Safca Report
Safca Report
CONTRACT NO
PROJECT TITLE
3 Attendance List
5 Audit Checklist :
General Overhead Lines
Substation Underground Cable
6 Audit Scoresheet :
General Overhead Lines
Substation Underground Cable
*Please tick
( ✓)
SAFCA REPORT
Attendance List
Date & Day :
Opening Time :
Venue :
1
(Chair person)
10
11
12
13
14
15
16
17
18
19
20
21
SAFCA REPORT
Project Information & Result
Contract Name :
Contractor :
GD Project Director :
GD Project Engineer :
Scope of Audit :
Other Info :
Verdict :
SCORE PERCENTAGE : %
2 GD Representative
3 Contractor Representative
4 SHO / SSS
5 Other:
2.1: 1 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (GENERAL) OBSERVATION
2.1: 2 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (GENERAL) OBSERVATION
2.1: 3 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (GENERAL) OBSERVATION
2.1: 4 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (GENERAL) OBSERVATION
2.1: 5 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (GENERAL) OBSERVATION
2.1: 6 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (GENERAL) OBSERVATION
2.1: 7 of 30
Safety Compliance Audit (SAFCA)
COMPONENT NO.2a : SUBSTATION (CHECKLIST)
(JANUARY 2022)
1a Head Protection
Provided and worn properly where necessary (refer
i
item 1.iv)
Approved / standard type by SIRIM/DOSH or relevant
ii
autorities. Suitable for the job. (CE EN397)
2.2a: 8 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (SUBSTATION) OBSERVATION
2.2a: 9 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (SUBSTATION) OBSERVATION
v Equipment unobstructed
5 Working at Height
Working at height awareness training given to workers
i
by certified training provider / trainer
Evidence / proof of certified training provider / trainer
ii
available. Record of training module provided.
Safe work procedure for WAH available,
iii
communicated and inline with item 5.iv below.
Fall prevention / protection provided where workers is
at risk of a fall of 2 metres or more (e.g. guard rail,
iv
safety net, blanket, double lanyard with energy/shock
absorber, safety line etc.)
6 Ladders
2.2a: 10 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (SUBSTATION) OBSERVATION
7 Scaffolding
Compliance to MS 1462 (system & materials) and
i availability of the certificate Perakuan Pematuhan
Standard (PPS) by CIDB
Appointment of Competent Scaffolder by contractor
ii
available
Used/Refurbished scaffold to be inspected and
iii approved by Professional Engineer for Temporary
Work (PETW)
Design and drawings of scaffolds to be approved by
Professional Engineer for Temporary Work (PETW)
for:
a) tube >40m height,
iv b) others types such as frame type >15m height
c) falsework for all tier
2.2a: 11 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (SUBSTATION) OBSERVATION
2.2a: 12 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (SUBSTATION) OBSERVATION
v Adequate lighting
2.2a: 13 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (SUBSTATION) OBSERVATION
16 Confined Space
Safe Work Procedure available, communicated &
i
comply with ICOP.
2.2a: 14 of 30
Safety Compliance Audit (SAFCA)
COMPONENT NO.2b : OVERHEAD LINES (CHECKLIST)
(JANUARY 2022)
1a Head Protection
Provided and worn properly where necessary (refer
i
item 1.vi)
Approved / standard type by SIRIM/DOSH or relevant
autorities. Suitable for the job.
ii
i. Ground work - EN397
ii. WAH - EN12492
Condition of Safety Helmet including expiry according
iii
to manufacturer's leaflet and no modification.
1b Foot Protection
Suitable safety footwear provided and worn properly
i
where necessary (refer item 1.vi)
Approved / standard type by SIRIM/DOSH or relevant
ii autorities. Suitable for the job and the hazards. (WAH:
EN 12568)
Condition of safety shoe and its ability to function
iii
properly
1c Hand Protection
Suitable hand glove provided and worn properly
i
where necessary (refer item 1.vi)
Type of hand protection suitable for the job and the
ii
hazards (WAH: CE EN 420, CE EN 388)
2.2b: 15 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) OBSERVATION
2.2b: 16 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) OBSERVATION
2.2b: 17 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) OBSERVATION
2.2b: 18 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) OBSERVATION
2.2b: 19 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) OBSERVATION
2.2b: 20 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) OBSERVATION
2.2b: 21 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) OBSERVATION
2.2b: 22 of 30
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) OBSERVATION
19 Traffic Safety
Procedure/Traffic Management Plan as per relevant
local authority requirement (temporary signage, work
i
zones control, blinkers etc.) e.g JKR arahan teknik
(jalan) 2C/85
Approval obtained from relevant authority for
ii
Highway/ railway track/ river (e.g crossing)
Proper control/Traffic controller / Flag man /
iii
Communication established in line with 19.i
Reflective safety vest to be used during working near
iv
traffic area
20 Security System (Site Store)
Validity of licensed security company hired as per
i
contract requirement
Security staff reporting insecure conditions and action
taken. Daily record such as clocking/checking system
ii
established by Security Guard and implemented if
relevant
Control of entry and exit of persons, vehicles, etc.
iii
(logbook)
Proper guard house with adequate facilities e.g. power
iv source, fire extinguisher, emergency contact number
etc.
2.2b: 23 of 30
Safety Compliance Audit (SAFCA)
COMPONENT NO.2c : UNDERGROUND CABLE (CHECKLIST)
(JANUARY 2022)
1a Head Protection
Provided and worn properly where necessary (refer
i
item 1.iv)
Approved / standard type by SIRIM/DOSH or relevant
ii
autorities. Suitable for the job. (CE EN397)
2.2c: 24 of 30
DESCRIPTIONS / REQUIREMENTS (UNDERGROUND
ELEMENT OBSERVATION
CABLE)
1e Eye / Face Protection
Eye / face protection provided and worn properly
i
where necessary (refer item 1.iv)
Approved / standard type by SIRIM/DOSH or relevant
ii
autorities. Suitable for the job and the hazards.
Condition of eye / face protection and its ability to
iii
function properly
1f Hearing Protection
Hearing protection provided and worn properly where
i
necessary (refer item 1.iv)
Approved / standard type by SIRIM/DOSH or relevant
ii autorities. Suitable for the job and the hazard's risk
level.
Condition of the hearing protection and its ability to
iii
function properly
1g Vest
Suitable vest with reflective materials provided and
i
worn properly where necessary (refer item 1.iv)
2.2c: 25 of 30
DESCRIPTIONS / REQUIREMENTS (UNDERGROUND
ELEMENT OBSERVATION
CABLE)
3 First Aid Facilities
Adequate facilities provided as per DOSH guideline on
First Aid in the workplace 2nd edition / FMA (Safety
i
Health & Welfare Regulation), Forth Schedule
guideline and properly registered.
2.2c: 26 of 30
DESCRIPTIONS / REQUIREMENTS (UNDERGROUND
ELEMENT OBSERVATION
CABLE)
7 Ladders
2.2c: 27 of 30
DESCRIPTIONS / REQUIREMENTS (UNDERGROUND
ELEMENT OBSERVATION
CABLE)
9 Cranes, Hoist and Machineries
All lifting gears are identified. Register list and
i inspection checklist available (jacks, wire or chain
slings, steel chain blocks, winch, pulley etc.)
All crane shall be operated by competent operator. To
ii check and verify the crane operator competency
(mobile crane / overhead crane)
Crane inspection carried out and recorded including
physical condition, hook measurement, safety latches
iii
condition, function of limit switch, outrigger, earthing
discharge (if required) etc.
2.2c: 28 of 30
DESCRIPTIONS / REQUIREMENTS (UNDERGROUND
ELEMENT OBSERVATION
CABLE)
13 Premises (Site Office and Site Store) and Worksite
Provide approved Master layout plan for office & store
i
(Toilet, Pantry, bins, scrap area location etc).
Location of Fire Extinguisher, First Aid facility &
ii
Assembly Point indicated in layout (office & store)
2.2c: 29 of 30
DESCRIPTIONS / REQUIREMENTS (UNDERGROUND
ELEMENT OBSERVATION
CABLE)
16 Excavation and Trenching
17 Traffic Safety
Procedure / Traffic Management Plan as per relevant
local authority requirement (temporary signage, work
i
zones control, cones, blinkers etc.) e.g JKR arahan
teknik (jalan) 2C/85
Approval obtained from relevant authority for highway
ii
/ roads / railway track / river (e.g. crossing)
Proper Control / Traffic controller / Flag man /
iii
Communication established inline with 19.i
18 Security System
Validity of licensed security company hired as per
i contract requirement (if applicable upon delivery of
material)
Security staff reporting insecure conditions and action
ii
taken
Measures taken to safeguard materials stored at
iii
public area
2.2c: 30 of 30
Safety Compliance Audit (SAFCA)
COMPONENT NO.1 : GENERAL (SCORESHEET)
(DECEMBER
(JANUARY 2022)
2018)
ii Contractors Policy signed, dated, visibly displayed and updated accordingly. 5 M2 YES 100% 5
iv Employees have been briefed and familiar with policy. 5 M1 YES 100% 5
2 Designated Responsible for Health, Safety & Environment (Contractor)
Designation of senior management (CEO,MD,GM) responsible for HSE.
i 2.5 M1 YES 100% 2.5
(duties & responsibilities of HSE management at site clearly stated)
Designation of Managers / Engineers / Site supervisor responsible for HSE. (duties & responsibilities of
ii 2.5 M1 YES 100% 2.5
HSE management at site clearly stated)
Involvement and commitment of PM / PE (Contractor) in HSE management during project execution (eg:
iii 10 M1 YES 100% 10
promotional activity, MBWA, internal penalty/reward, toolbox, HSE facilities comprehensive etc.)
ii Name list of all site workers and identify skilled/unskilled workers including CIDB and NTSP details. 10 M1 YES 100% 10
iii Safety Induction conducted for all workers by SHO/SSS 10 M1 YES 100% 10
iv All workers attended CIDB & NTSP training and hold valid CIDB and NTSP. 10 M2 YES 100% 10
v Safety training for site supervisor other than CIDB & NTSP (e.g. HIRADC, ERP, ERT, WAH, etc ). 5 M1 YES 100% 5
vi Project insurance is valid and available at project site office 5 M2 YES 100% 5
vii Safety Performance Grading Board installed and details updated 5 M1 YES 100% 5
4 General Document Requirement
i Safety manual available and updated according to actual work condition at site 5 M1 YES 100% 5
Masterlist of documentation available with latest revision number. Obselete/previous documents to be
ii 5 M1 YES 100% 5
retained & labelled/identified.
Safety Corner including relevant HSE reference available i.e. Notice boards, Safety Manual, Acts and
iii 5 M1 YES 100% 5
Regulations, Guidelines, Safety monthly Report, Visitor Logbook for DOSH etc.
5 Permits to Work (PTW)
i Valid TNB permits used where required & available at site (copy at site office) 5 M2 YES 100% 5
ii Permits signed by responsible person (issuer & receiver) and work supervised accordingly 5 M2 YES 100% 5
Contractor Qualified Person (CQP) available for Competent Engineer's representatives with delegation
iii 5 M2 YES 100% 5
letter
3.1: 1 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (GENERAL) SCORE
POINT SCHEME CABLE AGE
6 Joint Safety and Health Committees
i Written appointment and acceptance of Chairman, Secretary and members are in order 5 M1 YES 100% 5
ii Attendance by the chairman, secretary and at least 50% of appointed members. 10 M2 YES 100% 10
iii Meeting conducted not less than once in 3 months. 5 M2 YES 100% 5
i MS provided is complete and comprehensive to cover all work activities under the scope of project. 10 M1 YES 100% 10
MS shall be endorsed by the Competent Engineer and agreed by Grid Maintenance (Live Apparatus) or
ii 5 M1 YES 100% 5
Contractor's Project Manager (Dead Apparatus).
MS prepared shall reflect the actual activities at site and site condition. A copy of each MS available at
iii 15 M1 YES 100% 15
site.
iv SWP developed for activities according to Method Statement 10 M1 YES 100% 10
3.1: 2 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (GENERAL) SCORE
POINT SCHEME CABLE AGE
11 Hazard Identification Risk Assessment and Risk Control (HIRARC)
i HIRARC established according to DOSH guideline with proper matrix, likelihood and severity identified. 5 M1 YES 100% 5
HIRARC developed is complete to cover Occupational Safety & Health (OSH) hazards at each work place
ii 20 M1 YES 100% 20
and each activity related to the scope of work of the project.
Identified controls are specific to each hazards. Evidence of controls taken are available and according
iii 20 M1 YES 100% 20
to hierarchy of control.
iv Risk Assessment reflects actual condition and specific for each hazards 20 M1 YES 100% 20
HIRARC are endorsed by Site Safety & Health Committee chairman and reviewed or updated accordingly
v 10 M2 YES 100% 10
(e.g if any incidents occurs, change in MS or change of site)
Risk Action Plan are developed for medium / high risk activities. (Should be additional to existing
vi 10 M1 YES 100% 10
controls to further reduce the risk)
12 Environmental Aspect & Impact (AIR)
i Environmental Aspect & Impact identified according to site condition and risks assessed 5 M1 YES 100% 5
Mitigation measures for each environmental Aspect identified & implemented (control of water run-off,
ii 20 M1 YES 100% 20
excessive dust, waste management, boundary noise etc.)
AIR are endorsed by at least Contractor Project Manager and reviewed or updated accordingly (e.g if
iii 5 M2 YES 100% 5
any incidents occurs, change in MS or change of site)
13 Evaluation of Compliance : Legal & Other Requirements
i Masterlist of Legal Register identifies applicable legal requirements and endorsed. 5 M1 YES 100% 5
Evaluation of legal requirement i.e OSHA, FMA, EQA & ABE with their regulations and other requirement
ii 15 M1 YES 100% 15
of local authorities reflect actual condition at site and reviewed from time to time
iii Evaluation of Compliance for HSE Requirement For Contractor reflect actual condition at site 10 M1 YES 100% 10
14 HSE Programs And Communication
Endorsed HSE program by Contractor's Project Manager available, updated and reviewed e.g gantt
i 10 M1 YES 100% 10
chart. (Plan vs. Actual)
ii Safety briefing given to Third Party (Visitors, Auditors,etc) 5 M2 YES 100% 5
Tool Box Talk conducted on daily basis by site supervisor / SHO / Site Safety Supervisor (SSS) and involve
iii 5 M1 YES 100% 5
everyone working at site including crane/skylift & piling operators
iv Tool Box Talk conducted by Project manager or Project Engineer Quaterly 5 M1 YES 100% 5
Tool Box Talk topic shall cover the work scope of the day and its related MS, HIRADC, SDS, SWP, PPE,
v 10 M1 YES 100% 10
ERP and tools / equipment and current HSE issues
Toolbox talk shall be conducted by Competent Person for high risk activity i.e.: WAH, Electrical hazard
vi 10 M1 YES 100% 10
(ESE / CE), Confined space
vii Safety monthly report submitted and record kept at site office 10 M1 YES 100% 10
Incident (Near Miss) & Accident (Occupational Injury, Dangerous Occurrence, Occupational Poisoning,
15
Occupational Diseases, Environmental) Notification Reporting and Investigation
i Incident Reporting System including procedure and flowchart 10 M1 YES 100% 10
All Incident reported to relevent parties and recorded (TNB, DOSH, EC, Police, DOE, etc). Legally
ii 10 M2 YES 100% 10
reportable incidents are managed accordingly (JKKP 6, 7 etc.)
Safety committee conduct incident meeting, investigation conducted, cause identified, effective
iii 20 M1 YES 100% 20
recommendation and corrective action taken. Records available.
16 Incident Statistics and Performance
i Monthly progressive statistical data and HSE performance indicator available (LTIF etc.) 10 M1 YES 100% 10
ii Graphical display of statistical data and incidents/ accidents/near miss on notice board. 5 M1 YES 100% 5
iii Analysis of incident (type of accidents / injuries / body parts etc.) 5 M1 YES 100% 5
3.1: 3 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (GENERAL) SCORE
POINT SCHEME CABLE AGE
17 Safety Inspection (Contractor)
Safety & Health Officer (SHO) / Site Safety Supervisor (SSS)
i At least weekly inspections of work areas using a checklist for reporting back 10 M1 YES 100% 10
ii To ensure action taken on all Safety Memo/NCR/NOI issued at site and close accordingly. 10 M1 YES 100% 10
Site Supervisor (Contractor)
Checklist shall be used prior to commence of any activities. (Job scope based e.g. erection work,
iii 10 M1 YES 100% 10
excavation etc. covering quality & safety aspect)
18 Management Self Audit (Health, Safety & Environment)
i Audited by Contractor's Top Management at least once
a) Reports available including observation and result. 5 M1 YES 100% 5
ii Monthly inspection conducted by ST competent person as per Reg. 67 Electricity Reg. 1994 5 M1 YES 100% 5
iii Generator set must be placed with a proper bund or tray 5 M1 YES 100% 5
21 Fencing, Hoarding and Barricades
i Fencing, Hoarding or barricades erected where required and must be in good condition. 10 M1 YES 100% 10
3.1: 4 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (GENERAL) SCORE
POINT SCHEME CABLE AGE
23 Scrap and Removal System
i Regular, controlled removal of scrap item and wastes (planning, no overflow wastes etc.) 5 M1 YES 100% 5
ii Evidence of waste disposal at designated place (e.g receipt, etc) 5 M1 YES 100% 5
iii Proper and dedicated scrap bins / area provided, demarcated / barricaded 10 M1 YES 100% 10
Scraps are segregated and disposed accordingly.(such as combustibles, non-combustible, chemical and
iv 5 M1 YES 100% 5
other materials)
v No superfluous materials (including items no longer in use) 5 M1 YES 100% 5
vi Disposal of Scheduled Waste as per EQA (inventory, consignment note, labelling, storage etc.) 5 M1 YES 100% 5
24 Hazardous Substances & Noise Control
Chemical register list of all substances is available in record (guideline for the preparation of chemical
i 5 M1 YES 100% 5
register from DOSH)
SDS provided in Malay and English Language for all chemical used at site and according to OSH (CLASS )
ii 10 M1 YES 100% 10
Regulation 2013
iii SDS displayed at chemical storage / during construction 5 M1 YES 100% 5
Designated storage and handling of hazardous substances. (e.g cement flooring, oil pit, bunding,
iv 10 M1 YES 100% 10
covered, ventilated etc.)
v Labelling of all containers clearly displayed and according to OSH (CLASS) Reg. 2013 10 M2 YES 100% 10
vi Awareness training / programs related to chemical handling conducted to workers 5 M1 YES 100% 5
25 Noise Identification
i Identification of Excessive Noise survey conducted as per OSH (Noise Exposure) Reg. 2019 5 M2 YES 100% 5
The subsequent Noise Risk Assessment including resulting further action if required based on Excessive
ii 5 M2 YES 100% 5
Noise Survey.
Total Elements : 24
Total Applicable Sub-Elements : 108
3.1: 5 of 20
Safety Compliance Audit (SAFCA)
COMPONENT NO.2a : SUBSTATION (SCORESHEET)
(JANUARY 2022)
ii PPE inspection by SHO / SSS / Supervisors (at least once in every three months). 10 M1 YES 100% 10
iv Relevant PPE identified where required according to activities, job, hazard and risk assessment. 5 M1 YES 100% 5
ii Approved / standard type by SIRIM/DOSH or relevant autorities. Suitable for the job. (CE EN397) 5 M1 YES 100% 5
iii Condition of Safety Helmet including expiry according to manufacturer's leaflet and no modification. 5 M1 YES 100% 5
1b Foot Protection
i Suitable safety footwear provided and worn properly where necessary (refer item 1.iv) 5 M2 YES 100% 5
ii Approved / standard type by SIRIM/DOSH or relevant autorities. Suitable for the job and the hazards. 5 M1 YES 100% 5
iii Condition of safety shoe and its ability to function properly 5 M1 YES 100% 5
1c Hand Protection
i Suitable hand glove provided and worn properly where necessary (refer item 1.iv) 5 M1 YES 100% 5
ii Type of hand protection suitable for the job and the hazards 5 M1 YES 100% 5
iii Condition of glove and its ability to function properly 5 M1 YES 100% 5
1d Full body harness
Complete set of Full body harness with double lanyard provided and worn properly where necessary
i 10 M2 YES 100% 10
(refer item 1.iv)
ii Approved / standard type by SIRIM/DOSH or relevant autorities (CE EN 361, EN 358) 5 M1 YES 100% 5
iii Double lanyard with shock absorber (CE EN 355, EN 354, EAC) and suitable hook size 5 M1 YES 100% 5
iv Condition of Full body harness, its accessories and their ability to function properly 5 M1 YES 100% 5
1e Eye / Face Protection
i Eye / face protection provided and worn properly where necessary (refer item 1.iv) 5 M1 YES 100% 5
ii Approved / standard type by SIRIM/DOSH or relevant autorities. Suitable for the job and the hazards. 5 M1 YES 100% 5
iii Condition of eye / face protection and its ability to function properly 5 M1 YES 100% 5
1f Hearing Protection
i Hearing protection provided and worn properly where necessary (refer item 1.iv) 5 M1 YES 100% 5
Approved / standard type by SIRIM/DOSH or relevant autorities. Suitable for the job and the hazard's
ii 5 M1 YES 100% 5
risk level.
iii Condition of the hearing protection and its ability to function properly 5 M1 YES 100% 5
3.2a: 6 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (SUBSTATION) SCORE
POINT SCHEME CABLE AGE
2 Emergency Response Plan and Team
i Emergency Response Team structure available, appointed (fulltime at site) and updated as necessary. 5 M1 YES 100% 5
Possible scenario adequately identified including environmental incidents. Emergency action plan /
ii flowchart developed accordingly and communicated. (E.g. Fire, structure collapse, soil collapse, flood, 10 M1 YES 100% 10
WAH, Chemical spillage etc.)
Important telephone numbers (e.g fire station, hospital/clinic, police, DOSH, DOE, EC) and names of
iii 5 M1 YES 100% 5
responsible persons strategically displayed (site office, guard post etc.)
iv Basic spill kit provided. 5 M1 YES 100% 5
Yearly evacuation drill conducted or according to major stages of work. Report / post-mortem and
v 10 M1 YES 100% 10
attendance recorded.
Training for ERT members by BOMBA or reputable training provider/trainer to take control and
vi 5 M1 YES 100% 5
understand their roles & responsibilities.
Escape route layout to be identified and displayed. Direction indicated with arrows posted at site for
vii 5 M1 YES 100% 5
large working compound.
viii Assembly point for emergency established & marked at site 5 M1 YES 100% 5
Proper Emergency Alert System (EAS) available.(e.g. siren, bell, loudhailer, whistle) and are in good
ix 5 M1 YES 100% 5
working condition.
x Workers aware on Emergency Response System at site 5 M1 YES 100% 5
3 First Aid Facilities
Adequate facilities provided as per DOSH guideline on First Aid in the workplace 2nd edition / FMA
i 10 M1 YES 100% 10
(Safety Health & Welfare Regulation), Forth Schedule guideline and properly registered.
ii Monthly inspection and usage records updated using checklist. Contents maintained. 10 M1 YES 100% 10
iii Qualified first aider (Contractor) appointed & known by worker. 10 M2 YES 100% 10
ii Inspection record of Fire Extinguishing Equipments available. Equipment in good condition and valid. 5 M1 YES 100% 5
iii Adequate number of correct types of fire extinguishing equipment provided 5 M1 YES 100% 5
ii Evidence / proof of certified training provider / trainer available. Record of training module provided. 5 M1 YES 100% 5
iii Safe work procedure for WAH available, communicated and inline with item 5.iv below. 5 M1 YES 100% 5
Fall prevention / protection provided where workers is at risk of a fall of 2 metres or more (e.g. guard
iv 10 M2 YES 100% 10
rail, safety net, blanket, double lanyard with energy/shock absorber, safety line etc.)
6 Ladders
i Safe work procedures available & communicated 5 M1 YES 100% 5
v Ladder shall be leveled on a firm footing and secured against slipping or tumbling 5 M1 YES 100% 5
3.2a: 7 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (SUBSTATION) SCORE
POINT SCHEME CABLE AGE
7 Scaffolding
Compliance to MS 1462 (system & materials) and availability of the certificate Perakuan Pematuhan
i 10 M2 YES 100% 10
Standard (PPS) by CIDB
ii Appointment of Competent Scaffolder by contractor available 10 M2 YES 100% 10
Used/Refurbished scaffold to be inspected and approved by Professional Engineer for Temporary Work
iii 5 M1 YES 100% 5
(PETW)
Design and drawings of scaffolds to be approved by Professional Engineer for Temporary Work (PETW)
for:
a) tube >40m height,
iv b) others types such as frame type >15m height 10 M2 YES 100% 10
c) falsework for all tier
A copy of approved design and drawings of the scaffold by PETW shall be submitted to DOSH.
Design and drawings of scaffold other than the above (iv), shall be provided by Competent Scaffolder
v 10 M2 YES 100% 10
and submitted to DOSH.
Installation, modification and dismantling of scaffolding to be supervised & inspected by Competent
vi 5 M1 YES 100% 5
Scaffolder and approved by PETW (for item iv) or Competent Scaffolder (for item v).
Inspection of scaffolding to be carried out every 7 days (or when it may have been affected by exposure
vii 10 M2 YES 100% 10
to weather condition) by Competent Scaffolder according to the level of certification.
viii Working platform to be installed according to BOWEC Regulation No.86 / CIS 22:2017 10 M2 YES 100% 10
Adequate and Standard Tagging for Scaffoldings above 3 meters (Red, Yellow or Green) (if falsework, by
ix 5 M2 YES 100% 5
PETW)
x Condition of scaffolds and accessories (broken, dented, rusted etc.) 10 M1 YES 100% 10
vii Stability of adjacent structure and ground condition during piling work 10 M1 YES 100% 10
viii Record of machineries that runs on fuel including estimated/average duration of use 5 M1 YES 100% 5
ix Condition of other machineries inspected and recorded (e.g. backhoe, excavator, forklift etc.) 5 M1 YES 100% 5
All machineries other than Cranes shall be operated by trained/qualified personnel. To verify
x 10 M1 YES 100% 10
competency based on available documentations (eg: JPJ H/I license, CIDB tred etc.)
3.2a: 8 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (SUBSTATION) SCORE
POINT SCHEME CABLE AGE
9 Portable Electrical Equipment & Installation
All portable equipment identified, checked and register list kept (Main/Sub Contractor). e.g. Drilling
i 10 M1 YES 100% 10
machine, grinding machine etc.)
ii Condition of all portable equipment. 5 M1 YES 100% 5
Safe Electrical installation (proper wiring, legal connection) with good condition and approved type for
iii all cords, plugs, switches, cable etc. (cable/cord not directly laid on the ground without proper 5 M1 YES 100% 5
protection such as trunking)
10 Machine Guarding
All hazardous moving machine parts within reach completely guarded/fenced. (E.g. air compressor,
i 5 M2 YES 100% 5
drilling / grinding machine, bar bending machine, motorised winch etc.)
ii All guards should be in good condition and well maintained. 5 M1 YES 100% 5
11 Compressed Gas Cylinders, Welding and Cutting
i Safety relief valve adjustment device locked or sealed e.g Flashback Arrestor 5 M1 YES 100% 5
ii Vertical cylinder storage with chain or proper trolley if in use 5 M1 YES 100% 5
iii Valid PMT available for any unfired pressure vessel. 5 M2 YES 100% 5
v Housekeeping maintained around premises and work area as far as practicable. 10 M1 YES 100% 10
13 Hygiene Facilities
i Toilet at construction site provided and maintained (PMU / store / site office) 5 M1 YES 100% 5
iv Foods, eating, drinking & resting are not in working area. 5 M1 YES 100% 5
14 Construction Site Store Requirement
i List of equipment / tools / materials available, displayed and updated. 10 M1 YES 100% 10
ii Store Master Layout Plan available, displayed and updated including area of temporary storage. 5 M1 YES 100% 5
iii Signage of store (types etc.) and labeling of materials/content inside 10 M1 YES 100% 10
vi Housekeeping maintained in storage area including safe path and space for retrieval 10 M1 YES 100% 10
Material stored in orderly manner with proper stacking and storage system in place and do not initiate
vii 5 M1 YES 100% 5
potential tripping hazard or collapse
3.2a: 9 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (SUBSTATION) SCORE
POINT SCHEME CABLE AGE
15 Excavation and Trenching
i Utility mapping done and report available (if applicable) 5 M1 YES 100% 5
Safe Work Procedure communicated. Excavation Supervisor appointed and excavation/ trenching
ii 10 M1 YES 100% 10
inspection recorded
Excavated soil to be placed at least 610mm from excavation area or provision to take out to a proper
iii 10 M2 YES 100% 10
dumping area if needed.
iv Adequate barricades, proper signages used. 5 M1 YES 100% 5
Proper slope protection (Shoring, sloping, benching, or any other approve method) erected for depth
more than 1.5 meter and in good condition.
v 10 M1 YES 100% 10
If the depth is more than 4 meter, such protection shall be constructed in accordance with the design
and drawings of Professional Engineer.
vi Safe access and egress provided. 10 M1 YES 100% 10
16 Confined Space
i Safe Work Procedure available, communicated & comply with ICOP. 5 M1 YES 100% 5
iii PTW issued by at least AGTES-trained person to ES before entrance 5 M2 YES 100% 5
iv Only AE are allowed to enter and SP available at entrance all the time with in/out log record. 5 M2 YES 100% 5
Means of safe access/egress, communication between AE & SP and exhaust fan or other appropriate air
v 10 M1 YES 100% 10
circulation provided and maintained, inline with item 5.i.
17 Dismantling
i Record of dismantling checklist 5 M1 YES 100% 5
Total Elements : 18
Total Applicable Sub-Elements : 117
3.2a: 10 of 20
Safety Compliance Audit (SAFCA)
COMPONENT NO.2b : OVERHEAD LINES (SCORESHEET)
(JANUARY 2022)
ii PPE inspection by SHO / SSS / Supervisors (at least once in every three months). 10 M1 YES 100% 10
iv Relevant PPE identified where required according to activities, job, hazard and risk assessment. 5 M1 YES 100% 5
iii Condition of Safety Helmet including expiry according to manufacturer's leaflet and no modification. 5 M1 YES 100% 5
1b Foot Protection
i Suitable safety footwear provided and worn properly where necessary (refer item 1.vi) 5 M2 YES 100% 5
Approved / standard type by SIRIM/DOSH or relevant autorities. Suitable for the job and the hazards.
ii 5 M1 YES 100% 5
(WAH: EN 12568)
iii Condition of safety shoe and its ability to function properly 5 M1 YES 100% 5
1c Hand Protection
i Suitable hand glove provided and worn properly where necessary (refer item 1.vi) 5 M1 YES 100% 5
ii Type of hand protection suitable for the job and the hazards (WAH: CE EN 420, CE EN 388) 5 M1 YES 100% 5
iii Condition of glove and its ability to function properly 5 M1 YES 100% 5
1d Full body harness & Lifeline
Complete set of Full body harness with double lanyard provided and worn properly where necessary
i 10 M2 YES 100% 10
(refer item 1.vi)
ii Approved / standard type by SIRIM/DOSH or relevant autorities (CE EN 361, EN 358) 5 M1 YES 100% 5
v Condition of Full body harness, lifeline & their accessories as well as their ability to function properly 5 M1 YES 100% 5
ii Approved / standard type by SIRIM/DOSH or relevant autorities. Suitable for the job and the hazards. 5 M1 YES 100% 5
iii Condition of eye / face protection and its ability to function properly 5 M1 YES 100% 5
3.2b: 11 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) SCORE
POINT SCHEME CABLE AGE
2 Emergency Response Plan and Team
i Emergency Response Team structure updated and appointed (fulltime at site). 5 M1 YES 100% 5
Possible scenario adequately identified including environmental incidents. Emergency action plan /
ii flowchart developed accordingly and communicated. (E.g. Fire, structure collapse, soil collapse, flood, 10 M1 YES 100% 10
fall from height, riot etc.)
Important telephone numbers (e.g fire station, hospital/clinic, police, DOSH, DOE, EC) and names of
iii 5 M1 YES 100% 5
responsible persons strategically displayed (site office, store, in mobile form for site)
iv Basic spill kit provided. 5 M1 YES 100% 5
Yearly evacuation drill conducted according to major stages of work. Report / post-mortem and
v 10 M1 YES 100% 10
attendance recorded.
Training for ERT members by BOMBA or reputable training provider/trainer to take control and
vi 5 M1 YES 100% 5
understand their roles & responsibilities.
vii Escape route layout to be identified and displayed / communicated. 5 M1 YES 100% 5
viii Assembly point for emergency established & marked at site at least in mobile form or type. 5 M1 YES 100% 5
Proper Emergency Alert System (EAS) available.(e.g. siren, bell, loudhailer, whistle) and are in good
ix 5 M1 YES 100% 5
working condition.
x Workers aware on Emergency Response System at site 5 M1 YES 100% 5
3 First Aid Facilities
Adequate facilities provided as per DOSH guideline on First Aid in the workplace 2nd edition / FMA
i 10 M1 YES 100% 10
(Safety Health & Welfare Regulation), Forth Schedule guideline and properly registered.
ii Available all the time at each work site. 5 M1 YES 100% 5
iii Monthly inspection and usage records updated using checklist. Contents maintained. 10 M1 YES 100% 10
iv Qualified first aider (Contractor) appointed & known by worker. 10 M2 YES 100% 10
ii Inspection record of Fire Extinguishing Equipments available. Equipment in good condition and valid. 5 M1 YES 100% 5
iii Adequate number of correct types of fire extinguishing equipment. 5 M1 YES 100% 5
iv Equipment correctly located, uniformly marked and unobstructed (for Site office/ site store) 5 M1 YES 100% 5
v Equipment unobstructed and easily accessible (portable). Available all the time at work site 5 M2 YES 100% 5
5 Working At Height
i Working at height (WAH) training for linesman by TNB ILSAS only 10 M2 YES 100% 10
Safety training for Team Leader (erection and stringging) -
i. ERP
ii. First Aid/CPR
ii 10 M1 YES 100% 10
iii. WAH Training ILSAS
iv. Effective Toolbox Talk Briefing -SHO (in house)
v. Machinery, Tools and PPE inspection - SHO (in house)
iii Safe work procedure for WAH available, communicated and inline with item 5.iv-vi below. 5 M1 YES 100% 5
iv Lifeline correctly used as fall protection at least during erection and stringing work. 10 M1 YES 100% 10
If required, other fall protection provided where workers is at risk of a fall of 2 metres or more (e.g.
v 5 M1 YES 100% 5
guard rail, safety net, blanket, double lanyard with energy/shock absorber, safety line etc.)
Loudhailer provided for the use of Team Leader and watchmen to constantly remind, communicate &
vi 5 M1 YES 100% 5
monitor linesman to maintain lanyard and fall arrestor 100% tie-off
3.2b: 12 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) SCORE
POINT SCHEME CABLE AGE
6 Ladders
i Safe work procedures available & communicated 5 M1 YES 100% 5
v Ladder shall be leveled on a firm footing and secured against slipping or tumbling 5 M1 YES 100% 5
7 Scaffolding And Crossing Support (Highway / KTM etc.)
i Competent scaffolder appointed for above 3 meters (certificate & appointment letter available) 10 M2 YES 100% 10
Design and drawings of scaffolds to be approved by Professional Engineer for:
a) tube>40m height,
b) others types such as frame type>15m height
ii 10 M2 YES 100% 10
c) falsework for all tier
A copy of approved design and drawings of the scaffold by PE shall be submitted to DOSH.
Design and drawings of scaffold other than the above, shall be provided by Competent Scaffolder and
iii 10 M2 YES 100% 10
submitted to DOSH.
Installation, modification and dismantling of scaffolding to be inspected by Competent Scaffolder and
iv 5 M1 YES 100% 5
approved by PE (for item ii) or Competent Scaffolder (for item iii).
Inspection of scaffolding to be carried out every 7 days (or when it may have been affected by exposure
v 10 M1 YES 100% 10
to weather condition) by Competent Scaffolder according to the level of certification.
vi Working platform to be installed according to BOWEC Regulation No.86 10 M2 YES 100% 10
vii Adequate and Standard Tagging for Scaffoldings above 3 meters (Red, Yellow or Green) 5 M2 YES 100% 5
viii Condition of scaffolds and accessories (broken, dented, rusted etc.) 10 M1 YES 100% 10
All lifting gears are identified. Register list and inspection checklist with applicable certificate available
i 5 M1 YES 100% 5
(conductor pulling socks, jacks, wire or chain slings, steel chain blocks, winch, pulley, derrick etc.).
All crane shall be operated by competent operator. To check and verify the crane operator competency
ii 10 M2 YES 100% 10
(mobile crane / overhead crane)
Crane inspection carried out and recorded including physical condition, hook measurement, safety
iii 10 M2 YES 100% 10
latches condition, function of limit switch, outrigger, earthing discharge (if required) etc.
iv Valid PMA for all cranes 5 M2 YES 100% 5
Safe work procedure & safe operation of Crane. Lifting Supervisor (compulsary for Mobile Crane),
v 10 M1 YES 100% 10
Rigger & Signalman familiar with their roles. Tagline used if necessary.
vi Record of daily inspection of Piling Machinery and condition of the machines. 5 M1 YES 100% 5
vii Stability of adjacent structure and ground condition during piling work 10 M1 YES 100% 10
viii Record of machineries that runs on fuel including estimated/average duration of use 5 M1 YES 100% 5
ix Condition of other machineries inspected and recorded (e.g. backhoe, excavator, forklift etc.) 5 M1 YES 100% 5
All machineries other than Cranes shall be operated by trained/qualified personnel. To verify
x 10 M1 YES 100% 10
competency based on available documentations (eg: JPJ H/I license, CIDB trade etc.)
3.2b: 13 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) SCORE
POINT SCHEME CABLE AGE
9 Portable Electrical Equipment
All portable equipment identified, checked and register list kept (Main/Sub Contractor). e.g. Drilling
i 10 M1 YES 100% 10
machine, grinding machine etc.)
ii Condition of all portable equipment. 5 M1 YES 100% 5
Safe Electrical installation (proper wiring, legal connection) with good condition and approved type for
iii 5 M1 YES 100% 5
all cords, plugs, switches, cable etc.
10 Machine Guarding
All hazardous moving machine parts within reach completely guarded/fenced. (E.g. air compressor,
i 5 M2 YES 100% 5
drilling / grinding machine, motorised winch etc.)
ii All guards should be in good condition and well maintained. 5 M1 YES 100% 5
11 Compressed Gas Cylinders, Welding and Cutting
i Safety relief valve adjustment device locked or sealed e.g Flashback Arrestor 5 M1 YES 100% 5
ii Vertical cylinder storage with chain or proper trolley if in use 5 M1 YES 100% 5
iii Valid PMT available for any unfired pressure vessel. 5 M2 YES 100% 5
v Housekeeping maintained around premises and work area as far as practicable. 10 M1 YES 100% 10
13 Hygiene Facilities
Toilet at site office & site store provided and maintained.
i 5 M1 YES 100% 5
Toilet facility for worksite identified and accessible.
ii Facilities in a clean and tidy condition. 5 M1 YES 100% 5
iii Means of access to clean water supply available at site. 5 M1 YES 100% 5
iv Foods, eating, drinking & resting are not in working area. 5 M1 YES 100% 5
14 Construction Site Store Requirement
i List of equipment / tools / materials available, displayed and updated. 10 M1 YES 100% 10
ii Store Master Layout Plan available, displayed and updated. 5 M1 YES 100% 5
iii Signage of store (types etc.) and labeling of materials/content inside 10 M1 YES 100% 10
vi Housekeeping maintained in storage area including safe path and space for retrieval 10 M1 YES 100% 10
Material stored in orderly manner with proper stacking and storage system in place and do not initiate
vii 5 M1 YES 100% 5
potential tripping hazard or collapse.
3.2b: 14 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (OVERHEAD LINES) SCORE
POINT SCHEME CABLE AGE
15 Excavation and Trenching
Safe Work Procedure communicated. Excavation Supervisor appointed and excavation/trenching
i 10 M1 YES 100% 10
inspection recorded
Excavated soil to be placed at least 610mm from excavation area or provision to take out to a proper
ii 10 M2 YES 100% 10
dumping area if needed.
iii Adequate barricades, proper signages used. 5 M1 YES 100% 5
Proper slope protection (Shoring, sloping, benching, or any other approve method) erected for depth
more than 1.5 meter in good condition.
iv 10 M1 YES 100% 10
If the depth is more than 4 meter, such protection shall be constructed in accordance with the design
and drawings of Professional Engineer.
v Safe access and egress provided. 10 M1 YES 100% 10
16 Confine Space (E.g. Caisson Method)
i Safe Work Procedure available, communicated & comply with ICOP. 5 M1 YES 100% 5
iii PTW issued by at least AGTES-trained person to ES before entrance 5 M2 YES 100% 5
iv Only AE are allowed to enter and SP available at entrance all the time with in/out log record. 5 M2 YES 100% 5
Means of safe access/egress, communication between AE & SP and exhaust fan or other appropriate air
v 10 M1 YES 100% 10
circulation provided and maintained, inline with item 5.i.
17 Backstay
i Approved backstay design are available 5 M1 YES 100% 5
iii Inspection carry out by using contractor's backstay checklist and in good condition 5 M1 YES 100% 5
18 Dismantling
i Permit / Approval obtained if applicable. (PTW available) 10 M2 YES 100% 10
iii Proper control/Traffic controller / Flag man / Communication established in line with 19.i 10 M1 YES 100% 10
iv Reflective safety vest to be used during working near traffic area 5 M1 YES 100% 5
20 Security System (Site Store)
i Validity of licensed security company hired as per contract requirement 5 M2 YES 100% 5
Security staff reporting insecure conditions and action taken. Daily record such as clocking/checking
ii 5 M1 YES 100% 5
system established by Security Guard and implemented if relevant
iii Control of entry and exit of persons, vehicles, etc. (logbook) 5 M1 YES 100% 5
Proper guard house with adequate facilities e.g. power source, fire extinguisher, emergency contact
iv 10 M1 YES 100% 10
number etc.
Total Elements : 20
Total Applicable Sub-Elements : 122
3.2b: 15 of 20
Safety Compliance Audit (SAFCA)
COMPONENT NO.2c : UNDERGROUND CABLE (SCORESHEET)
(JANUARY 2022)
ii PPE inspection by SHO / SSS / Supervisors (at least once in every three months). 10 M1 YES 100% 10
iv Relevant PPE identified where required according to activities, job, hazard and risk assessment. 5 M1 YES 100% 5
ii Approved / standard type by SIRIM/DOSH or relevant autorities. Suitable for the job. (CE EN397) 5 M1 YES 100% 5
iii Condition of Safety Helmet including expiry according to manufacturer's leaflet and no modification. 5 M1 YES 100% 5
1b Foot Protection
i Suitable safety footwear provided and worn properly where necessary (refer item 1.iv) 5 M2 YES 100% 5
ii Approved / standard type by SIRIM/DOSH or relevant autorities. Suitable for the job and the hazards. 5 M1 YES 100% 5
iii Condition of safety shoe and its ability to function properly 5 M1 YES 100% 5
1c Hand Protection
i Suitable hand glove provided and worn properly where necessary (refer item 1.iv) 5 M1 YES 100% 5
ii Type of hand protection suitable for the job and the hazards 5 M1 YES 100% 5
iii Condition of glove and its ability to function properly 5 M1 YES 100% 5
1d Full body harness
Complete set of Full body harness with double lanyard provided and worn properly where necessary
i 10 M2 YES 100% 10
(refer item 1.iv)
ii Approved / standard type by SIRIM/DOSH or relevant autorities (CE EN 361, EN 358) 5 M1 YES 100% 5
iii Double lanyard with shock absorber (CE EN 355, EN 354, EAC) and suitable hook size 5 M1 YES 100% 5
iv Condition of Full body harness, its accessories and their ability to function properly 5 M1 YES 100% 5
1e Eye / Face Protection
i Eye / face protection provided and worn properly where necessary (refer item 1.iv) 5 M1 YES 100% 5
ii Approved / standard type by SIRIM/DOSH or relevant autorities. Suitable for the job and the hazards. 5 M1 YES 100% 5
iii Condition of eye / face protection and its ability to function properly 5 M1 YES 100% 5
1f Hearing Protection
i Hearing protection provided and worn properly where necessary (refer item 1.iv) 5 M1 YES 100% 5
Approved / standard type by SIRIM/DOSH or relevant autorities. Suitable for the job and the hazard's
ii 5 M1 YES 100% 5
risk level.
iii Condition of the hearing protection and its ability to function properly 5 M1 YES 100% 5
1g Vest
i Suitable vest with reflective materials provided and worn properly where necessary (refer item 1.iv) 10 M1 YES 100% 10
3.2c: 16 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (UNDERGROUND CABLE) SCORE
POINT SCHEME CABLE AGE
2 Emergency Response Plan and Team
i Emergency Response Team structure updated and appointed (fulltime at site). 5 M1 YES 100% 5
Possible scenario adequately identified including environmental incidents. Emergency action plan /
ii 10 M1 YES 100% 10
flowchart developed accordingly and communicated.
Important telephone numbers (e.g fire station, hospital/clinic, police, DOSH, DOE, EC) and names of
iii 5 M1 YES 100% 5
responsible persons strategically displayed (site office, store, in mobile form for site)
iv Basic spill kit provided. 5 M1 YES 100% 5
Yearly evacuation drill conducted or according to major stages of work. Report / post-mortem and
v 10 M1 YES 100% 10
attendance recorded.
Training for ERT members by BOMBA or reputable training provider/trainer to take control and
vi 5 M1 YES 100% 5
understand their roles & responsibilities.
vii Escape route layout to be identified and displayed / communicated. 5 M1 YES 100% 5
viii Assembly point for emergency established & marked at site at least in mobile form or type. 5 M1 YES 100% 5
Proper Emergency Alert System (EAS) available.(e.g. siren, bell, loudhailer, whistle) and are in good
ix 5 M1 YES 100% 5
working condition.
x Workers aware on Emergency Response System at site 5 M1 YES 100% 5
3 First Aid Facilities
Adequate facilities provided as per DOSH guideline on First Aid in the workplace 2nd edition / FMA
i 10 M1 YES 100% 10
(Safety Health & Welfare Regulation), Forth Schedule guideline and properly registered.
ii Available all the time at each work site. 5 M1 YES 100% 5
iii Monthly inspection and usage records updated using checklist. Contents maintained. 10 M1 YES 100% 10
iv Qualified first aider (Contractor) appointed & known by worker. 10 M2 YES 100% 10
ii Inspection record of Fire Extinguishing Equipments available. Equipment in good condition and valid. 5 M1 YES 100% 5
iii Adequate number of correct types of fire extinguishing equipment. 5 M1 YES 100% 5
iv Equipment correctly located, uniformly marked and unobstructed (for Site office/ site store) 5 M1 YES 100% 5
v Equipment unobstructed and easily accessible (portable). Available all the time at work site 5 M2 YES 100% 5
5 Confined Space
i Safe Work Procedure available, communicated & comply with ICOP. 5 M1 YES 100% 5
iii PTW issued by at least AGTES-trained person to ES before entrance 5 M2 YES 100% 5
iv Only AE are allowed to enter and SP available at entrance all the time with in/out log record. 5 M2 YES 100% 5
Means of safe access/egress, communication between AE & SP and exhaust fan or other appropriate air
v 10 M1 YES 100% 10
circulation provided and maintained, inline with item 5.i.
6 Working at Height
i Working at height awareness training given to workers by certified training provider / trainer 10 M1 YES 100% 10
ii Evidence / proof of certified training provider / trainer available. Record of training module provided. 5 M1 YES 100% 5
iii Safe work procedure for WAH available, communicated and inline with item 5.iv below. 5 M1 YES 100% 5
Fall protection provided where workers is at risk of a fall of 2 metres or more (e.g. guard rail, safety net,
iv 10 M2 YES 100% 10
blanket, double lanyard with energy/shock absorber, safety line etc.)
7 Ladders
i Safe work procedures available & communicated 5 M1 YES 100% 5
v Ladder shall be leveled on a firm footing and secured against slipping or tumbling 5 M1 YES 100% 5
3.2c: 17 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (UNDERGROUND CABLE) SCORE
POINT SCHEME CABLE AGE
8 Scaffolding
i Competent scaffolder appointed for above 3 meters (certificate & appointment letter available) 10 M2 YES 100% 10
Design and drawings of scaffold (less than 40m for tube type, and 15m for frame type) shall be provided
by Competent Scaffolder and submitted to DOSH.
For falsework, the design, drawing and installation approval shall be done by Professional Engineer and
submitted to DOSH.
Installation, modification and dismantling of scaffolding to be inspected and approved by Competent
iii 5 M1 YES 100% 5
Scaffolder
Inspection of scaffolding to be carried out every 7 days (or when it may have been affected by exposure
iv 10 M1 YES 100% 10
to weather condition) by Competent Scaffolder according to the level of certification.
v Working platform to be installed according to BOWEC Regulation No.86 10 M2 YES 100% 10
vi Adequate and Standard Tagging for Scaffoldings above 3 meters (Red, Yellow or Green) 5 M2 YES 100% 5
vii Condition of scaffolds and accessories (broken, dented, rusted etc.) 10 M1 YES 100% 10
Installation of scaffolding as per design and approved
a. Sitting on firm ground / proper sole plate / stable.
viii 10 M1 YES 100% 10
b. Stepladder / Hand railing / Guard rail / Toe-board.
c. Wall ties.
9 Cranes, Hoist and Machineries
All lifting gears are identified. Register list and inspection checklist available (jacks, wire or chain slings,
i 5 M1 YES 100% 5
steel chain blocks, winch, pulley etc.).
All crane shall be operated by competent operator. To check and verify the crane operator competency
ii 10 M2 YES 100% 10
(mobile crane / overhead crane)
Crane inspection carried out and recorded including physical condition, hook measurement, safety
iii 10 M2 YES 100% 10
latches condition, function of limit switch, outrigger, earthing discharge (if required) etc.
iv Valid PMA for all cranes 5 M2 YES 100% 5
Safe work procedure & safe operation of Crane. Lifting Supervisor (compulsary for Mobile Crane), Rigger
v 10 M1 YES 100% 10
& Signalman familiar with their roles. Tagline used if necessary.
vi Record of machineries that runs on fuel including estimated/average duration of use 5 M1 YES 100% 5
vii Condition of other machineries inspected and recorded (e.g. backhoe, excavator, forklift etc.) 5 M1 YES 100% 5
All machineries other than Cranes shall be operated by trained/qualified personnel. To verify
viii 10 M2 YES 100% 10
competency based on available documentations (eg: JPJ H/I license, CIDB trade etc.)
10 Portable Electrical Equipment
All portable equipment identified, checked and register list kept (Main/Sub Contractor). e.g. Drilling
i 10 M1 YES 100% 10
machine, grinding machine etc.)
ii Condition of all portable equipment. 5 M1 YES 100% 5
Safe Electrical installation (proper wiring, legal connection) with good condition and approved type for
iii 5 M1 YES 100% 5
all cords, plugs, switches, cable etc.
11 Machine Guarding
All hazardous moving machine parts within reach completely guarded/fenced. (E.g. air compressor,
i 10 M2 YES 100% 10
drilling / grinding machine, motorised winch etc.)
ii All guards should be in good condition and well maintained. 5 M1 YES 100% 5
12 Compressed Gas Cylinders, Welding and Cutting
i Safety relief valve adjustment device locked or sealed e.g Flashback Arrestor 5 M1 YES 100% 5
ii Vertical cylinder storage with chain or proper trolley if in use 5 M1 YES 100% 5
iii Valid PMT available for any unfired pressure vessel. 5 M2 YES 100% 5
3.2c: 18 of 20
MAX. MARKING APPLI- WEIGHT-
ELEMENT DESCRIPTIONS / REQUIREMENTS (UNDERGROUND CABLE) SCORE
POINT SCHEME CABLE AGE
13 Premises (Site Office and Site Store) and Worksite
i Provide approved Master layout plan for office & store (Toilet, Pantry, bins, scrap area location etc). 5 M1 YES 100% 5
ii Location of Fire Extinguisher, First Aid facility & Assembly Point indicated in layout (office & store) 5 M1 YES 100% 5
v Housekeeping maintained around premises and work area as far as practicable. 10 M1 YES 100% 10
14 Hygiene Facilities
Toilet at site office & site store provided and maintained.
i 5 M1 YES 100% 5
Toilet facility for worksite identified and accessible.
ii Facilities in a clean and tidy condition. 5 M1 YES 100% 5
iii Means of access to clean water supply available at site. 5 M1 YES 100% 5
iv Foods, eating, drinking & resting are not in working area. 5 M1 YES 100% 5
15 Site and Temporary Storage Requirement
i List of equipment / tools / materials available and updated. 10 M1 YES 100% 10
iii Housekeeping maintained in storage area including safe path and space for retrieval 10 M1 YES 100% 10
Material store in orderly manner with proper stacking and storage system in place and do not initiate
iv 5 M1 YES 100% 5
potential tripping hazard or collapse
v Temporary storage in public area should not obstruct walkway, pathway or any type of traffic 5 M1 YES 100% 5
16 Excavation and Trenching
i Permit/Approval obtained from local authority 10 M2 YES 100% 10
ii Utility mapping done and report available (if applicable) 5 M1 YES 100% 5
Safe Work Procedure communicated. Excavation Supervisor appointed and excavation/trenching
iii 10 M1 YES 100% 10
inspection recorded
Excavated soil to be placed at least 610mm from excavation area or provision to take out to a proper
iv 10 M2 YES 100% 10
dumping area if needed.
Adequate barricades, proper signages used including for control at night at public area (blinkers,
v 5 M1 YES 100% 5
reflector, etc)
Proper slope protection (Shoring, sloping, benching, or any other approve method) erected for depth
more than 1.5 meter in good condition.
vi 10 M1 YES 100% 10
If the depth is more than 4 meter, such protection shall be constructed in accordance with the design
and drawings of Professional Engineer.
vii Safe access and egress provided. 10 M1 YES 100% 10
17 Traffic Safety
Procedure / Traffic Management Plan as per relevant local authority requirement (temporary signage,
i 10 M1 YES 100% 10
work zones control, cones, blinkers etc.) e.g JKR arahan teknik (jalan) 2C/85
ii Approval obtained from relevant authority for highway / roads / railway track / river (e.g. crossing) 5 M2 YES 100% 5
iii Proper Control / Traffic controller / Flag man / Communication established inline with 19.i 10 M1 YES 100% 10
18 Security System
Validity of licensed security company hired as per contract requirement (if applicable upon delivery of
i 5 M2 YES 100% 5
material)
ii Security staff reporting insecure conditions and action taken 5 M1 YES 100% 5
iii Measures taken to safeguard materials stored at public area 5 M1 YES 100% 5
Total Elements : 18
Total Applicable Sub-Elements : 113
3.2c: 19 of 20
SUMMARY OF SAFCA RESULT
Please Select
Site
Applicable Documentation Assessment Sub
1. ASSESSMENT (85% of SAFCA) Implementation
Component Score Score (%)
Score
Component 1 : General YES 100.0 100.0 100.0
SAFCA GRADING
SAFCA GRADING % RANGE RATING
EXCELLENT 91% - 100% 5 STAR
GOOD 81% - 90.9% 4 STAR
AVERAGE 71% - 80.9% 3 STAR
POOR 61% - 70.9% 2 STAR
VERY POOR 60.9% and less 1 STAR
3.0: 20 of 20