0% found this document useful (0 votes)
43 views3 pages

TR202133 1001558 SS1627 Civil 2gis Peb DRG PLB - 0

123

Uploaded by

akash goel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views3 pages

TR202133 1001558 SS1627 Civil 2gis Peb DRG PLB - 0

123

Uploaded by

akash goel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

संदभर्/Ref : CC-ENGG-TR202133-1001558-SS1627-CIVIL-2GIS-PEB-DRG-PLB Date : 15/06/2023

From : S J Lahiri To : KEC INTERNATIONAL LTD.


Senior GM 247, Park, 502,B Wing, 5th Floor, N Mumbai
400083
400083

Cc : CGM (Projects), RHQ, WR-II

Subject : GIS Substation Package SS-85 for : (i) (a) Establishment of Digital 400/220kV Navsari (New) (South
Gujrat) GIS S/S (b) Extension works at 400kV Kala GIS S/S (c) Extension works at 400kV Magarwada
GIS S/S under Transmission Network Expansion in Gujarat to increase its ATS from ISTS: Part B (ii) 08
Nos 220kV GIS Feeder Bays at Navsari (New) as Deposit Work of GETCO
LOA Ref : CC-CS/5002002195/GIS-INCLUDING/DOM/A02-CC CS -3/NOA-I/WR2-400015 & NOA-II/WR2-4000016
Dated 20/09/2022

Please find enclosed following drawings/ documents for necessary action at your end.

Vendor Drg. No. : KEC-SA313-NVS-ESC-610-DRG-708


Orgn. Drg. No. : TR202133-1001558-SS1627-CIVIL-2GIS-PEB-DRG-PLB
Revision No. : 00
Drg. Title : 400/220KV NEW NAVSARI GIS S/S- 220KV GIS BUILDING (PEB) -
LAYOUT AND RC DETAILS OF PLINTH BEAMS
App. Category : CAT-I
Scan to verfiy
Release Date : 15/06/2023

Comments : Generally in order.

अनुमोिदत श्रेणी/App. Category:

I. फेिब्रकेशन/िनमार्ण/टाइप टेिस्टंग हेतु जारी।


Approved/released for fabrication/construction.
II. फेिब्रकेशन/िनमार्ण/टाइप टेिस्टंग हेतु अनुमोिदत/जारी बशतेर् िदए गए िटप्पिणयाँ एवं आशोधनों की सिम्मिलत िकया जाये। कृपया िरवाइजड दस्तावेज अनुमोदनाथर् प्रस्तुत
करें।
Approved/released for fabrication/ construction subject to incorporation of comments and modification as noted. Revised
drawing required for approval.
III. िटप्पिणयाँ सिम्मिलत करने के उपरांत दस्तावेज को अनुमोदनाथर् प्रस्तुत करें।
To be resubmitted for approval after incorporating the comments.
IV. सूचनाथर् एवं िरकाडर् हेतु।
For information and record.
REL-CON िनमार्ण हेतु जारी।
Released for construction.

नोट/Note:

1. Approval/Comments conveyed herein neither relieve the contractor of his contractual obligations and his responsibilities, weights,
quantities, design details assemble fits, performance particulars and conformity of the supplies with the Indian Statutory Laws as
may be applicable, nor does it limits the purchaser's right under the contract.
2. The approval conveyed vide this letter does not cover the approval of make for sub-vendor items.

केन्द्रीय कायार्लय: “सौदािमनी“, प्लॉट नंबर 2, सेक्टर -29, गुरुग्राम -122001, (हिरयाणा) ,दूरभाष: 0124-2571700-719
Corporate Office: “Saudamini“, Plot No. 2, Sector-29, Gurugram-122001, (Haryana) Tel.: 0124-2571700-719
पंजीकृत कायार्लय: बी -9, कुतुब इं स्टीट्यूशनल एिरया, कटवािरया सराय, नई िदल्ली -110016. दूरभाष: 011-26560112, 26560121, 26564812, 26564892, सीआईएन: L40101DL1989GOI038121
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016. Tel: 011-26560112, 26560121, 26564812, 26564892, CIN : L40101DL1989GOI038121
Website: www.powergridindia.com
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TR202133-1001558-SS1627-CIVIL-2GIS-PEB-DRG-PLB/00/CAT-I/Page:
16 17 18 19 20 1 of 2
NOTES :-
1. ALL DIMENSIONS ARE IN MM UNLESS NOTED
OTHERWISE.
2. UNLESS NOTED OTHERWISE, THE GRADE OF
CONCRETE FOR R.C.C WORKS SHALL BE M30
3. HIGH YIELD STRENGTH DEFORMED BARS OF GRADE
A Fe-500D CRS CONFORMING TO IS-1786 SHALL BE A
USED AS REINFORCEMENT STEEL.
4. UNLESS NOTED OTHERWISE, THE LAP LENGTH OF
BARS SHALL BE 47xDIA OF BAR.
5. LAPPING OF BARS SHALL BE SUITABLY STAGGERED
1A 1' 1 2 2' 3 4 5 6 7 7' 7A AND IN NO CASE MORE THAN 50% BARS SHALL BE
LAPPED AT ANY SECTION. LAP SHOWN ON DRAWING
ARE ONLY FOR REINFORCEMENT CURTAILMENT.
2630 41850 [O/O OF STEEL LINE] 2500 6. ALL HOOKS BENDS, LAPS AND SPLICES SHALL BE AS
PER IS:456(LATEST) & IS:2502 (LATEST) UNLESS
NOTED OTHERWISE.
422 2208 760 40330 [C/C OF STEEL COLUMN] X 760 2078 422 7. CLEAR COVER OVER THE MAIN REINFORCEMENT
SHALL BE AS FOLLOWS:-.
A) PEDESTAL - 50MM
B) FOUNDATION - 50MM
B 2968 C/C 7090 C/C 1188 5352 C/C 6000 C/C 6000 C/C 7600 C/C 7100 C/C 2838 C/C C) COLUMN - 40MM B
C/C D) GRADE BEAM - 25MM
8. P.C.C OF 1:4:8 GRADE SHALL BE WITH 40MM NOMINAL
SIZE AGGREGATE.

500
9. CHAIRS IN RAFT / FOOTING SHALL BE OF 12MM DIA

350
A' C2 PB1 C3 C1 C1 PB1 C3 C1 C3 PB3 C1 PB1 C3 C3 C2 @1000MM C/C.
C/L OF 10. 02 (TWO) COAT OF BITUMINOUS PAINTING OF
COL. 0.55 KG/SQM PER COAT, TOTAL PAINTING OF 1.10
A KG/SQM, SHALL BE APPLIED ON ALL THE EXPOSED
C/L OF FACES OF THE FOUNDATIONS (i.e. PEDESTAL AND
BASE SLAB).
BASE PLT.
X 11. THIS DRAWING SHOULD BE READ IN CONJUNCTION
WITH RELEVANT ARCHITECTURAL DRAWING ANY

3730
DISCREPANCY SHOULD BE IMMEDIATELY BROUGHT
COMMUNICATION ROOM

3880
C C
LCR ROOM AHU ROOM TO NOTICE.

PB1

PB1
12. ANCHOR BOLT ARRANGEMENT SHALL BE CHECKED

PB1
WITH PEB ANCHOR BOLT SETTING PLAN & DETAILS
DRAWING NO : - KEC-SA313-NVS-ESC-610-DRG-713
BEFORE CASTING PEDESTAL AND PUTTING
B' PB2 C3 PB2 PB1 PB2 C3 PB2
C2 C3 C3 C1 C3 C3 C1 PB2 C3 PB2 C1 PB2 C3 C5 C2 C/L OF
FOUNDATION BOLT.
750

635
LEGENDS :-

600

600
COL.
B 1. F.G.L. - FINISHED GROUND LEVEL
2. F.F.L. - FINISH FLOOR LEVEL
C/L OF
14940 [C/C OF STEEL COLUMN]

1714
3. T.O.C - TOP OF CONCRETE
1460 480 BASE PLT. 4. N.G.L. - NATURAL GROUND LEVEL
16190 [O/O OF STEEL LINE]

5. PED. - PEDESTAL
D
C2 PB1 C4 C/C C/C D

C/L OF
6. FDN. - FOUNDATION

C/L OF

COL.
C/L OF COL.

COL.
7. COL. - COLUMN
B1 8. C/L - CENTER LINE
- TOP REINFORCEMENT

2200
PB1
6760 C/C

- BOTTOM REINFORCEMENT

C1 PB1 REFERENCE DRAWINGS :-


C/L OF COL.
C2 220kV GIS HALL 1. KEC-SA307-NVS-ESC-605-DRG-715 - 200KV GIS
C4 ARCHITECTURAL GROUND FLOOR , ROOF PLAN &
SECTIONS (LATEST REV.)
2. KEC-SA313-NVS-ESC-610-DRG-713 - PEB G.A PLAN,
2846

E ELEVATION, CROSS SECTION & DETAILS (SH-01 TO E


SH-17) (LATEST REV.)
3. KEC-SA313-NVS-ESC-610-DRG-707 - RCC DETAILS OF

414
FOOTING & PEDESTAL FOR 220kV GIS BUILDING
C2 4. KEC-SA313-NVS-ESC-600-DRG-701 - FOUNDATION
C PB1 C2 LAYOUT
C/L OF COL.
C4 D2

PB1
3700 C/C

2200

PB1
PB1

C4 PB1 D1
F C/L OF COL. F
C2

1086
D
635
750

PB1
D' C2
C2 C5 C1 C5 C1 C5 C1 C5 C1 C5 C1 C5 C5
645 3545 3545 3270 3270 3000 3000 3000 3000 3800 3800 2150 2865 2085 645
C/L OF

C/L OF

C/L OF

C/L OF

C/L OF

C/L OF

C/L OF

C/L OF
COL.

COL.

COL.

COL.

COL.

COL.

COL.

COL.
G G

COLUMN & PLINTH BEAM LAYOUT PLAN


(SCALE 1:100)

H H
1A 1 2 2' 3 4 5 6 7 7' 7A

2630 41850 [O/O OF STEEL LINE] 2500

422 2208 760 40330 [C/C OF STEEL COLUMN] 760 2078 422

2968 C/C 7090 C/C 1188 5352 C/C 6000 C/C 6000 C/C 7600 C/C 7100 C/C 2838 C/C
C/C
500

I
A' TB1 TB1 TB1 I

A
3730

COMMUNICATION ROOM LCR ROOM AHU ROOM


TB1

TB1
TB1
TB1

TB1

J J
B' TB1 TB1 TB1 TB2
750

B
14940 [C/C OF STEEL COLUMN]
FILE PATH:Design Common Drive (\\kecmumpdfsr):\(_):\04- Other\KEC STD SHEET\FINAL\HORIZONTAL SHEET\KEC-STD-SHEET-A0 (L SHAPE) R0

16190 [O/O OF STEEL LINE]

TB1
400
B1
1700 C/C

K K
TB1
6760 C/C

CLIENT:
C1 TB1 POWER GRID CORPORATION OF INDIA LTD.
400
220kV GIS HALL LEAD PARTNER OF JV

KEC INTERNATIONAL LIMITED


OTHER PARTNER OF JV
HYOSUNG CORPORATION
CONTRACT NO:
L C TB1 CC-CS/5002002195/GIS-INCLUDING/DOM/A02-CC L
CS-3/NOA-I/WR2-400015 DATE: 20/09/2022
400
D2 NOA-I : SUPPLY:

1700 C/C
CC-CS/5002002195/GIS-INCLUDING/DOM/A02-CC
3700 C/C

TB1
CS-3/NOA-I/WR2-400015 DATE: 20/09/2022

TB1
NOA-II : SERVICE
CC-CS/5002002195/GIS-INCLUDING/DOM/A02-CC
B.O.LB ABOVE DOOR & WINDOW TB1
400 D1 CS-3/NOA-II/WR2-400016 DATE: 20/09/2022
@ EL. (+) 3.15M (TYP.)
TB1

SPEC. NO :
5002002195/GIS-INCLUDING/DOM/A02-CC CS-3

D TB2 3
PROJECT:
4 TB2
750

M 400kV GIS Substation Package: SS-85 for: (I) (a) Establishment of Digital M
400/220kV Navsari (New) (South Gujrat) GIS S/S (b) Extension works at 400kV
D' Kala GIS S/S (c) Extension works at 400kV Magarwada GIS S/S under
Transmission Network Expansion in Gujrat to increase its ATC from ISTS : Part B.
(II) 400kV GIS ICT bay extension under augmentation of transformation capacity
S3 3 S3 S3 S3 S3 S3 S3 S3 S3
(TYP.)
450

S4 4 at Navsari (New) 765/400kV GIS S/S under 'Transmission Network Expansion in


(TYP.)
750

Gujrat associated with integration of RE projects from Khavda potential RE Zone'


(III) 08 Nos 220kV GIS Feeder Bays at Navsari (New) as
Deposit Work of GETCO.

SUBSTATION:
400/220kV SUBSTATION NAVSARI

N
TIE BEAM LAYOUT PLAN TITLE:
COLUMN, PLINTH , LINTEL & TIE BEAMS N
(SCALE 1:100) LAYOUT AND DETAILS OF FOR 220kV GIS BUILDING
DIVISION: DATE:(CURRENT ISSUE)
12.06.2023
DWG.NO. SCALE:

SIZE-A1
KEC-SA313-NVS-ESC-610-DRG-708 AS SHOWN
R0 12.06.23 ISSUED FOR APPROVAL RK SK V.V. CLIENT DRG. NO: REV.
REV DATE DESCRIPTION DRN CHD APP XXXXXXXXXXXXXXXXXXX R0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SH-01 OF 01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TR202133-1001558-SS1627-CIVIL-2GIS-PEB-DRG-PLB/00/CAT-I/Page:
16 17 18 19 20 2 of 2
NOTES :-

1. ALL DIMENSIONS ARE IN MM UNLESS NOTED


BRICK OTHERWISE.
1A 1 2 2' 3 4 5 6 7 7' 7A MODULAR CABLE
WALL 2. FOR NOTES AND OTHER DETAILS REFER SHEET 01 OF
SEALING SYETEM 02 OF THIS DRAWING.
A 41850 [O/O OF STEEL LINE] A
2630 2500
F.F.L. OUTDOOR ROOM
(+)0.75m LCR ROOM
422 2208 760 40330 [C/C OF STEEL COLUMN] 760 2078 422

600
2968 C/C 7090 C/C 1188 5352 C/C 6000 C/C 6000 C/C 7600 C/C 7100 C/C 2838 C/C
C/C OUTDOOR

(TYP.)
S2 2 SEC. A-A

450
TRENCH

150
S1 S1 S1 S1 S1 S1 F.G.L.

500
(±)0.00m TYPE 2-2
A' LB1 LB1 LB1 LB1 LB1 LB1 LB1 LB1
B A 1500 1500 1500 1500 1500 1500 1500 2000 B

300
300 300 300 300 300 2 300 300 300 300 300 300 300 300 300 300 300 PLINTH BEAM
2 2

300

300 300
LEGENDS :-

300
1500
LB1

LB1
1500

1800
1500
LB1

LB1
3730

S2
S1
S2

S1
1. F.G.L. - FINISHED GROUND LEVEL
LCR ROOM AHU ROOM (SECTION X-X)

300
2. F.F.L. - FINISH FLOOR LEVEL
COMMUNICATION ROOM (SCALE 1:30)
3. T.O.C - TOP OF CONCRETE
4. N.G.L. - NATURAL GROUND LEVEL
750
S1 1 S1 S1 5. PED. - PEDESTAL

300

300
B' (TYP.) 6. FDN. - FOUNDATION
LB1 LB1 LB1 LB1 BRICK 7. COL. - COLUMN
WALL 8. C/L - CENTER LINE
750

C C
1500 1500 1500 1200 - TOP REINFORCEMENT
B F.F.L - BOTTOM REINFORCEMENT
300 300 300 300 300 300 300 (+)0.750M GIS HALL LCR ROOM
300
14940 [C/C OF STEEL COLUMN]

S1 1 REFERENCE DRAWINGS :-
16190 [O/O OF STEEL LINE]

300

450
LB1 B.O.LB ABOVE DOOR & WINDOW SEC. B-B 1. KEC-SA307-NVS-ESC-605-DRG-715 - 200KV GIS
SEC. A-A ARCHITECTURAL GROUND FLOOR , ROOF PLAN &

750
B1 @ EL. (+) 3.15M (TYP.) SECTIONS (LATEST REV.)
1500 PIPE 2. KEC-SA313-NVS-ESC-610-DRG-713 - PEB G.A PLAN,
F.G.L./T.O.B

300
1500

300 300 SLEEVES ELEVATION, CROSS SECTION & DETAILS (SH-01 TO


S2

LB1

(+)0.00M
LB1
6760 C/C

SH-17) (LATEST REV.)


300

300 300 3. KEC-SA313-NVS-ESC-610-DRG-707 - RCC DETAILS OF


1500 FOOTING & PEDESTAL FOR 220kV GIS BUILDING
D C1 4. KEC-SA313-NVS-ESC-600-DRG-701 - FOUNDATION D
300

LAYOUT
750 LB1 220kV GIS HALL
S1 PLINTH
BEAM
1500
LB1
S1

300

S1 (SECTION Y-Y)
(SCALE 1:30)
C
300

LB1
1500 D2
E E
3700 C/C

300 300
1500
LB1

TIE BEAM / AS PER DETAIL

S2
S1

LB1
LB1
300 300
300

1500
D1 10 ɸ @150 C/C
2 - 10ɸ HANG BAR U-SHAPE BAR
LB1
8 ɸ @150 C/C

600
D S1
750

B.O.LB
D'

150
AS / PLAN
F F
L/2

100
230 L=750

PIECE LINTEL BEAM LAYOUT PLAN SECTION 4-4


(SCALE 1:100) (TYPICAL DETAIL OF SUNSHADE TYPE-S4)
(SCALE 1:20)

G G
230 230 230
G/L G/L
AS PER PLAN (+)0.50m (±)0.30m (±)0.150m TIE BEAM / AS PER DETAIL
3 - 16ɸ TOP BAR 3 - 16ɸ TOP BAR 3 - 16ɸ TOP BAR LINTEL BEAM (LB1)
T.O.BEAM T.O.BEAM T.O.BEAM
T.O.BEAM 'Ld' (TYP.) TOP BAR BOTTOM BAR F.G.L. LINTEL BEAM (LB1) 10 ɸ @150 C/C

150
REFER SEC.

300
8 ɸ @100 C/C (ST1) 8 ɸ @100 C/C (ST1) 8 ɸ @100 C/C (ST1) 10 ɸ @150 C/C U-SHAPE BAR 10 ɸ @150 C/C
F.G.L. 2 - 10ɸ HANG BAR
8 ɸ @150 C/C (ST2) 8 ɸ @150 C/C (ST2) 8 ɸ @150 C/C (ST2) 2 - 10ɸ HANG BAR 2 - 10ɸ HANG BAR
500

U-SHAPE BAR 8 ɸ @150 C/C U-SHAPE BAR


600

600

600

600
D

STIRRUPS STIRRUPS STIRRUPS 8 ɸ @150 C/C 8 ɸ @150 C/C

450
F.G.L.

300
100

300
H B.O.LB H

300

150
75MM THK. 75MM THK. 75MM THK. B.O.LB B.O.LB

150

150
2D ST2 2D AS / PLAN
75

75
P.C.C (1:4:8) P.C.C (1:4:8) P.C.C (1:4:8) AS / PLAN AS / PLAN
50 ST1 ST1 50 L/2

100
75MM THK. L/2 L/2

100

100
75

P.C.C (1:4:8) 75 75 75 230 L=750


230 L=450 230 L=450
(TYP.) 3 - 16ɸ BOTTOM BAR (TYP.) 3 - 16ɸ BOTTOM BAR (TYP.) 3 - 16ɸ BOTTOM BAR

SECTION 1-1 SECTION 2-2 SECTION 3-3


TYPICAL PLINTH BEAM L.S SECTION TYPICAL CROSS SECTION TYPICAL CROSS SECTION TYPICAL CROSS SECTION (TYPICAL DETAIL OF SUNSHADE TYPE-S2)
(TYPICAL DETAIL OF SUNSHADE TYPE-S1) (TYPICAL DETAIL OF SUNSHADE TYPE-S3)
(SCALE 1:50) OF PLINTH BEAM MKD "PB1" OF PLINTH BEAM MKD "PB2" OF PLINTH BEAM MKD "PB3" (SCALE 1:20)
I (SCALE 1:20) (SCALE 1:20) I
(SCALE 1:20) (SCALE 1:20) (SCALE 1:20)

230 230
G/L G/L
AS PER PLAN (+)3.550m (+)3.00m 230 T.O.C AS PER
T.O.BEAM T.O.BEAM SCHEDULE OF COL.
3 - 12ɸ TOP BAR
T.O.BEAM TOP BAR BOTTOM BAR FROM F.F.L. 3 - 16ɸ TOP BAR FROM F.F.L. 3 - 16ɸ TOP BAR
'Ld' (TYP.) TIE
REFER SEC. a1

300
8 ɸ 2L @125 C/C BEAM
8 ɸ @100 C/C (ST1) 8 ɸ @100 C/C (ST1) B.O.LB a1 a1
J STIRRUPS J
D

450

8 ɸ @150 C/C (ST2) 8 ɸ @150 C/C (ST2) AS / PLAN


600

STIRRUPS STIRRUPS

b1
1 / 1a

600
2D ST2 2D 1 / 1a

S
3 - 16ɸ BOTTOM BAR

b1
b1
ST1 ST1 1 / 1a
50 50
FILE PATH:Design Common Drive (\\kecmumpdfsr):\(_):\04- Other\KEC STD SHEET\FINAL\HORIZONTAL SHEET\KEC-STD-SHEET-A0 (L SHAPE) R0

2 / 2a
2 / 2a
3 - 16ɸ BOTTOM BAR 2 / 2a

(CLEAR HEIGHT BETWEEN BEAMS)


3 - 16ɸ BOTTOM BAR SECTION 5-5
TYPICAL TIE BEAM L.S SECTION (TYPICAL CROSS SECTION COLUMN - C1 & C3 COLUMN - C2 & C4
(SCALE 1:50) TYPICAL CROSS SECTION COLUMN - C5
K TYPICAL CROSS SECTION OF PIECE LINTEL BEAM MKD "LB1") (SCALE 1:20) (SCALE 1:20) K
OF TIE BEAM MKD "TB1" (SCALE 1:20)
(SCALE 1:20)
OF TIE BEAM MKD "TB2" CLIENT:
(SCALE 1:20)
(SCALE 1:20) COLUMN POWER GRID CORPORATION OF INDIA LTD.

N
LEAD PARTNER OF JV

KEC INTERNATIONAL LIMITED


AFTER PLACEMENT OF REINFORCEMENT PIECE RCC LINTEL SUPPORTED
COL. REINF. AS PER OTHER PARTNER OF JV
PIECE RCC LINTEL SUPPORTED BRICK WALL INTO THE HOLE GROUTING SHALL BE ON BRICK WORK & R.C.C COLUMN
DONE WITH CEMENT MORTAR 1:3 (TYP) SCHEDULES OF COL. HYOSUNG CORPORATION
ON BRICK WORK BRICK WALL CONTRACT NO:
L CC-CS/5002002195/GIS-INCLUDING/DOM/A02-CC L
TABLE 01-SCHEDULE OF COLUMN & REINF. ABOVE PLINTH LEVEL :- CS-3/NOA-I/WR2-400015 DATE: 20/09/2022
NOA-I : SUPPLY:
TOP BAR TOP BAR COLUMN NO. OF COLUMN COLUMN SIZE LONGITUDINAL SPECIAL CC-CS/5002002195/GIS-INCLUDING/DOM/A02-CC
5 5 SI.NO. (+)0.75m
TYPE. COLUMNS TERMINATION REINFORCEMENT CONFINING NORMAL TIES CS-3/NOA-I/WR2-400015 DATE: 20/09/2022

600
FFL.

S
LEVEL a1 b1 DETAILS TIES. - (S) (N) NOA-II : SERVICE
CC-CS/5002002195/GIS-INCLUDING/DOM/A02-CC
2x2NOS. 23Ø HOLES TOP OF PLINTH BEAM
AS PER SECTION CS-3/NOA-II/WR2-400016 DATE: 20/09/2022
IN COLUMNS EL. (+)3.550M 8 ɸ @ 75 - 1 8 ɸ @ 150 - 1a SPEC. NO :
1 C1 & C3 12+13=25 (FROM F.F.L.) 300 230 6-20 ɸ 5002002195/GIS-INCLUDING/DOM/A02-CC CS-3
8 ɸ @ 75 - 2 8 ɸ @ 150 - 2a
BOTTOM BAR BOTTOM BAR (±)0.00m PROJECT:
M 50 5 STIRRUPS 50 5 STIRRUPS 50 EL. (+)3.550M 8 ɸ @ 75 - 1 8 ɸ @ 150 - 1a FGL. 400kV GIS Substation Package: SS-85 for: (I) (a) Establishment of Digital M
R.C.C COLUMN 400/220kV Navsari (New) (South Gujrat) GIS S/S (b) Extension works at 400kV
50 2 C2 & C4 11+4=15 (FROM F.F.L.) 230 300 6-20 ɸ Kala GIS S/S (c) Extension works at 400kV Magarwada GIS S/S under
300 CLEAR SPAN 300 200 CLEAR SPAN 300 8 ɸ @ 75 - 2 8 ɸ @ 150 - 2a
Transmission Network Expansion in Gujrat to increase its ATC from ISTS : Part B.
(II) 400kV GIS ICT bay extension under augmentation of transformation capacity
EL. (+)3.0M 8 ɸ @ 75 - 1 8 ɸ @ 150 - 1a PLINTH PLINTH BEAM at Navsari (New) 765/400kV GIS S/S under 'Transmission Network Expansion in
3 C5 8 300 230 6-20 ɸ BEAM REINF. Gujrat associated with integration of RE projects from Khavda potential RE Zone'
(FROM F.F.L.) 8 ɸ @ 75 - 2 8 ɸ @ 150 - 2a (III) 08 Nos 220kV GIS Feeder Bays at Navsari (New) as
Deposit Work of GETCO.
TOTAL TYPICAL SECTION FOR COLUMN C3, C4 & C5 FROM PLINTH BEAM
COLUMN 48 SUBSTATION:
(SCALE 1:30) 400/220kV SUBSTATION NAVSARI
TYP. DETAIL-1 OF PIECE LINTEL BEAM (LB1) OVER DOOR & WINDOW TYP. DETAIL-2 OF PIECE LINTEL BEAM (LB1) OVER DOOR & WINDOW * ALL COLUMNS MARKED AS C1, C2, C3, C4 & C5 SHALL TERMINATED AT TOP OF TIE BEAM (3.00 / 3.550M FROM F.F.L.) TITLE:
N COLUMN, PLINTH , LINTEL & TIE BEAMS N
FOR LOCATION OF DOOR & WINDOW REFER ARCHITECTURE FOR LOCATION OF DOOR & WINDOW REFER ARCHITECTURE LAYOUT AND DETAILS OF FOR 220kV GIS BUILDING
DIVISION: DATE:(CURRENT ISSUE)
(SCALE 1:20) (SCALE 1:20) 12.06.2023
DWG.NO. SCALE:

SIZE-A1
KEC-SA313-NVS-ESC-610-DRG-708 AS SHOWN
R0 12.06.23 ISSUED FOR APPROVAL RK SK V.V. CLIENT DRG. NO: REV.
REV DATE DESCRIPTION DRN CHD APP XXXXXXXXXXXXXXXXXXX R0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SH-01 OF 01

You might also like