Net Metering Requirements Sir Carl 1
Net Metering Requirements Sir Carl 1
:
ENERGY REGULATORY COMMISSION
Market Operations Service
Licensing Division
QUALIFIED END-USER (QE) CERTIFICATE OF COMPLIANCE (COC) APPLICATION
QE-COC Application Form No. 1
Fill all applicable white spaces. Mark all appropriate boxes with an “X”. Write N/A if not applicable.
Attach QE-COC Form No. 1.1.
N/A N/A
Page 1 of 2
MOS-LD/Revised as of November 2023
QE-COC Application Form No. 1
Republic of the Philippines COC Application No.:
ENERGY REGULATORY COMMISSION
Market Operations Service
Licensing Division
QUALIFIED END-USER (QE) CERTIFICATE OF COMPLIANCE (COC) APPLICATION
QE-COC Application Form No. 1
Fill all applicable white spaces. Mark all appropriate boxes with an “X”. Write N/A if not applicable.
Attach QE-COC Form No. 1.1.
Page 2 of 2
MOS-LD/Revised as of November 2023
QE-COC Application Form No. 1
Republic of the Philippines
ENERGY REGULATORY COMMISSION QE-COC Application Form No. 1.1
Market Operations Service (Solar)
Licensing Division
Fill all applicable white spaces. All values in three (3) decimal places. Write N/A if not applicable.
Attach to QE-COC Form No. 1.
1
Indicate Actual Date of Installation of the Facility
2
Indicate Actual Date of Test and Commissioning (from start to end of Test and Commissioning)
Page 1 of 2
MOS-LD/Revised as of November 2023
QE-COC Application Form No. 1.1 - Solar
Republic of the Philippines
ENERGY REGULATORY COMMISSION QE-COC Application Form No. 1.1
Market Operations Service (Solar)
Licensing Division
Fill all applicable white spaces. All values in three (3) decimal places. Write N/A if not applicable.
Attach to QE-COC Form No. 1.
Page 2 of 2
MOS-LD/Revised as of November 2023
QE-COC Application Form No. 1.1 - Solar
Application Form for Inter-connection of Renewable Energy Facility
Address: LOT 3 BLOCK 6, STA VERONICA VILLAGE, IBABANG DUPAY, LUCENA CITY, QUEZON
Service Point Address: LOT 3 BLOCK 6, STA VERONICA VILLAGE, IBABANG DUPAY, LUCENA CITY, QUEZON
Signature:
All applicable items must be accurately completed in order that facilities may be effectively evaluated by
the Company for interconnection with the utility system.
GENERATING FACILITY
No. of Units: 1
Manufacturer: DEYE
Ampere Rating: 25
Number of Phases: 2
Frequency: 60
Normal Operation of Interconnection (examples: provide power to meet base load, demand management,
stand-by, back-up, others (please describe): provide power to meet base load, demand management,
back-up
Has the Manufacturer supplied its dynamic modelling values to the DU? ✓ Yes (Note that answer here
requires “Yes” for complete application. For Pre-certified Equipment, answer is Yes.)
Title: 4.99KWP HYBRID SOLAR INSTALLATION Title: 4.99KWP HYBRID SOLAR INSTALLATION
MDP
DC Combiner
20AT DC 20AT DC
Breaker Breaker
1000v,2p 1000v,2p
125AT DC
Breaker
SPD SPD
32AT AC MCB
600v,2p w/ INVERTER
SPD
Lithium Battery IMAX = 6000W / 220V = 26.09A
48V, 100AH USE : 32 AT AC BREAKER
8.0m sq THHN Cu Wire in 25mm RSC/IMC
SERVICE
ENTRANCE
SURGE
VOLTAGE DROP PROTECTION
DEVICE DC
CT SENSOR
Ppv_cable = 13.29W (PER string ) Vpv_input = 209.5V ( PER string ) USE : 125 AT DC BREAKER REC METER / BI M AC / DC BREAKER
38 mm sq DC Wire DIRECTIONAL
METER
Ppv_input = Ppv_peak - Ppv_cable Voltage Drop:
Ppv_input = 555*5*1.03*0.912 - 13.29 Vdrop_cable = 2*3.39ohms/km*0.02km*9.92 1-100AH 48V LITHIUM BATTERY SOLAR PANEL
AC / DC ISOLATOR
ON
PROFESSIONAL ELECTRICAL ENGINEER PROJECT TITLE OWNER NOTE REVISION SHEET CONTENT SHEET NO.
Drawings and specifications and other contract documents duly signed, DRAFTED BY:
4.995kWp Hybrid Solar Installation CARLITO M. RODRIGUEZ
stamped of sealed, as instruments of service, are the intellectual property
and documents of the architect, whether the object for which they are
made is executed or not. It shall be unlawful for any person to duplicate
or to make copies of said documents for use in the repetition of and for DATE: AS SHOWN
E-1
other projects or buildings, whether executed partly or in whole, without
LOCATION : LOT3, BLOCK 6, STA. VERONICA VILLAGE, BRGY. IBABANG DUPAY, LUCENA CITY
the written consent of architect or author of said documents.
SCALE NTS
Model SUN-6K-SG01/03LP1-EU
Battery Input Data
Battery Type Lead-acid or Lithium-ion
Battery Voltage Range (V) 40~60V
Max. Charging Current (A) 120A
Max. Discharging Current (A) 120A
Charging Curve 3 Stages / Equalization
No.of Strings Per MPPT Tracker Optional
External Temperature Sensor Self-adaption to BMS
Charging Strategy for Li-Ion Battery
Efficiency 97.60%
Max. Efficiency 96.50%
Euro Efficiency 99.90%
MPPT Efficiency
600
SCALE NTS
MODULE NUMBER CS6W-555MS
RATED MAXIMUM POWER 555W
1. UTILITY HAS 24HRS UNRESTRICTED ACCESS TO ALL PV SYSTEM COMPONENTS
LOCATED AT SERVICE ENTRANCE. SECTION-B CURRENT AT PMAX 13.25A
VOLTAGE AT PMAX 41.9V
2. MODULES CONFORM TO AND ARE LISTED UNDER UL 1703
SHORT CIRCUIT CURRENT 14.05A
3. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT
RESISTANCE AS PER PEC
MOUNTING DETAIL NTS
OPEN CIRCUIT VOLTAGE
49.8V
SCALE
4. CONDUCTORS EXPOSED TO WET LOCATION SHALL BE SUITABLE
FOR USE WET LOCATION AS PER PEC
7. THE LINE SIDE CONDUCTORS OF THE REC METER BETWEEN THE GRID TIE INVERTER
REC METERS SHALL BE AN EXPOSED RIGID METALLIC CONDUIT OR INTERMEDIATE
SECTION-A
SPLICE KIT DETAIL
METALLIC CONDUIT.
PROFESSIONAL ELECTRICAL ENGINEER PROJECT TITLE OWNER NOTE REVISION SHEET CONTENT SHEET NO.
Drawings and specifications and other contract documents duly signed, DRAFTED BY:
4.995kWp Hybrid Solar Installation CARLITO M. RODRIGUEZ
stamped of sealed, as instruments of service, are the intellectual property
and documents of the architect, whether the object for which they are
made is executed or not. It shall be unlawful for any person to duplicate
or to make copies of said documents for use in the repetition of and for DATE: AS SHOWN
E-2
other projects or buildings, whether executed partly or in whole, without
LOCATION : LOT3, BLOCK 6, STA. VERONICS VILLAGE, BRGY. IBABANG DUPAY, LUCENA CITY
the written consent of architect or author of said documents.
PROFESSIONAL ELECTRICAL ENGINEER PROJECT TITLE OWNER NOTE REVISION SHEET CONTENT SHEET NO.
Drawings and specifications and other contract documents duly signed, DRAFTED BY:
4.995kWp Hybrid Solar Installation CARLITO M. RODRIGUEZ
stamped of sealed, as instruments of service, are the intellectual property
and documents of the architect, whether the object for which they are
made is executed or not. It shall be unlawful for any person to duplicate
or to make copies of said documents for use in the repetition of and for DATE: AS SHOWN
E-3
other projects or buildings, whether executed partly or in whole, without
LOCATION : LOT3, BLOCK 6, STA. VERONICS VILLAGE, BRGY. IBABANG DUPAY, LUCENA CITY
the written consent of architect or author of said documents.
PROFESSIONAL ELECTRICAL ENGINEER PROJECT TITLE OWNER NOTE REVISION SHEET CONTENT SHEET NO.
Drawings and specifications and other contract documents duly signed, DRAFTED BY:
4.995kWp Hybrid Solar Installation CARLITO M. RODRIGUEZ
stamped of sealed, as instruments of service, are the intellectual property
and documents of the architect, whether the object for which they are
made is executed or not. It shall be unlawful for any person to duplicate
or to make copies of said documents for use in the repetition of and for DATE: AS SHOWN
E-4
other projects or buildings, whether executed partly or in whole, without
LOCATION : LOT3, BLOCK 6, STA. VERONICS VILLAGE, BRGY. IBABANG DUPAY, LUCENA CITY
the written consent of architect or author of said documents.
[email protected]
4. Telephone / Fax / Email: ________________________________________________
Contact Number
09171472170 09171472170
Landline/Mobile:
E-mail Address: [email protected] [email protected]
2. Inverter Specifications
For additional model/ rating, please fill out form A.1 (Inverter Specifications).
i) Is the inverter paralleling equipment and/or design pre-certified?
/ Yes No
Certifying laboratory (Please attach copy of test certification, if any).________________
If yes, to which standard(s), e.g. IEEE 1547, UL-1741, please specify: _______________
DEYE
ii) Manufacturer/Brand : _______________ SUN-6K-SG05LP1-EU
Model : ___________________
6
iii) Maximum AC Power : ___________ kW 1
Number of Units : ___________
230
iv) Rated output AC Voltage : ___________ V 60
Rated Frequency: ___________ Hz
v) Number of phases : / One Three
3. Solar Panel Specifications Please provide values taken under Standard Test Conditions (STC).
CANADIAN
i) Manufacturer/Brand : ____________ Model : ___________________
555
ii) Rated Output per unit : ___________ kW 9
Number of Units : ___________
4.99
iii) Total Plant Capacity : ____________ kWp DC
6
4. Total Inverter AC Power Output (Maximum): ______________ kW
I hereby certify that, to the best of my knowledge, all the information provided in this
plant parameter form is true and correct.
Accomplished by:
Signature: ENGR. MARK NEL A. INOJOSA
___________________________ 10/21/2024
Date: ________________ (dd/mm/yyyy)
Plant Parameter Form For Distribution Impact Study of Solar PV RE Facility Application Page 2
In case of Additional or Multiple Inverter Models/Ratings Only and/or Primary-
Metered Customers, accomplish this form.
A.1 Inverter Specifications (To be accomplished for facilities with multiple inverter models/
ratings. Please provide specifications of each additional model/ rating.)
v) Tap information:
Number of steps/taps: _______ Position of Nominal tap: _______
Minimum Tap: __________ (volts; p.u.; %)
Maximum Tap: __________ (volts; p.u.; %)
Accomplished by:
Name: ______________________________ Date: ________________ (dd/mm/yyyy)
Signature: ______________________________
Plant Parameter Form For Distribution Impact Study of Solar PV RE Facility Application Annex