Suite 605 GPK Holdings
Suite 605 GPK Holdings
Designer: Clifford Sargent Cagle, a Florida Registered Interior Designer, is Sheet Index The following general conditions apply to all sheets in this set and shall extend to all supplemental drawings, specifications, and submittals:
Section A Section B Section D
also the project coordinator.
Engineer: Peninsula Engineering is the Owner's engineering consultant. The T1.1 General Conditions and notes 1. Contractor shall visit and inspect the premises, prior to submitting their
proposal, to familiarize themselves with the conditions under which work
1. Contractor shall be answerable for his work and shall not accept
instruction from local personnel without verification from the Tenant's
1. Do not scale drawings. Detail drawings shall govern over plan and
elevation drawings. Large-scale details shall govern over small-scale details.
project contact shall be Mat Shearer.
Owner/Landlord: Foundry Commercial is the building owner's id2.1 Demolition & Construction Plans and notes will be performed. No subsequent extras or additions will be allowed on
any claim due to lack of knowledge of conditions or circumstances about
agreed upon representative. The Contractor will be liable for any expense
caused by the execution and removal of such work without written
2. It is intended that the Contractor provide a complete job. Any
omissions in the notes or contract documents shall not be construed as
representative. The project contacts shall be Don Hamilton and Maria
Maldonado. id2.2 Furniture/Electrical & Reflected Ceiling Location Plans and notes which the contractor could have informed himself.
2. Contractor shall, before commencing work, review all plans, notes,
authorization from the tenant's representative.
2. Contractor shall comply with all the rules and regulations of the building
relieving the Contractor of such responsibility except for items specifically
noted.
End User/ Tenant: GPK Holdings is the end user and will occupy the
premises. id3.1 Details general conditions, and specifications and verify all governing dimensions as to hours of availability of elevators, loading docks, etc. for the purpose 3. All "hold" or "clear" dimension shall be exact within a 1/8" tolerance
along full distance of dimension.
on the job site. He shall examine any adjoining areas or areas upon which of delivery and the manner of handling materials, equipment and debris, to
Building Data: FP1.1 Fire Protection Plan the performance of his work is in any way dependent. Any variances or avoid conflict or interference with normal building operation. 4. There shall be no substitution of materials where a manufacturer is Clifford
Sand Lake IV
E1.1 Electrical Specifications
discrepancies must be reported to Designer prior to fabrication or
erection of work in question. Any variances or discrepancies in the
3. Before commencing work, the Contractor shall notify the Owner and
Designer of any areas that have not been satisfactorily completed to meet
specified. Where the term "or approved equal" is used, Designer alone
shall determine equality based upon information submitted by the Sargent
Cagle
7380 Sand Lake Road
documents not reported immediately to Designer shall become the base building standards. (i.e. fireproofing, ductwork, slab conditions, Contractor. Bidders shall submit pricing based upon the specified
Suite 605
Orlando, Florida 32819
E1.2 Electrical Specifications responsibility of the contractor. demising walls, utility hookups, electrical panels, etc.) materials or products with a separate line item for substituted or alternate
3. The design concept of this project is based on the color, texture, and 4. Contractor shall exercise great care in protecting from damage all items.
Number of stories: 10, including 4 floors of parking
Building type: I-A
E2.1 Electrical Plans design of finished products as specified. Designer will not entertain any existing conditions indicated as "to remain", all areas of the building 5. All work shall be performed in accordance with the rules and Florida License #id0004351
request for material substitution if the contractor fails to order materials in indicated as "not in contract", and all materials delivered to job site prior to regulations of the governmental agency having jurisdiction and shall 1135 Thunder Trail
Fire sprinklers: Fully sprinklered, modifications shall be completed by
certified sprinkler contractor
M1.1 Mechanical Renovation Plan sufficient time for orderly installation within the project. Instead, the their installation. Any damages due to this work or to accidents shall be conform to all safety and sanitary laws, city, county, state, and/or federal Maitland, Florida 32751
Contractor shall provide and install temporary finishes or materials patched, repaired, or replaced at the discretion of the Designer or of the ordinances that apply. Office (321) 316-4622
Fire alarm system: Existing system with modifications completed by [email protected]
satisfactory to Designer, provide and install the specified finishes or Owner and at the Contractor's cost. 6. All work shall be performed by skilled workmen and in accordance with
licensed fire alarm contractor
materials upon their arrival, and bear all costs associated with the 5. Existing mechanical or HVAC devices, including return air diffusers and the best practices of the trades involved.
Building Occupancy: "B"
installation. duct openings, shall be covered with 2" filter media throughout the 7. All work shall be erected and installed plumb, square, level, and true
1 Location Map
T1.1 Not to scale N
Area of work
UP
DN
UP
s e tn
iew ructio
RNeotvfor const
2 Sixth Floor Egress Plan
T1.1 3/32" = 1'-0" N
T1.1
Wall Type Legend General Life Safety Notes
1. All egress doors shall be self-closing and self-latching in accordance
with FBC and with NFPA 80.
Existing partition or construction to be removed 2. Provide building standard sprinklers as required by code per new
partition layout.
3. General Contractor shall be responsible for final quantity and location
Existing partition or construction to remain of all emergency devices (including but not limited to battery packs, exit
signs, fire alarms, FECs, etc.) with field inspectors having jurisdiction.
4. Provide building standard fire extinguisher cabinets, smoke detectors,
Existing deck-high partition to remain and all other life safety devices as required by code. Any life safety
devices not indicated as part of these drawings shall be submitted for
Designer review prior to framing of walls.
Clifford
UP Sound attenuated partition Sargent
Cagle
See drawing 1/id3.1 General Demolition Notes
1. It is the intent of these documents to utilize where possible the reuse
Partial height partition with GWB cap of building standards such as (but not limited to) doors, door frames &
See drawing 2/id3.1 hardware, electrical and telephone receptacles, diffusers, speakers, fire Florida License #id0004351
alarms, exit signs, window treatments, light fixtures, and plumbing fixtures. 1135 Thunder Trail
Existing tempered glass sidelight in new location All such building standard materials removed during demolition shall be Maitland, Florida 32751
neatly stored on site for reuse. All surplus fixtures and material items Office (321) 316-4622
removed during demolition but not reused during this project shall be [email protected]
Building standard semi-recessed cabinet (white or paintable turned over to the Owner. Contractor shall identify such building standard
F.E.C.
UP
finish) and fire extinguisher with minimum rating of 2A10BC. items and coordinate with the Owner the sequence for demolition, the
48" clr.
Office Office All existing doors and hardware to remain shall be 7. Remove all existing electrical/voice/data devices not shown as "to
Adjacent Conf. Room 605 604 put in good working order to make as new. remain". Patch and repair GWB following removal and prepare wall to
Office Suite 1 (241 sf) Office Replace any doors or hardware beyond feasible receive new finishes.
N.I.C. 609 Office Office 12"
608 607 606 repair. 8. The disconnection of all electrical devices being removed shall be at
609 (w/ closer) the nearest junction box. Contractor shall re-label such circuits as "spare"
Xx Door Types in the panel schedule. No unused wiring shall be left in walls or ceilings.
align
· All doors which are means of egress shall have a minimum clear opening Outlets and switches removed shall be stored on site for reuse where
608 607 606 605 604 align of 32" when opened to 90° in accordance with 2020 FBC 1010.1.1 and feasible.
Aa Aa Aa Xx Xx with 2018 NFPA 101 Section 7.2.1.2.1.1. 9. Remove and recycle all low voltage cable and connectors no longer
Corr. F.E.C. UP required for the operation of telephone, data or other systems. No
610 Corr. A - 3'-0"w building standard solid core flush wood door, (see 4/id3.1 and unused cabling shall be left in walls or ceilings per NEC 725.25.
Xx 610
603 5/id3.1) 10. Where glue down carpet, resilient floor, or other glued flooring
align align installation is removed, remove all adhesive to leave floor with a smooth
611 X - Existing door to remain
Xx 5'-9" 5'-9" level finish.
LVP-1
Break Corr. Open Open Open Hardware Types 11. All carpet removed during demolition shall be delivered to Shaw
Room 612 Office Office Office · All hardware (including existing to remain) shall be unlocked in the Carpet Recycling ((706) 532-4135) or other Owner-approved vendor.
Open
611 Office 614 601 602 direction of egress regardless of other lock functions and shall be lever Cost for delivery and for recycling shall be included as part of bidding.
613 EQ EQ type in compliance with ADA and Florida Building Code. 12. All existing base shall be removed, and walls, if to remain, shall be
align
614 repaired so as to create a smooth surface ready to receive new base.
UP
612 Xx a - Latch set
Xx x - Existing hardware to remain General Construction Notes
1. Typical dimensions are to finish face of partition unless otherwise
Public noted.
Corridor
N.I.C.
Finish Legend 2. All existing wall surfaces and partitions to remain shall be patched,
spackled and sanded smooth as not to leave any evidence of demolition
or repair work. Prepare surfaces for new finishes as required.
PT-1 General paint (all walls, u.o.n.)
Mfr: Sherwin-Williams "SuperPaint" 3. Where new partition aligns with the face of an existing furred column or
partition, remove corner bead, tape and spackle new partition to existing
2 Construction Plan
Color: To be selected
gypsum board.
PT-2 Trim paint (all door frames and interior trim, u.o.n.)
id2.1 1/8" = 1'-0" N Mfr: Sherwin-Williams "SuperPaint"
4. All new steel studs shall have a minimum of 75% recycled content.
5. All waste metal not used during construction shall be delivered to
Color: To be selected
Trademark Metals Recycling ((407) 299-1661) or other Owner-approved
B-1 4" x 1/8" vinyl cove base (throughout, u.o.n.)
Mfr: Tarkett vendor. Cost for delivery and for recycling shall be included as part of
Color: To be selected bidding.
General carpet (throughout, u.o.n.) 6. All fiberglass insulation used shall be Greenguard certified (Knauf
CPT-1
Mfr: Patcraft "QuietTherm" or Owens-Corning "Ecotouch") or formaldehyde-free
Color: To be selected (Johns-Manville).
Pattern: Ashlar 7. All door frames and door hardware shall be building standard, U.O.N.
8. Any new doors shall be Algoma PC-5 Novodor (or approved equal)
LVP-1 6" vinyl plank flooring (where indicated)
with building standard veneer and finish. All door cores shall be free of
Mfr: Patcraft
urea-formaldehyde.
Color: To be selected
9. Any existing doors which are to remain shall be patched & repaired or
Pattern: Brick
replaced to make as new.
10. Contractor shall coordinate keying of locks with Owner and Tenant
upon substantial completion of space. Keying shall be performed by
owner-approved locksmith and bitting information provided to building
Construction Plan Key Notes engineer. Budget for this function shall be included in initial bids.
11. Doors shall operate freely without binding.
tn
the installed material.
14. All waste carpet not used during construction and not delivered to
s e
iew ructio
Tenant or Owner as attic stock shall be delivered to Carpet Recycling
RNeotvfor const
((386) 259-2239) or other Owner-approved vendor. Cost for delivery
and for recycling shall be included as part of bidding.
15. Provide Schluter VINPRO transitions at all non-ceramic flooring material
transitions. Color shall match door hardware. Alternate: Provide rubber
transition strips. Color shall match either adjacent floor finish.
id2.1
16. All vinyl base shall be seamed a minimum of 12" from an inside or
outside corner.
17. All vinyl base shall be delivered to the job site in flat boxes. Rolled
goods are not acceptable.
18. Repair or replace existing building standard blinds to make as new.
Electrical Legend General Electrical Notes
1. Locations and dimensions shall be per Designer's drawings. It is the
responsibility of the electrical subcontractor to coordinate the interior
Office E design drawings with the electrical engineering drawings for bidding and
E E Office Duplex wall receptacle
Adjacent E Conf. Room 605 construction purposes. Discrepancies (if any) between interior design and
+80" (241 sf) E E 604
Office Suite Office E J-box, conduit, and pull-string for voice/data cabling engineering documents must be brought to Designer's attention prior to
E Office Office
N.I.C. +80" 609 E 608 commencement of work. No omissions or substitutions due to such
E 607 606
E Quadruplex wall receptacle discrepancies will be accepted once work has begun.
E E 2. It is the responsibility of the General Contractor to provide this sheet to
E E E the electrical subcontractor along with the electrical engineering drawings
Wiremold #6ATCFFBK (or approved equal) flush-mounted
poke-thru or Wiremold #RFB6 floor box (GC shall coordinate
for bidding and construction purposes.
3. Electrical contractor shall locate all devices as close as possible to
Clifford
Corr. UP
location in field w/ Tenant) locations illustrated on this plan. If devices are not located within a Sargent
Cagle
satisfactory range, the Contractor shall move them at the direction of
610 E Corr.
"E" indicates existing device to remain Designer.
603
4. The Tenant shall provide all telephone and computer equipment and
6" non-electric cabling. Contractor shall provide for coordination with Florida License #id0004351
Break Corr. Open Open Open vendors/installers regarding deliveries and schedules. 1135 Thunder Trail
Room 612 Office Office Office FA 5. The electrical contractor shall be responsible for providing electrical Maitland, Florida 32751
E Open E
611 Office 614 601 602 service, 1" conduit (2" conduit at floor boxes) with pull strings, and Office (321) 316-4622
E E
E j-boxes as necessary to complete Tenant's cable requirements. Electrical
E+44"
E 613 [email protected]
+44"
E E E contractor may coordinate directly with Tenant's cable contractor to
E E E FA Fire alarm
assure fulfillment of conduit locations and requirements.
UP
E W Wall phone
80"
N.I.C. F Wall-mounted 8. All electrical wiring shall be coated with TPE or other non-PVC material.
in-feed GC may provide alternate pricing for PVC-coated wiring.
4'-0"
3'-8"
9. Where telephone and electrical outlets appear on plan as back to
E V F back, outlets shall be staggered to reduce noise transmission through wall.
1 Furniture/Electrical Location Plan 10. All anchors shall be toggle bolts, "red heads", or in solid concrete,
1'-6"
powder actuated fasteners.
id2.2 1/8" = 1'-0" N 11. All existing electrical devices which are to remain shall be repaired or
replaced to make as new.
Sidelights as Sidelights as 12. All floor cores shall be flush mounted, u.o.n.
specified specified 13. Verify final locations of floor-mounted devices with Tenant prior to
commencement of work.
14. General contractor shall assure that no electric receptacle or
1'-0" 1'-0" telecommunications outlet cover plates have been installed prior to
completion of application of any wall finish materials. Any such cover
plates or surface hardware in place shall be removed prior to wall finish
application.
Switch/sensor
General Furniture Notes
1. All furniture indicated on plan is for electrical location reference only.
2. Furniture installer shall maintain a minimum 44" clearance at all exit
pathways and minimum 32" clearance at all furniture openings.
3. Compliance with local codes relating to furniture installation shall be the
responsibility of the furniture vendor (including payment of fines for
non-compliance).
4. Scope of General Contractor's work in relation to furniture shall be
limited to coordination of installer access to job site.
5. All finish materials used shall meet the minimum flame spread
requirements in FBC. The furniture installer shall provide flame & smoke
spread documentation if requested by the Building or Fire Department.
6. Furniture installer shall be responsible for field verification of any walls
or dimensions which affect the furniture prior to placement of furniture
order.
7. Furniture installer shall provide protection for all surfaces susceptible to
damage during delivery and installation. Installer will be responsible for
costs of repairing any damage caused by delivery or installation.
8. Systems furniture installer shall coordinate with GC all necessary wood
blocking in conjunction with any work that involves the support of furniture
(panels, overhead storage cabinets, etc.) upon drywall partitions.
s e tn
iew ructio
RNeotvfor const
id2.2
Minimum design horizontal load
Underside of deck above shall be l/120 at 5 lbs.
Underside of deck above
Optional: Contractor may attach any
unintersected section of wall longer than 15' Extend stud above ceiling and brace
to ceiling grid mains w/ (2) #12 tech to structure above or laterally to an
screws at 4'-0" o.c. (with landlord's adjacent perpendicular partition with
approval) or brace to structure above (max 35 8" metal studs at 45 degrees.
6'-0" o.c.). w/ 35 8" metal studs Contractor may attach wall to ceiling
Optional bracing (if required): 25 gauge grid with Owner's prior approval.
Clifford
metal drywall runner secured at max. 6'-0"
o.c. to concrete deck with Hilti (or equal)
Existing mullion system
CL Sargent
powder-actuated fasteners or to metal
deck with (2) #12 tech screws
Suspended grid and tile ceiling
system
Non-rated partition as scheduled
Cagle
Formaldehyde-free, non-fiberglass sound Building standard non-rated door Florida License #id0004351
Verify in field
wall
Formaldehyde-free, non-fiberglass sound 3 5 8" 25 gauge metal studs at
maximum 24" o.c. Building standard non-rated door
attenuation batt insulation. Any fiberglass
insulation used shall be Greenguard certified Non-rated partition as Extend stud above ceiling and brace
(Knauf "QuietTherm") or formaldehyde-free specified to structure above or laterally to an
(Johns-Manville). 25 gauge metal drywall runner adjacent partition. Contractor may
25 gauge metal studs at maximum 24" o.c. secured with Hilti (or equal) attach wall to ceiling grid with
Contour GWB to sill below as
powder-actuated fasteners at Owner's prior approval.
25 gauge metal drywall runner secured with required
max. 24" o.c.
Hilti (or equal) powder-actuated fasteners
at max. 24" o.c. Base material as scheduled Note: No physical or Non-rated partition as scheduled
mechanical attachment to
Base material as scheduled
mullion system will be
Concrete floor slab Concrete floor slab
allowed
Building standard non-rated door
5 " 5 " 5/8"
8 35 8" 8 35 8" 5/8" frame
1 Typical Interior Partition Section 2 Sound Attenuation Partition Section 3 Partition - Mullion Detail 5 Typical Interior Door Jamb Detail
id3.1 3" = 1'-0" id3.1 3" = 1'-0" id3.1 6" = 1'-0" id3.1 3" = 1'-0"
5'-0"
A.F.F.
Semi-recessed fire extinguisher
cabinet, white or paintable finish
ELEVATION
Double 3 5 8" metal studs
Partition as specified
Semi-recessed fire extinguisher
cabinet
PLAN
Details
Permit Issue 12/16/24
s e tn
iew ructio
RNeotvfor const
id3.1
MEP CONSULTING ENGINEERS
E E E E E E E
E E E
UP
E E E
E E E E E E E
Permit Issue
E E E E E E E
UP
12/16/24
1 Fire Protection Renovation Plan
fp1.1 1/8" = 1'-0" N
Review
Not For
Construction
MEP CONSULTING ENGINEERS
Permit Issue
12/16/24
Review
Not For
Construction
MEP CONSULTING ENGINEERS
Permit Issue
12/16/24
Review
Not For
Construction
GENERAL DEMOLITION NOTES DEMOLITION PLAN NOTES
1. UNLESS OTHERWISE NOTED, ALL DEVICES SHOWN ON THIS PLAN 1 -
SHALL BE REMOVED.
UP
MEP CONSULTING ENGINEERS
1 Electrical Demolition Plan
e2.1 1/8" = 1'-0" N
Permit Issue
RELAMPED.
12/16/24
4. DASHED ARCS INDICATE CONTINUATION OF BRANCH CIRCUIT BUT
NOT SWITCH CONTROL.
UP
6. ELECTRICAL CONTRACTOR SHALL PROVIDE A LUMINAIRE DISCONNECT
CONNECTOR FOR ALL FLUORESCENT FIXTURES, AS REQUIRED BY N.E.C.
410.130(g)3 2011. UL LISTED CONNECTORS ARE MANUFACTURER BY
IDEAL, THOMAS AND BETTS AND WAGO, ANY UL LISTED
CONNECTOR WILL BE ACCEPTABLE. INSTALL PER MANUFACTURERS
SPECIFICATIONS.
Existing 2' x 4' fluorescent light fixture with 3500K lamps (GE
F32T8SP35/ECO or Sylvania FP28/835/pm/eco or building standard
where applicable). Provide emergency battery packs as needed.
Review
Not For
Construction
GENERAL POWER NOTES POWER PLAN NOTES
Office E 1. CONNECT NEW FIRE ALARM DEVICES TO EXISTING FIRE ALARM 1 PROVIDE FLUSH MOUNTED FLOOR BOX WITH POWER AND
E E Office
Adjacent E Conf. Room 605 SYSTEM. WIRE PER MANUFACTURER'S SPECIFICATIONS IN 3/4" TELE/DATA OUTLETS, WALKER RC4 SERIES OR APPROVED
+80" (241 sf) E E E
604
Office Suite E Office CONDUIT. PROVIDE NEW POWER MODULES IF REQUIRED TO EQUAL. PROVIDE X-RAY OF SLAB, CORE-DRILLING,
N.I.C. +80" 609 E Office Office POWER NEW UNITS.
E 608 607 606 FIRE-PROOFING AND COORDINATE WITH BUILDING ENGINEER
E
AND TENANT BELOW. COORDINATE EXACT LOCATION WITH
E E 2. HORN/STROBE TO MEET db AND CANDELA AS PER ADA AND FINAL FURNITURE LAYOUT. PROVIDE 1" CONDUIT FOR LOW
E E E NFPA-72 REQUIREMENTS. UNLESS OTHERWISE NOTED, DEVICES VOLTAGE CABLING.
SHALL BE NO LESS THAN 75 CANDELA AND 82 DECIBEL. REFER
TO NFPA 72 TABLES 18.5.4.3.1(a) AND 18.5.4.3.1(b).
Corr. UP 3. INDICATED CIRCUIT NUMBERS ARE SUGGESTED FROM EXISTING
610 E Corr.
603 SPARE BREAKERS AND SPACES IN EXISTING PANELS.
CONTRACTOR MAY USE DIFFERENT CIRCUIT NUMBERS TO MATCH
FIELD CONDITIONS.
Break Corr. Open Open Open
Room 612 Office Office Office 4. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH INTERIOR
E Open E
611 Office 614 601 602 DESIGN PACKAGE FOR ALL MILLWORK AND WALL DESIGNS PRIOR
E E
E TO COMMENCING WORK.
E+44"
E 613
+44"
E E E
E E E
5. EXISTING BRANCH CIRCUITS HAVE BEEN TAKEN FROM FIELD
UP
E
INVESTIGATION AND /OR ORIGINAL DOCUMENTS AND SHOWN
FOR THE CONVENIENCE OF THE ELECTRICAL CONTRACTOR AND
Public SHALL NOT BE CONSIDERED "AS-BUILT" CONDITION. BEFORE
Corridor CONSTRUCTION BEGINS, ELECTRICAL CONTRACTOR SHALL FIELD
N.I.C. VERIFY ALL BRANCH CIRCUITS.
Corr.
UP
610
Corr.
603
Corr.
Break 612 Open Open Open
Room Office Office Office
611 614 601 602
Open
Office
613
UP
MEP CONSULTING ENGINEERS
Public
Corridor
N.I.C.
Permit Issue
12/16/24
Review
Not For
Construction