Net Metering Requirements Sir Carl 1

Carlito M. Rodriguez is applying for a Qualified End-User Certificate of Compliance for a solar generation facility located in Lucena City, Quezon. The application includes details about the facility, including specifications for a 6KW hybrid inverter and solar panels, as well as the contact information for the installer, Mark Nel Inojosa. The application is part of the process for interconnecting the renewable energy facility to the MERALCO distribution grid.

Uploaded by

Mark Ken
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
281 views20 pages

Net Metering Requirements Sir Carl 1

Carlito M. Rodriguez is applying for a Qualified End-User Certificate of Compliance for a solar generation facility located in Lucena City, Quezon. The application includes details about the facility, including specifications for a 6KW hybrid inverter and solar panels, as well as the contact information for the installer, Mark Nel Inojosa. The application is part of the process for interconnecting the renewable energy facility to the MERALCO distribution grid.

Uploaded by

Mark Ken
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

Republic of the Philippines COC Application No.

:
ENERGY REGULATORY COMMISSION
Market Operations Service
Licensing Division
QUALIFIED END-USER (QE) CERTIFICATE OF COMPLIANCE (COC) APPLICATION
QE-COC Application Form No. 1
Fill all applicable white spaces. Mark all appropriate boxes with an “X”. Write N/A if not applicable.
Attach QE-COC Form No. 1.1.

Part I – INFORMATION OF THE APPLICANT


Name of Owner/QE CARLITO M. RODRIGUEZ
☐ Government
☒ Residential ☐ Commercial ☐ Industrial ☐ Others:1 _________
Institution
Complete Address
Unit/Room/Floor/Building No. Building Name/Tower

N/A N/A

Lot/Block/Phase Street Name


LOT 3 BLOCK 6 N/A

Barangay /Subdivision Municipality/City

STA VERONICA VILLAGE, IBABANG DUPAY LUCENA CITY


Province Zip Code
QUEZON 4301
Contact Number/s 09171472170
E-mail Address/es [email protected]
Website
n/a
(if applicable)
Taxpayer
Identification No.
(TIN) (if applicable)

Part II – REGISTRATIONS / ACCREDITATION / COMPLIANCE CERTIFICATES


Document Issued Reference No. Date Issued Validity Period
Securities and Exchange Commission (SEC) [if Corporation/Partnership]
SEC Certificate of Registration / N/A N/A N/A
Certificate of Partnership2, if
applicable
Articles of Incorporation (AOIs) / N/A N/A N/A
3
Articles of Partnership (AOPs) , if
applicable

1 Please indicate (e.g. religious institution, embassy)


2 Indicate ALL subsequent amendments, if any.
3 Ibid.

Page 1 of 2
MOS-LD/Revised as of November 2023
QE-COC Application Form No. 1
Republic of the Philippines COC Application No.:
ENERGY REGULATORY COMMISSION
Market Operations Service
Licensing Division
QUALIFIED END-USER (QE) CERTIFICATE OF COMPLIANCE (COC) APPLICATION
QE-COC Application Form No. 1
Fill all applicable white spaces. Mark all appropriate boxes with an “X”. Write N/A if not applicable.
Attach QE-COC Form No. 1.1.

Part II – REGISTRATIONS / ACCREDITATION / COMPLIANCE CERTIFICATES


Document Issued Reference No. Date Issued Validity Period
Department of Trade and Industry (if Sole Proprietorship)
Business Name Registration, if N/A N/A N/A
applicable
Local Government Unit (LGU)
Business Permit (BP), if N/A N/A N/A
applicable
Certificate of Final Electrical
Inspection (CFEI), if applicable
Note: Please provide additional sheet(s) if necessary.

PERSON WHO PROVIDED THE ABOVE INFORMATION


MARK NEL A.
Name Designation INSTALLER
INOJOSA
Date Accomplished 10/01/2024
Government Issued Identification Card No. 66056
Date Issued 09/25/2017 Place Issued LUCENA CITY
Signature

Page 2 of 2
MOS-LD/Revised as of November 2023
QE-COC Application Form No. 1
Republic of the Philippines
ENERGY REGULATORY COMMISSION QE-COC Application Form No. 1.1
Market Operations Service (Solar)
Licensing Division
Fill all applicable white spaces. All values in three (3) decimal places. Write N/A if not applicable.
Attach to QE-COC Form No. 1.

QUALIFIED END-USER (SOLAR GENERATION FACILITY)


Name of Owner/QE CARLITO M. RODRIGUEZ
Name of Facility, if N/A
applicable
Distribution Utility (DU) MERALCO
Lot/Block/Phase Street Name Barangay / Subdivision
STA VERONICA VILLAGE,
LOT 3 BLOCK 6 -
Generation Facility IBABANG DUPAY
Address Municipality/City Province Zip Code
LUCENA CITY QUEZON 4301
1
Number of Units

TECHNICAL SPECIFICATION (SOLAR)


PARTICULARS Unit No. __ Unit No. __ Unit No. __ Unit No. __
Installation Date1 June 23, 2024 N/A N/A N/A
Test and Commissioning Date2 June 25, 2024 N/A N/A N/A
Economic Life 25 years N/A N/A N/A
INVERTER
Year Manufactured 2024 N/A N/A N/A
Manufacturer DEYE N/A N/A N/A
Serial Number 10010101000280 N/A N/A N/A
Rated Capacity (kW) 6KW N/A N/A N/A
Dependable Capacity (kW) 6KW N/A N/A N/A
Voltage (V) 230 N/A N/A N/A
Frequency (Hz) 60 N/A N/A N/A
MODULES / SOLAR PANEL
Manufacturer CANADIAN SOLAR N/A N/A N/A
No. of Solar Panels Connected 9 N/A N/A N/A
Rated Capacity per panel (WP) 555 N/A N/A N/A
Aggregated Rated Capacity N/A N/A N/A
4.99
per Inverter (kWP)
Note: Please provide additional sheet(s) if necessary

1
Indicate Actual Date of Installation of the Facility
2
Indicate Actual Date of Test and Commissioning (from start to end of Test and Commissioning)

Page 1 of 2
MOS-LD/Revised as of November 2023
QE-COC Application Form No. 1.1 - Solar
Republic of the Philippines
ENERGY REGULATORY COMMISSION QE-COC Application Form No. 1.1
Market Operations Service (Solar)
Licensing Division
Fill all applicable white spaces. All values in three (3) decimal places. Write N/A if not applicable.
Attach to QE-COC Form No. 1.

PERSON WHO PROVIDED THE ABOVE INFORMATION


Name MARK NEL INOJSA Designation INSTALLER
Date Accomplished 09/16/2024
Government Issued Identification Card No. 66056
Date Issued 09/25/2017 Place Issued LUCENA CITY
Signature

Page 2 of 2
MOS-LD/Revised as of November 2023
QE-COC Application Form No. 1.1 - Solar
Application Form for Inter-connection of Renewable Energy Facility

to the MERALCO Distribution Grid

Name: CARLITO M. RODRIGUEZ

Address: LOT 3 BLOCK 6, STA VERONICA VILLAGE, IBABANG DUPAY, LUCENA CITY, QUEZON

Contact Person: MARK NEL INOJOSA

Telephone Number: 09171472170

Service Point Address: LOT 3 BLOCK 6, STA VERONICA VILLAGE, IBABANG DUPAY, LUCENA CITY, QUEZON

Information Prepared and Submitted by (Name and Address):

MARK NEL A. INOJOSA , LUCENA CITY

Signature:

All applicable items must be accurately completed in order that facilities may be effectively evaluated by
the Company for interconnection with the utility system.

GENERATING FACILITY
No. of Units: 1

Manufacturer: DEYE

Type (Synchronous/Induction/Inverter): INVERTER

Source Type (Solar, Biogas, Wind, etc.): SOLAR

kW Rating (95F at location) 6KW

Kilovolt-Ampere Rating (95F at location): 6KVA

Power factor: 0.97

Voltage rating: 220-230

Ampere Rating: 25

Number of Phases: 2

Frequency: 60

Do you plan to export power: ✓ Yes ______ No


If yes, maximum amount expected: 500KWP/MONTH

Pre-Certification label or Type Number: SUN-5K-SG05LP1-EU

Expected Energizing and Start-up Date: 9/15/2024

Normal Operation of Interconnection (examples: provide power to meet base load, demand management,
stand-by, back-up, others (please describe): provide power to meet base load, demand management,
back-up

One-line diagram attached? ✓ Yes

Has the Manufacturer supplied its dynamic modelling values to the DU? ✓ Yes (Note that answer here
requires “Yes” for complete application. For Pre-certified Equipment, answer is Yes.)

Layout sketch showing lockable, “visible” disconnect device. ✓ Yes

Company Customer Name

By: ENGR. MARK NEL A. INOJOSA By: CARLITO M. RODRIGUEZ

Title: 4.99KWP HYBRID SOLAR INSTALLATION Title: 4.99KWP HYBRID SOLAR INSTALLATION

Date: 10/01/2024 Date: 10/01/2024


TO SERVICE ENTRANCE 2P,
3-WIRE, 230V, 60hz 2-14mm sq THHN Cu Wire
SOLAR PANEL PER STRING 1- 8.0 sq THHN Cu Wire (G)
in 25mm dia. RSC
ISC = (14.05) X 1.25 = 17.56A
USE : 20AT DC BREAKER
2-4mm sq DC Wire in 20 mm 2- 8.0MM sq THHN Cu Wire
sq Liquitight Conduit or uPVC 1- 8.0 sq THHN Cu Wire (G)
in 25mm dia. RSC
2-4.0mm sq FR DC Cable

2-4.0mm sq FR DC Cable REC METER BI-DIRECTIONAL METER GRID


LOAD 2-14mm sq THHN Cu Wire
5X 555 Watts Canadian 4X 555 Watts Canadian 1- 8.0 sq THHN Cu Wire (G)
Brand MONO Brand MONO EPS in 32mm dia. uPVC
M M
Crystaline Solar Panel Crystaline Solar Panel ATS
in Series Connection in Series Connection
(STRING 1 ) (STRING 2 ) CT SENSOR
70AT
Nema 3R w/ Nema 3R w/
30AT MCCB 70AT MCCB
15AT 15AT
Lighting Outlet 01 02 Lighting Outlet
20AT 20AT
Convenience Outlet 03 04 Convenience Outlet
6KW DEYE
20AT 30AT
HYBRID Ref Outlet 05 06 Range Outlet
INVERTER 20AT 30AT
Washing Machine Outlet 07 08 2hp ACU Outlet
20AT 20AT
30AT
MCCB
Spare 09 10 Spare

MDP
DC Combiner

20AT DC 20AT DC
Breaker Breaker
1000v,2p 1000v,2p
125AT DC
Breaker

SPD SPD
32AT AC MCB
600v,2p w/ INVERTER
SPD
Lithium Battery IMAX = 6000W / 220V = 26.09A
48V, 100AH USE : 32 AT AC BREAKER
8.0m sq THHN Cu Wire in 25mm RSC/IMC

SERVICE
ENTRANCE
SURGE
VOLTAGE DROP PROTECTION
DEVICE DC
CT SENSOR

BATTERY PROTECTION INVERTER


SOLAR
INVERTER

Cable Loss: SURGE


PROTECTION
Ppv_cable = 2*3.39ohms/km*0.02km*(9.9)² Vpv_input = 41.9*5units PMAX = 5000W / 48V = 104.17A DEVICE AC

Ppv_cable = 13.29W (PER string ) Vpv_input = 209.5V ( PER string ) USE : 125 AT DC BREAKER REC METER / BI M AC / DC BREAKER
38 mm sq DC Wire DIRECTIONAL
METER
Ppv_input = Ppv_peak - Ppv_cable Voltage Drop:
Ppv_input = 555*5*1.03*0.912 - 13.29 Vdrop_cable = 2*3.39ohms/km*0.02km*9.92 1-100AH 48V LITHIUM BATTERY SOLAR PANEL
AC / DC ISOLATOR
ON

Ppv_input = 2593.43W (PER string ) Vdrop_cable = 1.34V OFF

LOCATION MAP SINGLE LINE DIAGRAM L E G E N D NTS


NTS SCALE
SCALE SCALE NTS

PROFESSIONAL ELECTRICAL ENGINEER PROJECT TITLE OWNER NOTE REVISION SHEET CONTENT SHEET NO.
Drawings and specifications and other contract documents duly signed, DRAFTED BY:
4.995kWp Hybrid Solar Installation CARLITO M. RODRIGUEZ
stamped of sealed, as instruments of service, are the intellectual property
and documents of the architect, whether the object for which they are
made is executed or not. It shall be unlawful for any person to duplicate
or to make copies of said documents for use in the repetition of and for DATE: AS SHOWN
E-1
other projects or buildings, whether executed partly or in whole, without

LOCATION : LOT3, BLOCK 6, STA. VERONICA VILLAGE, BRGY. IBABANG DUPAY, LUCENA CITY
the written consent of architect or author of said documents.

(R.A. 9266 , ARTICLE IV, Sec 33)


REVISION: 4
6KW DEYE HYBRID INVERTER C
S-03
SECTION B

SCALE NTS

Model SUN-6K-SG01/03LP1-EU
Battery Input Data
Battery Type Lead-acid or Lithium-ion
Battery Voltage Range (V) 40~60V
Max. Charging Current (A) 120A
Max. Discharging Current (A) 120A
Charging Curve 3 Stages / Equalization
No.of Strings Per MPPT Tracker Optional
External Temperature Sensor Self-adaption to BMS
Charging Strategy for Li-Ion Battery

PV String Input Data 7800W


Max. DC Input Power (W) 370V (100V~500V)
PV Input Voltage (V) 125~425V
MPPT Range (V) 240~425V
Full Load DC Voltage Range 150V
Start-up Voltage (V) 13A+13A
PV Input Current (A) 2
No.of MPPT Trackers 1+1
No.of Strings Per MPPT Tracker

AC Output Data 6000W


Rated AC Output and UPS Power (W) 5600W B
Max. AC Output Power (W) 2 times of rated power, 10 S S-03
Peak Power (off grid) 21.7A SECTION A
AC Output Rated Current (A) 25A
Max. AC Current (A) 35A
Max. Continuous AC Passthrough (A) 0.8 leading to 0.8 lagging
Power Factor
Output Frequency and Voltage
Grid Type
50/60Hz; 220/230 / 240Vac (single phase)
Single Phase
THD<3% (Linear load<1.5%)
PV MODULE DETAIL NTS
Current Harmonic Distortion
SCALE

Efficiency 97.60%
Max. Efficiency 96.50%
Euro Efficiency 99.90%
MPPT Efficiency

CANADIAN SOLAR PANEL NTS


SCALE
SOLAR ELECTRICAL NOTES

600
SCALE NTS
MODULE NUMBER CS6W-555MS
RATED MAXIMUM POWER 555W
1. UTILITY HAS 24HRS UNRESTRICTED ACCESS TO ALL PV SYSTEM COMPONENTS
LOCATED AT SERVICE ENTRANCE. SECTION-B CURRENT AT PMAX 13.25A
VOLTAGE AT PMAX 41.9V
2. MODULES CONFORM TO AND ARE LISTED UNDER UL 1703
SHORT CIRCUIT CURRENT 14.05A
3. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT
RESISTANCE AS PER PEC
MOUNTING DETAIL NTS
OPEN CIRCUIT VOLTAGE
49.8V
SCALE
4. CONDUCTORS EXPOSED TO WET LOCATION SHALL BE SUITABLE
FOR USE WET LOCATION AS PER PEC

5. NEW REC METER SHALL BE INSTALLED NEAR TO NEW BI DIRECTIONAL METER

6. TAPPING POINT OF REC METER LOAD SIDE CONDUCTORS SHALL


BE AT THE LOAD VISIBLE, DISCONNECT DEVICE BEFORE SERVICE
EQUIPMENT, REC METERS LOAD SIDE CONDUCTORS SHOULD BE
SHORT AS POSSIBLE

7. THE LINE SIDE CONDUCTORS OF THE REC METER BETWEEN THE GRID TIE INVERTER
REC METERS SHALL BE AN EXPOSED RIGID METALLIC CONDUIT OR INTERMEDIATE
SECTION-A
SPLICE KIT DETAIL
METALLIC CONDUIT.

8. WARNING SHOULD BE MOUNTED ON OR ADJACENT TO SCALE NTS


THE VISIBLE DISCONNECTION DEVICE AND SHALL BE READ PROMINENTLY.

L-FEET & CLAMP DETAIL NTS


SCALE

PROFESSIONAL ELECTRICAL ENGINEER PROJECT TITLE OWNER NOTE REVISION SHEET CONTENT SHEET NO.
Drawings and specifications and other contract documents duly signed, DRAFTED BY:
4.995kWp Hybrid Solar Installation CARLITO M. RODRIGUEZ
stamped of sealed, as instruments of service, are the intellectual property
and documents of the architect, whether the object for which they are
made is executed or not. It shall be unlawful for any person to duplicate
or to make copies of said documents for use in the repetition of and for DATE: AS SHOWN
E-2
other projects or buildings, whether executed partly or in whole, without

LOCATION : LOT3, BLOCK 6, STA. VERONICS VILLAGE, BRGY. IBABANG DUPAY, LUCENA CITY
the written consent of architect or author of said documents.

(R.A. 9266 , ARTICLE IV, Sec 33)


REVISION: 4
LIGHTING LAYOUT NTS
P O W E R L A Y O U T NTS
SCALE SCALE

SCHEDULE OF LOADS NTS


SCALE

PROFESSIONAL ELECTRICAL ENGINEER PROJECT TITLE OWNER NOTE REVISION SHEET CONTENT SHEET NO.
Drawings and specifications and other contract documents duly signed, DRAFTED BY:
4.995kWp Hybrid Solar Installation CARLITO M. RODRIGUEZ
stamped of sealed, as instruments of service, are the intellectual property
and documents of the architect, whether the object for which they are
made is executed or not. It shall be unlawful for any person to duplicate
or to make copies of said documents for use in the repetition of and for DATE: AS SHOWN
E-3
other projects or buildings, whether executed partly or in whole, without

LOCATION : LOT3, BLOCK 6, STA. VERONICS VILLAGE, BRGY. IBABANG DUPAY, LUCENA CITY
the written consent of architect or author of said documents.

(R.A. 9266 , ARTICLE IV, Sec 33)


REVISION: 4
PV MODULE LAYOUT NTS
SCALE

PROFESSIONAL ELECTRICAL ENGINEER PROJECT TITLE OWNER NOTE REVISION SHEET CONTENT SHEET NO.
Drawings and specifications and other contract documents duly signed, DRAFTED BY:
4.995kWp Hybrid Solar Installation CARLITO M. RODRIGUEZ
stamped of sealed, as instruments of service, are the intellectual property
and documents of the architect, whether the object for which they are
made is executed or not. It shall be unlawful for any person to duplicate
or to make copies of said documents for use in the repetition of and for DATE: AS SHOWN
E-4
other projects or buildings, whether executed partly or in whole, without

LOCATION : LOT3, BLOCK 6, STA. VERONICS VILLAGE, BRGY. IBABANG DUPAY, LUCENA CITY
the written consent of architect or author of said documents.

(R.A. 9266 , ARTICLE IV, Sec 33)


REVISION: 4
Plant Parameter Form
For Distribution Impact Study of Solar PV RE Facility Application
Preamble and Instructions
An owner of a distributed generator resource who requests interconnection to MERALCO’s
distribution facilities, must submit an application to MERALCO, as follows:

MERALCO’s Designated Contact Person: _________________________________


MERALCO’s Contact Information: Office: ___________________________
Branch: __________________________
Phone: ___________________________
FAX: ___________________________
An application is a Complete Application when it provides all applicable and correct information required below.
1. Failure to provide complete information may delay the processing of the study.
2. The Annex Sheet may be attached to provide additional information, if applicable, on the following:
(a) Inverter Specifications, Annex A.1 – applicable only to solar PV facilities with more than one
inverter model or rating.
(b) Transformer Specifications, Annex A.2 – applicable only to customers served by MERALCO
through customer-owned transformers (primary-metered)

Section 1: Applicant Information


CARLITO M. RODRIGUEZ
1. Customer Name: ______________________________________________________
1951917584
2. Existing MERALCO SIN: ______________________________________________
LOT 3 BLOCK 6, STA VERONICA VILLAGE, IBABANG DUPAY, LUCENA CITY, QUEZON
3. Address: _____________________________________________________________

[email protected]
4. Telephone / Fax / Email: ________________________________________________

5. Project Information: 06/23/2024 (dd/mm/yyyy)


Date of Start of Construction: __________
06/24/2024 (dd/mm/yyyy)
Date In-Service (Operation): __________

Owner of the Generating Electrical contractor Consultant/s


Facilities /Installer
Name of Company:
ENGR. MARK NEL A. INOJOSA ENGR. MARK NEL A. INOJOSA
Represented By:
Address:
LUCENA CITY LUCENA CITY

Contact Number
09171472170 09171472170
Landline/Mobile:
E-mail Address: [email protected] [email protected]

6. Location Map and Site Plan


Site plan with approximate line routings for connection to nearby MERALCO facilities. The
Site Plan include roads (with street names) and lot numbers and nearby power lines.
Plant Parameter Form For Distribution Impact Study of Solar PV RE Facility Application Page 1
Section 2: Technical Details
1. Single Line Diagram
Provide a Single Line Diagram (SLD) of the customer generating facilities, loads, lines,
and transformers, including the customer’s point of connection to MERALCO’s Grid.

2. Inverter Specifications

For additional model/ rating, please fill out form A.1 (Inverter Specifications).
i) Is the inverter paralleling equipment and/or design pre-certified?
/ Yes No
Certifying laboratory (Please attach copy of test certification, if any).________________
If yes, to which standard(s), e.g. IEEE 1547, UL-1741, please specify: _______________
DEYE
ii) Manufacturer/Brand : _______________ SUN-6K-SG05LP1-EU
Model : ___________________
6
iii) Maximum AC Power : ___________ kW 1
Number of Units : ___________
230
iv) Rated output AC Voltage : ___________ V 60
Rated Frequency: ___________ Hz
v) Number of phases : / One Three

3. Solar Panel Specifications Please provide values taken under Standard Test Conditions (STC).
CANADIAN
i) Manufacturer/Brand : ____________ Model : ___________________
555
ii) Rated Output per unit : ___________ kW 9
Number of Units : ___________
4.99
iii) Total Plant Capacity : ____________ kWp DC

6
4. Total Inverter AC Power Output (Maximum): ______________ kW

5. Type of customer metering: / Secondary-metered Primary-metered


For primary-metered customers, please fill out form A.2 (Transformer Specifications)

I hereby certify that, to the best of my knowledge, all the information provided in this
plant parameter form is true and correct.

Accomplished by:
Signature: ENGR. MARK NEL A. INOJOSA
___________________________ 10/21/2024
Date: ________________ (dd/mm/yyyy)

Plant Parameter Form For Distribution Impact Study of Solar PV RE Facility Application Page 2
In case of Additional or Multiple Inverter Models/Ratings Only and/or Primary-
Metered Customers, accomplish this form.

A.1 Inverter Specifications (To be accomplished for facilities with multiple inverter models/
ratings. Please provide specifications of each additional model/ rating.)

i) Manufacturer/Brand : _____________ Model : __________________


ii) Maximum AC Power : ____________ kW Number of Units : __________
iii) Rated output AC Voltage : _________V Rated Frequency: _________ Hz
iv) Number of phases: One Three
v) Is the inverter paralleling equipment and/or design pre-certified?
Yes No
Certifying laboratory (Please attach copy of test certification, if any)._______________
If yes, to which standard(s), e.g. IEEE 1547, UL-1741, please specify: _____________

A.2 Transformer Characteristics (To be accomplished by primary-metered customers only.


Please provide on a separate sheet if the units are not identical.)

i) Transformer rating: _________ kVA; Number of phases: One Three


ii) Nominal winding voltage: High-side: _________ kV; Low-side: _________ V
iii) High voltage winding connection:
Wye(3-ph) Delta(3-ph) Line-to-line(1-ph) Line-to-ground(1-ph)
iv)Low voltage winding connection:
Wye(3-ph) Delta(3-ph) Line-to-line(1-ph) Line-to-ground(1-ph)

v) Tap information:
Number of steps/taps: _______ Position of Nominal tap: _______
Minimum Tap: __________ (volts; p.u.; %)
Maximum Tap: __________ (volts; p.u.; %)

Accomplished by:
Name: ______________________________ Date: ________________ (dd/mm/yyyy)
Signature: ______________________________

Plant Parameter Form For Distribution Impact Study of Solar PV RE Facility Application Annex