2) Name of the Section 2) Length of Road considered (in Kms) From : To:
3) Count Post at K.M.: Place (Railway Gate, If any ) : 3) Width of carriage way for the length considered
5) Name of the Traffic Enumerator : Designation : 6) Type of Railway Gate : Un-manned / Manual / Automatic
19-02-2020 6 AM to 7 AM
7 AM to 8 AM
8 AM to 9 AM
9 AM to 10 AM
10 AM to 11 AM
11 AM to 12 Noon
12 Noon to 1 PM
1 PM to 2 PM
2 PM to 3 PM
3 PM to 4 PM
4 PM to 5 PM
5 PM to 6PM
6 PM to 7 PM
7 PM to 8 PM
8 PM to 9 PM
9 PM to 10 PM
10 PM to 11 PM
11 PM to 12 AM
12 AM to 1 AM
1 AM to 2 AM
2 AM to 3 AM
3 AM to 4 AM
4 AM to 5 AM
5 AM to 6 AM
1
Total for 24 hours
2
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 16-11-2024 DOWN PART B : ROAD DETAILS
Time Intervals Fast Moving Vehicles Slow Moving Vehicles Locomotives (Railways)
Commerecial Vehicles Bullock Cart
Goods Vehicles (Trucks)
Total Slow Total
Total Fast Vehicles(1 Passenger No. of
Two Auto Car/Jeep/ 2 - Axle Multi Axle Pedal Cycle Horse Moving Goods
Date Time Van / 3 - Axle Tractor Moving 4+19) Gate
Wheeler Rickshaw Taxi Mini Bus Buses LCV Rigid Cycle Rickshaw Drawn Vehicles(15 Trains Trains
Tempo Rigid Vehicles Wooden rubber Closers
(6 ( more than with Trailer to 18b)
( 10 Tyres)
Tyres) 10 Tyres)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18a 18b 19 20 21 22 23
2 AM to 3 AM 54 9 42 2 3 4 7 0 0 0 0 121 0 0 0 0 0 0 121 0 0 0
3 AM to 4 AM 13 14 20 20 0 3 2 0 0 0 0 72 0 0 0 0 0 0 72 0 0 0
4 AM to 5 AM 63 17 40 0 2 5 9 14 2 0 0 152 0 0 0 0 0 0 152 0 0 0
3
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 17-11-2024 UP PART B : ROAD DETAILS
4
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 17-11-2024 DOWN PART B : ROAD DETAILS
1) Name of the Road 0 1) Classification of Road : NH/SH/MDR
MDR
2) Name of the Section Mangaluru Place (Railway Gate, If any ) : Babbukatte 2) Length of Road considered (in Kms) From : To:
16.40 to 27.00
3) Count Post at K.M.: 27.00km 3) Width of carriage way for the length considered
7.00
4) Direction of Traffic Up : From To 4) Width of formation for the length considered
20.00mtr
Down : From: Ullala To : Mani 5) Type of surface for the length considered
BT
5) Name of the Traffic Enumerator : Designation : 6) Type of Railway Gate : Un-manned / Manual / Automatic
Manual
6) Name of the Division : Mangalore Sub-division : Mangaluru 7) Weather : Clear / Cloudy / Rainy
Clear
8) GPS Coordinates: Latitude: 13.5.2 Longitude: 74.45' 30''
Clear
Time Intervals Fast Moving Vehicles Slow Moving Vehicles Locomotives (Railways)
Commerecial Vehicles Bullock Cart
Goods Vehicles (Trucks) Total Slow Total
Total Fast Vehicles(1 Passenger No. of
Two Auto Car/Jeep/ 2 - Axle Multi Axle Pedal Cycle Horse Moving Goods
Date Time Van / 3 - Axle Tractor Moving 4+19) Gate
Wheeler Rickshaw Taxi Mini Bus Buses LCV Rigid Cycle Rickshaw Drawn Vehicles(15 Trains Trains
Tempo Rigid Vehicles Wooden rubber Closers
(6 ( more than with Trailer to 18b)
( 10 Tyres)
Tyres) 10 Tyres)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18a 18b 19 20 21 22 23
5
5 AM to 6 AM 163 42 53 38 7 13 8 3 4 0 0 331 0 0 0 0 0 0 331 0 0 0
Total for 24 5963 3657 4372 1349 512 765 186 245 83 26 3 17161 11 0 0 0 0 11 17172 0 0 0
hours
6
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 18-11-2024 UP PART B : ROAD DETAILS
7
4 AM to 5 AM 10 3 0 0 0 0 0 0 0 0 0 13 0 0 0 0 0 0 13 0 0 0
5 AM to 6 AM 70 32 13 2 0 0 0 0 0 0 0 117 0 0 0 0 0 0 117
Total for 24 hours 7793 1657 3137 484 164 446 200 94 21 9 0 14005 23 0 0 0 0 28 14033 0 0 0
8
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 18-11-2024 DOWN PART B : ROAD DETAILS
1) Name of the Road 0 1) Classification of Road : NH/SH/MDR
MDR
2) Name of the Section Mangaluru Place (Railway Gate, If any ) : Babbukatte 2) Length of Road considered (in Kms) From : To:
16.40 to 27.00
3) Count Post at K.M.: 27.00km 3) Width of carriage way for the length considered
7.00
4) Direction of Traffic Up : From To 4) Width of formation for the length considered
20.00mtr
Down : From: Ullala To : Mani 5) Type of surface for the length considered
BT
5) Name of the Traffic Enumerator : Das prakash Designation : A.E 6) Type of Railway Gate : Un-manned / Manual / Automatic
Manual
6) Name of the Division : Mangalore Sub-division : Mangaluru 7) Weather : Clear / Cloudy / Rainy
Clear
8) GPS Coordinates: Latitude: Longitude:
Time Intervals Fast Moving Vehicles Slow Moving Vehicles Locomotives (Railways)
Commerecial Vehicles
Bullock Cart Total
Goods Vehicles (Trucks) Total Slow
Total Fast Vehicles(1 Passenger No. of
Two Auto Car/Jeep/ Pedal Cycle Horse Moving Goods
Date Time Van / 2 - Axle Multi Axle Tractor Moving 4+19) Gate
Wheeler Rickshaw Taxi Mini Bus Buses LCV 3 - Axle Cycle Rickshaw Drawn Vehicles(15 Trains Trains
Tempo Rigid with Trailer Vehicles Closers
Rigid Wooden rubber to 18b)
(6 ( more than
( 10 Tyres)
Tyres) 10 Tyres)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18a 18b 19 20 21 22 23
21.2.2020 6 AM to 7 AM 144 33 82 4 3 19 14 5 4 0 0 308 0 0 0 0 0 0 308 0 0 0
7 AM to 8 AM 225 45 160 9 7 59 12 5 2 0 0 524 0 0 0 0 0 0 524 0 0 0
8 AM to 9 AM 628 100 522 19 17 57 33 10 0 0 0 1386 0 0 0 0 0 0 1386 0 0 0
9 AM to 10 AM 550 98 342 14 4 39 59 5 7 3 0 1121 3 0 0 0 0 3 1124 0 0 0
10 AM to 11 AM 557 125 292 15 7 32 49 3 4 0 0 1084 0 0 0 0 0 0 1084 0 0 0
11 AM to 12 Noon 494 137 283 25 3 27 63 59 9 2 0 1102 0 0 0 0 0 0 1102 0 0 0
12 Noon to 1 PM 575 308 338 50 25 50 64 9 0 0 0 1419 2 0 0 0 0 2 1421 0 0 0
1 PM to 2 PM 913 443 669 68 28 57 65 33 0 0 3 2279 3 0 0 0 0 3 2282 0 0 0
2 PM to 3 PM 544 150 388 13 32 37 19 57 3 0 2 1245 0 0 0 0 0 0 1245 0 0 0
3 PM to 4 PM 390 200 313 0 0 18 5 4 0 0 0 930 2 0 0 0 0 2 932 0 0 0
4 PM to 5 PM 238 250 469 0 0 27 4 2 0 0 0 990 4 0 0 0 0 4 994 0 0 0
5 PM to 6PM 269 14 500 0 2 40 0 0 0 0 0 825 2 0 0 0 0 2 827 0 0 0
6 PM to 7 PM 708 94 269 0 0 23 4 0 0 0 0 1098 3 0 0 0 0 4 1102 0 0 0
7 PM to 8 PM 438 15 307 0 0 18 0 0 2 0 0 780 0 0 0 0 0 0 780 0 0 0
8 PM to 9 PM 269 32 238 0 0 14 3 2 0 0 0 558 0 0 0 0 0 0 558 0 0 0
9 PM to 10 PM 232 2 144 2 0 3 0 0 3 0 0 386 0 0 0 0 0 0 386 0 0 0
10 PM to 11 PM 178 4 168 0 0 0 3 0 0 0 0 353 0 0 0 0 0 0 353 0 0 0
11 PM to 12 AM 27 0 122 0 0 0 0 0 0 0 0 149 0 0 0 0 0 0 149 0 0 0
12 AM to 1 AM 75 2 13 0 0 3 0 0 0 0 0 93 0 0 0 0 0 0 93 0 0 0
1 AM to 2 AM 3 2 3 0 0 0 0 0 0 0 0 8 0 0 0 0 0 0 8 0 0 0
2 AM to 3 AM 4 0 3 0 0 0 0 0 0 0 0 7 0 0 0 0 0 0 7 0 0 0
3 AM to 4 AM 29 7 2 0 0 0 0 0 0 0 0 38 0 0 0 0 0 0 38 0 0 0
9
4 AM to 5 AM 32 3 52 0 0 2 0 0 0 0 0 89 0 0 0 0 0 0 89 0 0 0
5 AM to 6 AM 57 2 87 0 0 0 0 0 0 0 0 146 0 0 0 0 0 0 146 0 0 0
Total for 24 ho 7579 2066 5766 219 128 525 397 194 34 5 5 16918 19 0 0 0 0 19 16937 0 0 0
10
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 19-11-2024 UP PART B : ROAD DETAILS
11
3 AM to 4 AM 5 2 3 0 0 0 0 2 0 0 0 12 0 0 0 0 0 0 12 0 0 0
4 AM to 5 AM 17 3 4 0 0 3 0 0 0 0 0 27 0 0 0 0 0 0 27 0 0 0
5 AM to 6 AM 112 13 75 0 9 7 0 10 0 0 0 226 0 0 0 0 0 0 226 0 0 0
Total for 24 hours 7292 2135 6000 126 362 752 236 605 35 0 5 17548 5 0 0 0 0 15 17563 0 0 0
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 19-11-2024 DOWN PART B : ROAD DETAILS
Time Intervals Fast Moving Vehicles Slow Moving Vehicles Locomotives (Railways)
Commerecial Vehicles
Bullock Cart
Goods Vehicles (Trucks) Total Slow Total
Total Fast Vehicles(1 Passenger No. of
Two Auto Car/Jeep/ Pedal Cycle Horse Moving Goods
Date Time Van / 2 - Axle Multi Axle Tractor Moving 4+19) Gate
Wheeler Rickshaw Taxi Mini Bus Buses LCV 3 - Axle Cycle Rickshaw Drawn Vehicles(15 Trains Trains
Tempo Rigid
Rigid with Trailer Vehicles Wooden rubber to 18b)
Closers
(6 ( more than
( 10 Tyres)
Tyres) 10 Tyres)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18a 18b 19 20 21 22 23
22.02.2020 6 AM to 7 AM 644 297 395 13 17 8 57 49 3 0 0 1483 0 0 0 0 0 0 1483 0 0 0
7 AM to 8 AM 773 279 469 18 24 48 25 32 0 0 0 1668 0 0 0 0 0 0 1668 0 0 0
8 AM to 9 AM 925 275 413 12 7 24 22 18 0 0 0 1696 0 0 0 0 0 0 1696 0 0 0
9 AM to 10 AM 100 28 12 0 0 23 3 43 0 0 2 211 0 0 0 0 0 0 211 0 0 0
10 AM to 11 AM 689 232 258 20 2 19 15 33 0 3 0 1271 0 0 0 0 0 0 1271 0 0 0
11 AM to 12 Noon 300 70 215 7 8 50 25 57 3 0 0 735 0 0 0 0 0 0 735 0 0 0
12 Noon to 1 PM 128 313 515 8 7 29 13 29 0 0 3 1045 2 0 0 0 0 2 1047 0 0 0
1 PM to 2 PM 475 225 474 27 24 48 52 18 0 0 0 1343 2 0 0 0 0 2 1345 0 0 0
2 PM to 3 PM 444 217 359 27 4 70 39 27 3 0 2 1192 2 0 0 0 0 2 1194 0 0 0
3 PM to 4 PM 450 214 387 115 32 67 63 40 2 3 0 1373 0 0 0 0 0 0 1373 0 0 0
4 PM to 5 PM 463 310 392 97 18 60 67 35 0 0 0 1442 0 0 0 0 0 0 1442 0 0 0
5 PM to 6PM 713 212 449 22 14 54 28 25 0 0 0 1517 0 0 0 0 0 0 1517 0 0 0
6 PM to 7 PM 425 157 375 10 13 23 18 45 0 0 0 1066 0 0 0 0 0 0 1066 0 0 0
7 PM to 8 PM 325 65 313 34 12 42 64 48 0 2 2 907 0 0 0 0 0 0 907 0 0 0
8 PM to 9 PM 507 147 253 19 4 48 38 33 0 0 0 1049 0 0 0 0 0 0 1049 0 0 0
9 PM to 10 PM 424 195 258 53 3 85 50 24 0 0 0 1092 0 0 0 0 0 0 1092 0 0 0
12
10 PM to 11 PM 313 159 335 70 8 53 29 35 0 0 0 1002 0 0 0 0 0 0 1002 0 0 0
11 PM to 12 AM 125 32 82 3 13 30 23 43 0 2 0 353 0 0 0 0 0 0 353 0 0 0
12 AM to 1 AM 175 38 165 2 3 5 4 15 0 0 0 407 0 0 0 0 0 0 407 0 0 0
1 AM to 2 AM 63 19 83 3 0 3 7 3 2 0 0 183 0 0 0 0 0 0 183 0 0 0
2 AM to 3 AM 24 5 20 2 3 2 5 4 2 0 0 67 0 0 0 0 0 0 67 0 0 0
3 AM to 4 AM 18 0 13 3 0 0 2 0 0 0 0 36 0 0 0 0 0 0 36 0 0 0
4 AM to 5 AM 19 14 19 3 2 7 4 0 0 0 0 68 0 0 0 0 0 0 68 0 0 0
5 AM to 6 AM 94 25 40 3 3 13 7 15 0 0 0 200 0 0 0 0 0 0 200 0 0 0
Total for 24 ho 8616 3528 6294 571 221 811 660 671 15 10 9 21406 6 0 0 0 0 6 21412 0 0 0
13
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 20-11-2024 UP PART B : ROAD DETAILS
Time Intervals Fast Moving Vehicles Slow Moving Vehicles Locomotives (Railways)
Commerecial Vehicles Bullock Cart
Goods Vehicles (Trucks) Total Slow Total
Total Fast Vehicles(1 Passenger No. of
Two Auto Car/Jeep/ 2 - Axle Multi Axle Pedal Cycle Horse Moving Goods
Date Time Van / 3 - Axle Tractor Moving 4+19) Gate
Wheeler Rickshaw Taxi Mini Bus Buses LCV Rigid Cycle Rickshaw Drawn Vehicles(15 Trains Trains
Tempo Rigid Vehicles Wooden rubber Closers
(6 ( more than with Trailer to 18b)
( 10 Tyres)
Tyres) 10 Tyres)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18a 18b 19 20 21 22 23
23.2.2020 6 AM to 7 AM 373 78 138 4 2 19 27 13 0 0 0 654 0 0 0 0 0 0 654 0 0 0
7 AM to 8 AM 375 83 165 3 13 33 34 15 0 0 0 721 2 0 0 0 0 2 723 0 0 0
8 AM to 9 AM 550 138 187 20 19 38 18 25 0 0 2 997 0 0 0 0 0 0 997 0 0 0
9 AM to 10 AM 575 185 245 28 15 38 28 12 0 0 0 1126 0 0 0 0 0 0 1126 0 0 0
10 AM to 11 AM 700 183 293 22 9 42 27 13 0 0 2 1291 2 0 0 0 0 2 1293 0 0 0
11 AM to 12 Noon 700 294 427 27 35 43 19 24 0 0 0 1569 3 0 0 0 0 3 1572 0 0 0
12 Noon to 1 PM 463 263 248 24 7 28 19 8 0 0 0 1060 2 0 0 0 0 2 1062 0 0 0
1 PM to 2 PM 450 363 450 13 5 25 12 58 0 0 0 1376 3 0 0 0 0 3 1379 0 0 0
2 PM to 3 PM 513 400 307 25 40 39 23 70 0 0 2 1419 0 0 0 0 0 0 1419 0 0 0
3 PM to 4 PM 650 488 663 28 8 30 12 25 0 0 0 1904 3 0 0 0 0 3 1907 0 0 0
4 PM to 5 PM 425 350 438 24 8 32 17 22 0 0 0 1316 0 0 0 0 0 4 1320 0 0 0
5 PM to 6PM 638 550 675 42 24 28 32 19 0 0 0 2008 0 0 0 0 0 2 2010 0 0 0
6 PM to 7 PM 119 388 110 18 0 19 19 53 0 0 0 726 2 0 0 0 0 4 730 0 0 0
7 PM to 8 PM 619 222 510 25 10 33 30 45 0 2 0 1496 0 0 0 0 0 0 1496 0 0 0
8 PM to 9 PM 519 200 379 13 0 13 2 17 0 0 0 1143 0 0 0 0 0 0 1143 0 0 0
9 PM to 10 PM 682 167 500 5 0 23 18 0 0 0 0 1395 0 0 0 0 0 0 1395 0 0 0
10 PM to 11 PM 325 73 325 4 7 14 10 13 0 0 0 771 0 0 0 0 0 0 771 0 0 0
11 PM to 12 AM 150 38 144 10 0 2 9 0 0 0 0 353 0 0 0 0 0 0 353 0 0 0
12 AM to 1 AM 75 8 62 0 2 4 0 3 0 0 0 154 0 0 0 0 0 0 154 0 0 0
1 AM to 2 AM 37 3 35 0 4 0 3 0 0 0 0 82 0 0 0 0 0 0 82 0 0 0
2 AM to 3 AM 33 4 20 0 0 0 0 2 0 0 0 59 0 0 0 0 0 0 59 0 0 0
3 AM to 4 AM 63 10 20 5 3 5 2 0 0 0 0 108 0 0 0 0 0 0 108 0 0 0
14
4 AM to 5 AM 100 13 28 7 4 3 3 0 0 0 0 158 0 0 0 0 0 0 158 0 0 0
5 AM to 6 AM 238 65 113 25 7 15 13 7 2 0 0 485 0 0 0 0 0 0 485 0 0 0
Total for 24 hours 9372 4566 6482 372 222 526 377 444 2 2 6 22371 17 0 0 0 0 25 22396 0 0 0
15
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 20-11-2024 DOWN PART B : ROAD DETAILS
16
4 AM to 5 AM 63 4 8 2 0 3 2 0 0 0 0 82 0 0 0 0 0 0 82 0 0 0
5 AM to 6 AM 182 57 42 5 0 8 4 2 0 0 0 300 0 0 0 0 0 0 300 0 0 0
Total for 24 ho 9227 2675 5884 473 385 817 500 262 47 11 2 20283 8 0 0 0 0 8 20291 0 0 0
17
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 21-11-2024 UP PART B : ROAD DETAILS
18
5 AM to 6 AM 64 40 65 8 4 30 10 2 4 0 0 227 0 0 0 0 0 0 227 0 0 0
Total for 24 hours 8251 3164 6219 542 412 942 491 307 50 23 6 20407 0 0 0 0 0 10 20417 0 0 0
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 21-11-2024 DOWN PART B : ROAD DETAILS
19
12 AM to 1 AM 143 193 35 140 3 3 4 3 0 5 0 529 0 0 0 0 0 0 529 0 0 0
1 AM to 2 AM 32 2 30 0 3 0 2 0 2 0 0 71 0 0 0 0 0 0 71 0 0 0
2 AM to 3 AM 17 3 17 0 0 3 0 0 0 0 0 40 0 0 0 0 0 0 40 0 0 0
3 AM to 4 AM 15 3 24 2 3 0 3 2 0 0 0 52 0 0 0 0 0 0 52 0 0 0
4 AM to 5 AM 5 7 0 0 0 3 2 0 2 0 0 19 0 0 0 0 0 0 19 0 0 0
5 AM to 6 AM 64 40 57 9 4 30 9 2 3 0 0 218 0 0 0 0 0 0 218 0 0 0
Total for 24 ho 8122 3382 6099 712 378 918 503 332 43 29 7 20525 13 0 0 0 0 13 20538 0 0 0
20
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 22-11-2024 UP PART B : ROAD DETAILS
21
5 AM to 6 AM 162 42 87 22 0 7 9 3 0 0 0 332 0 0 0 0 0 0 332 0 0 0
Total for 24 hours 7891 2779 6049 838 382 703 212 113 24 0 6 18997 16 0 0 0 0 24 19021 0 0 0
22
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 22-11-2024 DOWN PART B : ROAD DETAILS
23
5 AM to 6 AM 120 40 112 15 0 10 15 23 0 0 0 335 0 0 0 0 0 0 335 0 0 0
Total for 24 7558 2392 6612 355 263 688 409 259 11 12 2 18561 2 0 0 0 0 2 18563 0 0 0
hours
24
Page 25
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. III
TWO DAYS TRAFFIC SUMMARY
Time Intervals Fast Moving Vehicles Slow Moving Vehicles Locomotives (Railways)
Commerecial Vehicles
Bullock Cart Total Train
Goods Vehicles (Trucks)
Multi Total Fast Slow Total Vehicle
No. of
Direction of Two Auto Car/Jeep/ 2 - Axle 3 - Axle Axle Tractor Moving Pedal Cycle Horse Moving Vehicles(1 PCU Passenger Goods Unit
Date Van / Gate
Traffic Wheeler Rickshaw Taxi Mini Bus Buses LCV Rigid Rigid with Vehicles(c Cycle Rickshaw Drawn Vehicles(c 4+19) Trains Trains (TVU)
Tempo Wooden rubber Closers (15 x 25)
(6 ( 10 ( more Trailer ol. 3 to 13) l.15 to
Tyres) Tyres) than 10 18b)
Tyres)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18a 18 b 19 20 21 22 23 24 25
Day 1 UP 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
DOWN 10567 6267 7152 1863 556 738 474 314 66 18 2 28017 0 0 0 0 0 0 28017 0 0 0
Day 2 UP 8352 4645 6101 1714 688 1062 375 231 118 22 0 23308 9 0 0 0 0 9 23317 0 0 0
DOWN 5963 3657 4372 1349 512 765 186 245 83 26 4 17162 11 0 0 0 0 11 17173 0 0 0
Day 3 UP 7793 1657 3137 484 164 446 200 94 21 9 0 14005 23 0 0 0 0 28 14033 0 0 0
DOWN 7579 2066 5766 219 128 525 397 194 34 5 5 16918 19 0 0 0 0 19 16937 0 0 0
Day 4 UP 7292 2135 6000 126 362 752 236 605 35 0 5 17548 5 0 0 0 0 15 17563 0 0 0 0
DOWN 8616 3528 6294 571 221 811 660 671 15 10 9 21406 6 0 0 0 0 6 21412 0 0 0 0
Day 5 UP 9372 4566 6482 372 222 526 377 444 2 2 6 22371 17 0 0 0 0 25 22396 0 0 0 0
DOWN 9227 2675 5884 473 385 817 500 262 47 11 2 20283 8 0 0 0 0 8 20291 0 0 0
Day 6 UP 8251 3164 6219 542 412 942 491 307 50 23 6 20407 0 0 0 0 0 10 20417 0 0 0 0
DOWN 8122 3382 6099 712 378 918 503 332 43 29 7 20525 13 0 0 0 0 13 20538 0 0 0
Day 7 UP 7891 2779 6049 838 382 703 212 113 24 0 6 18997 16 0 0 0 0 24 19021 0 0 0 0
DOWN 7558 2392 6612 355 263 688 409 259 11 12 2 18561 2 0 0 0 0 2 18563 0 0 0
Two Days Total 106583 42913 76167 9618 4673 9693 5020 4071 549 167 54 259508 129 0 0 0 0 170 259678 0 0 0 0
Average Per Day (ADT) 15226 6130 10881 1374 668 1385 717 582 78 24 8 37073 18 0 0 0 0 24 37097 0 0 0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21A 21 B 22 23 24 25 26
Mani - Ullala 16.40 27 10.60 0.30 15226 6130 10881 1374 668 1385 717 582 78 24 8 37073 18 0 0 0 0 18 37091 0 4836 -
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 19-02-202 19-02-2020 UP PART B : RO PART B : ROAD DETAILS
3) Count Post at K.M.: 27.00km 27.00km Place (RailPlace (Railway Gate, If any ) : Babbukatte
Down : From To
new
updated
25% old
Time Intervals Fast Moving Vehicles
Commerecial Vehicles
Goods Vehicles (Trucks)
Two Two Auto Auto Car/Jeep/ Car/Jeep/ 2 - Axle 2 - Axle Multi Axle Multi Axle
Date Time Van / Van / 3 - Axle 3 - Axle Tractor Tractor
Wheeler Wheeler Rickshaw Rickshaw Taxi Taxi Mini Bus Mini Bus Buses Buses LCV LCV Rigid Rigid
Tempo Tempo Rigid Rigid
(6 (6 ( more than ( more than with Trailer with Trailer
( 10 Tyres) ( 10 Tyres)
Tyres) Tyres) 10 Tyres) 10 Tyres)
1 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13
19-02-2020 6 AM to 7 AM 50 14 40 12 4 23 0 3 0 0 0
7 AM to 8 AM 314 64 198 53 5 47 24 2 2 0 0
27
Total for 24 hours 8144 0 4174 0 6630 0 2886 0 545 0 625 0 359 0 154 0 57 0 8 0 0 0
28
0 0 0 0 0 0 0 0 0 0
-8144 -4174 -6630 -2886 -545 -625 -359 -154 -57 -8 0 0 0
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 19.02.20 19.02.2020 DOWN PART B : RO PART B : ROAD DETAILS
2) Name of the Section MangaluruMangaluru Place (RailPlace (Railway Gate, If any ) : Babbukatte
19-2-2020 6 AM to 7 AM 120 23 12 7 28 0 13 2 2 0 0
7 AM to 8 AM 463 199 280 18 4 52 7 3 0 0 0
8 AM to 9 AM 1404 270 410 34 33 68 10 9 0 0 0
9 AM to 10 AM 675 289 412 73 23 40 39 20 0 0 0
10 AM to 11 AM 507 164 195 19 25 40 62 13 2 2 0
11 AM to 12 Noon 330 132 240 15 10 35 53 15 2 0 0
12 Noon to 1 PM 675 284 550 43 17 75 57 24 7 2 0
1 PM to 2 PM 444 163 318 17 20 50 28 27 0 0 0
2 PM to 3 PM 588 428 525 220 125 33 14 20 3 0 2
3 PM to 4 PM 488 338 425 94 32 32 9 19 3 2 0
4 PM to 5 PM 550 429 502 165 37 44 27 22 4 0 0
5 PM to 6PM 575 452 413 148 37 47 17 14 3 2 0
6 PM to 7 PM 627 463 425 144 40 39 15 15 4 0 0
7 PM to 8 PM 624 457 419 138 34 33 13 14 3 0 0
8 PM to 9 PM 454 388 372 132 30 29 24 27 5 0 0
9 PM to 10 PM 388 488 425 163 7 50 29 30 2 3 0
10 PM to 11 PM 475 313 290 44 13 19 14 13 7 5 0
11 PM to 12 AM 425 463 369 162 12 17 5 3 5 0 0
12 AM to 1 AM 413 438 367 138 8 13 4 3 4 0 0
1 AM to 2 AM 24 14 23 42 3 3 2 0 4 2 0
2 AM to 3 AM 54 9 42 2 3 4 7 0 0 0 0
3 AM to 4 AM 13 14 20 20 0 3 2 0 0 0 0
4 AM to 5 AM 63 17 40 0 2 5 9 14 2 0 0
5 AM to 6 AM 188 32 78 25 13 7 14 7 4 0 0
Total for 24 hours 10567 0 6267 0 7152 0 1863 0 556 0 738 0 474 0 314 0 66 0 18 0 2 0
29
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 20.2.2019 20.2.2019 UP PART B : RO PART B : ROAD DETAILS
3) Count Post at K.M.: 27.00km 27.00km Place (RailPlace (Railway Gate, If any ) : Babbukatte
Down : From To
30
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 20.2.201 20.2.2019 DOWN PART B : RO PART B : ROAD DETAILS
1) Name of the Road Mani Ullala Road
2) Name of the Section MangaluruMangaluru Place (RailPlace (Railway Gate, If any ) : Babbukatte
20-02-2020 6 AM to 7 AM 132 32 93 0 4 25 10 10 4 3 0 0
7 AM to 8 AM 450 313 335 125 39 88 13 7 7 0 0
8 AM to 9 AM 350 300 263 225 22 63 27 25 7 0 0
9 AM to 10 AM 325 338 325 38 33 57 8 4 4 4 0
10 AM to 11 AM 263 250 238 44 20 10 10 5 2 0 0
11 AM to 12 Noon 157 88 138 9 3 2 0 0 0 0 0
12 Noon to 1 PM 282 243 150 10 13 10 9 19 0 0 0
1 PM to 2 PM 313 305 269 50 4 9 13 32 0 0 0
2 PM to 3 PM 219 150 188 125 10 58 4 19 8 2 0
3 PM to 4 PM 438 260 313 100 25 38 5 18 0 2 0
4 PM to 5 PM 275 213 250 100 82 75 24 14 12 7 0
5 PM to 6PM 354 300 269 88 107 63 7 4 7 7 3
6 PM to 7 PM 338 282 263 94 94 68 13 14 2 2 0
7 PM to 8 PM 125 52 234 50 12 47 0 7 0 0 0
8 PM to 9 PM 358 57 243 44 9 49 3 8 0 0 0
9 PM to 10 PM 594 75 238 38 10 44 7 8 0 0 0
10 PM to 11 PM 313 138 195 35 3 13 0 20 0 0 0
11 PM to 12 AM 225 107 140 25 0 9 3 4 0 0 0
12 AM to 1 AM 32 12 30 25 4 5 7 20 0 0 0
1 AM to 2 AM 24 14 23 42 2 3 2 0 4 2 0
2 AM to 3 AM 55 9 42 2 3 4 7 2 0 0 0
3 AM to 4 AM 65 39 40 7 4 8 3 0 14 0 0
4 AM to 5 AM 113 38 40 35 2 4 3 2 8 0 0
5 AM to 6 AM 163 42 53 38 7 13 8 3 4 0 0
Total for 24 5963 0 3657 0 4372 0 1349 0 512 0 765 0 186 0 245 0 83 26 0 3 0
hours 31
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 21-02-202 21-02-2020 UP PART B : RO PART B : ROAD DETAILS
Down : From To
32
Total for 24 hours 7793 6228 1657 1319 3137 2502 484 383 164 128 446 350 200 156 94 71 21 15 9 5 0 0
33
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 21.2.201 21.2.2019 DOWN PART B : RO PART B : ROAD DETAILS
1) Name of the Road Mani Ullala Road
34
Total for 24 ho 7579 0 2066 0 5766 0 219 0 128 0 525 0 397 0 194 0 34 0 5 0 5 0
35
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 22-02-202 22-02-2020 UP PART B : RO PART B : ROAD DETAILS
Down : From To
36
5 AM to 6 AM 112 13 75 0 9 7 0 10 0 0 0
Total for 24 hours 7292 0 2135 0 6000 0 126 0 362 0 752 0 236 0 605 0 35 0 0 0 5 0
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 22.02.20 22.02.2020 DOWN PART B : RO PART B : ROAD DETAILS
38
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 23-02-202 23-02-2020 UP PART B : RO PART B : ROAD DETAILS
Down : From To
39
Total for 24 hours 9372 0 4566 0 6482 0 372 0 222 0 526 0 377 0 444 0 2 0 2 0 6 0
40
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 23.02.20 23.02.2020 DOWN PART B : RO PART B : ROAD DETAILS
23.02.2020 6 AM to 7 AM 120 23 29 12 7 28 0 13 2 0 0
7 AM to 8 AM 599 113 210 29 57 88 22 5 0 0 0
8 AM to 9 AM 1404 270 410 34 33 68 10 9 0 0 0
9 AM to 10 AM 675 289 412 73 23 40 39 20 0 0 0
10 AM to 11 AM 507 165 197 20 30 45 60 14 3 4 2
11 AM to 12 Noon 332 134 250 18 12 38 58 18 3 0 0
12 Noon to 1 PM 675 284 550 44 15 84 63 25 8 3 0
1 PM to 2 PM 450 175 320 18 53 37 27 35 2 0 0
2 PM to 3 PM 512 150 355 27 19 54 14 40 0 0 0
3 PM to 4 PM 452 112 447 38 35 48 50 25 4 0 0
4 PM to 5 PM 480 130 533 23 45 64 38 12 3 0 0
5 PM to 6PM 544 160 424 30 18 53 32 13 2 0 0
6 PM to 7 PM 469 193 390 20 4 57 20 8 5 2 0
7 PM to 8 PM 564 190 462 27 5 50 25 4 5 0 0
8 PM to 9 PM 314 70 259 9 5 35 8 3 2 2 0
9 PM to 10 PM 449 70 310 15 7 10 5 5 0 0 0
10 PM to 11 PM 213 27 143 5 4 2 2 3 8 0 0
11 PM to 12 AM 95 18 65 0 2 3 7 3 0 0 0
12 AM to 1 AM 35 4 28 3 4 2 3 0 0 0 0
1 AM to 2 AM 22 4 19 0 0 0 2 0 0 0 0
2 AM to 3 AM 8 13 2 8 0 0 0 2 0 0 0
3 AM to 4 AM 63 20 19 13 7 0 9 3 0 0 0
4 AM to 5 AM 63 4 8 2 0 3 2 0 0 0 0
5 AM to 6 AM 182 57 42 5 0 8 4 2 0 0 0
41
Total for 24 ho 9227 0 2675 0 5884 0 473 0 385 0 817 0 500 0 262 0 47 0 11 0 2 0
42
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 24-02-202 24-02-2020 UP PART B : RO PART B : ROAD DETAILS
Down : From To
43
Total for 24 hours 8251 0 3164 0 6219 0 542 0 412 0 942 491 0 307 0 50 0 23 0 6 0
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 24.02.20 24.02.2020 DOWN PART B : RO PART B : ROAD DETAILS
44
3 AM to 4 AM 15 3 24 2 3 0 3 2 0 0 0
4 AM to 5 AM 5 7 0 0 0 3 2 0 2 0 0
5 AM to 6 AM 64 40 57 9 4 30 9 2 3 0 0
Total for 24 ho 8122 0 3382 0 6099 0 712 0 378 0 918 0 503 0 332 0 43 0 29 0 7 0
45
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 25-02-202 25-02-2020 UP PART B : RO PART B : ROAD DETAILS
Down : From To
Commerecial Vehicles
Goods Vehicles (Trucks)
Two Two Auto Auto Car/Jeep/ Car/Jeep/ 2 - Axle 2 - Axle Multi Axle Multi Axle
Date Time Van / Van / 3 - Axle 3 - Axle Tractor Tractor
Wheeler Wheeler Rickshaw Rickshaw Taxi Taxi Mini Bus Mini Bus Buses Buses LCV LCV Rigid Rigid
Tempo Tempo Rigid Rigid
(6 (6 ( more than ( more than with Trailer with Trailer
( 10 Tyres) ( 10 Tyres)
Tyres) Tyres) 10 Tyres) 10 Tyres)
1 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13
2 PM to 3 PM 207 38 138 24 10 13 8 5 2 0 0
3 PM to 4 PM 188 82 207 48 22 23 3 0 2 0 0
5 PM to 6PM 162 42 87 22 0 7 9 3 0 0 0
6 PM to 7 PM 594 244 600 87 13 64 14 7 0 0 0
7 PM to 8 PM 750 459 648 10 28 12 3 2 0 0 0
8 PM to 9 PM 450 107 279 13 4 45 12 3 0 0 0
9 PM to 10 PM 342 38 175 5 0 14 14 2 3 0 0
10 PM to 11 PM 308 58 194 2 0 3 2 0 2 0 0
11 PM to 12 AM 154 9 105 3 2 0 2 4 3 0 0
12 AM to 1 AM 54 15 53 0 0 2 0 0 0 0 0
1 AM to 2 AM 65 2 8 0 2 0 0 0 0 0 0
2 AM to 3 AM 42 3 49 0 3 0 2 2 3 0 0
3 AM to 4 AM 52 8 62 4 2 2 2 0 0 0 0
4 AM to 5 AM 134 45 68 15 2 4 5 3 0 0 0
5 AM to 6 AM 162 42 87 22 0 7 9 3 0 0 0
46
Total for 24 hours 7891 0 2779 0 6049 0 838 0 382 0 703 0 212 0 113 0 24 0 0 0 6 0
47
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. II
DAILY TRAFFIC SUMMARY SHEET
PART A : GENERAL 25.02.20 25.02.2020 DOWN PART B : RO PART B : ROAD DETAILS
146 0 0 0 0 0 0 146 0 0 0
709 0 0 0 0 0 0 709 0 0 0
1669 0 0 0 0 0 0 1669 0 0 0
1519 1 0 0 0 0 1 1520 0 0 0
1124 2 0 0 0 0 2 1126 0 0 0
2490 0 0 0 0 0 0 2490 0 0 0
1385 0 0 0 0 0 0 1385 0 0 0
882 2 0 0 0 0 2 884 0 0 0
953 0 0 0 0 0 0 953 0 0 0
1353 2 0 0 0 0 2 1355 0 0 0
2846 2 0 0 0 0 4 2850 0 0 0
1196 0 0 0 0 0 2 1198 0 0 0
1770 0 0 0 0 0 4 1774 0 0 0
1556 0 0 0 0 0 0 1556 0 0 0
1188 0 0 0 0 0 0 1188 0 0 0
728 0 0 0 0 0 0 728 0 0 0
730 0 0 0 0 0 0 730 0 0 0
313 0 0 0 0 0 0 313 0 0 0
150 0 0 0 0 0 0 150 0 0 0
65 0 0 0 0 0 0 65 0 0 0
50 0 0 0 0 0 0 50 0 0 0
134 0 0 0 0 0 0 134 0 0 0
325 0 0 0 0 0 0 325 0 0 0
301 0 0 0 0 0 0 301 0 0 0
49
23582 9 0 0 0 0 0 0 0 0 0 17 23599 0 0 0
50
-23582
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
207 0 0 0 0 0 0 0 207 0 0 0
1026 0 0 0 0 0 0 0 1026 0 0 0
2238 0 0 0 0 0 0 0 2238 0 0 0
1571 0 0 0 0 0 0 0 1571 0 0 0
1029 0 0 0 0 0 0 0 1029 0 0 0
832 0 0 0 0 0 0 0 832 0 0 0
1734 0 0 0 0 0 0 0 1734 0 0 0
1067 0 0 0 0 0 0 0 1067 0 0 0
1958 0 0 0 0 0 0 0 1958 0 0 0
1442 0 0 0 0 0 0 0 1442 0 0 0
1780 0 0 0 0 0 0 0 1780 0 0 0
1708 0 0 0 0 0 0 0 1708 0 0 0
1772 0 0 0 0 0 0 0 1772 0 0 0
1735 0 0 0 0 0 0 0 1735 0 0 0
1461 0 0 0 0 0 0 0 1461 0 0 0
1585 0 0 0 0 0 0 0 1585 0 0 0
1193 0 0 0 0 0 0 0 1193 0 0 0
1461 0 0 0 0 0 0 0 1461 0 0 0
1388 0 0 0 0 0 0 0 1388 0 0 0
117 0 0 0 0 0 0 0 117 0 0 0
121 0 0 0 0 0 0 0 121 0 0 0
72 0 0 0 0 0 0 0 72 0 0 0
152 0 0 0 0 0 0 0 152 0 0 0
368 0 0 0 0 0 0 0 368 0 0 0
28017 0 0 0 0 0 0 0 0 0 0 0 28017 0 0 0
51
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
52
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
313 0 0 0 0 0 0 313 0 0 0
1377 0 0 0 0 0 0 1377 0 0 0
1282 2 0 0 0 0 2 1284 0 0 0
1136 0 0 0 0 0 0 1136 0 0 0
842 2 0 0 0 0 2 844 0 0 0
397 2 0 0 0 0 2 399 0 0 0
736 0 0 0 0 0 0 736 0 0 0
995 3 0 0 0 0 3 998 0 0 0
783 0 0 0 0 0 0 783 0 0 0
1199 0 0 0 0 0 0 1199 0 0 0
1052 2 0 0 0 0 2 1054 0 0 0
1209 0 0 0 0 0 0 1209 0 0 0
1170 0 0 0 0 0 0 1170 0 0 0
527 0 0 0 0 0 0 527 0 0 0
771 0 0 0 0 0 0 771 0 0 0
1014 0 0 0 0 0 0 1014 0 0 0
717 0 0 0 0 0 0 717 0 0 0
513 0 0 0 0 0 0 513 0 0 0
135 0 0 0 0 0 0 135 0 0 0
116 0 0 0 0 0 0 116 0 0 0
124 0 0 0 0 0 0 124 0 0 0
180 0 0 0 0 0 0 180 0 0 0
245 0 0 0 0 0 0 245 0 0 0
331 0 0 0 0 0 0 331 0 0 0
17161 11 0 0 0 0 0 0 0 0 0 11 17172 0 0 0
53
54
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
55
14005 23 0 0 0 0 0 0 0 0 0 28 14033 0 0 0
56
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
57
16918 19 0 0 0 0 0 0 0 0 0 19 16937 0 0 0
58
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
59
226 0 0 0 0 0 0 226 0 0 0
17548 5 0 0 0 0 0 0 0 0 0 15 17563 0 0 0
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
Bullock Cart
Total Slow Total
Total Fast Vehicles(1 Passenger No. of
Pedal Pedal Cycle Cycle Horse Horse Moving Goods
Moving 4+19) Gate
Cycle Cycle Rickshaw Rickshaw Drawn Drawn Vehicles(15 Trains Trains
Vehicles Closers
Wooden Wooden rubber rubber to 18b)
61
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
62
22371 17 0 0 0 0 0 0 0 0 0 25 22396 0 0 0
63
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
Bullock Cart
Total Slow Total
Total Fast Vehicles(1 Passenger No. of
Pedal Pedal Cycle Cycle Horse Horse Moving Goods
Moving 4+19) Gate
Cycle Cycle Rickshaw Rickshaw Drawn Drawn Vehicles(15 Trains Trains
Vehicles Closers
Wooden Wooden rubber rubber to 18b)
234 0 0 0 0 0 0 234 0 0 0
1123 0 0 0 0 0 0 1123 0 0 0
2238 0 0 0 0 0 0 2238 0 0 0
1571 2 0 0 0 0 2 1573 0 0 0
1047 0 0 0 0 0 0 1047 0 0 0
863 2 0 0 0 0 2 865 0 0 0
1751 2 0 0 0 0 2 1753 0 0 0
1117 0 0 0 0 0 0 1117 0 0 0
1171 0 0 0 0 0 0 1171 0 0 0
1211 2 0 0 0 0 2 1213 0 0 0
1328 0 0 0 0 0 0 1328 0 0 0
1276 0 0 0 0 0 0 1276 0 0 0
1168 0 0 0 0 0 0 1168 0 0 0
1332 0 0 0 0 0 0 1332 0 0 0
707 0 0 0 0 0 0 707 0 0 0
871 0 0 0 0 0 0 871 0 0 0
407 0 0 0 0 0 0 407 0 0 0
193 0 0 0 0 0 0 193 0 0 0
79 0 0 0 0 0 0 79 0 0 0
47 0 0 0 0 0 0 47 0 0 0
33 0 0 0 0 0 0 33 0 0 0
134 0 0 0 0 0 0 134 0 0 0
82 0 0 0 0 0 0 82 0 0 0
300 0 0 0 0 0 0 300 0 0 0
64
20283 8 0 0 0 0 0 0 0 0 0 8 20291 0 0 0
65
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
66
20407 0 0 0 0 0 0 0 0 0 0 10 20417 0 0 0
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
Bullock Cart
Total Slow Total
Total Fast Vehicles(1 Passenger No. of
Pedal Pedal Cycle Cycle Horse Horse Moving Goods
Moving 4+19) Gate
Cycle Cycle Rickshaw Rickshaw Drawn Drawn Vehicles(15 Trains Trains
Vehicles Closers
Wooden Wooden rubber rubber to 18b)
67
52 0 0 0 0 0 0 52 0 0 0
19 0 0 0 0 0 0 19 0 0 0
218 0 0 0 0 0 0 218 0 0 0
20525 13 0 0 0 0 0 0 0 0 0 13 20538 0 0 0
68
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
1772 0 0 0 0 0 0 1772 0 0 0
1163 0 0 0 0 0 0 1163 0 0 0
1077 0 0 0 0 0 0 1077 0 0 0
1742 3 0 0 0 0 3 1745 0 0 0
923 2 0 0 0 0 2 925 0 0 0
511 0 0 0 0 0 0 511 0 0 0
1036 2 0 0 0 0 2 1038 0 0 0
1197 2 0 0 0 0 2 1199 0 0 0
445 0 0 0 0 0 0 445 0 0 0
575 0 0 0 0 0 0 575 0 0 0
1287 2 0 0 0 0 4 1291 0 0 0
332 0 0 0 0 0 2 334 0 0 0
1623 0 0 0 0 0 4 1627 0 0 0
1912 3 0 0 0 0 3 1915 0 0 0
913 2 0 0 0 0 2 915 0 0 0
593 0 0 0 0 0 0 593 0 0 0
569 0 0 0 0 0 0 569 0 0 0
282 0 0 0 0 0 0 282 0 0 0
124 0 0 0 0 0 0 124 0 0 0
77 0 0 0 0 0 0 77 0 0 0
104 0 0 0 0 0 0 104 0 0 0
132 0 0 0 0 0 0 132 0 0 0
276 0 0 0 0 0 0 276 0 0 0
332 0 0 0 0 0 0 332 0 0 0
69
18997 16 0 0 0 0 0 0 0 0 0 24 19021 0 0 0
70
T OF KARNATAKA
RKS DEPARTMENT
RM No. II
C SUMMARY SHEET
Bullock Cart
Total Slow Total
Total Fast Vehicles(1 Passenger No. of
Pedal Pedal Cycle Cycle Horse Horse Moving Goods
Moving 4+19) Gate
Cycle Cycle Rickshaw Rickshaw Drawn Drawn Vehicles(15 Trains Trains
Vehicles Closers
Wooden Wooden rubber rubber to 18b)
381 0 0 0 0 0 0 381 0 0 0
863 2 0 0 0 0 2 865 0 0 0
1021 0 0 0 0 0 0 1021 0 0 0
1525 0 0 0 0 0 0 1525 0 0 0
960 0 0 0 0 0 0 960 0 0 0
1369 0 0 0 0 0 0 1369 0 0 0
1187 0 0 0 0 0 0 1187 0 0 0
1226 0 0 0 0 0 0 1226 0 0 0
898 0 0 0 0 0 0 898 0 0 0
1051 0 0 0 0 0 0 1051 0 0 0
1043 0 0 0 0 0 0 1043 0 0 0
1291 0 0 0 0 0 0 1291 0 0 0
1585 0 0 0 0 0 0 1585 0 0 0
1560 0 0 0 0 0 0 1560 0 0 0
807 0 0 0 0 0 0 807 0 0 0
359 0 0 0 0 0 0 359 0 0 0
338 0 0 0 0 0 0 338 0 0 0
218 0 0 0 0 0 0 218 0 0 0
146 0 0 0 0 0 0 146 0 0 0
88 0 0 0 0 0 0 88 0 0 0
130 0 0 0 0 0 0 130 0 0 0
88 0 0 0 0 0 0 88 0 0 0
92 0 0 0 0 0 0 92 0 0 0
335 0 0 0 0 0 0 335 0 0 0
18561 2 0 0 0 0 0 0 0 0 0 2 18563 0 0 0
71
72
VDF = (0.01 * 625 + 0.05 * 2609 + 0.10 * 5159 + 0.03 * 2690 + 0.15 * 2113 + 0.30 * 303 + 0.50 * 88) / (625 + 2609 +
Vehicle
Van/ Temp 0.5 6252 3126
Mini bus 0.5 2609 1304.5
Bus 2.5 5159 12897.5
LCV 1.5 2690 4035
Two axle 2.5 2113 5282.5
Three axle 4.5 303 1363.5
Multi 7 88 616
4.5 27 121.5
19241 28746.5 0.67 1.494023
0.50 * 88) / (625 + 2609 + 5159 + 2690 + 2113 + 303 + 88)