0% found this document useful (0 votes)
14 views1 page

Kidde HPCO2 Discharge Delays K-81-5211

Discharge Delays
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

Kidde HPCO2 Discharge Delays K-81-5211

Discharge Delays
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Kidde Fire Systems

HPCO2 Component Description


Effective: April 2022
Discharge Delays K-81-5211 Rev AC

PILOT CHECK
CONNECTION FOR
CONTROL HEAD OUTLET CHAMBER

OUTLET
INLET CHAMBER
BALL CHECK

PISTON

PISTON CHAMBER
MAIN CHECK

PRESSURE ACCUMULATOR

CONTROL HEAD PILOT CHECK

BALL CHECK

MAIN CHECK
OUTLET
CHAMBER
INLET
PISTON

PISTON
INLET CHAMBER
CHAMBER
OUTLET
FILTER

PRESSURE
METERING ACCUMULATOR
TUBE

EXPORT INFORMATION (USA)


Jurisdiction: EAR
Classification: EAR99
This document contains technical data subject to the EAR.
All trademarks are the property of their respective owners.
This literature is provided for informational purposes only. KIDDE-FENWAL, INC. ©2022 Carrier
believes this data to be accurate, but it is published and presented without any
guarantee or warranty whatsoever. KIDDE-FENWAL, INC. assumes no responsibility
for the product's suitability for a particular application. The fire suppression system Kidde Fire Systems
design, installation, maintenance, service and troubleshooting must be performed by 400 Main Street
trained, authorized Kidde Fire Systems distributors for the product to work correctly. If Ashland, MA 01721
you need more information on this product, or if you have a particular problem or Ph: 508.881.2000
question, contact KIDDE-FENWAL, INC., Ashland, MA 01721 USA. Fax: 508.881.8920
Telephone: (508) 881-2000. kiddefiresystems.com

You might also like