TC−10
TURBOCHARGING − TURBOCHARGER (European Spec.)
TC02C−02
INSTALLATION
1. INSTALL COMPRESSOR INLET ELBOW
Install a new gasket and compressor inlet elbow with the 2 new
nuts.
Torque:19.6 N·m (200 kgf·cm, 14 ft·lbf)
B12236
2. INSTALL TURBO OUTLET ELBOW
Install a new gasket and turbo outlet with the 3 nuts.
Torque:52 N·m (530 kgf·cm, 38 ft·lbf)
B12235
No.1 Turbo 3. REMOVE NO.1 TURBO WATER PIPE
Water Pipe Install a new gasket and No.1 turbo water pipe with the 2 nuts.
Torque:7.8 N·m (80 kgf·cm, 69 in.·lbf)
B12234
4. INSTALL OIL PIPE
Install a new gasket and turbo oil pipe with the 2 nuts.
Torque:7.8 N·m (80 kgf·cm, 69 in.·lbf)
B12233
5. INSTALL TURBOCHARGER TO EXHAUST MAN-
IFOLDS
Install a new gasket and turbocharger with the 4 nuts.
Torque:52 N·m (530 kgf·cm, 38 ft·lbf)
B12232
1HD−FTE ENGINE SUP (RM896E)
TC−11
TURBOCHARGING − TURBOCHARGER (European Spec.)
6. INSTALL HEAT INSULATOR
Install the heat insulator with the 2 bolts.
Torque:18.1 N·m (185 kgf·cm, 13.4 ft·lbf)
B12231
7. I NSTALL T URBO CHARG ER AND EXHAUST M AN-
IFOLDS ASSEMBLY
(a) Install 2 new gaskets, turbocharger and exhaust man-
ifolds assembly with the 12 nuts.
Torque:41.7 N·m (425 kgf·cm, 31 ft·lbf)
(b) Connect the 2 water hoses from the turbocharger.
(c) Install 2 new gaskets and the union bolt of the turbo oil
pipe.
B12230 Torque:24.5 N·m (250 kgf·cm, 18 ft·lbf)
(d) Connect the turbo oil hose.
(e) Install the turbocharger stay with the 3 bolts.
Torque:117.7 N·m (1200 kgf·cm, 86.8 ft·lbf)
8. INSTALL PCV HOSE AND COMPRESSOR OUTLET
ELBOW
(a) Install a new gasket and compressor outlet elbow with the
2 nuts.
Torque:19.6 N·m (200 kgf·cm, 14.5 ft·lbf)
(b) Connect the PCV hose.
9. INSTALL HEAT INSULATOR (See page EM−36)
10. I NSTALL EG R W / CO O L ER PI PE SUB−ASSY ( See
B12229 page EM−36)
11. INSTALL INTAKE PIPE ASSEMBLY
(See page EM−36)
12. FILL WITH ENGINE COOLANT
13. START ENGINE AND CHECK FOR LEAK
14. CHECK ENGINE OIL LEVEL
1HD−FTE ENGINE SUP (RM896E)