Body Repair Manual
Body Repair Manual
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
Symbol meaning
Plug Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
3. After welding, apply body sealer to the corresponding parts. (See the painting / coating)
4. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
HINT:
Make sure the caution label is not attached over a spot weld.
When attaching the caution label, make sure not to touch the label's
adhesive surface.
To prevent the edges of the caution label from peeling, apply extra
pressure to the label's periphery.
If the work area's temperature is 5°C or less, the caution label's
adhesive will deteriorate. It is recommended that you heat the label to
20 to 40°C.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
Follow the welding conditions below
when welding ultra high strength
INSTALLATION steel to assure sufficient weld
strength. (When repairing this
model)
*1: When welding 2 panels together
including 980 MPa ultra high strength
steel.
*2: When welding more than 3 panels together including 980 MPa ultra high strength steel.
(When plug welding a third panel to 2 panels which are welded under the conditions
described above.)
REMOVAL
Symbol meaning
REMOVAL POINT
1. Do not butt weld or heat repair because the heat decreases the strength of areas where
ultra high strength steel is used. (See the introduction)
2. *3 is reused.
INSTALLATION
Symbol meaning
Plug Weld
Plug Weld
Cut and Join Location
Fillet Weld
Butt Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
3. If the entire supply part is not needed, remove the part of the supply part that is needed.
4. Follow the welding conditions when welding *1 and *2 to assure sufficient weld strength.
(See the introduction)
5. Before temporarily installing the new parts, weld the center body pillar reinforcement sub-
assembly and rocker reinforce sub-assembly outer with the standard number of welding
points.
6. After welding the No.1 inner pillar sub-assembly the vehicle side, install the center body
pillar reinforcement sub-assembly and rocker reinforce sub-assembly outer.
7. After welding the No.1 inner pillar sub-assembly, center body pillar reinforcement sub-
assembly and rocker reinforce sub-assembly outer the vehicle side, install the *3.
8. After welding, apply body sealer to the corresponding parts. (See the painting / coating)
9. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
REMOVAL POINT
1. *1: Bolts.
2. After removing the front fender apron patch No.4 and front fender apron patch, remove the
cowl top side panel sub-assembly.
INSTALLATION
Symbol meaning
Plug Weld
Plug Weld
Fillet Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimension diagram)
3. *1: Bolts.
4. After welding the cowl top side panel sub-assembly to the vehicle side, install the front
fender apron patch No.4 and front fender apron patch.
5. After welding, apply body sealer to the corresponding parts. (See the painting / coating)
6. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
INSPECT LUGGAGE
COMPARTMENT DOOR
PANEL SUB-ASSEMBLY
ADJUST LUGGAGE
COMPARTMENT DOOR
PANEL SUB-ASSEMBLY
a. Check that the clearance measurements of areas *a through *e are within each standard
range.
Reference Value
Area Measurement Area Measurement
*a 5.8 to 9.8 mm (0.2283 to 0.3858 in.) *b 3.0 to 7.0 mm (0.1181 to 0.2756 in.)
*c -2.0 to 2.0 mm (-0.0787 to 0.0787 in.) *d 2.0 to 5.0 mm (0.0787 to 0.1969 in.)
*e -2.0 to 1.0 mm (-0.0787 to 0.0394 in.) - -
HINT:
Use the same procedure for the LHD and RHD vehicles.
The procedure listed below is for the LHD vehicles.
Centering bolts are used to mount the hood hinge and hood lock. The hood and
hood lock cannot be adjusted with the centering bolts installed. Substitute the
centering bolts with standard bolts when making adjustments.
Torque:
25 N*m{ 255 kgf*cm ,
18 ft.*lbf }
HINT:
Torque:
33 N*m{ 337 kgf*cm ,
24 ft.*lbf }
a. Check that the clearance measurements of areas *a through *j are within each standard
range.
Reference Value
Area Measurement Area Measurement
*a 0.5 mm (0.0197 in.) *b 7.0 mm (0.2756 in.)
*c 5.0 mm (0.1969 in.) *d 6.7 mm (0.2638 in.)
13.5 to 16.5 mm (0.5315 to 0.6496
*e *f 2.5 to 5.5 mm (0.0984 to 0.2165 in.)
in.)
*g 0.0 to 1.5 mm (0.0 to 0.0591 in.) *h 4.8 to 7.8 mm (0.1890 to 0.3071 in.)
-1.0 to 1.5 mm (-0.0394 to 0.0591
*i 3.1 to 5.6 mm (0.122 to 0.220 in.) *j
in.)
Text in Illustration
*1 Front Glass *2 Front Door
HINT:
SST
09812-18010
Text in Illustration
*1 SST
Reference Value
Area Measurement
*a 5.0 mm (0.1969 in.)
*b 6.7 mm (0.2638 in.)
Torque:
7.5 N*m{ 76 kgf*cm , 66
in.*lbf }
e. Loosen the 2 nuts on the front door rear
lower frame sub-assembly, and adjust
the glass position.
Torque:
14 N*m{ 143 kgf*cm , 10
ft.*lbf }
Torque:
7.5 N*m{ 76 kgf*cm , 66
in.*lbf }
Torque:
14 N*m{ 143 kgf*cm , 10
ft.*lbf }
SST
09812-18020
Text in Illustration
*1 SST
Reference Value
Area Measurement
2.5 to 5.5 mm (0.0984 to
*a
0.2165 in.)
5.2 to 8.2 mm (0.2047 to
*b
0.3228 in.)
Torque:
14 N*m{ 143 kgf*cm , 10
ft.*lbf }
Torque:
30 N*m{ 306 kgf*cm , 22
ft.*lbf }
Torque:
25 N*m{ 255 kgf*cm , 18
ft.*lbf }
Torque:
18 N*m{ 184 kgf*cm , 13
ft.*lbf }
Reference Value
Area Measurement Area Measurement
*a 8.2 mm (0.3228 in.) *b 2.0 to 5.0 mm (0.0787 to 0.1969 in.)
*c -2.0 to 1.0 mm (-0.0787 to 0.0394 in.) *d 5.8 to 10.2 mm (0.2283 to 0.4016 in.)
-2.0 to 1.0 mm (-0.0787 to 0.0394
*e 4.3 to 7.3 mm (0.1693 to 0.2874 in.) *f
in.)
HINT:
Centering bolts are used to mount the door hinge to the vehicle body and door. The door cannot be
adjusted with the centering bolts on. Substitute the centering bolts with standard bolts when making
adjustments.
Torque:
18 N*m{ 184 kgf*cm , 13
ft.*lbf }
b. When adjusting the rear edge of the
doors left or right, or adjusting the
luggage door closer assembly, loosen
the bolts before making adjustments.
Torque:
7.5 N*m{ 76 kgf*cm , 66
in.*lbf }
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
Symbol meaning
Plug Weld
Plug Weld
Plug Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
3. When welding *1, make a hole on a new part for plug welding and weld the panel with the
panel behind completely.
4. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
*2: When welding more than 3 panels together including 980 MPa ultra high strength steel.
(When plug welding a third panel to 2 panels which are welded under the conditions
described above.)
REMOVAL
Symbol meaning
REMOVAL POINT
1. Do not butt weld or heat repair because the heat decreases the strength of areas where
ultra high strength steel is used. (See the introduction)
INSTALLATION
Symbol meaning
Spot Weld
Plug Weld
Plug Weld
Plug Weld
Fillet Weld
Butt Weld
Body Sealer
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
3. If the entire supply part is not needed, remove the part of the supply part that is needed.
4. Before installing a new part, apply body sealer.
HINT:
5. Follow the welding conditions when welding *1 and *2 to assure sufficient weld strength.
(See the introduction)
6. Before temporarily installing the new parts, weld the front body pillar sub-assembly inner
and front pillar extension lower with the standard number of welding points.
7. When welding *3, make a hole on a new part for plug welding and weld the panel with the
panel.
8. After welding the front body lower inner pillar the vehicle side, install the front body pillar
sub-assembly inner and front pillar extension lower.
9. After welding the front body lower inner pillar, front body pillar sub-assembly inner and
front pillar extension lower the vehicle side, install the rocker reinforce sub-assembly outer.
10. After welding the front body lower inner pillar, front body pillar sub-assembly inner, front
pillar extension lower and rocker reinforce sub-assembly outer the vehicle side, install the
front body pillar reinforce sub-assembly lower.
11. After welding the front body lower inner pillar, front body pillar sub-assembly inner, front
pillar extension lower, rocker reinforce sub-assembly outer and front body pillar reinforce
sub-assembly lower the vehicle side, install the front body pillar upper outer and rocker
panel outer rear.
12. After welding, apply body sealer to the corresponding parts. (See the painting / coating)
13. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
Symbol meaning
Plug Weld
Plug Weld
Fillet Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimension diagram)
3. Make sure to attach correctly in accordance with the body dimension diagram as this part
affects the front wheel alignment.
4. After welding, apply body sealer and undercoating to the corresponding parts. (See the
painting / coating)
5. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
REMOVAL POINT
1. *1: Bolts.
INSTALLATION
Symbol meaning
Plug Weld
Plug Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimension diagram)
3. *1: Bolts.
4. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
FRONT SIDE MEMBER > CUT AND JOIN REPLACEMENT SECTIONS (SMALL
FRONT SIDE MEMBER AREAS)
> CUT AND JOIN
REPLACEMENT
SECTIONS (SMALL
AREAS) With the radiator support and front
fender mounting bracket removed.
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
REMOVAL POINT
1. Carefully cut the member so not to damage *1.
Reference Value
Area Measurement Area Measurement
*a 135 mm (5.31 in.) *b 271 mm (10.67 in.)
*c 410 mm (16.14 in.) *d 135 mm (5.31 in.)
*e 271 mm (10.67 in.) *f 410 mm (16.14 in.)
INSTALLATION
Symbol meaning
Plug Weld
Butt Weld
INSTALLATION POINT
1. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
2. After welding, apply body sealer and undercoating to the corresponding parts. (See the
painting / coating)
3. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
REMOVAL POINT
1. After removing the front side member reinforcement No.1, remove the front side member
sub-assembly.
INSTALLATION
Symbol meaning
Plug Weld
Plug Weld
Fillet Weld
INSTALLATION POINT
1. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
2. After welding the front side member sub-assembly to the vehicle side, install the front side
member reinforcement No.1.
3. Make sure to attach correctly in accordance with the body dimension diagram as this part
affects the front wheel alignment.
4. After welding, apply body sealer and undercoating to the corresponding parts. (See the
painting / coating)
5. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
REMOVAL POINT
1. After removing the front side member reinforcement No.1, remove the front side member
sub-assembly.
INSTALLATION
Symbol meaning
Plug Weld
INSTALLATION POINT
1. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
2. After welding the front side member sub-assembly to the vehicle side, install the front side
member reinforcement No.1.
3. Make sure to attach correctly in accordance with the body dimension diagram as this part
affects the front wheel alignment.
4. After welding, apply body sealer and undercoating to the corresponding parts. (See the
painting / coating)
5. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
REMOVAL POINT
1. Cut the quarter panel and fold it upward as shown in *1. Then cut through the welded area
of the quarter panel inner rear and quarter inner panel rear, and remove the quarter panel
extension rear lower.
INSTALLATION
Symbol meaning
Plug Weld
Plug Weld
Butt Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
3. After welding, apply body sealer to the corresponding parts. (See the painting / coating)
4. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
Work Procedure
1. Cut the wheel arch portion.
2. Heat the quarter panel adhesive area and remove the quarter panel.
HINT:
Using an industrial heater gun or gas burner, heat the quarter panel to 110 to 140°C.
Make sure the quarter panel does not warp.
HINT:
Using an industrial heater gun or gas burner, heat the adhesive to 110 to
140°C.
Using a scraper, scrape away the adhesive.
If adhesive remains, the strength of any subsequently applied adhesive
will be weak.
4. Using a disc grinder or belt sander, scuff and sand any adhesive that remains on the
vehicle.
HINT:
Scuff at a width of approximately 10 mm (0.39 in.) over the previous adhesive coating.
5. Apply adhesive to the exposed metal areas on the vehicle. Using a spatula, spread the
adhesive evenly.
6. Apply adhesive to the vehicle again.
7. Using #60-120 grit sandpaper, scuff the adhesive application area on the new quarter
panel.
8. Apply adhesive to the new quarter panel. Using a spatula, spread the adhesive evenly.
9. Using a vise grip or the palms of your hands, press the quarter panel so that the thickness
of the adhesive is even.
10. Complete installation the new quarter panel.
11. Dry the adhesive areas of the new quarter panel.
HINT:
REMOVAL
Symbol meaning
Remove Weld Points
REMOVAL POINT
1. *1 in illustration above indicates where the adhesive is located.
2. Roughly cut open the panel so that the adhesive can be reached. Cut through the adhesive
with a cut chisel to remove the panel.
HINT:
In cases where the adhesive cannot be removed with a cut chisel, heat the adhesive with
an industrial heater gun or gas burner taking care not to cause panel deformation by
overheating.
INSTALLATION
Symbol meaning
Spot Weld
Plug Weld
Plug Weld
Plug Weld
Butt Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
3. When welding *1, make a hole on a new part for plug welding and weld the panel with the
panel behind completely.
4. Apply adhesive (3MTM AutomixTM Panel Bonding Adhesive #8115) to the area indicated by
*2 in the illustration.
HINT:
5. Perform spot-welding on the flange indicated by *3 in the illustration. Modify/cut the spot
tip as shown in the illustration*4 so that it can fit in to the narrow flange.
6. After welding, apply body sealer to the corresponding parts. (See the painting / coating)
7. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
REMOVAL POINT
1. *1 and *2 is reused.
2. After removing the *1, *2 and quarter lock pillar extension sub-assembly, remove the
quarter wheel house panel outer.
INSTALLATION
Symbol meaning
Spot Weld
Plug Weld
Plug Weld
Plug Weld
Butt Weld
Assembly Mark
INSTALLATION POINT
1. When welding *1, make a hole on a new part for plug welding and weld the panel with the
panel behind completely.
2. For positioning of the new parts, align the installation standard holes of the outer panel and
the inner panel.
3. After welding the quarter wheel house panel outer to the vehicle side, install the quarter
lock pillar extension sub-assembly, *1 and *2.
4. After welding, apply body sealer and undercoating to the corresponding parts. (See the
painting / coating)
5. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
REMOVAL POINT
1. *1: Bolts.
INSTALLATION
Symbol meaning
Plug Weld
Plug Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
3. *1: Bolts.
4. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
REMOVAL POINT
1. *1: Bolts.
INSTALLATION
Symbol meaning
Plug Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
3. *1: Bolts.
4. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
Symbol meaning
Plug Weld
Plug Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
3. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
4. Measure the dimensions before installing the headlights.
Reference Value
Area Measurement Area Measurement
*a 1360 mm (53.54 in.) *b 1278 mm (50.31 in.)
*c 1097 mm (43.19 in.) *d 888 mm (34.96 in.)
*e 881 mm (34.68 in.) *f 889 mm (35.00 in.)
*g 805 mm (31.69 in.) - -
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
Cut Location
REMOVAL POINT
1. After removing the rear floor side panel and rear bumper bracket, remove the rear floor
pan.
INSTALLATION
Symbol meaning
Plug Weld
Plug Weld
Plug Weld
Cut Location
Fillet Weld
Body Sealer
INSTALLATION POINT
1. Cut the new part so that it overlaps the previous cut location.
2. When welding *2, make a hole on a new part for plug welding and weld the panel with the
panel behind completely.
3. *1: Perform plug-welding in the area where the panel are overlapped. Apply body sealer to
both sides of each panel.
HINT:
4. After welding the rear floor pan to the vehicle side, install the rear floor side panel and rear
bumper bracket.
5. After welding, apply body sealer and undercoating to the corresponding parts. (See the
painting / coating)
6. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
REMOVAL POINT
1. After removing the rear floor side panel and rear bumper bracket, remove the rear floor
side member reinforcement sub-assembly rear.
INSTALLATION
Symbol meaning
Plug Weld
Plug Weld
Plug Weld
INSTALLATION POINT
1. When welding *1, make a hole on a new part for plug welding and weld the panel with the
panel behind completely.
2. After welding the rear floor side member reinforcement sub-assembly rear to the vehicle
side, install the rear floor side panel and rear bumper bracket.
3. After welding, apply body sealer and undercoating to the corresponding parts. (See the
painting / coating)
4. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
REMOVAL POINT
1. After removing the rear floor side panel and rear bumper bracket, remove the rear floor pan
to quarter panel extension.
INSTALLATION
Symbol meaning
Plug Weld
Plug Weld
Plug Weld
INSTALLATION POINT
1. When welding *1, make a hole on a new part for plug welding and weld the panel with the
panel behind completely.
2. After welding the rear floor pan to quarter panel extension to the vehicle side, install the
rear floor side panel and rear bumper bracket.
3. After welding, apply body sealer to the corresponding parts. (See the painting / coating)
4. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
ROCKER OUTER PANEL > CUT AND JOIN REPLACEMENT SECTIONS (SMALL
ROCKER OUTER PANEL AREAS)
> CUT AND JOIN
REPLACEMENT
SECTIONS (SMALL
AREAS)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
Symbol meaning
Plug Weld
Butt Weld
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
3. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)
REMOVAL
INSTALLATION
REMOVAL
Symbol meaning
Symbol meaning
Spot Weld
Plug Weld
Body Sealer
INSTALLATION POINT
1. Inspect the fitting of the related parts around the new parts before welding. This affects the
appearance of the finish.
2. Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimensions)
3. Before temporarily installing the new parts, apply body sealer to the windshield header
panel and roof panel reinforcement.
HINT:
Apply just enough body sealer for the new parts to make contact.
4. After welding, apply body sealer to the corresponding parts. (See the painting / coating)
5. After applying the top coat, apply anti-rust agent to the internal panel portion of the closed
section structural weld points.
Toyota TechDoc 86 / ZN6
Outline OFF Top Back New (BM2090E)