DAILY DRILLING REPORT
Report No 61
Date: 3 3 2023
Rig Name FBOS-B6 Conssion NC151 Type Objective: DEVELOPMENT Company ZALLAF
SPUD DATE 1/1/2023 WELL No B9-NC151 Days : 61 Days Since Last Injury: 25
Present Operation: POOH W /TCP DST STRING
Next Operation: RIH W 3.1/2 OPENEND TBG
Proposed TD 3641 R.O.P Depth 3641 FD of Today Total Footge 3641 Move From: Move To:
Rig
Move Distance: Time:
B
H
A
N/A
N
O
0
Bit No #3 TypeRSX716M-A1 Size 12 1/4'' WOB 30-Dec RPM Pressure STg W 92lbs Flow Rate
Pump No. 1: m Liner Size: 7'' Pressure: T/Pressure SCR Toolpusher MOHAMMED
Mud
Pumps Pump No. 2: 70 Liner Size: 7'' Pressure: T/Pressure SCR Company Man WALID
Hole Size
12 1/4'' Casing Size 13 5/8'' Casing Shoe 3624 Mud Weight 8.7
BOP A-Date Last P/T: 11/2/2023 B - PRESSURE 1500-200 C -Date Last F/T: 1/3/2023
TM for Today 4 Cumulative 447 Since Last Cut 544 Length of Rope Remaining: 3290 Safety Meeting date 2/3/2023 Supject PPE
REPAIRS A-Last 24 Hrs 2 B-Month: 0 TOTAL PERSONNELS 75 SET CARD 3 TRIC CARD 3
From To OPERATIONS
00.00 01.00 L/D SLB logging tools
01.00 08.00 No Space out-Set PKR and P/T same back side t/500psi OK-R/U FH and lines, flush and P/T same OK-WODL
08.00 HPJSM-Lined up to flare pit, open choke on 16/64" adj-Start DST#4 (Mrar2-Upper FM) perfs interval (22193.5'-2207.5'
Apply 246 psia to annulus-Close FH kill valve, open FH swab and master valve-Drop bar good indication of firing-Confirm
no communication w/annulus-Bleed off csg pressure
Observe Wtr and gas bubbles at surface
-Increase choke t/24/64" -Avg reading WHP 48psia, WHT 77 F, WHCP 16 psia, Sal 42kppm Observe gas only on surface
Increase choke t/28/64"-Avg reading WHP 28psia, WHT 82 F, WHCP 20 psia
Decrease choke t/16/64"-Avg reading WHP 16 psia, WHT 88 F, WHCP 24 psia.
-Close choke manifold-Avg reading WHP 750 psia, WHT 88 F, WHCP 24 psia
00.00 -Open well on 32/64" choke-Observe low gas production-Decided to kill well
00.00 06.00 OPERATIONS F/ 00.00 TO / 06.00
Open HSRV and Perf. reverse circ.OK-R/D SLB FH-Unset PKR-Perf. reverse circ. OK-Flow check well static-POOH w/ DST#4 meantime L/D DPs
Time Disribution - Hours NOTES for Operation
Rih Time for
Rig U/D 0 Trips 23.5
Csg Safety 1/2 1
Drilling 0 Servise 0 Fishing 0 2
Reaming 0 Repair 0 0 3
Log 0 Slip/Cut 0 0 4
CMT 14.00 NU Bop 0 0 5
C/Mud 0 Test Bop 2 0 6
Coring 0 NDBop 0 0 7
Diesel Used 4481 Diesel Balance 65,598
Field Break : Received: Dispatchure Requirements:
PERSONNEL In Rig 28 Camp 10 Clinte 9 Well Service 14 Visitor 0 Others 13 Note
No. of Vehicles/ Trucks : 9 Condition of Vehicles: Qty 8 Good 1 Bad
Crane PL 5-58015 Crane 514563 Forklift 5-14130 Truck 5-39846/530914 Water Truck Qty 2540997 Bulldozer 269
140 Wt.: 1 90 Wt.: 1 50/20 Wt.: 1 40wt 6 37wt 1 ATF 2
Oxygen: Full 20 Empty 3 Acetylene: Full 9 Empty 2 Nitrogen Full 7 Empty 0