3)
Capaci-Meter
A Boldport Project by
Jez Siddons, Stephen Bernhoeft and Boldport.
Page 1 of 9
Capaci-Meter Project - Brief Assembly Guide By Jez Siddons, December 2018 (Rev 0.3)
Note that this list is not necessarily the assembly sequence, for example solder the chip sockets
before inserting the chips.
Capacitors
C1, C2 2 10uF, 10V or higher, 20%, electrolytic
C3, C4, C5 3 100nF, 16V or higher, 20%, ceramic, Y5V/X7R
C6 1 4.7nF, 1% or 5%, ceramic, COG/NPO
C7 1 47pF, 20%, ceramic, COG/NPO
C8 1 10nF, 20%, ceramic, X7R
LK1, LK2, LK3, LK4 4 Header pins (2 pins per header) for range selection jumper
JP1 1 Jumper needed for header pins (only 1 jumper needed)
J1, J2 2 Pads for aux battery or aux +5V.
J3 1 PP3 9V Battery Clip
J4 1 Connections to test capacitor
U1', U2' 2 16 pin DIL socket (7.62mm)
U3' 1 14 pin DIL socket (7.62mm)
PCB 1
Page 2 of 9
Capaci-Meter Project - Brief Assembly Guide By Jez Siddons, December 2018 (Rev 0.3)
Step 1 - Resistors
There are 13 resistors to fit.
1k
1k
Verify the resistor value before you fit
it in a particular position. Use the
13
k
resistor colour codes or a multimeter
to measure the resistances.
1k
If you’re using a multimeter then make
1k
560R
150k
1.5M
13k
1k
sure that your fingers are not in
contact with both probes at the same
13
k
time.
13
k0
1k
Insert the leads of each resistor into the “component side” of the PCB. That is, the face of the
board that has the solid looking circles for the LEDs clearly visible.
When a resistor is placed, bend both leads slightly away from each other so the resistor has a
tendency to stay in the board when you flip it over. If you hold the leads “taught” as you apply the
bend then it will hold better. If you apply a bend without holding the lead taught then the resistor
will still be wobbly when you flip it over. When you’re happy that the resistor is firm, solder just
one lead on the “solder side”.
Inspect the resistor to make sure it’s still flush to the PCB. Then solder the other lead. When
they’ve both been soldered you can trim the leads off with a pair of side-cutters. Repeat the
process for all the resistors.
Remember:
You will have empty spaces on the board for
resistors R1’, R2’ and R4’:
Page 3 of 9
Capaci-Meter Project - Brief Assembly Guide By Jez Siddons, December 2018 (Rev 0.3)
Step 2 - Capacitors
There are two varieties of capacitor
used in this project, Electrolytic
capacitors and the Ceramic capacitors.
10uF +
nF
F
0n
0
The Electrolytic capacitors are
10
10
polarised.
+
100nF
uF
10
The negative lead is clearly marked on 47pF
4.
7n
the body, so the other lead is the
F
positive that matches up to the “+”
symbol on the PCB.
10
Fn
The electrolytic capacitors must be
inserted the correct way round and are
best fitted flush to the PCB.
The ceramic capacitors are non-polarised and can be inserted either way round.
Marking Value
104 100nF
472 4.7nF
470 47pF
103 10nF
The first and second digit of the marking represent the first two digits of the capacitor value. The
third digit represents the number of zeros to add on the end. The value is then in Pico-Farads (pF).
So for example, 472 is 47 plus 2 zeros, so the value is 4700pF which is the same as 4.7nF.
Page 4 of 9
Capaci-Meter Project - Brief Assembly Guide By Jez Siddons, December 2018 (Rev 0.3)
Step 3 - Diodes
All 4 diodes in this project are the same
type (1N4148). Insert them the correct
way round.
16 pins 16 pins
14 pins
Page 5 of 9
Capaci-Meter Project - Brief Assembly Guide By Jez Siddons, December 2018 (Rev 0.3)
Step 5 - LEDs + - + -
+ - + -
+ - + - + - + -
+ - + -
78L05
0 0
70
2N
2N7000 MOSFET
Solder just one lead, make sure that the device is straight and then proceed to solder the other
two leads. Then trim.
The voltage regulator (U4) is marked 78L05. Place that device in the position of U4 as far down as it
will comfortably go. Ensure that the orientation matches the shape on the PCB. Solder one pin,
check the alignment and then proceed to solder the other 2 pins. Then trim.
Page 6 of 9
Capaci-Meter Project - Brief Assembly Guide By Jez Siddons, December 2018 (Rev 0.3)
Step 8 - Chips
BE
E
B
7
17
01
Insert the 3 chips in the orientation
40
4
D
D
shown here.
C
C
N
E5
56
N
Page 7 of 9
Capaci-Meter Project - Brief Assembly Guide By Jez Siddons, December 2018 (Rev 0.3)
Step 10 - Testing
Before testing, it’s worth having a double check that the whole board looks ok and that there are
no shorted joints. Check also that the chips are inserted correctly.
Place the jumper “shorting link” across one of the range selection headers.
If any of the devices are warm/hot then disconnect the battery and check your solder joints and
parts orientation.
Assuming that the board works ok at this stage, find a capacitor that you’d like to test. Ideally it
needs to be one that has a value that sits neatly within one of the 4 measurement ranges:
For example, if you have a 4.7nF capacitor then the best range to select would be range 1. Of
course, if you don’t know what the value of the capacitor you’re testing is then start with the top
range (9.9μF) and work downwards. It doesn’t matter if you start on a low range and work
upwards, no harm will result from over-range conditions. The display will show “99” if it is over-
range (or perhaps just at the top of the current range).
Apply your test capacitor across the two test pads, or use test leads if you wish. The holes in the
test pads are suitable for 2mm and 4mm banana plugs:
You should then be able to measure the capacitance value on the display. If not, check the selected
range and double-check your PCB joints.
Page 8 of 9
Capaci-Meter Project - Brief Assembly Guide By Jez Siddons, December 2018 (Rev 0.3)
Finally
I recommend that you read the “How it Works” document which gives much more detailed
information on the circuit design and operation. It will also help you if you need to make any
adjustments or if you have any problems.
I am happy to help with any questions regarding this project. The best way to contact me is via the
Capaci-Meter project channel on the Boldport Club Server on Discord.
Additionally, all documents (including the latest issue of this one) should be available on the
Boldport Github page.
I hope you enjoy building and using this project as much as I have.
Jez Siddons
E&OE