Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED
CHEMSEPT ENGINEERING PVT LTD
Office: Factory Address:
Office No. 612, Near Finolex Chowk,. Gate No. 67 & 70,
Morwadi Court Road, Pimpri, Pune, Jyotiba Nagar, Talwade, MIDC, Pune, MH. India
MH,India. PIN-411018 Pin-414112
Email:
[email protected] │Tel: +91-7972840160│Web: www.chemsept.in
To,
Mr. Narendra Kumar,
Email:
[email protected]MB: +91 8147667387
Subject: Offer for Supply of ATFD.
Reference: As per your email enquiry.
Dear Sir,
Concerning with above subject, we are pleased to submit our commercial quotation for the Supply
of ATFD.
Hope will be in line with your requirement.
We assure you to provide the best engineering services all the time, every time.
Thanking you in advance.
Yours Faithfully,
Prakash B.
ChemSepT Engineering Pvt Ltd.
Email:
[email protected]Phone: +91-7972840160
Web: www.chemsept.in | www.chemsept.com
ChemSepT® Engineering │Process Design│Manufacturing│Procurement│Service│Commissioning
ChemSepT ® Engineering │Complete Turnkey Solutions Page 1 of 11
Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED
SCOPE OF SUPPLY:
Sr No. Description Qty
1. Feed Tank 1 No.
A feed tank in SS 316L shall be supplied to receive feed.
2. Feed Pump 1 No
A Centrifugal pump from balance tank shall be feed to ATFD through the pump.
3. AGITATED THIN FILM DRYER (ATFD) 1 No
In a vertical vessel evaporator, the rotor blades are hinged. The feed enters the shell
tangentially and gets spread along the inside surface of the shell into a thin film. The hinged
rotor blades keep the film under intense agitation preventing any scale formation. The vapors
flow counter current to the film. Steam trap shall be provided.
Motor : 5 HP Flame Proof
Rotor : Multi-bladed, dynamically balance for smooth operation
Bearing : Heavy Duty External Roller
Rotor RPM : Approx. 150 (With VFD)
Shaft Seal : Mechanical Seal
MOC : Contact Part- SS 316L, Non-contact –CS
Shell : Cylindrical Jacketed suitable for Hot Water
Receiver : At bottom
Area :3S
4. Surface Condenser 1 No
Surface Condenser shall be provided to condense vapours from the ATFD. The condenser shall
be a shell and tube Heat exchanger with the cooling medium water.
MOC: Contact parts – SS 316l, Tubes – SS 316l (ERW), Shell – SS 304.
5. Surface Condenser Pump 1 No
A condenser pump shall be used to separate process condensate from the ATFD
Type: Centrifugal Pump
6. Ducting, piping and fittings 1 Lot
One lot of Ducting, piping and fittings in SS 316 / SS 304/Carbon Steel shall be provided
complete with necessary pipes, bends, tees, valves, etc for interconnection of various
components to form an optimum and compact layout. Suitable CS flanges with SS Short stub
end shall be provided.
7. Electrical Panel 1 No
A Non-Compartmental Electrical control panel (Non-Flame Proof) shall be provided in damp
proof construction out of CRCA sheets of thickness 14/16 gauge and Powder coated.
ChemSepT ® Engineering │Complete Turnkey Solutions Page 2 of 11
Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED
Following Instrumentation shall be provided:
Hot water control valve
Magnetic flow meter at the Feed line
Pressure transmitter at the ATFD jacket
ChemSepT ® Engineering │Complete Turnkey Solutions Page 3 of 11
Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED
BATTERY LIMITS:
Feed. At the inlet connection provided to balance tank.
Solid output. At the outlet of the ATFD.
Steam At the Inlet of connection provided to the ATFD
Vacuum At the Inlet of the Condensate pot /Surface condenser
Process Condensate. At the outlet provided to the condensate pump
Steam Condensate At the outlet provided to the ATFD.
Cooling water At the Inlet and Outlet of the Surface condenser
Soft / wash water. At the cooling tower basin and at Single Point within Battery Limit.
Electricity. At the incoming connections provided in Panel and respective motor
CIP Solution At the inlet of balance tank.
ChemSepT ® Engineering │Complete Turnkey Solutions Page 4 of 11
Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED
Agitated Thin Film Dryer (ATFD)
ChemSepT ® Engineering │Complete Turnkey Solutions Page 5 of 11
Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED
EXCLUSIONS:
Following items are excluded from our scope:
Boiler and boiler accessories including the pressure reducing station and steam pipelines.
Cooling tower, cooling tower pumps & the cooling water pipelines.
Disposal of Condensate / Concentrate or Salt sludge.
Incineration system /Disposal system for the disposal of concentrate out from the
evaporator.
All buildings, foundations, foundation nut-bolts and civil engineering works, plant cover,
etc.
Equipment necessary for machine / equipment positioning, e.g. cranes, forklift trucks, etc.
Obtaining permission / license from necessary authorities, Government agencies required.
Unloading/Storage/Security/Insurance of equipment at site.
Lodging and boarding of our erection Engineer/s and erection team during the entire
project.
Insulation & cladding of Piping & Ducting.
Interconnection (Electrical and Instrumentation) cable and cable trays
C.I.P. Chemicals.
Vacuum system
Any other goods or services not otherwise mentioned and necessary for completion of the
project.
Any other point not specifically mentioned in our scope of supply.
Customer to provide following:
Supply of personnel safety equipment, emergency lighting and firefighting equipment.
Sufficient lighting at the installation site.
Unskilled labours and technical staff needed during installation and start up.
Utilities such as Steam, Electricity, compressed air, wash / process water, etc. required for
site fabrication, erection, testing, commissioning, and operation of plant
ChemSepT ® Engineering │Complete Turnkey Solutions Page 6 of 11
Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED
SCOPE MATRIX:
Design & Supply Supervision of
Sr.
DESCRIPTION Engineering Erection &
No.
Commissioning
1. ATFD CSE CSE CSE
2. Vacuum system CUSTOMER CUSTOMER CUSTOMER
3. Interconnection cable and cable trays CUSTOMER CUSTOMER CUSTOMER
Cooling Tower, Cooling Tower pumps with
4. CUSTOMER CUSTOMER CUSTOMER
motors and piping.
5. Support Structure with plant cover CUSTOMER CUSTOMER CUSTOMER
6. Civil for Plant and machinery. CUSTOMER CUSTOMER CUSTOMER
7. Insulation & cladding for Equipment CUSTOMER CUSTOMER CUSTOMER
8. Plant Side panels CUSTOMER CUSTOMER CUSTOMER
9. Boiler with Accessories. CUSTOMER CUSTOMER CUSTOMER
Electrical (Plant & Yard lightening). Other CUSTOMER CUSTOMER
10. CUSTOMER
than Equipment.
DG set/ Transformer. CUSTOMER
11. CUSTOMER
CUSTOMER
Laboratory Equipments and C.I.P.chemicals. CUSTOMER
12. CUSTOMER
CUSTOMER
Firefighting Equipments and system. CUSTOMER
13. CUSTOMER
CUSTOMER
Land development, landscaping, gardening. CUSTOMER
14. CUSTOMER
CUSTOMER
E.T.P/ Effluent holding tanks. CUSTOMER
15. CUSTOMER
CUSTOMER
16. Unloading of material at site. CUSTOMER
Storage/Safety/Insurance for systems and CUSTOMER
17. Equipments.
18. Earthing pits. CUSTOMER CUSTOMER CUSTOMER
ChemSepT ® Engineering │Complete Turnkey Solutions Page 7 of 11
Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED
Design & Supply Supervision of
Sr.
DESCRIPTION Engineering Erection &
No.
Commissioning
19. Earthing of Equipments. CUSTOMER CUSTOMER CUSTOMER
Equipment supports for as per scope of
20. CUSTOMER CUSTOMER CUSTOMER
supply.
Piping support beyond scope of supply. CUSTOMER
21. CUSTOMER
CUSTOMER
22. Water during Erection & commissioning. CUSTOMER
23. Electricity during Erection & commissioning. CUSTOMER
24. Warehouse and material storage at site. CUSTOMER
Lodging, boarding and food for SSEPL CUSTOMER
25. Engineers, Project Manager & Sr. Managers.
26. Crane for Erection. CUSTOMER
27. Local Conveyance for SSEPL Team. CUSTOMER
ChemSepT ® Engineering │Complete Turnkey Solutions Page 8 of 11
Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED
A) FABRICATION NOTES:
Following steps and inspection will be followed during manufacturing of the system
Material identification in witness of Client / TPI
Dimensional Inspection and water fill up testing in witness of Client / TPI
If required, Matt finish from internal and external parts will be tested in witness if Client /TPI
In-case of any additional stage-wise inspection required, client has to intimate the same during DQ
approval
DOCUMENTATION:
Following documents and testing will be offered
Complete System GA drawing including plan and elevation view with detail BOM
Design qualification
FAT
Installation Qualification
INSTALLATION AND COMMISSIONING
If required ChemSepT will depute one Mechanical engineer for supervision of the installation and
commissioning activities on site on chargeable basis
EXCLUSIONS:
Loading and unloading on site
Positioning of the equipment’s on site
All tools / tackles and lifting equipment’s required on site.
All types of chemicals or utility required on site during installation and commissioning (Trials).
Any type of government / agency approval for the system.
ChemSepT ® Engineering │Complete Turnkey Solutions Page 9 of 11
Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED
ChemSepT® Commercial Terms & Conditions:
B) PRICE SUMMARY
UOM & TOTAL
SR. NO. DESCRIPTION AMOUNT EACH IN INR
QUANTITY
Price for Supply of
01 1 Nos. ₹ 17,50,000 /-
ATFD system with ₹17,50,000 /-
Automation
TOTAL PRICE ₹ 17,50,000/-
TOTAL IN WORDS : INR SEVENTEEN LAKHS FIFTY THOUSAND ONLY
Supervision of Erection and Commissioning:
We can provide services of our service engineer on chargeable basis for supervision of
installation and commissioning after completion of necessary infrastructure/ foundation/
civil work etc. at your end.
Our charges for Service Engineer shall be Rs. 10,000/- per Day considering normal working
hours of 8 hrs a day excluding To & Fro fare + Free lodging & boarding at site + Local
Conveyance-To be arranged by Purchaser.
If services are rendered on a weekend or for more than normal working hrs the same shall
be charged extra.
Delivery
The equipment shall be ready for final inspection at our works within 5-6 weeks from the
date of receipt of technically and commercially clear purchase order along with advance
payment whichever is later. Installation & commissioning shall be completed in 4 weeks
from the date of last supply. Any delays in receiving conformation for techno-commercial
information/approvals from your end will lead to delivery schedule getting delayed
accordingly. We will request for information/confirmation/approval etc, if required, within
ChemSepT ® Engineering │Complete Turnkey Solutions Page 10 of 11
Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED
7 days from date of receipt of purchase order. You will provide us the necessary inputs
within 7 days. The delay in receiving information/confirmation/approval etc will result in
delivery schedule getting delayed and the delay will be on your account. Any delay in
shipment of the equipment during transit shall not be our liability.
Commercial terms and Conditions of Supply
Price Basis
The prices quoted by us are on Ex-works Pune and are exclusive of packing, forwarding,
freight, insurance and any other levies that may be applicable. The same will be charged
extra at actual to your account at the rates prevailing at the time of dispatch of the
equipment.
The present rates are as below
Packing & Forwarding : 2% extra on quoted price
Transit Insurance & Freight : Extra at actual
Taxes & Duties : Extra at actual.
Payment Terms
For Supply
40% with taxes of the offered price as advance along with your techno-
commercially clear Purchase order.
60% payment with taxes & duties against the Proforma Invoice before dispatch in
three/four progressive lots.
Validity of offer
Our offer validity is for 15 days from the date hereof. If the validity period extension is
sought it should be obtained in writing from our end.
ChemSepT ® Engineering │Complete Turnkey Solutions Page 11 of 11