Group 4 HW 2-1

The document is a project manual for the construction of Didi Dighomi Central Mall, detailing various divisions and sections related to general requirements, site work, and specific construction tasks. It includes guidelines for environmental protection, construction facilities, waste management, irrigation systems, automatic gate operators, and landscaping, among others. Each section outlines responsibilities, materials, execution methods, and compliance with relevant codes and standards.

Uploaded by

Nini Kenchadze
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views21 pages

Group 4 HW 2-1

The document is a project manual for the construction of Didi Dighomi Central Mall, detailing various divisions and sections related to general requirements, site work, and specific construction tasks. It includes guidelines for environmental protection, construction facilities, waste management, irrigation systems, automatic gate operators, and landscaping, among others. Each section outlines responsibilities, materials, execution methods, and compliance with relevant codes and standards.

Uploaded by

Nini Kenchadze
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 21

PROJECT MANUAL

FOR

DIDI DIGHOMI CENTRAL MALL

NOVEMBER 13, 2023

FOR CONSTUCTION

Prepared By:
GNL Group
D.Aghmashenebeli Ave. 240
Table Of Contents

DIVISION 01 - GENERAL REQUIREMENTS


01450 Environment Protection
01500 Construction Facilities
01524 Construction Waste Management

DIVISION 02 - SITEWORK

02810 Irrigation Systems


02832 Automatic Gate Operators
02900 Landscaping

DIVISION 03 - CONCRETE
DIVISION 04 - MASONRY
DIVISION 05 - METALS
Not Used

DIVISION 06 - WOOD

06100 Rough Carpentry


06200 Finish Carpentry

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07270 Firestopping
07620 Flashing and Sheet Metal

DIVISION 08 - DOORS AND WINDOWS

08400 Entrances & Storefronts


08550 Pultruded Fiberglass Windows

DIVISION 09 - FINISHES

09680 Carpet Tile and Walk-Off Mats


09730 Elastomeric Deck Coating

DIVISION 10 - SPECIALTIES

10520 Fire Extinguishers and Cabinets


10800 Toilet Accessories

DIVISION 11 - EQUIPMENT
Not Used
DIVISION 12 - FURNISHINGS
Not Used

DIVISION 13 - SPECIALTIES
Not Used
DIVISION 14
Not Used

DIVISION 16 - ELECTRICAL

16418 Fuses

SECTION 01450
ENVIRONMENT PROTECTION
PART 1 - GENERAL
1.01 SUMMARY
A. Environmental pollution in this section means any type of elements which can have a bad impact on our health
and/or nature.
1. Contaminants could be sediments, solid, chemical or sanitary wastes (which arise during work) and
hazardous materials.
1.02 SUBMITTALS
● Obtain all necessary Federal and State approvals.
1.03 QUALITY CONTROL
● Proper amount of people who are professionals in the field are required.
1.04 PAYMENT
● Full payment should be made as said in the contract, no additional compensation can be allowed.

PART 2 - MATERIALS
2.01 MATERIALS (Not used)

PART 3 - EXECUTION
3.01 PROTECTION OF NATURAL RESOURCES
A. Land resources:
1. We need to provide tools and equipment which do not harm or pollute the environment and do not
produce noise over 85 decibels at 30.48 meters.
2. No areas around the construction will be harmed. If anything happens, the contractor will be
responsible for repairs or replacements.
3. Tree limbs can be removed as directed by the architect.
4. None of the harmful liquids, such as soil and contaminated or chlorinated water should enter the
ground or surface waters.
B. Noise control:
1. Trenchers, pavers, graders and trucks should not exceed 85 dba at 30.48 meters, other equipment - 85
dba at 15.24 meters.
2. “Whisperized” type air compressors should be used as approved.
a. Noisy equipment should be kept as far as possible from noise-sensitive site boundaries.
b. Machines should not be left idling or alone.
c. Mufflers should be provided on all engines.
d. Operations should be scheduled to be minimized.
3.02 ARCHAEOLOGICAL FINDINGS DURING CONSTRUCTION
● If there are any unexpected archeological findings at the site, operations should be suspended at that area, but
continued in other areas. Architect needs to be notified and they will provide directions afterwards.
3.03 BURNING RUBBISH AND DEBRIS
A. Burning any type of trash is forbidden.
B. Programs need to be developed to prevent the amount of dust in the area, including inside the buildings.
3.05 COMPLIANCE
A. If there are any non-compliances at the construction, the architect needs to notify the contractor and they
should take necessary actions.
If the contractor does not take actions, the architect may issue an order about stopping all or this particular work of the
contract until the problem is resolved.

End Of Section

SECTION 01500
CONSTRUCTION FACILITIES
PART 1 – GENERAL
1.01 - DESCRIPTION:
● Provide materials and labor for temporary facilities and controls during construction for all trades. Ensure strict
compliance of temporary facilities, construction processes, and techniques with applicable codes in this project.
1.02 - QUALITY ASSURANCE
1. Regulations orders and recommendations from Police and Fire Department, EPA, Regional Water Quality Board,
Title 22 CCR, CAL-OSHA.
2. Comply with requirements of NFPA Code 241, "Building Construction and Demolition Operations", the ANSI-A10
Series Standards for "Safety Requirements for Construction and Demolition".
3. Refer to "Guidelines for Bid Conditions for Temporary Job Utilities and Services", prepared jointly by AGC and
ASC, follow NEMA, NECA and UL standards and regulations for temporary electric service. Install service in
compliance with National Electric Code (NFPA 70). Get inspected by authorities before using.
1.03 - PROJECT CONDITIONS AND TEMPORARY SERVICES
● Do not allow hazardous, dangerous, or unsanitary conditions, or public nuisances to develop or persist on the
site. Arrange, provide, and maintain temporary utility and construction services for all trades on the project until
completion or when no longer needed. Remove materials when services are discontinued. Supply and maintain
runways, ladders, scaffolds, and temporary stairs for trade access, following safety guidelines, including the
"Manual of Accident Prevention in Construction" and relevant regulations.
1.04 - PAYMENT
● In accordance with the contract.
PART 2 – PRODUCTS
2.01 – FACILITIES
● Fence shall be chain-link type,1.8 meters high, complete with metal posts. Provide two gates, each one being a
minimum of 3.6 meters wide. Provide separate man gate entrance.
● Contractor shall have access to the adjacent house located at 12192 Lakeside Avenue to use as a construction
office. The house is owned by the District and will be made available for the contractor’s use.
● Provide suitable chemical type toilets maintained in sanitary condition as approved by the Health Department.
Toilets shall be removed, complete with contents upon completion of the project.
● Supply necessary temporary shoring, anchoring, and bracing for work stability. Contractor is liable for any
damage due to failure to provide these supports.
● Contractor must maintain a project identification sign during construction, indicating project’s detailed
information.
2.02 TEMPORARY LIGHT AND POWER:
The Contractor shall provide metered temporary lighting and power, including connection,
installation and maintenance.
● Everything used by contractor must be paid by contractor.

● Temporary electrical power for construction shall comply with applicable NEMA, NECA and UL Standards
safety regulations and codes.
● Remove temporary wiring and equipment when no longer needed and dispose of equipment and wiring.
Repair holes left in paving, walls and partitions.

PART 3 – EXECUTION
● Contractor is responsible for maintenance, operation, and control of new or temporary electrical/mechanical
facilities until final project acceptance.
● Clean and repair damage caused by installation or use of temporary facilities. Remove temporary underground
installations.
End Of Section

SECTION 01524
CONSTRUCTION WASTE MANAGEMENT
PART 1 - GENERAL
1.1 SUMMARY
A. This section is about getting rid of non-hazardous waste from landfill.
1.2 PERFORMANCE REQUIREMENT
A. By requirements, a minimum of 75% of non-hazardous construction waste and demolition debris should be
diverted from the landfill.
1.3 DEFINITIONS
A. There is construction and demolition waste, disposal, recycle, salvage and reuse.
B. Recyclable materials: metals, gypsum boards, paper, cardboard, wood products, carpets, plastics, copper wiring,
mechanical and electrical products and equipment.
● Final “stages” of recycling will be based on the recycling abilities of the local area we are working at.
1.4 SUBMITTALS
A. Employees need to make waste management plan, which should include appropriate calculations, information
about facilities and every necessary detail.
B. Contractor should try to recycle/reuse as much as possible and only transport to the landfill whatever is left.
1.5 WASTE MANAGEMENT GOALS
Waste management plan identifies the waste by weight and/or value, using the same units. It includes estimated
quantities and assumptions for estimates.

End Of Section

SECTION 02810
IRRIGATION SYSTEM
PART 1 – GENERAL
1.01 - SUMMARY
● Trenching, backfilling in section 02225

● Project close-out (record "as-built" drawings) in section 01720.

● Selective demolition in sections 02050 / 02110

● Plumbing in Section 15000

● Electrical in Section 16000

● Landscaping in Section 02900


1.02 - REFERENCES
● Refer to Section 01090 for information concerning availability and use of references.
1.03 - DESCRIPTION
● Due to drawing scale, not all details are shown. Contractor must investigate and plan accordingly, providing
necessary fittings to meet structural and finished conditions. Install work to avoid conflicts with irrigation,
planting, and architectural features.
● Contractor must not install irrigation system as shown if field conditions present unaccounted obstacles. Report
issues to Owner's Representative; failure to do so makes the contractor responsible for and obligated to cover
expenses for necessary revisions.
1.04 - SUBMITTALS
● Furnish a certificate of Full Approval or a current Certificate of Approval from FCCCHR-USC for size, and make of
backflow preventer being provided for this project. A Certificate of Provisional Approval will not be acceptable.
● No substitution will be

● allowed without prior written approval by the Owner's Representative and approved

● as or equal in accordance with Section 01340.

● Contractor shall provide Owner's Representative with a record set of drawings before final acceptance of work.
1.05 - GENERAL REQUIREMENTS
● Code Requirements shall be those of State and Municipal Codes and Regulations locally governing this work,
providing that any requirements of the Drawings and Specifications, not conflicting therewith but exceeding the
Code Requirements shall govern, unless written permission to the contrary is granted by the Owner's
Representative.
● It is the responsibility of the Contractor to request inspection of work as noted in the observation schedule.

PART 2 – PRODUCTS
2.02 MATERIALS
● Materials, equipment or suppliers shall be as shown on drawings or herein specified or approved equal in
accordance with Section 01630.

PART 3 – EXECUTION
3.01 INSPECTION
● Inspect site and check all grades. Carefully verify all dimensions at site and existing conditions prior to
demolition and compare with proposed work.
3.02 INSTALLATION
● Install and extend system as shown on the Drawings, and as necessary to carry out the intent of the Drawings
and Specifications.
3.03 CLEAN UP
During the project, keep areas tidy and remove debris regularly. After completion, clean all surfaces, remove
debris and containers used in the work, and sweep adjacent sidewalks and areas.
End Of Section

SECTION 02832
AUTOMATIC GATE OPERATORS
PART 1 – GENERAL
1.01 WORK INCLUDED
A. The work includes gates, posts, rollers, sliding gate operators, controls, safety loops in paving and key boxes for
official access.
1.02 SUBMITTALS
A. Submit shop drawings which include installation and assembly conditions, wiring diagrams, components,
anchorage, materials and finishes. Should be coordinated with electrical drawings.
B. Submit manufacturer’s instructions and data.
C. Submit manufacturer’s certificate of confirmation to the specified requirements.
1.03 PRODUCT DELIVERY, STORAGE AND HANDLING
● Materials should be delivered undamaged and fully covered.
1.04 WARRANTY
● Fire year manufacturer’s warranty and one year maintenance agreement should be provided.

PART 2 – PRODUCTS
2.01 GATES
● Gates shall be constructed from the structural shapes and sizes shown in the drawings.
2.02 AUTOMATIC GATE OPERATORS
● Dual motor, high traffic commercial slide gate operator.
2.03 OPERATOR UNIT
A. In event of power failure, manual operation needs to be provided.
B. Gate speed shall be min. 18.29m/min
C. Power should be 12 volt, 60 hertz and single phase power.
D. Wire loops in paving for safety.
2.04 CARD READER CONTROL UNIT
● Gate controller should have programmable key pad with multiple four digit codes.
2.05 MISCELLANEOUS EQUIPMENT
A. Power should be provided as required to the emergency strobe.
B. Knox box for keys for the Fire Department.
C. Electric eye in order for the gate to stop operating if there are any obstructions in the way.
D. Exit and safety loops which detect in a car has left the perimeter.
2.06 SEQUENCE OF OPERATION
A. Operations should be in a certain order:
1. A keypad activates and opens the gate.
2. After the sensor checks that the car has already left, the gate automatically closes.
3. On a keypad there should be another option which lets you keep the gate open without automatically
closing if needed.
PART 3 – EXECUTION
3.01 CONSTRUCTION
● Starting work means acceptance of site conditions.
3.02 INSTALLATION
● All the products should be installed according to the shop drawings.
3.03 WRENCHES AND TOOLS
● Wrenches and tools should be provided as necessary.
End Of Section

SECTION 02900
LANSCAPING
PART 1 – GENERAL
1.01 – SUBMITALS
● Submit certificates of compliance, trip slips and invoices for soil amendments, fertilizers, and plant materials,
with quantities of each.
● Submit testing laboratory’s interpretation, recommendations, and comments to Landscape Architect within 14
days after the completion of rough grading.
● Submittal procedures and quantities are specified in Section 01700.
1.02 – QUALITY INSURANCE
● Submit soil amendment sample to Landscape Architect within 35 days of "Notice to Proceed" for testing. After
thorough mixing, provide random soil samples to the testing lab for comparison with a control mix. Contractor is
responsible for testing costs.
● Before planting, locate and protect active underground utility lines. If conflicts arise with plant locations, notify
the On-Site Inspector for relocation. Contractor is responsible for repairing damage to existing facilities from
landscaping activities.
1.03 - GUARANTEES AND REPLACEMENTS
● Replace within 14 days, plants found to be dead and plants not in a vigorous condition noted within the
guarantee period.

PART 2 – PRODUCTS
2.01 - MATERIALS
● Organic Soil Amendment

● Fertilizer: Nitrogen 6 percent minimum, Phosphoric Acid 20 percent minimum, Potash 20 percent minimum

● Soil Sulfur: Elemental sulfur (99.5 percent) minimum.


2.02 - TREE STAKING
● Double staking: Stakes shall be 0.0508 meters outside diameter x 4.3 meters long lodge pole pine post (refer to
details on plans).

PART 3 – EXECUTION
3.01 - SOIL CONDITIONING, FERTILIZING AND ROTOTILLING:
● Soil conditioner: 3cubic meters per 93 square meters

● Soil sulphur: 9 kgs per 93 square meters

● Iron sulphate: 4.5 kgs per 93 square meters

● Gypsum 45 kgs per 93 square meters

● Pre-plant fertilizer 7 kgs per 93 square meters


● Wetting agent 1 pint per 93 square meters (all areas prior to amending)
3.02 - CLEAN UP
● During landscaping, keep areas tidy, remove debris, and clean surfaces. After completion, clear debris and
containers, and sweep adjacent areas.

End Of Section

SECTION 06100
ROUGH CARPENTRY
PART 1 – GENERAL
1.01 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with applicable provisions of the following codes and
standards, unless modified by the specifications or drawings.
1.02 SUBMITTALS
A. Submit manufacturer's Data for all items to be used under this section of work.
B. Submit manufacturer's Certification that wood materials meet the requirements specified.

PART 2 – PRODUCTS
2.01 GRADE STAMPS
A. Framing lumber: Identify all framing lumber by the grade stamp of the West Coast
Lumber Inspection Bureau.
B. Plywood: Identify all plywood as to species, grade, and glue type by the stamp of the
American Plywood Association.
2.02 ENERAL REQUIREMENTS
● Sizing and surfacing: Mill size. All exposed surfaces of wood members shall be surfaced smooth except as
indicated otherwise.
● Seal Coat: Where specified, and at cut ends and concealed faces apply a heavy saturation coat of penetrating
sealer, except for treated wood, where treatment has included a water repellent.
2.03 PLYWOOD
A. Structural plywood, U.S. Product Standard PS-1 per Structural Wood Notes.
1. OSB Board will not be permitted.
2.04 BUILDING PAPER
A. As specified in Section 09200, Lath & Plaster.
2.05 WATERPROOF MEMBRANE
A. Sheet Waterproofing: Jiffy Seal 140/60, by Protecto Wrap Co., Bituthene 3000, by W. R. Grace Company, or equal.

PART 3 – EXECUTION
3.01 INSPECTION
A. Examine the areas and conditions under which work of this Section will be performed. Correct
conditions detrimental to the proper and timely completion of the Work. Do not proceed until
unsatisfactory conditions have been corrected.
3.02 - INSTALLATION OF PLYWOOD SHEATHING
1. Place all plywood with face grain perpendicular to supports and continuously over at
least two supports, except where otherwise specifically indicated on the Drawings.
2. Center joints accurately over supports. Unless otherwise specifically shown on the
Drawings, stagger the end joints of plywood panels to achieve a minimum of continuity of
joints.
3. Leave 0.003175 meters spacing between adjacent plywood sheathing at edge joints and 0.0015875 meters spacing at
end joints.
3.05 - CLEANING UP
A. Keep the premises in neat, safe, and orderly condition at all times during execution of this
portion of the Work, free from accumulation of sawdust, cut ends, and debris.

End Of Section

SECTION 06200
FINISH CARPENTRY
PART 1 – GENERAL
1.01 QUALITY ASSURANCE
A. Comply with “Manual of Millwork” of the Woodwork Institute (WI) for the grades specified.
B. Millwork supplier shall issue a WI Certified Compliance Certificate indicating the grade of millwork he will
furnish for this job and certifying that they will fully meet all requirements of the grade specified.
C. This project shall be monitored by the staff of Woodwork Institute.

1.02 SUBMITTALS
A. Submit shop drawings showing each of the items to be provided under this section.
B. Submit samples of plastic laminate, solid surface material, stainless steel, and wood veneer.

1.03 PRODUCT DELIVERY, STORAGE AND HANDLING


A. Materials shall be delivered to the site in undamaged condition, stored in proper areas recommended by WI.

PART 2 – PRODUCTS
2.01 GRADES
A. Provide wood casework in accordance with WI "Manual of Millwork" Section 14
B. Provide plastic covered casework in accordance with WI "Manual of Millwork" Section 15
C. Solid Surface Countertops: Countertops shall be homogeneous filled polymer material, Corian Countertops as
manufactured by Dupont, Corian Building products, or equal.
D. Stainless Steel Countertops: Type 316, 2mm stainless steel countertop with integral backsplash and sinks as
indicated. Fabricate in shop to greatest extent possible to sizes and shapes indicated.
E. Sheet Metal Countertops: 1.6mm sheet metal countertop with integral backsplash as indicated. Fabricate in
shop to greatest extent possible to sizes and shapes indicated.
2.02 HARDWARE & ACCESSORIES
A. Provide all finished hardware for all casework included in work of this section
B. Provide right fasteners to have proper strength.
PART 3 – EXECUTION
3.01 PREPARATION
A. Do all the work (electrical, mechanical, plumbing…) that should be behind the casework.

3.02 INSTALLATION
A. Install work in this section as specified in WI "Manual of Millwork".
B. Install all components in accordance with approved Shop Drawings and manufacturer’s guidelines
C. Make plumbing connections to sinks in accordance with Division 15, Mechanical.

3.03 FINISHING
A. Finish all wood casework and related trim as specified in WI "Manual of Millwork," Section 5 for shop finishing, A
Custom Grade. Field finishing of casework will not be permitted.

3.04 ADJUSTMENT, CLEANING FINISHING AND PROTECTION


A. Repair damaged and defective casework wherever possible to eliminate defects functionally and visually; where
not possible to repair properly, replace casework.
B. Clean casework surfaces.

END OF SECTION

SECTION 07620
FLASHING AND SHEET METAL

PART 1 – GENERAL
1.01 QUALITY ASSURANCE
A. Quality Standards: In addition to complying with all pertinent codes and regulations, comply
with all pertinent recommendations contained in "Architectural Sheet Metal Manual", current
edition, of the Sheet Metal and Airconditioning Contractors National Association (SMACNA).
1.02 SUBMITTALS
A. Submit complete materials list of all items proposed to be furnished and installed under this
section.
B. Submit scaled shop drawings showing layout, joining, profiles, and anchorages of fabricated
work, including major counter flashings, gutters, leader boxes, downspouts, and expansion joint
systems, and interface of the work with the work of adjacent trades.
1.03 JOB CONDITIONS
A. Coordinate work of this section with interfacing and adjoining work for proper sequencing of
each installation. Ensure best possible weather resistance and durability of work and protection
of materials and finishes.
PART 2 – PRODUCTS
2.01 MATERIALS
● Zinc-Coated Steel: Commercial quality with 0.20% copper, ASTM A 525 except ASTM A 527 for lock-forming, G90
hot-dip galvanized, mill phosphatised where indicated for painting, 22 gage minimum except as otherwise
indicated.
● Fasteners: Same metal as flashing and sheet metal or, other non-corrosive metal as recommended by sheet
manufacturer. Match finish of exposed heads with material being fastened: Gutter Fastener: Hangtite NC with
Hidden Hanger Strp Gutter Hanger by Raytec Manufacturing (www.gutterworks.com), or equal.
● Lead Sheet: Minimum weight 0.5kgs per square foot, unless otherwise noted. See also Section 07500.
2.02 FABRICATED UNITS
Metal Fabrication:
● Comply with details shown, and with applicable requirements of SMACNA "Architectural Sheet Metal
Manual" and other recognized industry practices.
● Comply with material manufacturer instructions and recommendations for forming material.

● Provide for separation of metal from non-compatible metal or corrosive substrates by coating concealed
surfaces at locations of contract, with bituminous coating or other permanent separation as recommended
by manufacturer and/or fabricator.
PART 3 – EXECUTION
3.01 INSTALLATION
1.Except as otherwise indicated, comply with manufacturer's installation instructions and recommendations, and
with SMACNA "Architectural Sheet Metal Manual".
2. Install reglets to receive counter flashing in manner and by methods indicated.
3. Nailing will not be permitted through exposed faces of flashings.
4. Install cleats for sheet metal items 0.5 meters and over in width. Fasten cleats evenly at 0.3 meters on center.
Cleats shall be at least 0.05 meters wide, 0.07 meters long, and of the same material and thickness as the sheet
metal being installed.
3.02 CLEANING AND PROTECTION
A. Clean exposed metal surfaces, removing substances which might cause corrosion of metal or
deterioration of finishes.
B. Installer shall advise Contractor of required procedures for surveillance and
protection of flashings and sheet metal work during construction, to ensure that work will be
without damage or deterioration, other than natural weathering, at time of substantial completion.

End Of Section
SECTION 07720
ROOF ACCESSORIES
PART 1 – GENERAL
1.04 SUBMITTALS
D. Shop drawings: Shop drawings shall indicate thickness and dimension of all parts, and fastening and anchoring
methods.

PART 2 – PRODUCTS
2.01 MATERIALS
F. Roof Hatch: Provide roof hatch, complete including cover, hold open arm, lifting mechanism, spring latch, and
padlock hasp. Hatch shall be galvanized steel, prime painted, 1.9mm cover and curb, 0.76mm cover liner, with
30.5cm high curb, "S" Series, 46cm x 92cm, as manufactured by the Bilco Company, Milcor, Inc., or equal.
Provide with Hatch Rail System, RL-S by Bilco, or equal, for attachment to roof access hatch.
G. Attic Vents: Attic ventilation shall be by O’Hagin’s Inc., or equal. Vent shall be two-piece system as compatible
with the roof tile as specified in Section 07325.
H. Roof drain down spot nozzle: Watts Drainage Product RD-490 or equal, cast nickel bronze downspout with
anchor flange, countersunk mounting holes, and IPS threaded NH connection.
PART 3 – EXECUTION
3.01 INSPECTION
B. Determine that construction of openings for roof accessories have been completed.
C. Assure that surfaces to receive roof accessories are free of debris.
D. Do not proceed with installation until conditions are satisfactory.

3.02 INSTALLATION
D. Comply with manufacturer's instructions and reviewed shop drawings.
E. Set units plumb, level, and true to line without warp or rack.
F. Anchor securely to surrounding construction.
G. Install accessories in accordance with manufacturer’s recommendations.

3.03 CLEANING
B. Clean metal surfaces in accordance with manufacturer's instructions.
C. Remove debris from work site.

END OF SECTION

SECTION 08400
ENTRANCES AND STOREFRONTS
PART 1 – GENERAL
1.05 QUALITY ASSURANCE
A. Provide manufacturer’s stock system, which has been tested in accordance with ASTM E-330 to withstand
minimum design wind pressures. (0.96KPa acting normal to the plane of the wall)
1. When tested in accordance with ASTM E-283, air infiltration shall not exceed 0.1 m 3/h.
2. No water shall pass interior frame when tested in accordance with ASTM E-331 of a test pressure of 20% of
design load.
3. When tested in accordance with ASTM E-330, the maximum deflection of the member shall not exceed
L/175 of its span. Should be no permanent damage after the load is removed.

1.06 SUBMITTALS
E. Product Data: Submit the following:
1. Complete materials list of all items proposed to be installed in this section
2. Submit shop drawings including wall elevations, typical unit elevations, detail sections of every typical
composite member. Show other components not included in standard
F. Samples: submit samples of each type and color of aluminum finish.

PART 2 – PRODUCTS
2.01 MATERIALS
I. Manufacturers: Kawneer company, inc., United States Aluminum, Inc., or equal.
J. Entrance Doors and Frames: Kawneer 350 Series Standard Aluminum Entrance System, or equal.
K. Finish: Factory Applied, Kynar finish to meet AAMA 605.2-92 specifications. 30.5 microns min. thickness.
L. Hardware: Specified in Section 08710.
M. Glazing: 12.7 insulated glazing (tinted) per section 08800.
N. All other materials required for a complete installation shall be new and first quality of their respective kinds.
2.02 FABRICATIONS
A. Shop prefabricates all doors and frames into complete units, verifying all measurements at the job side.
B. Fabricate in strict accordance with the approved Shop Drawings and the manufacturer’s recommendations.
C. Accurately miter and fit all members to hairline joints.

PART 3 – EXECUTION
3.01 SURFACE CONDITIONS
E. Prior to installation of the work of this Section, carefully inspect the installed work of all other trades and verify
that all such work is complete to the point where this installation may properly commence.
F. Verify that doors and frames may be installed in complete accordance with the original design.
G. Discrepancies: In the event of discrepancy, immediately notify the Engineer.

3.02 INSTALLATION
H. Install all members with provision for settling, expanding, and contracting to occur without breaking glass.
I. Anchoring: Firmly anchor all members, using all anchoring devices required to ensure positive attachment of the
members for long life under hard use.
J. Protection: Wherever aluminum is in contact with steel, concrete, or other material potentially creative of
electrolytic action, provide all required permanent isolation of the aluminum by backpainting with first quality
bituminous paint or by such other isolation accepted in advance by the Engineer. Protect all finished surfaces as
necessary to prevent damage during progress of the work.

END OF SECTION

SECTION 08550
PULTRUDED FIBERGLASS WINDOWS
PART 1 – GENERAL
1.01 QUALITY ASSURANCE
A. Drawings indicate all the details such as sizes, profiles and other requirements of the windows.
B. Should be checked on air infiltration, water resistance and uniform load deflection tests.
1.02 SUBMITTALS
A. Product data should be provided according to the manufacturer’s instructions.
B. Full list of all the complete materials and shop drawings should be provided.
C. Certificates of the tests should be provided.
1.03 QUALIFICATIONS
● Company providing windows needs to have minimum 5 years of documented experience.
1.04 WARRANTY
● 10-year warranty period which includes coverage of materials and labor should be provided.

PART 2 – PRODUCTS
2.01 MATERIALS
A. Milgard Ultra Series pultruded fiberglass windows, dual glazed, color as indicated.
B. Factory exterior glazing except where field glazing is required due to the size of the window.
C. Provide the hardware according to the manufacturer’s instructions.
D. All the other materials which are not mentioned above should be completely new and approved by the
architect.

PART 3 – EXECUTION
3.01 SURFACE CONDITIONS
● All the surfaces should be properly checked and verified.
3.02 INSTALLATION
A. All windows should be installed carefully, without breaking glass.
B. Opening panels must be closed and locked during installation.
C. Headers must not be nailed.
D. All the surfaces must be protected.
3.03 CLEANING UP
A. Al the extra materials must be taken out immediately.
B. Surfaces need to be washed with appropriate materials.
C. Do not use petroleum distillants, abrasives or any harmful cleaning agents.

END OF SECTION

SECTION 09680
CARPET TILE AND WALK-OFF MATS
PART 1 - GENERAL
1.01 QUALITY ASSURANCE
A. For quality assurance, manufacturers should be chosen as cited. Different manufacturers may be proposed only
if the material is an exact match.
1.02 SUBMITTALS
A. Samples should be shown in manufacturers standard colors for selection, three samples of each carpet should
be used to clearly indicate the construction.
B. Drawings need to clearly indicate the location of areas to be carpeted along with all the necessary details and
data needed for installation.
C. Along with this, certificates are needed to assure the contractors about the experience of installation carpenter.
List of previous jobs with details are necessary.
1.03 ENVIRONMENTAL REQUIREMENTS
A. Carpet installation should start after all the painting is complete and ceilings and overhead work is tested and
approved.
B. Room temperature should be maintained at minimum 15oC for at least 24 hours prior to installation, humidity
should be maintained depending on the area.
C. Sufficient lighting should be provided.
1.04 REGULATORY REQUIREMENTS
● Carpet shall have the Carpet and Rug Institute (CRI) Indoor Air Quality (IAQ) label.
1.05 ADDITIONAL STOCK
● Two extra cartons of carpet tiles should be provided.
PART 2 - PRODUCTS
A. Carpet (CPT-1): Lees, 7.31m x 7.31m modular carpet tile, style and color as indicated, as follows: 1. Face Yarn:
Antron Legacy nylon with DuraTech Soil Protection by DuPont. 2. Dye System: Yarn dyed; 3. Yarn Weight: 0.65
L/SY, 1/10 gauge textured loop graphics. 4. Total Weight: 5.21 L/SY; 5. Primary Backing: Reinforced synthetic; 6.
Secondary Backing: Fiberglass reinforced Thermoplastic composite; 7. Lifetime warranty. 8. All carpet shall be
from a single dye lot.
B. Carpet (CPT-2): Lees, "First Step", 5.49m x 5.49m modular carpet tile, color as indicated, as follows: 1. Face Yarn:
Dupont nylon 6.6 with nylon 6.6 scraper yarn; 2. Dye System: Yarn dyed; 3. Yarn Weight: 1.12 L/SY,. 4. Total
Weight: 6.37 L/SY 5. Primary Backing: Reinforced synthetic; 6. Secondary Backing: Fiberglass reinforced
Thermoplastic composite; 7. Lifetime warranty. 8. All carpet shall be from a single dye lot.
C. Installation adhesive needs to be water-resistant.
D. Seaming cement, miscellaneous materials and moisture seeker should be recommended by carpet
manufacturer, floor patching underlayment and crack fillers should be recommended by the flooring
manufacturer.
PART 3 - EXECUTION
3.01 PRE-INSTALLATION REQUIREMENTS
A. Substrate should be checked for moisture content and other conditions, sealers, crack fillers and floor patching
should be applied as needed.
B. Alkalinity test and moisture test must be performed. PH level should be in the range of 7 to 8.5.
3.02 INSTALLATION
A. Wherever the carpet edges are exposed, carpet edge guards should be installed.
B. Carpets should be installed according to the manufacturer’s instructions.
3.03 CLEANING AND PROTECTION
Surrounding space should get cleaned appropriately.
END OF SECTION
SECTION 09730
ELASTOMERIC DECK COATING
PART 1 – GENERAL
1.07 QUALITY ASSURANCE
G. Applicator shall be trained and approved by the manufacturer.
H. All materials used shall be by the same manufacturer or approved by the manufacturer.

1.08 SUBMITTALS
C. Product Data: Submit manufacturer’s specifications, test reports, recommendations and installation instructions.
D. Colors: Submit manufacturer’s standard colors for final selection by Architect.

1.09 PRODUCT DELIVERY, STORAGE AND HANDLING


B. Deliver materials in manufacturer’s unopened, labeled containers, and comply with manufacturer’s instructions
for storage and handling.

PART 2 – PRODUCTS
2.01 MANUFACTURERS
O. Acceptable manufacturer: Westcoat Specialty Coatings; 770 Gateway Center Drive, San Diego, CA 92102.
Telephone 800-250-4519. Fax 619-262-8606. Web Site: www.westcoat.com.
2.01 MARERIALS
A. WP-47 Fiberlath. Place WP-47 Fiberlath over concrete or plywood substrate overlapping seams 2 inches.
B. Base Coat: Combine one 22.5kg bag of TC-1 Base Coat Cement and 22.7 litres of WP-90 Waterproofing Resin.
Apply by trowel at 25 square meter per batch.
C. Smooth Texture Coat: Combine one 22.5kg pound bag of TC-1 Base Coat Cement and 15 litres of WP-90
Waterproofing Resin. Apply by trowel at 28 to 32.5 square meter per batch.
D. Top Coat: Apply SC-10 Acrylic Topcoat in desired color at 3 square meter per liter.
E. Supplemental Materials: Drains, Sealant (WP-51), Patching materials (EC-72/74)
PART 3 – EXECUTION
3.01 INSPECTION & PREPARATION
H. Examine surfaces and Correct defects and deficiencies which may adversely affect work of this section.
Application of deck coating implies acceptance of surface.
I. Prepare surfaces using methods recommended by the manufacturer for achieving the best result for the
substrate under the project conditions.

3.02 INSTALLATION
K. Install coatings, mix all materials and use application equipment, tools and techniques in accordance with
manufacture’s instructions.
L. Uniformly apply coatings at spread rates and in number of coats to achieve specified coverage.

3.03 QUALITY CONTROL


D. Verify coatings and other materials are as specified.
E. Verify coverages and finish of the system as work progresses.

3.03 PROTECTION AND CLEAN-UP


C. Protect finished surfaces of coating system from damage during construction. Free from traffic during cure time.
D. Touch-up, repair or replace damaged coating system after substantial completion.

END OF SECTION

SECTION 10520
FIRE EXTINGUISHERS & CABINETS
PART 1 – GENERAL
1.01 SUBMITTALS
● Submit fully detailed drawings to the manufacturer.
1.02 PRODUCT DELIVERY, STORAGE AND HANDLING
● Pack all the accessories individually for safety reasons.

PART 2 – PRODUCTS
2.01 FIRE EXTINGUISHER CABINET AND FIRE ETINGUISHER
A. Recessed Fire Extinguisher Cabinet: Larsen's Manufacturing Co., Architectural Series #2409- R1, or equal. Cold
rolled steel cabinet, trims and door frames, with recessed style, "Vertical Duo" door style, Stainless Steel #4
finish. Provide the "Larsen-Loc" system for securing cabinets.
B. Fire Extinguisher Bracket (surface mounted in electrical room): Larsen's Manufacturing Co., 846, or equal.
C. Fire Extinguisher: Larsen's Manufacturing Co., #MP5.

PART 3 – EXECUTION
3.01 PREPARATION
A. Templates and exact measurements are required along with the appropriate time for deliveries.
B. The architect should be notified about the details before starting.
3.02 INSTALLATION
A. Fire extinguishers and fire extinguisher cabinets need to be installed according to the approved drawings.
B. Approved identification should be provided to meet City and State Fire Marshal's requirements.

END OF SECTION

SECTION 10800
TOILET ACCESSORIES
PART 1 – GENERAL
1.01 SUBMITTALS
A. Mirrors should be provided with 15 year guarantee, data should be illustrated at large scale to show installation
methods.
B. Products should be packed individually in order to be delivered safely.

PART 2 – PRODUCTS
2.01 MATERIALS
A. Manufacturer: Bobrick Washroom Equipment, Inc., or equal as follows:
1. Toilet Seat Cover Dispenser and Toilet Tissue Dispenser: B-3474.
2. Recessed Toilet Tissue Dispenser for Two Rolls: B-697.
3. Recessed Paper Towel Dispenser/Waste Receptacle: B-3944.
4. Recessed Paper Towel Dispenser: B-359.
5. Soap Dispenser: B-2112.
6. Stainless Steel Angle Frame Mirror: Series 290, size as indicated on drawings.
7. Grab Bars: Bobrick #256 Series, 0.02-0.01m diameter, length as indicated, stainless steel with concealed
mountings.
8. Shower Door: Extruded aluminum Alloy frame, obscure safety glazing, continuous 0.0032m pin
aluminum piano hinge and magnetic safety latch, by American Shower Door Company, Keystone, or
equal. Door handle shall be an integral part of door construction.
9. Robe Hook: B-671, quantity as indicated.
10. Soap Holder: B-680.
11. Shelf with Mop and Broom Holder and hooks: B-239X34.
12. Kitchen Paper Towel Dispenser: B-262.
13. Towel Bar: B-674, size and quantity as indicated.
14. Accessible Shower Fold Down Bench: B-5181.
15. Wall Mount Soap Dispenser: B-42.

PART 3 – EXECUTION
3.01 PREPARATION
A. During preparation, inserts and frames should be delivered at an appropriate time along with the exact
measurements with required backings and blockings.
B. Before starting, the architect needs to be notified about all the details.
3.02 INSTALLATION
All the fixtures, accessories and items should be installed according to the manufacturer’s instructions.

END OF SECTION

SECTION 16418
FUSES
PART 1 – GENERAL
1.10 SUBMITTALS
E. Product Data: For each type of product indicated.
F. Operation and maintenance data.

1.11 QUALITY ASSURANCE


C. Comply with National Electrical Code (NEC)

PART 2 – PRODUCTS
2.01 MANUFACTURERS
P. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Siemens
2. Schneider
3. Chint
PART 3 – EXECUTION
3.01 FUSE APPLICATIONS
J. Service Entrance: Per coordination study, see section 260573.
K. Feeders: Per coordination study, see section 260573.

3.02 INSTALLATION
M. Install fuses in accordance with safety regulations.

3.03 IDENTIFICATION
F. Install labels complying with requirements for identification specified in Division 26 Section "Identification for
Electrical Systems" and indicating fuse replacement information on inside door of each fused switch and
adjacent to each fuse block and holder.

END OF SECTION