Cse-Qrn-Shilpa Medicare-2122-314-R1

ChemSept Engineering Pvt Ltd submitted a commercial quotation to Shilpa Medicare Limited for the design and supply of an Agitated Thin Film Dryer (ATFD) system, including various components such as feed tanks, pumps, and electrical panels. The total price for the ATFD system is ₹17,50,000, with specific payment terms and conditions outlined. The offer is valid for 15 days from the date of the quotation, and delivery is expected within 5-6 weeks after receiving a clear purchase order.

Uploaded by

Aravind
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views11 pages

Cse-Qrn-Shilpa Medicare-2122-314-R1

ChemSept Engineering Pvt Ltd submitted a commercial quotation to Shilpa Medicare Limited for the design and supply of an Agitated Thin Film Dryer (ATFD) system, including various components such as feed tanks, pumps, and electrical panels. The total price for the ATFD system is ₹17,50,000, with specific payment terms and conditions outlined. The offer is valid for 15 days from the date of the quotation, and delivery is expected within 5-6 weeks after receiving a clear purchase order.

Uploaded by

Aravind
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1

Date 20TH DEC 2021


Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED

CHEMSEPT ENGINEERING PVT LTD


Office: Factory Address:
Office No. 612, Near Finolex Chowk,. Gate No. 67 & 70,
Morwadi Court Road, Pimpri, Pune, Jyotiba Nagar, Talwade, MIDC, Pune, MH. India
MH,India. PIN-411018 Pin-414112
Email: [email protected] │Tel: +91-7972840160│Web: www.chemsept.in
To,
Mr. Narendra Kumar,
Email: [email protected]
MB: +91 8147667387

Subject: Offer for Supply of ATFD.


Reference: As per your email enquiry.
Dear Sir,
Concerning with above subject, we are pleased to submit our commercial quotation for the Supply
of ATFD.
Hope will be in line with your requirement.
We assure you to provide the best engineering services all the time, every time.
Thanking you in advance.

Yours Faithfully,
Prakash B.

ChemSepT Engineering Pvt Ltd.


Email: [email protected]
Phone: +91-7972840160
Web: www.chemsept.in | www.chemsept.com

ChemSepT® Engineering │Process Design│Manufacturing│Procurement│Service│Commissioning

ChemSepT ® Engineering │Complete Turnkey Solutions Page 1 of 11


Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED

SCOPE OF SUPPLY:
Sr No. Description Qty

1. Feed Tank 1 No.


A feed tank in SS 316L shall be supplied to receive feed.

2. Feed Pump 1 No
A Centrifugal pump from balance tank shall be feed to ATFD through the pump.

3. AGITATED THIN FILM DRYER (ATFD) 1 No


In a vertical vessel evaporator, the rotor blades are hinged. The feed enters the shell
tangentially and gets spread along the inside surface of the shell into a thin film. The hinged
rotor blades keep the film under intense agitation preventing any scale formation. The vapors
flow counter current to the film. Steam trap shall be provided.

Motor : 5 HP Flame Proof


Rotor : Multi-bladed, dynamically balance for smooth operation
Bearing : Heavy Duty External Roller
Rotor RPM : Approx. 150 (With VFD)
Shaft Seal : Mechanical Seal
MOC : Contact Part- SS 316L, Non-contact –CS
Shell : Cylindrical Jacketed suitable for Hot Water
Receiver : At bottom
Area :3S
4. Surface Condenser 1 No
Surface Condenser shall be provided to condense vapours from the ATFD. The condenser shall
be a shell and tube Heat exchanger with the cooling medium water.
MOC: Contact parts – SS 316l, Tubes – SS 316l (ERW), Shell – SS 304.

5. Surface Condenser Pump 1 No


A condenser pump shall be used to separate process condensate from the ATFD
Type: Centrifugal Pump

6. Ducting, piping and fittings 1 Lot


One lot of Ducting, piping and fittings in SS 316 / SS 304/Carbon Steel shall be provided
complete with necessary pipes, bends, tees, valves, etc for interconnection of various
components to form an optimum and compact layout. Suitable CS flanges with SS Short stub
end shall be provided.

7. Electrical Panel 1 No
A Non-Compartmental Electrical control panel (Non-Flame Proof) shall be provided in damp
proof construction out of CRCA sheets of thickness 14/16 gauge and Powder coated.

ChemSepT ® Engineering │Complete Turnkey Solutions Page 2 of 11


Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED

Following Instrumentation shall be provided:


 Hot water control valve
 Magnetic flow meter at the Feed line
 Pressure transmitter at the ATFD jacket

ChemSepT ® Engineering │Complete Turnkey Solutions Page 3 of 11


Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED

BATTERY LIMITS:

Feed. At the inlet connection provided to balance tank.

Solid output. At the outlet of the ATFD.

Steam At the Inlet of connection provided to the ATFD

Vacuum At the Inlet of the Condensate pot /Surface condenser

Process Condensate. At the outlet provided to the condensate pump

Steam Condensate At the outlet provided to the ATFD.

Cooling water At the Inlet and Outlet of the Surface condenser

Soft / wash water. At the cooling tower basin and at Single Point within Battery Limit.

Electricity. At the incoming connections provided in Panel and respective motor

CIP Solution At the inlet of balance tank.

ChemSepT ® Engineering │Complete Turnkey Solutions Page 4 of 11


Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED

Agitated Thin Film Dryer (ATFD)

ChemSepT ® Engineering │Complete Turnkey Solutions Page 5 of 11


Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED

EXCLUSIONS:

Following items are excluded from our scope:

 Boiler and boiler accessories including the pressure reducing station and steam pipelines.
 Cooling tower, cooling tower pumps & the cooling water pipelines.
 Disposal of Condensate / Concentrate or Salt sludge.
 Incineration system /Disposal system for the disposal of concentrate out from the
evaporator.
 All buildings, foundations, foundation nut-bolts and civil engineering works, plant cover,
etc.
 Equipment necessary for machine / equipment positioning, e.g. cranes, forklift trucks, etc.
 Obtaining permission / license from necessary authorities, Government agencies required.
 Unloading/Storage/Security/Insurance of equipment at site.
 Lodging and boarding of our erection Engineer/s and erection team during the entire
project.
 Insulation & cladding of Piping & Ducting.
 Interconnection (Electrical and Instrumentation) cable and cable trays
 C.I.P. Chemicals.
 Vacuum system
 Any other goods or services not otherwise mentioned and necessary for completion of the
project.
 Any other point not specifically mentioned in our scope of supply.

Customer to provide following:

 Supply of personnel safety equipment, emergency lighting and firefighting equipment.


 Sufficient lighting at the installation site.
 Unskilled labours and technical staff needed during installation and start up.
 Utilities such as Steam, Electricity, compressed air, wash / process water, etc. required for
site fabrication, erection, testing, commissioning, and operation of plant

ChemSepT ® Engineering │Complete Turnkey Solutions Page 6 of 11


Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED

SCOPE MATRIX:
Design & Supply Supervision of
Sr.
DESCRIPTION Engineering Erection &
No.
Commissioning

1. ATFD CSE CSE CSE

2. Vacuum system CUSTOMER CUSTOMER CUSTOMER

3. Interconnection cable and cable trays CUSTOMER CUSTOMER CUSTOMER

Cooling Tower, Cooling Tower pumps with


4. CUSTOMER CUSTOMER CUSTOMER
motors and piping.

5. Support Structure with plant cover CUSTOMER CUSTOMER CUSTOMER

6. Civil for Plant and machinery. CUSTOMER CUSTOMER CUSTOMER

7. Insulation & cladding for Equipment CUSTOMER CUSTOMER CUSTOMER

8. Plant Side panels CUSTOMER CUSTOMER CUSTOMER

9. Boiler with Accessories. CUSTOMER CUSTOMER CUSTOMER

Electrical (Plant & Yard lightening). Other CUSTOMER CUSTOMER


10. CUSTOMER
than Equipment.

DG set/ Transformer. CUSTOMER


11. CUSTOMER
CUSTOMER

Laboratory Equipments and C.I.P.chemicals. CUSTOMER


12. CUSTOMER
CUSTOMER

Firefighting Equipments and system. CUSTOMER


13. CUSTOMER
CUSTOMER

Land development, landscaping, gardening. CUSTOMER


14. CUSTOMER
CUSTOMER

E.T.P/ Effluent holding tanks. CUSTOMER


15. CUSTOMER
CUSTOMER

16. Unloading of material at site. CUSTOMER

Storage/Safety/Insurance for systems and CUSTOMER


17. Equipments.

18. Earthing pits. CUSTOMER CUSTOMER CUSTOMER

ChemSepT ® Engineering │Complete Turnkey Solutions Page 7 of 11


Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED

Design & Supply Supervision of


Sr.
DESCRIPTION Engineering Erection &
No.
Commissioning

19. Earthing of Equipments. CUSTOMER CUSTOMER CUSTOMER

Equipment supports for as per scope of


20. CUSTOMER CUSTOMER CUSTOMER
supply.

Piping support beyond scope of supply. CUSTOMER


21. CUSTOMER
CUSTOMER

22. Water during Erection & commissioning. CUSTOMER

23. Electricity during Erection & commissioning. CUSTOMER

24. Warehouse and material storage at site. CUSTOMER

Lodging, boarding and food for SSEPL CUSTOMER


25. Engineers, Project Manager & Sr. Managers.

26. Crane for Erection. CUSTOMER

27. Local Conveyance for SSEPL Team. CUSTOMER

ChemSepT ® Engineering │Complete Turnkey Solutions Page 8 of 11


Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED

A) FABRICATION NOTES:
Following steps and inspection will be followed during manufacturing of the system

 Material identification in witness of Client / TPI


 Dimensional Inspection and water fill up testing in witness of Client / TPI
 If required, Matt finish from internal and external parts will be tested in witness if Client /TPI
 In-case of any additional stage-wise inspection required, client has to intimate the same during DQ
approval

 DOCUMENTATION:

Following documents and testing will be offered

 Complete System GA drawing including plan and elevation view with detail BOM
 Design qualification
 FAT
 Installation Qualification

 INSTALLATION AND COMMISSIONING

If required ChemSepT will depute one Mechanical engineer for supervision of the installation and
commissioning activities on site on chargeable basis

 EXCLUSIONS:

 Loading and unloading on site


 Positioning of the equipment’s on site
 All tools / tackles and lifting equipment’s required on site.
 All types of chemicals or utility required on site during installation and commissioning (Trials).
 Any type of government / agency approval for the system.

ChemSepT ® Engineering │Complete Turnkey Solutions Page 9 of 11


Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED

ChemSepT® Commercial Terms & Conditions:


B) PRICE SUMMARY

UOM & TOTAL


SR. NO. DESCRIPTION AMOUNT EACH IN INR
QUANTITY

Price for Supply of


01 1 Nos. ₹ 17,50,000 /-
ATFD system with ₹17,50,000 /-
Automation

TOTAL PRICE ₹ 17,50,000/-

TOTAL IN WORDS : INR SEVENTEEN LAKHS FIFTY THOUSAND ONLY

Supervision of Erection and Commissioning:


We can provide services of our service engineer on chargeable basis for supervision of
installation and commissioning after completion of necessary infrastructure/ foundation/
civil work etc. at your end.
Our charges for Service Engineer shall be Rs. 10,000/- per Day considering normal working
hours of 8 hrs a day excluding To & Fro fare + Free lodging & boarding at site + Local
Conveyance-To be arranged by Purchaser.
If services are rendered on a weekend or for more than normal working hrs the same shall
be charged extra.

Delivery
The equipment shall be ready for final inspection at our works within 5-6 weeks from the
date of receipt of technically and commercially clear purchase order along with advance
payment whichever is later. Installation & commissioning shall be completed in 4 weeks
from the date of last supply. Any delays in receiving conformation for techno-commercial
information/approvals from your end will lead to delivery schedule getting delayed
accordingly. We will request for information/confirmation/approval etc, if required, within

ChemSepT ® Engineering │Complete Turnkey Solutions Page 10 of 11


Reference CSE-QRN-SHILPA MEDICARE-2122-314/R1
Date 20TH DEC 2021
Project DESIGN AND SUPPLY OF ATFD
Client SHILPA MEDICARE LIMITED

7 days from date of receipt of purchase order. You will provide us the necessary inputs
within 7 days. The delay in receiving information/confirmation/approval etc will result in
delivery schedule getting delayed and the delay will be on your account. Any delay in
shipment of the equipment during transit shall not be our liability.

Commercial terms and Conditions of Supply


Price Basis
The prices quoted by us are on Ex-works Pune and are exclusive of packing, forwarding,
freight, insurance and any other levies that may be applicable. The same will be charged
extra at actual to your account at the rates prevailing at the time of dispatch of the
equipment.

The present rates are as below


Packing & Forwarding : 2% extra on quoted price
Transit Insurance & Freight : Extra at actual
Taxes & Duties : Extra at actual.

Payment Terms
For Supply
 40% with taxes of the offered price as advance along with your techno-
commercially clear Purchase order.
 60% payment with taxes & duties against the Proforma Invoice before dispatch in
three/four progressive lots.

Validity of offer
Our offer validity is for 15 days from the date hereof. If the validity period extension is
sought it should be obtained in writing from our end.

ChemSepT ® Engineering │Complete Turnkey Solutions Page 11 of 11