0% found this document useful (0 votes)
19 views2 pages

ISM T&A Assign 2

Uploaded by

viggnees96
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views2 pages

ISM T&A Assign 2

Uploaded by

viggnees96
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Time & Action Plan

Order No. 4587 Style # 458794 Purchase Order no.1547 Order Quantity

Fabric detail : 100% cotton,Plain Manufecturing


weave,150 GSM Style description:Means Formal Shirt Country:Chhindwara,India
Destination Port: New York Shipment port:Mumbai,India Buyer Country:USA
Sr. no. Activity Planned Date Actual Date
Buyers enquiry and specification(Proto kit) receved 01.06.2012
2 Pattern is made acording to specification 04.06.2012
3 Proto sample submission 09.06.2012
4 proto sample approval 29.06.2012
5 Order conformation 29.06.2012
6 Trims and art work send for approval 14.07.2012
7 lab dip send for approval 14.07.2012
8 Requist for sample of trims and fabric send 30.06.2012
9 Sample lot of trims and fabric enterd in to store 20.07.2012
10 Meating with samplling and all other department 20.07.2012
11 Sample lot of finishedfabric(yardage) enterd in to store 22.07.2012
12 Fit sample send to buyer 27.07.2012
13 Approval of fit sample 22.08.2012
14 Sales man sample send to buyer 27.07.2012
15 Approval of sales man sample 22.08.2012
16 P.O. ralsed by buyer 23.08.2012
17 trims and art work appproved 15.08.2012
18 Approval of Lab-dip 20.08.2012
19 P.O. ralsed for fabric and trims by merchandiser/sourcing team 26.08.2012
20 FPT send to buyer 31.08.2012
21 Approval of FPT 15.09.2012
22 Ad/photo shoot sample send to buyer 29.07.2012
23 Approval of Ad/photo shoot 22.08.2012
24 All fabric in house 03.10.2012
25 All trims in house 03.10.2012
26 Fabrics and trim quality and quantity measured 05.10.2012
27 Size set sample sent to buyer 08.10.2012
28 Approval of size set sample 25.10.2012
29 GPT submitted to buyer 08.10.2012
30 GPT approved by buyer 30.10.2012
31 Planned cut date 31.10.2012
32 cut panels send to embriodery 01.11.2012
33 embriodery completed 07.11.2012
34 Pilot run 03.11.2012
35 Pre production meeting 06.11.2012
36 PP sample send to buyer 03.11.2012
37 Approval of PP sample 12.11.2012
38 Production start date 15.11.2012
39 TOP sampes send to buyer 17.11.2012
40 TOP sample approval 21.11.2012
41 Production end date 15.12.2012
42 Finishing and packing start 17.11.2012
43 Finishing and packing completed 18.12.2012
44 Buyer Quality Audit 19.12.2012
45 Shipment sample sent to buyer 19.12.2012
46 ExFactory 20.12.2012
47 ExCountry 26.12.2012
Season : SS 14

Delivery Date:1st March


2013
Deviation(No. of Days

You might also like