
s
2
6
F
2
ri
6 Tu
1
1 1 e 10
N N 5/ 0 0
3 First Floor d 05/ 0
A A 0 % %
5 a 05/ %
1/
y 26
2
s
7
F
2
ri
2
Fri 0
1 2 10
01/ N N 4/ 0 0
3 Floor Finishes d 0
05/ A A 1 % %
6 a %
26 2/
y
2
s
6
7 T
Fri
1 d h 10
MEP First 01/ N N 0 0
3 a u 0
Fixes 05/ A A % %
7 y 0 %
26
s 7/

81
0
5/
2
6
T
h
7 u
Fri
1 APP water d 0 10
01/ N N 0 0
3 proofing to roof/tank a 7/ 0
05/ A A % %
8 slab y 0 %
26
s 5/
2
6
S
at
5 Tu
2
1 d e 10
Screeding to N N 0/ 0 0
3 a 16/ 0
protect water proofing A A 0 % %
9 y 06/ %
6/
s 26
2
6
T
u
1
e
1 Fri
1 1 10
Cement/ Sand d 01/ N N 0 0
4 2/ 0
Screeding to Floors a 05/ A A % %
0 0 %
y 26
5/
s
2
6
T
1
h
Non Slip 4 Fri
1 u 10
Porcelain Tile d 01/ N N 0 0
4 1 0
Installations to floor and a 05/ A A % %
1 4/ %
Skirtings y 26
0
s
5/

82
2
6
T
h
7 u
Fri
1 Installation of d 0 10
01/ N N 0 0
4 Polished Terrazo and a 7/ 0
05/ A A % %
2 matching skirting y 0 %
26
s 5/
2
6
T
h
2
u
1 Fri
1 Installation of 2 10
d 01/ N N 0 0
4 polished Terrazzo on 1/ 0
a 05/ A A % %
3 floors and skirtings 0 %
y 26
5/
s
2
6
W
e
3
Tu d
0
1 e 0 10
d N N 0 0
4 Wall Finishes 05/ 3/ 0
a A A % %
4 05/ 0 %
y
26 6/
s
2
6
T
7 Th h
1 Plastering wall d u u 10
N N 0 0
4 and concrete surfaces a 14/ 2 0
A A % %
5 and cove cornice y 05/ 1/ %
s 26 0
5/

83
2
6
W
e
3
Tu d
0
1 Prepare and e 0 10
d N N 0 0
4 apply Silk Vinyl 05/ 3/ 0
a A A % %
6 Emulsion Paint 05/ 0 %
y
26 6/
s
2
6
T
h
7 Th u
1 Cement/ Sand d u 2 10
N N 0 0
4 backing on masonry wall a 21/ 8/ 0
A A % %
7 to receive wall tiles y 05/ 0 %
s 26 5/
2
6
T
h
7 Th u
1 d u 2 10
Glazed wall N N 0 0
4 a 14/ 1/ 0
tiling with corner strip A A % %
8 y 05/ 0 %
s 26 5/
2
6
T
7 Th h
1 d u u 10
Tile Fixing to N N 0 0
4 a 21/ 2 0
Walls A A % %
9 y 05/ 8/ %
s 26 0
5/

84
2
6
M
o
1
Tu n
4
1 e 1 10
d N N 0 0
5 Ceiling Finishes 05/ 8/ 0
a A A % %
0 05/ 0 %
y
26 5/
s
2
6
M
o
1
Tu n
4
1 e 1 10
Metal Lathe d N N 0 0
5 05/ 8/ 0
Ceiling a A A % %
1 05/ 0 %
y
26 5/
s
2
6
M
o
1
Tu n
4
1 Plastering e 1 10
d N N 0 0
5 Ceiling Soffits and 05/ 8/ 0
a A A % %
2 suspended slab soffit 05/ 0 %
y
26 5/
s
2
6
M
7 Mo o
1 Application of d n n 10
N N 0 0
5 first grade Ceiling Matt a 11/ 1 0
A A % %
3 Emulsion y 05/ 8/ %
s 26 0
5/

85
2
6
T
h
3 Tu u
1 d e 0 10
Ramp and N N 0 0
5 a 05/ 7/ 0
Staircase Finishes A A % %
4 y 05/ 0 %
s 26 5/
2
6
W
e
2 Tu d
Polished
1 d e 0 10
Terrazo to ramp floor N N 0 0
5 a 05/ 6/ 0
and external steps , A A % %
5 y 05/ 0 %
landing
s 26 5/
2
6
F
ri
4 Tu
Internal lime 0
1 d e 10
pastering of landing N N 8/ 0 0
5 a 05/ 0
,sloping soffits of A A 0 % %
6 y 05/ %
staircase 5/
s 26
2
6
F
ri
4 Tu
0
1 Application of d e 10
N N 8/ 0 0
5 silk Vynl emulsion paint a 05/ 0
A A 0 % %
7 to the above y 05/ %
5/
s 26
2
6

86
T
h
3 Tu u
Polished
1 d e 0 10
Terrazo to N N 0 0
5 a 05/ 7/ 0
Landing,treads , risers A A % %
8 y 05/ 0 %
and skirting
s 26 5/
2
6
F
ri
7
Fri 1
1 d 10
Joinery & 04/ N N 1/ 0 0
5 a 0
Fittings 12/ A A 1 % %
9 y %
26 2/
s
2
6
F
ri
7
Fri 1
1 d 10
Placement of 04/ N N 1/ 0 0
6 a 0
signages 12/ A A 1 % %
0 y %
26 2/
s
2
6
6 M
1 o
8. Tu n
1 5 e 0 10
N N 0 0
6 Second Floor 6 04/ 2/ 0
A A % %
1 d 03/ 1 %
a 25 1/
y 2
s 6
1 4 Tu T 10
N N 0 0
6 Floor Finishes 8 e h 0
A A % %
2 6. 04/ u %

87
1 03/ 2
9 25 5/
d 0
a 6/
y 2
s 6
T
h
7 Th u
1 d u 1 10
MEP First N N 0 0
6 a 07/ 4/ 0
Fixes A A % %
3 y 05/ 0 %
s 26 5/
2
6
T
h
7 Th u
1 d u 1 10
Screeding to N N 0 0
6 a 07/ 4/ 0
Floors A A % %
4 y 05/ 0 %
s 26 5/
2
6
T
h
5 u
Sat
1 APP Water d 2 10
20/ N N 0 0
6 proofing to tank and a 5/ 0
06/ A A % %
5 ramp slab y 0 %
26
s 6/
2
6
1 T
1 Cement/Sand Th 10
4 N N h 0 0
6 screeding to protect u 0
d A A u % %
6 waterproofing 14/ %
a 2

88
y 05/ 8/
s 26 0
5/
2
6
T
h
7 Th u
1 Cement/Sand d u 1 10
N N 0 0
6 screeding to receive a 04/ 1/ 0
A A % %
7 floor tiles y 06/ 0 %
s 26 6/
2
6
T
h
2
Th u
1
1 Installation of u 0 10
d N N 0 0
6 polished Terrazzo on 14/ 4/ 0
a A A % %
8 floors and skirtings 05/ 0 %
y
26 6/
s
2
6
T
u
1
Tu e
4
1 e 1 10
Installation of d N N 0 0
6 04/ 8/ 0
non slip porcelain tiles a A A % %
9 03/ 0 %
y
25 3/
s
2
5
Th T
1
1 u h 10
4 N N 0 0
7 Wall Finishes 28/ u 0
d A A % %
0 05/ 1 %
a
26 1/

89
y 0
s 6/
2
6
T
h
7 Th u
plastering of
1 d u 0 10
wals and concrete N N 0 0
7 a 28/ 4/ 0
surfaces and cove A A % %
1 y 05/ 0 %
cornices
s 26 6/
2
6
T
h
7 Th u
1 Application of d u 1 10
N N 0 0
7 Silk Emulsion Paint to a 04/ 1/ 0
A A % %
2 plastered surfaces y 06/ 0 %
s 26 6/
2
6
T
h
7 Th u
1 Cement Sand d u 0 10
N N 0 0
7 Backing to on Masonry a 28/ 4/ 0
A A % %
3 wall to receive tile y 05/ 0 %
s 26 6/
2
6
T
7 Th
h
1 d u 10
Tile Fixing to N N u 0 0
7 a 04/ 0
Walls A A 1 % %
4 y 06/ %
1/
s 26
0

90
6/
2
6
T
3
h
4
u
1. Fri
1 2 10
5 27/ N N 0 0
7 Ceiling Finishes 8/ 0
d 06/ A A % %
5 0 %
a 25
5/
y
2
s
6
T
h
1
u
4 Fri
1 Metal Lathe 0 10
d 24/ N N 0 0
7 Ceiling on softwood 7/ 0
a 04/ A A % %
6 ceiling joists 0 %
y 26
5/
s
2
6
W
e
1
We d
4
1 Plastering d 2 10
d N N 0 0
7 Ceiling soffits and 15/ 9/ 0
a A A % %
7 suspended slab soffits 04/ 0 %
y
26 4/
s
2
6
W
7 We e
1 d d d 10
Installation of N N 0 0
7 a 22/ 2 0
cement Board Ceiling A A % %
8 y 04/ 9/ %
s 26 0
4/

91
2
6
T
h
3
We u
0
1 Application of d 2 10
d N N 0 0
7 first grade Ceiling Mattt 29/ 8/ 0
a A A % %
9 Emulsion paint 04/ 0 %
y
26 5/
s
2
6
M
o
3 n
Fri
1 d 0 10
Ramp and 04/ N N 0 0
8 a 7/ 0
Staircase Finishes 07/ A A % %
0 y 0 %
25
s 7/
2
5
T
u
2 e
Polished Sat
1 d 0 10
Terrazo to ramp floor 28/ N N 0 0
8 a 3/ 0
and external steps , 02/ A A % %
1 y 0 %
landing 26
s 3/
2
6
M
Cement/Sand o
1 Sat
1 Plastering to ramp n 10
d 28/ N N 0 0
8 slopping soffits , landing 0 0
a 02/ A A % %
2 soffits ,edges of ramp 2/ %
y 26
and landing 0
3/

92
2
6
M
o
3 n
Polishhed Fri
1 d 3 10
Terrazo to 27/ N N 0 0
8 a 0/ 0
Landing,treads , risers 06/ A A % %
3 y 0 %
and skirting 25
s 6/
2
5
5 S
1 a
6. Tu t
1 8 e 2 10
Joinery & N N 0 0
8 8 04/ 5/ 0
Fittings A A % %
4 d 03/ 0 %
a 25 7/
y 2
s 6
T
u
7 Tu e
1 Pantry d e 1 10
N N 0 0
8 Worktops and Vanity a 04/ 1/ 0
A A % %
5 Worktops y 03/ 0 %
s 25 3/
2
5
S
4 at
Th
5 2
1 u 10
Installation of d N N 5/ 0 0
8 11/ 0
Concrete Planter Boxes a A A 0 % %
6 06/ %
y 7/
26
s 2
6
93
T
u
5
M e
9
1 on 0 10
DOORS & d N N 0 0
8 05/ 1/ 0
IRONMONGERY a A A % %
7 10/ 1 %
y
26 2/
s
2
6
S
a
1
M t
4
1 on 1 10
d N N 0 0
8 Ground Floor 05/ 7/ 0
a A A % %
8 10/ 1 %
y
26 0/
s
2
6
S
a
1
M t
4
1 on 1 10
Aluminum d N N 0 0
8 05/ 7/ 0
Doors a A A % %
9 10/ 1 %
y
26 0/
s
2
6
S
1 at
Installation of Mo
4 1
1 Purpose made n 10
d N N 7/ 0 0
9 Aluminium door 05/ 0
a A A 1 % %
0 sections for double 10/ %
y 0/
glazing 26
s 2
6

94
T
1 u
3 M e
1 7 on 1 10
Timber Framed N N 0 0
9 d 05/ 6/ 0
Hardwood doors A A % %
1 a 10/ 0 %
y 26 2/
s 2
7
S
1 at
Mo
4 1
1 Installation of n 10
d N N 7/ 0 0
9 Door Frames, Shutters 05/ 0
a A A 1 % %
2 and Iron Mongery 10/ %
y 0/
26
s 2
6
T
u
3 e
Application of Fri
1 d 1 10
touch up primer,one 12/ N N 0 0
9 a 6/ 0
undercoat;two finishing 02/ A A % %
3 y 0 %
coatsof varnish 27
s 2/
2
7
W
e
3 Mo d
1 Fixing d n 0 10
N N 0 0
9 associated iron mongery a 05/ 7/ 0
A A % %
4 to hardwood y 10/ 1 %
s 26 0/
2
6

95
W
1 e
5 M d
1 3 on 0 10
N N 0 0
9 First Floor d 05/ 3/ 0
A A % %
5 a 10/ 0 %
y 26 3/
s 2
7
S
a
1
M t
4
1 on 1 10
Aluminum d N N 0 0
9 05/ 7/ 0
Doors a A A % %
6 10/ 1 %
y
26 0/
s
2
6
S
1 at
Installation of Mo
4 1
1 Purpose made n 10
d N N 7/ 0 0
9 Aluminium door 05/ 0
a A A 1 % %
7 sections for double 10/ %
y 0/
glazing 26
s 2
6
W
1 e
5 M d
1 3 on 0 10
Timber Framed N N 0 0
9 d 05/ 3/ 0
Hardwood doors A A % %
8 a 10/ 0 %
y 26 3/
s 2
7

96
S
1 at
Mo
4 1
1 Installation of n 10
d N N 7/ 0 0
9 Door Frames, Shutters 05/ 0
a A A 1 % %
9 and Iron Mongery 10/ %
y 0/
26
s 2
6
W
e
1
d
Application of 9 Fri
2 0 10
touch up primer,one d 12/ N N 0 0
0 3/ 0
undercoat;two finishing a 02/ A A % %
0 0 %
coatsof varnish y 27
3/
s
2
7
W
e
3 Mo d
2 Fixing d n 0 10
N N 0 0
0 associated iron mongery a 05/ 7/ 0
A A % %
1 to hardwood y 10/ 1 %
s 26 0/
2
6
T
1 u
3 M e
2 7 on 1 10
N N 0 0
0 Second Floor d 05/ 6/ 0
A A % %
2 a 10/ 0 %
y 26 2/
s 2
7

97
T
u
5
M e
2
2 on 2 10
Aluminum d N N 0 0
0 05/ 4/ 0
Doors a A A % %
3 10/ 1 %
y
26 1/
s
2
6
T
u
5
Installation of Mo e
2
2 Purpose made n 2 10
d N N 0 0
0 Aluminium door 05/ 4/ 0
a A A % %
4 sections for double 10/ 1 %
y
glazing 26 1/
s
2
6
T
1 u
3 M e
2 7 on 1 10
Timber Framed N N 0 0
0 d 05/ 6/ 0
Hardwood doors A A % %
5 a 10/ 0 %
y 26 2/
s 2
7
S
1 at
Mo
4 1
2 Installation of n 10
d N N 7/ 0 0
0 Door Frames, Shutters 05/ 0
a A A 1 % %
6 and Iron Mongery 10/ %
y 0/
26
s 2
6

98
T
u
3 e
Application of Fri
2 d 1 10
touch up primer,one 12/ N N 0 0
0 a 6/ 0
undercoat;two finishing 02/ A A % %
7 y 0 %
coatsof varnish 27
s 2/
2
7
W
e
3 Mo d
2 Fixing d n 0 10
N N 0 0
0 associated iron mongery a 05/ 7/ 0
A A % %
8 to hardwood y 10/ 1 %
s 26 0/
2
6
S
1
a
4.
M t
1
2 STAIRCASE on 3 10
3 N N 0 0
0 BALUSTRADING 18/ 0/ 0
d A A % %
9 AND HANDRAIL 05/ 0 %
a
26 5/
y
2
s
6
S
at
7 Mo
2
2 d n 10
N N 3/ 0 0
1 Ground Floor a 18/ 0
A A 0 % %
0 y 05/ %
5/
s 26
2
6

99
S
at
7
Sat 3
2 d 10
23/ N N 0/ 0 0
1 First Floor a 0
05/ A A 0 % %
1 y %
26 5/
s
2
6
M
1 o
8 W n
2 0 ed 3 10
EXTERNAL N N 0 0
1 d 03/ 0/ 0
WORKS A A % %
2 a 07/ 1 %
y 24 2/
s 2
4
W
e
1
W d
5
2 ed 1 10
Site Clearance d N N 0 0
1 03/ 7/ 0
and Earthworks a A A % %
3 07/ 0 %
y
24 7/
s
2
4
T
u
7 We e
2 d d 0 10
N N 0 0
1 Cut Down Trees a 03/ 9/ 0
A A % %
4 y 07/ 0 %
s 24 7/
2
4

100
F
ri
7
Fri 1
2 d 10
Mass 12/ N N 9/ 0 0
1 a 0
Excavations 07/ A A 0 % %
5 y %
24 7/
s
2
4
F
1 ri
4 Fri 2
2 10
Load and Cart d 12/ N N 6/ 0 0
1 0
away Surplus Soil Heaps a 07/ A A 0 % %
6 %
y 24 7/
s 2
4
S
at
5 Tu
3
2 Import and d e 10
N N 1/ 0 0
1 Compact Approved a 27/ 0
A A 0 % %
7 marram fill y 08/ %
8/
s 24
2
4
M
1 o
3 M n
2 5 on 0 10
Agromachinery N N 0 0
1 d 24/ 4/ 0
Shed A A % %
8 a 06/ 1 %
y 24 1/
s 2
4
1 S
2 Mo 10
4 N N at 0 0
1 Substructure n 0
d A A 0 % %
9 24/ %
a 6/

101
y 06/ 0
s 24 7/
2
4
T
h
3
We u
0
2 d 1 10
d N N 0 0
2 Super Structure 14/ 2/ 0
a A A % %
0 08/ 0 %
y
24 9/
s
2
4
M
o
3
Th n
8
2 u 2 10
d N N 0 0
2 Roofing 12/ 1/ 0
a A A % %
1 09/ 1 %
y
24 0/
s
2
4
M
o
2
Tu n
1
2 e 2 10
d N N 0 0
2 Finishes 05/ 5/ 0
a A A % %
2 11/ 1 %
y
24 1/
s
2
4
9 M
M
2 o
2 on 10
Underground d N N n 0 0
2 15/ 0
Water Tank a A A 1 % %
3 07/ %
y 4/
24
s 1

102
0/
2
4
S
1 at
Mo
4 2
2 n 10
d N N 7/ 0 0
2 Pit excavation 15/ 0
a A A 0 % %
4 07/ %
y 7/
24
s 2
4
T
u
2
e
3 Sat
2 2 10
d 27/ N N 0 0
2 RC framing 0/ 0
a 07/ A A % %
5 0 %
y 24
8/
s
2
4
M
o
3
Tu n
5
2 e 2 10
Concrete d N N 0 0
2 20/ 3/ 0
Casting a A A % %
6 08/ 0 %
y
24 9/
s
2
4
M
2
Mo o
0
2 n n 10
d N N 0 0
2 Finishes 23/ 1 0
a A A % %
7 09/ 4/ %
y
24 1
s
0/

103
2
4
F
7 ri
M
Power House 6 2
2 on 10
,Solid concrete d N N 5/ 0 0
2 12/ 0
Boundary wall & Gate a A A 1 % %
8 10/ %
House y 2/
26
s 2
6
T
u
5
Mo e
9
2 Setting out n 0 10
d N N 0 0
2 for Power House and 12/ 8/ 0
a A A % %
9 Gate House 10/ 1 %
y
26 2/
s
2
6
T
u
2
Mo e
3
2 n 0 10
Installation of d N N 0 0
3 12/ 3/ 0
Mild Steel Gates a A A % %
0 10/ 1 %
y
26 1/
s
2
6
S
3 at
Mo
5 1
2 Construction n 10
d N N 4/ 0 0
3 of Solid concrete block 12/ 0
a A A 1 % %
1 boundary wall 10/ %
y 1/
26
s 2
6

104
W
e
5
Mo d
3
2 Construction n 0 10
d N N 0 0
3 of Gate House and 12/ 2/ 0
a A A % %
2 Power House 10/ 1 %
y
26 2/
s
2
6
S
a
5
M t
6
2 on 0 10
Storm Water d N N 0 0
3 12/ 5/ 0
Drainage a A A % %
3 10/ 1 %
y
26 2/
s
2
6
S
1 at
Mo
4 2
2 n 10
Open Storm d N N 4/ 0 0
3 12/ 0
Water Channels a A A 1 % %
4 10/ %
y 0/
26
s 2
6
S
1 at
4 Sat 0
2 10
Storm water d 24/ N N 7/ 0 0
3 0
drainage pipe a 10/ A A 1 % %
5 %
y 26 1/
s 2
6
2 1 S 10
Inspection Sat N N 0 0
3 4 at 0
Chambers 07/ A A % %
6 d 2 %

105
a 11/ 1/
y 26 1
s 1/
2
6
S
1 at
4 Sat 0
2 10
Culvert d 21/ N N 5/ 0 0
3 0
Crossings a 11/ A A 1 % %
7 %
y 26 2/
s 2
6
1
S
0
a
3
W t
8.
2 ed 2 10
5 N N 0 0
3 Landscaping 03/ 4/ 0
6 A A % %
8 07/ 0 %
d
24 4/
a
2
y
7
s
S
at
7
Remove existing Sat 2
2 d 10
ground weeds, roots, 17/ N N 4/ 0 0
3 a 0
spread and level 04/ A A 0 % %
9 y %
imported soil 27 4/
s
2
7
T
7 We
u
2 d d 10
Construction of N N e 0 0
4 a 03/ 0
Planters A A 0 % %
0 y 07/ %
9/
s 24
0

106
7/
2
4
W
e
1
Th d
4
2 Plant selected u 0 10
d N N 0 0
4 and approved shrubs and 25/ 8/ 0
a A A % %
1 flowering plants 06/ 0 %
y
26 7/
s
2
6
F
6 ri
We
0 3
2 d 10
Plant onamental d N N 0/ 0 0
4 03/ 0
and fruit trees a A A 0 % %
2 07/ %
y 8/
24
s 2
4
W
1 e
0 Tu d
2 1 e 2 10
N N 0 0
4 Other works d 15/ 3/ 0
A A % %
3 a 09/ 1 %
y 26 2/
s 2
6
M
7 Tu o
2 d e n 10
Giraffee N N 0 0
4 a 15/ 2 0
Sculpture A A % %
4 y 09/ 1/ %
s 26 0
9/

107
2
6
T
h
6
Tu u
0
2 e 1 10
Incinerator d N N 0 0
4 15/ 2/ 0
House a A A % %
5 09/ 1 %
y
26 1/
s
2
6
T
h
6
Tu u
0
2 e 1 10
d N N 0 0
4 Gas Cages 15/ 2/ 0
a A A % %
6 09/ 1 %
y
26 1/
s
2
6
1 W
3 e
0. Tu d
2 0 e 2 10
N N 0 0
4 Paved Walkways 6 15/ 0/ 0
A A % %
7 d 09/ 0 %
a 26 1/
y 2
s 7
W
3
Tu e
Stabilize murram 0
2 e d 10
bed laid into falls and d N N 0 0
4 15/ 1 0
camber, roll and a A A % %
8 09/ 4/ %
compact t0 95%MDD y
26 1
s
0/

108
2
6
T
u
3
Mo e
0
2 n 0 10
Laying of Heavy d N N 0 0
4 07/ 5/ 0
duty paving blocks a A A % %
9 12/ 0 %
y
26 1/
s
2
7
W
e
1
Tu d
5
2 Laying and e 2 10
d N N 0 0
5 Splaying kerbs decorated 05/ 0/ 0
a A A % %
0 to 200-300mm girth 01/ 0 %
y
27 1/
s
2
7
M
3
o
5
M n
7
2 on 1 10
MECHANICAL d N N 0 0
5 02/ 8/ 0
INSTALLATION a A A % %
1 02/ 0 %
y
26 1/
s
2
?
7
T
9
M h
0
2 on u 10
Cold and Hot d N N 0 0
5 02/ 3 0
water installation a A A % %
2 02/ 0/ %
y
26 0
s
4/

109
2
6
M
o
1
Mo n
5
2 Installation of n 1 10
d N N 0 0
5 Compact flat plate solar 04/ 8/ 0
a A A % %
3 water heater 01/ 0 %
y
27 1/
s
2
7
W
e
3
Mo d
1
2 n 0 10
Waste Water d N N 0 0
5 02/ 4/ 0
drainage installation a A A % %
4 02/ 0 %
y
26 3/
s
2
6
T
u
3
Mo e
0
2 Main Supply n 0 10
d N N 0 0
5 including Excavations to 02/ 3/ 0
a A A % %
5 all Floors 02/ 0 %
y
26 3/
s
2
6
T
3
Mo u
0
2 Manhole and n e 10
d N N 0 0
5 Septic Tank 02/ 0 0
a A A % %
6 Construction 02/ 3/ %
y
26 0
s
3/

110
2
6
S
at
7 Mo
0
2 Testing, d n 10
N N 7/ 0 0
5 Inspection and a 02/ 0
A A 0 % %
7 Commissioning y 02/ %
2/
s 26
2
6
M
o
9
Th n
7
2 Plumbing - u 1 10
d N N 0 0
5 Distribution & 07/ 0/ 0
a A A % %
8 Drainage 05/ 0 %
y
26 8/
s
2
6
F
3 ri
Th
0 0
2 u 10
Water Supply d N N 5/ 0 0
5 07/ 0
and Distribution piping a A A 0 % %
9 05/ %
y 6/
26
s 2
6
S
3 at
0 Fri 0
2 10
Installation and d 05/ N N 4/ 0 0
6 0
sanitary fittings a 06/ A A 0 % %
0 %
y 26 7/
s 2
6

111
M
o
7 Mo n
2 Testing, d n 1 10
N N 0 0
6 Inspection and a 03/ 0/ 0
A A % %
1 Commissioning y 08/ 0 %
s 26 8/
2
6
W
1
e
5
W d
0
2 ed 1 10
d N N 0 0
6 Fire Fighting 17/ 1/ 0
a A A % %
2 06/ 1 %
y
26 1/
s
2
?
6
T
h
3
We u
0
2 Installation of d 1 10
d N N 0 0
6 Fire Fighting Class B 17/ 6/ 0
a A A % %
3 Galvanised Iron piping 06/ 0 %
y
26 7/
s
2
6
T
h
3
We u
0
2 d 1 10
Installation of d N N 0 0
6 17/ 6/ 0
Hose Reels a A A % %
4 06/ 0 %
y
26 7/
s
2
6

112
T
h
7 Th u
2 d u 1 10
Installation of N N 0 0
6 a 09/ 6/ 0
portable extinguishers A A % %
5 y 07/ 0 %
s 26 7/
2
6
T
h
3
We u
0
2 Installation of d 1 10
d N N 0 0
6 fire suppression system 17/ 6/ 0
a A A % %
6 in the server room 06/ 0 %
y
26 7/
s
2
6
F
6 ri
We
Installation of 0 1
2 d 10
fire hydrants, fire pumps d N N 4/ 0 0
6 17/ 0
and general fire fighting a A A 0 % %
7 06/ %
accessories y 8/
26
s 2
6
M
o
3
n
2 Fri
2 1 10
installation of d 10/ N N 0 0
6 0/ 0
fire alarm systems a 07/ A A % %
8 0 %
y 26
8/
s
2
6

113
M
o
7 Mo n
2 Testing, d n 1 10
N N 0 0
6 Inspection and a 03/ 0/ 0
A A % %
9 Commissioning y 08/ 0 %
s 26 8/
2
6
S
a
9
W t
0
2 Mechanical ed 1 10
d N N 0 0
7 Ventilation and Air 17/ 2/ 0
a A A % %
0 Conditioning 06/ 0 %
y
26 9/
s
2
6
W
e
1
We d
5
2 Installation of d 0 10
d N N 0 0
7 VRF Air Conditioning 17/ 1/ 0
a A A % %
1 ,fittings and pipes 06/ 0 %
y
26 7/
s
2
6
S
9 at
We
0 1
2 d 10
Installation d N N 2/ 0 0
7 17/ 0
toilet extraction system a A A 0 % %
2 06/ %
y 9/
26
s 2
6

114
S
9 at
We
0 1
2 Installation d 10
d N N 2/ 0 0
7 Kitchen extraction 17/ 0
a A A 0 % %
3 system 06/ %
y 9/
26
s 2
6
F
ri
3 We
1
2 Explosion d d 10
N N 9/ 0 0
7 proofed gas piping a 17/ 0
A A 0 % %
4 system for Laboratories y 06/ %
6/
s 26
2
6
W
e
8 We d
2 Installation of d d 2 10
N N 0 0
7 Laboratory Extarction a 17/ 4/ 0
A A % %
5 system y 06/ 0 %
s 26 6/
2
6
M
o
7 Mo n
Cleaning,
2 d n 1 10
testing, balancing and N N 0 0
7 a 03/ 0/ 0
commissioning of A A % %
6 y 08/ 0 %
MVAC System
s 26 8/
2
6
2 1 M S 10
ELECTRICAL & N N 0 0
7 2 on a 0
ICT INSTALLATION A A % %
7 0 10/ t %

115
d 08/ 0
a 26 5/
y 1
s 2/
? 2
6
T
u
3
M e
0
2 on 0 10
Main Supply and d N N 0 0
7 10/ 8/ 0
Reticulation a A A % %
8 08/ 0 %
y
26 9/
s
2
6
T
u
3
Mo e
0
2 Mains Supply - n 0 10
d N N 0 0
7 Service Subscriptions for 10/ 8/ 0
a A A % %
9 power 08/ 0 %
y
26 9/
s
2
6
F
1 ri
Mo
Installation of 2 2
2 n 10
Generator as specified in d N N 1/ 0 0
8 10/ 0
contract,switch gears, a A A 0 % %
0 08/ %
stabiliser y 8/
26
s 2
6
6 Mo S
2 d n at 10
Installation of N N 0 0
8 a 10/ 1 0
capacitor bank A A % %
1 y 08/ 5/ %
s 26 0

116
8/
2
6
T
u
3
Mo e
0
2 Testing, n 0 10
d N N 0 0
8 Inspection and 10/ 8/ 0
a A A % %
2 Commissioning 08/ 0 %
y
26 9/
s
2
6
2 T
1 h
8. M u
2 3 on 0 10
Power N N 0 0
8 8 05/ 6/ 0
Distrubution A A % %
3 d 01/ 0 %
a 26 8/
y 2
s 6
F
1
ri
5
Fri 1
2 0 10
Installation of 16/ N N 2/ 0 0
8 d 0
Second Fixes 01/ A A 0 % %
4 a %
26 6/
y
2
s
6
1 M
Installation of 8 o
Sat
2 third fixes - Light 0 n 10
13/ N N 0 0
8 Fittings, Switches, d 0 0
06/ A A % %
5 Socketcs, Floor a 7/ %
26
Boxes,hand dryers y 1
s 2/

117
2
6
M
o
3
n
0 Sat
2 0 10
Installation of d 07/ N N 0 0
8 7/ 0
Security lighting a 11/ A A % %
6 1 %
y 26
2/
s
2
6
T
u
3
Mo e
0
2 Testing, n 0 10
d N N 0 0
8 Inspection and 07/ 5/ 0
a A A % %
7 Commissioning 12/ 0 %
y
26 1/
s
2
7
F
3
ri
2
Fri 0
2 8 10
Solar System 16/ N N 4/ 0 0
8 d 0
installation 01/ A A 1 % %
8 a %
26 2/
y
2
s
6
F
1
ri
5
Fri 1
2 0 10
Installation of 16/ N N 2/ 0 0
8 d 0
mounting frame 01/ A A 0 % %
9 a %
26 6/
y
2
s
6

118
F
1
ri
7
Installation of Sat 0
2 8 10
solar charge controllers 13/ N N 4/ 0 0
9 d 0
,battery bank and 06/ A A 1 % %
0 a %
inverter 26 2/
y
2
s
6
F
3 ri
Th
0 0
2 u 10
Installation of d N N 4/ 0 0
9 05/ 0
solar modules a A A 1 % %
1 11/ %
y 2/
26
s 2
6
M
o
8 Mo n
2 Providing d n 1 10
N N 0 0
9 Lockable Battery ruck a 05/ 2/ 0
A A % %
2 for system y 01/ 0 %
s 26 1/
2
6
M
o
3
n
0 Fri
2 Testing, 0 10
d 04/ N N 0 0
9 Inspection and 4/ 0
a 12/ A A % %
3 Commissioning 0 %
y 26
1/
s
2
7
2 1 M T 10
Lightening N N 0 0
9 5 on u 0
Protection Scheme A A % %
4 1. 10/ e %

119
7 08/ 0
5 26 5/
d 0
a 1/
y 2
s 7
W
e
6
Mo d
Installation 0
2 n 0 10
copper tape complete d N N 0 0
9 10/ 7/ 0
with all fixing a A A % %
5 08/ 1 %
accessories y
26 0/
s
2
6
S
at
7 Mo
1
2 Installation of d n 10
N N 5/ 0 0
9 earthing burried in the a 10/ 0
A A 0 % %
6 ground y 08/ %
8/
s 26
2
6
T
u
3
Mo e
0
2 Testing, n 0 10
d N N 0 0
9 Inspection and 07/ 5/ 0
a A A % %
7 Commissioning 12/ 0 %
y
26 1/
s
2
7
1 M T
2 8 on u 10
N N 0 0
9 CCTV 0 10/ e 0
A A % %
8 d 08/ 0 %
a 26 2/

120
y 0
s 2/
2
7
T
1 u
8 Mo e
2 0 n 0 10
N N 0 0
9 Wiring d 10/ 2/ 0
A A % %
9 a 08/ 0 %
y 26 2/
s 2
7
T
u
7 Tu e
3 d e 0 10
Installation of N N 0 0
0 a 26/ 2/ 0
control panels A A % %
0 y 01/ 0 %
s 27 2/
2
7
M
o
1
n
5 Sat
3 Installation of 0 10
d 21/ N N 0 0
0 third fixes - Cameras, 7/ 0
a 11/ A A % %
1 TV Screens 1 %
y 26
2/
s
2
6
2 F
Tu
5 ri
3 Programming e 10
d N N 2 0 0
0 ,Testing, Inspection and 29/ 0
a A A 2/ % %
2 Commissioning 12/ %
y 0
26
s 1/

121
2
7
W
1
e
5
W d
0
3 ed 1 10
d N N 0 0
0 Voice and Data 17/ 1/ 0
a A A % %
3 06/ 1 %
y
26 1/
s
2
?
6
T
1 u
2 We e
3 Installation of 0 d 0 10
N N 0 0
0 trunking system and d 07/ 2/ 0
A A % %
4 wiring a 10/ 0 %
y 26 2/
s 2
7
T
h
9
Mo u
0
3 n 0 10
d N N 0 0
0 Wiring 10/ 5/ 0
a A A % %
5 08/ 1 %
y
26 1/
s
2
6
F
1 ri
We
0 2
3 Installation of d 10
d N N 6/ 0 0
0 Acces Control system 17/ 0
a A A 0 % %
6 server computer 06/ %
y 6/
26
s 2
6
122
S
4 at
We
Installation of 0 2
3 d 10
Public Address d N N 5/ 0 0
0 17/ 0
Equipment and a A A 0 % %
7 06/ %
necessary accessories y 7/
26
s 2
6
T
h
3
We u
0
3 d 1 10
Installation of IP d N N 0 0
0 17/ 6/ 0
Telephones a A A % %
8 06/ 0 %
y
26 7/
s
2
6
S
1 at
Installation of
4 Sat 2
3 free standing network 10
d 11/ N N 5/ 0 0
0 cabinets, Network 0
a 07/ A A 0 % %
9 Switches ,data outlet %
y 26 7/
points
s 2
6
M
o
3
n
0 Sat
3 0 10
Installation of d 07/ N N 0 0
1 7/ 0
Remote Monitoring Unit a 11/ A A % %
0 1 %
y 26
2/
s
2
6
3 1 Tu F 10
N N 0 0
1 0 e ri 0
Labelling,Testing, A A % %
1 d 12/ 2 %

123
Certification,Documenta a 01/ 2/
tion and Commissioning y 27 0
s 1/
2
7
2 M
4 o
0. W n
3 Installation of 9 ed 0 10
N N 0 0
1 Interactive 4 17/ 8/ 0
A A % %
2 Presentation System d 06/ 0 %
a 26 2/
y 2
s 7
S
1 at
We
8 0
3 d 10
d N N 4/ 0 0
1 Wiring 17/ 0
a A A 0 % %
3 06/ %
y 7/
26
s 2
6
T
u
3
Mo e
7
3 Installation of n 0 10
d N N 0 0
1 Touch Smart Screens in 28/ 2/ 0
a A A % %
4 laboratories 12/ 0 %
y
26 2/
s
2
7
3 T
Mo
0 u
3 Installation of n 10
d N N e 0 0
1 atleast 1 GBPS speed 19/ 0
a A A 1 % %
5 dedcated Router 10/ %
y 7/
26
s 1

124
1/
2
6
T
h
3
Tu u
Installation of 9
3 e 2 10
Projector lifts and d N N 0 0
1 22/ 8/ 0
Projectors in lecture a A A % %
6 12/ 0 %
rooms y
26 1/
s
2
7
T
h
8 Th u
3 d u 2 10
Fixing 100 inch N N 0 0
1 a 21/ 8/ 0
whiteboards A A % %
7 y 01/ 0 %
s 27 1/
2
7
W
e
3 Mo d
3 d n 2 10
Labelling,Testing, N N 0 0
1 a 22/ 4/ 0
Certification,Documenta A A % %
8 y 02/ 0 %
tion and Commissioning
s 27 2/
2
7
3 M
8 M o
3 Installation of 5. on n 10
N N 0 0
1 Conference 8 10/ 2 0
A A % %
9 Microphone System 1 11/ 3/ %
d 25 1
a 1/

125
y 2
s 6
M
o
9
Th n
0
3 u 0 10
d N N 0 0
2 Wiring 08/ 4/ 0
a A A % %
0 10/ 0 %
y
26 1/
s
2
7
T
h
9
Mo u
0
3 n 0 10
Mounting d N N 0 0
2 10/ 5/ 0
Speakers a A A % %
1 11/ 0 %
y
25 2/
s
2
6
W
e
1
Mo d
0
3 n 1 10
Installation of d N N 0 0
2 10/ 9/ 0
Production Unit a A A % %
2 11/ 1 %
y
25 1/
s
2
5
M
3
o
Installation of 0 Sat
3 n 10
60W performance d 07/ N N 0 0
2 0 0
Digital Mixer power a 11/ A A % %
3 7/ %
Amplifier y 26
1
s
2/

126
2
6
T
h
1
u
4 Fri
3 Installation of 2 10
d 15/ N N 0 0
2 projector with in built 8/ 0
a 01/ A A % %
4 speakers 0 %
y 27
1/
s
2
7
T
h
Th u
1
3 u 2 10
Testing and d N N 0 0
2 28/ 8/ 0
Commissioning a A A % %
5 01/ 0 %
y
27 1/
2
7
F
1 ri
Th
6 1
3 u 10
Door Access d N N 2/ 0 0
2 28/ 0
Control System a A A 0 % %
6 01/ %
y 2/
27
s 2
7
F
3 ri
5 Sat 1
3 10
d 07/ N N 1/ 0 0
2 Wiring 0
a 11/ A A 1 % %
7 %
y 26 2/
s 2
6

127
T
u
2
Th e
7
3 u 2 10
Installation of d N N 0 0
2 28/ 3/ 0
control panel a A A % %
8 01/ 0 %
y
27 2/
s
2
7
S
2 at
Th
4 2
3 Door Access u 10
d N N 0/ 0 0
2 Control System Stand 28/ 0
a A A 0 % %
9 alone 01/ %
y 2/
27
s 2
7
F
1 ri
We
7 2
3 Testing, d 10
d N N 6/ 0 0
3 Inspection and 10/ 0
a A A 0 % %
0 Commissioning 02/ %
y 2/
27
s 2
7
S
a
5
t
8 Fri
3 2 10
d 26/ N N 0 0
3 SITE HANDOVER 4/ 0
a 02/ A A % %
1 0 %
y 27
4/
s
2
7
3 1 W 10
Site Inspection and Fri N N 0 0
3 9 e 0
Snagging 26/ A A % %
2 d d %

128
a 02/ 1
y 27 7/
s 0
3/
2
7
W
e
9 Mo d
3 d n 1 10
Desmantling N N 0 0
3 a 01/ 0/ 0
Temporaray Structures A A % %
3 y 03/ 0 %
s 27 3/
2
7
S
1 at
We
8 2
3 d 10
Site Cleaning and d N N 7/ 0 0
3 10/ 0
cart away rubbish a A A 0 % %
4 03/ %
y 3/
27
s 2
7
T
u
2 e
Sat
3 d 3 10
User Training and 27/ N N 0 0
3 a 0/ 0
Workshops 03/ A A % %
5 y 0 %
27
s 3/
2
7
W
1 Sat
3 Issuance of e 10
1 27/ N N 0 0
3 operating and d 0
d 03/ A A % %
6 maintenace Manual 0 %
a 27
7/

129
y 0
s 4/
2
7
T
h
8 We u
3 d d 1 10
Keys Registry and N N 0 0
3 a 07/ 5/ 0
Handover A A % %
7 y 04/ 0 %
s 27 4/
2
7
S
at
9 Th
2
3 d u 10
N N 4/ 0 0
3 As Built Drawings a 15/ 0
A A 0 % %
8 y 04/ %
4/
s 27
2
7
S
a
0 t
Sat
3 d 2 10
START OF DEFECTS 24/ N N 0 0
3 a 4/ 0
LIABILITY PERIOD 04/ A A % %
9 y 0 %
27
s 4/
2
7
33
80 10 70
6 79 0
% % %

130
131
132

You might also like