ITP-CT-02_R0

The document outlines an Inspection and Test Plan (ITP) for Current Transformers, detailing the tests and inspections required, applicable standards, and acceptance criteria. It specifies the responsibilities of the manufacturer regarding compliance and documentation, including the need for approval from authorized personnel. The ITP is valid for testing after approval from the Standards & Specifications Department.

Uploaded by

SalmanEjaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views4 pages

ITP-CT-02_R0

The document outlines an Inspection and Test Plan (ITP) for Current Transformers, detailing the tests and inspections required, applicable standards, and acceptance criteria. It specifies the responsibilities of the manufacturer regarding compliance and documentation, including the need for approval from authorized personnel. The ITP is valid for testing after approval from the Standards & Specifications Department.

Uploaded by

SalmanEjaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

INSPECTION AND TEST PLAN (ITP) For Current Transformer

Type Routine Special

Manufacturer Name: Contract No. / Project Title:


Plant Location: ITP No. : ITP-CT-02
Equipment/Material Description: Review Cycle No. :
Type of Equipment / Material Date:
No. of days:

Equipment Technical data: (Below Data shall be filled by as per Equipment)


Rated Voltage (Ur [kV])
Height voltage (Um [kV])
Rated Current (A)
Rated Frequency (Hz)

Tests/Inspection Applicable Test Type of Location of Manufacturer’s


Item Sampling Acceptance Criteria Remarks
items Standard procedures Inspection tests Compliance
Power-frequency
IEC 61868-1 1 Typical CT “W”
1 voltage withstand tests Subclause 7.3.1 100% Subclause 7.3.1
IEC 61869-2 Remaining “RC”
on primary terminals
Partial discharge IEC 61868-1 1 Typical CT “W”
2 Subclause 7.3.2 100% Subclause 7.3.2
measurement IEC 61869-2 Remaining “RC”
Power-frequency
IEC 61868-1 1 Typical CT “W”
3 voltage withstand tests Subclause 7.3.3 100% Subclause 7.3.3
IEC 61869-2 Remaining “RC”
between sections
Power-frequency
IEC 61868-1 1 Typical CT “W”
4 voltage withstand tests Subclause 7.3. 4 100% Subclause 7.3. 4
IEC 61869-2 Remaining “RC”
on secondary terminals
IEC 61868-1 1 Typical CT “W”
5 Tests for accuracy Subclause 7.3.5 100% Subclause 7.3.5
IEC 61869-2 Remaining “RC”
Verification of IEC 61868-1 1 Typical CT “W”
6 Subclauses 7.3.6 100% Subclauses 7.3.6
markings IEC 61869-2 Remaining “RC”
Determination of the
IEC 61868-1 1 Typical CT “W”
7 secondary winding 7.3.201 100% 7.3.201
IEC 61869-2 Remaining “RC”
resistance
ITP-CT-02 Standards & Specifications Department PAGE 1 OF 3
INSPECTION AND TEST PLAN (ITP) For Current Transformer

Tests/Inspection Applicable Test Type of Location of Manufacturer’s


Item Sampling Acceptance Criteria Remarks
items Standard procedures Inspection tests Compliance
Determination of the
IEC 61868-1 1 Typical CT “W”
8 secondary loop time 7.3.202 100% 7.3.202
IEC 61869-2 Remaining “RC”
constant
Test for rated knee
point e.m.f. and IEC 61868-1 1 Typical CT “W”
9 7.3.203 100% 7.3.203
exciting current at IEC 61869-2 Remaining “RC”
rated knee point e.m.f.
Inter-turn overvoltage IEC 61868-1 1 Typical CT “W”
10 7.3.204 100% 7.3.204
test IEC 61869-2 Remaining “RC”

Legend:

W = Witness [by SEC/National Grid SA Engineers. and/or SEC approved 3rd Party Independent Inspection Agency (IIA) Inspector]
RC = Review of Certificates [by SEC/National Grid SA Engineers. and/or SEC approved 3rd Party Independent Inspection Agency (IIA) Inspector]
 = Green highlighted are not applicable for RING CT types.

General instructions:

1- Manufacturer’s compliance shall be indicated in front of each test.


2- Approved Data Schedule & final drawings for the equipment / Material shall be attached.
3- Test Procedure & Day-to-day activity schedule shall be attached for approval.
4- The ITP must be duly signed and stamped by manufacturer's authorized personnel.
5- This document is valid for testing after S&SD approval.

ITP-CT-02 Standards & Specifications Department PAGE 2 OF 3


INSPECTION AND TEST PLAN (ITP) For Current Transformer

Prepared by (Mfr's authorized QC test inspector) Approved by: (Mfr's authorized QA/QC personnel)

Date: Date:
Manufacturer Stamp

S&SD Approval

ITP-CT-02 Standards & Specifications Department PAGE 3 OF 3