0% found this document useful (0 votes)
48 views3 pages

AIE TP23 AFI GS NG 0455-Merged

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views3 pages

AIE TP23 AFI GS NG 0455-Merged

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

TRX – THE EXCHANGE

APPLICATION FOR INSPECTION


PACKAGE NAME/ NO TP23 AFI REF. NO. AIE_TP23_AFI_GS_NG_0455
TRADE CONTRACTOR AIE ENGINEERING (M) SDN BHD ISSUE DATE/ TIME 20th APRIL 2024
LEVEL GROUND FLOOR– GS.07.0

INSPECTION NOTICE: WE REQUEST YOUR INSPECTOR’S PRESENCE ACCORDING TO THE FOLLOWING SCHEDULE:

REQUESTED BY TRADE CONTRACTOR/ SUPPLIER:


Tick [x] where applicable

INSPECTION DATE & TIME: 20th APRIL 2024/ 10.30 AM WORKS COMMENCEMENT DATE & TIME:

INSPECTION ITEM: FUNCTIONAL TEST INSPECTION AT LEVEL CONCOURSE AT TENANT LOT GS.07.0

APPROVAL: SWMS - YES NO N/A Method Statement - YES NO N/A Material/ Sample - YES NO N/A

ITP Checklist AFC Drawing PE Drawing/ Details


ATTACHMENT(S):
3rd party Review/ Report Others:

SUBMITTED BY: NAME: SYAHIRAN SIGNATURE: DATE & TIME: 20th APRIL 2024

INSPECTED BY SUPERVISION CONSULTANT: DPA KTP GNP PLY OTHERS :

Tick [x] where applicable

INSPECTION NOTICE: ACCEPTED REJECTED - POSTPONED – NEW DATE & TIME:

NAME: SIGNATURE: DATE & TIME:

COMMENTS:

NAME: SIGNATURE: DATE & TIME:

INSPECTION A – APPROVED. B – REMEDIAL WORKS REQUIRED. C – INSPECTION POSTPONED


RESPONSE: INSPECTION PASSED. RE-INSPECTION REQUIRED: YES / NO NEW AFI: YES NO

ACKNOWLEDGED BY LLPM:
Tick [x] where applicable

INSPECTION NOTICE: ACCEPTED REJECTED - POSTPONED – NEW DATE & TIME:

NAME: SIGNATURE: DATE & TIME:

COMMENTS:

NAME: SIGNATURE: DATE & TIME:

INSPECTION A – APPROVED. B – REMEDIAL WORKS REQUIRED. C – INSPECTION POSTPONED


RESPONSE: INSPECTION PASSED. RE-INSPECTION REQUIRED: YES / NO NEW AFI: YES NO

LLM_CN_FRM_3025_00.00 (Rev.04) / Date: 7/09/2018


TRX LQ /Application for Inspection (AFI) Form.doc
PM&C : Page No. : 1 of 1
LENDLEASE PROJECTS (MALAYSIA) SDN BHD Doc Ref. : AIE_TP23_CHK_GS_0007
No.
Project : TRX LQ THE EXCHANGE
TRADE CONTRACTOR/ SUPPLIER: Trade
Package
: TP23
AIE
GAS DETECTION SYSTEM COMMISSIONING CHECKLIST

Description of Works/ Elements/ Structure: AFI No. :


Functional Test For Gas Detector AIE_TP23_AFI_GS_NG_0455

Location/ Zone/ Sub-Zone/ Level/ Block /Unit/ Area : Drawing Ref. No. :
GROUND FLOOR/ GS.07.0 AIE_GS_SD_TP23_11000_GF.G0_PDF

Date of Inspection : 20/4/2024 Material : (Approved / Not Approved)


Time : 1030 AM Method Statement : (Approved / Not Approved)

AIE PLY LLPM


Description of Works Remarks
(√ / X ) (√ / X ) (√ / X )
1. Are the LEDs, signals and relays functioning properly?
2. Are the alarm bells functioning properly?
3. Are the solenoid valved triggered on alarm mode?
4. Are the back up power supplies working properly?
5. Are the back signal received by the zoning panel?

6. Are the correct location tested appeared on the zoning panel screen?

STATUS OF INSPECTION
We have carried out all necessary inspections and verify that the above items/ activities conform to the contract specifications/ document
Checked By: Checked By: Checked By:

Initial : Initial : Initial :


Name : SYAHIRAN Name : SYAHIRAN Name :
Position : SITE ENGINEER Position : SITE ENGINEER Position :
Date : 20/04/2024 Date : 20/04/2024 Date :
NSC (if applicable) : Trade Contractor (if applicable) : Lendlease Projects (M) Sdn Bhd
Checked By: Approved By : Acknowledged by:

Initial : Initial : Initial :


Name : Name : Name :
Position : C.o.W/ ARE / ARA Position : RE / RA Position :
Date : Date : Date :
Client's Consultant : Client's Consultant : Lendlease Projects (M) Sdn Bhd
AIE_TP23_ CHK _GS_0007 Rev: 00 Effective Date : 16/12/2020

LLM_CN_TMP_3014_00.00 Revision No: 01


TRX LQ/ Inspection Checklist Template for Trade Contractor.doc Revision Date: 7/09/2018
A19 A32 APPROVED FOR CONSTRUCTION
Drawing Status
A14

SGDP-R1,GL SGDP-R3,GL
B14 SGDP-R4,GL
B08
B07

SGDP-R2,GL
TRX The Exchange - Retail

B05 Boon Wai


Reviewer: ______________
31/03/2022
Date: __________________ C AS PER LATEST CO-ORDINATION 21/01/22 TKH

DETAIL 'A' DETAIL 'B' DETAIL 'C' DETAIL 'D' □


ü Approved B INCORPORATE AS PER PREVIOUS 24/05 TKH
COMMENT
□ Approved with Comments A 1ST SUBMISSION 20/12 TKH
REV DESCRIPTION DATE CHK/APP
(Revise and resubmit)
□ Rejected CLIENT :

(Revise and resubmit)


General comments:
297500 Refer WF-020108
8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500 8500
This review is for general compliance with the client LQ Retail Sdn Bhd 201501009979 (Reg No : 1135314-H)
EQ EQ requirements. Comments or approval shall not be Level 8, Menara JCorp, 249 Jalan Tun Razak, 50400 Kuala Lumpur, Malaysia
construed as relieving the Consultant from their Tel : 603-2163 4511, Fax : 603-21615421
contractual obligations. The Consultant remains
responsible for details, accuracy, compliance with local DESIGN AND CONSTRUCT CONTRACTOR :
regulations and co-ordination with other consultants.

Lendlease Projects (M) Sdn. Bhd.


199401019827 (305506-K)
Level 8, Menara JCorp, 249 Jalan Tun Razak,
50400 Kuala Lumpur, Malaysia

84
00
Tel : +603 2385 9888 Fax : +603 2385 9899
www.lendlease.com

84
00
10300 1200

SUBMITTING ARCHITECT :

84
00
DP ARCHITECTS SDN BHD

84
00
GD GD GD (NO SYARIKAT 306988 T)
10800

GD
LEVEL 20, AMODA, 22 JALAN IMBI,

84
0

00
GD
90

GD GD GD GD 55100 KUALA LUMPUR, MALAYSIA


16

GD GD GD GD TEL: 03 2143 9268 FAX: 03 2143 9076

84
GD GD
GD

00
8100

10
9 20
GD GD

84
00

0
00
CIVIL & STRUCTURAL CONSULTANT :
81
12850

GD

84
SGDP-R1,GL

KTP CIVIL & STRUCTURAL SDN BHD

00
(A MEMBER OF SURBANA JURONG)
00
81

(1012054-U)

84
DETAIL 'A'

00
20mm G.I CONDUIT DROP 33-10, THE BOULEVARD,

10125
FROM FLOOR ABOVE MID VALLEY CITY,
LINGKARAN SYED PUTRA,

84
17000

00

00
59200 KUALA LUMPUR, MALAYSIA
81

8000
84
00
00

MECHANICAL & ELECTRICAL CONSULTANT :


81

84
10650

8000
00
GD

GD SGDP-R3,GL
PERUNDING LY SEPAKAT SDN. BHD.

84
00

UNIT A102, 1ST FLOOR,

00

40000
8000
81

BLOCK A, KELANA SQUARE,


8100

20mm G.I CONDUIT UP


ADDRESSABLE TYPE MAIN NO.17, JALAN SS7/26, KELANA JAYA,
FROM FLOOR BELOW/
GD GAS DETECTOR MASTER
DETAIL 'C' FLOOR ABOVE.
PANEL C/W GRAPHIC
47301 PETALING JAYA, SELANGOR

8000
TEL: 03 7806 1907 FAX: 03 7805 4252
00

20mm G.I CONDUIT UP DISPLAY STATION.


8100

81

SGDP-R2,GL
FROM FLOOR ABOVE
DETAIL 'B'

8000
GD
00 SUB CONTRACTOR :
85
8100

00
81

00
85
GD

AESB A.I.E ENGINEERING (M) SDN. BHD.


8100

0 0
85
00
85
8100

85
00 00
224800

85 0
85 50
76
8100

00 00
85
ZONING LEGEND :
85
00 00
20mm G.I CONDUIT DROP 85 A1 A36
8100

85 FROM FLOOR BELOW


00 00
SGDP-R4,GL 85 D00

85 B00
G01
00 00
8100

85 G02
85 A1 A2 B1 B2 B3 C1 C2
00 DETAIL 'D' E01
K01
8100

85
00 A3 A4 B4 B5 B6 C3 C4 D13

GD E07
85 C01 K06
00
A5 A6 B7 B8 B9 C5
8100

F01
13 85
60 00 9120 10300 9120
00 C10
85 37155 D1 D2 D3 D4
8100

00 J04 J00

85
00 F17
D5 D6 D7
8100

85 GD B26 N
00
85
00
8100

85 PROJECT TITLE :
00
8100

85
00
85
00
8100

GD
8100
8100

DRAWING TITLE :

GAS DETECTION SYSTEM


8100

GD

- GROUND FLOOR PLAN


8100

DRAWN BY : AZ CHECKED BY : SYUKRI DATE : 20/01/2022

SCALE : 1 : 500 @ A0 APPROVED BY : TKH

DRAWING NO : REVISION NO :

AIE_GS_SD_TP23_11000_GF.G0_DWG C
6 GROUND - OVERALL LAYOUT PLAN THIS DRAWINGS IS COPYRIGHT. All designs are the property of
be used without their written permission. All prints, specifications and copyrights are the
property of Lendlease and shall be returned on completion of work. All measurements
Lendlease and cannot

PLAN SCALE 1 : 500 must be checked at site by the contractor and notification to be made to the Architects
before commencement of work in the event of any discrepancy arising from the drawings.
All drawings must be read in conjunction with other consultant's drawings.

You might also like