interview_questions
interview_questions
62011
Delliote:
Entries :
Mm, dr debit ?
BANK MASTER DATA FIELDS CHANGES?
Open item Line item diff?
Sort key Uses ?purpose?
Accumaled entry?
Dep Methods?
Keys dep?
09-10-2011 Suresh
1. What is the commitment a/c ?
2. Tell me how to configure in account payable and AR? Working the cash
mgt?
3. Tell me subsequent debit memo and subsequent cr memo?
4. You know how ecc6.0 your working? are not? What about the new g/l
a/c ?what is parallel ledger
5. I want business area wise financial statement? How to doing in sap?
6. Document splitting?
7. Tell me procurement cycle? What are the entries passed in the
system?
8. Are you working on the product costing and profitability analysis?
1. What is the chart of a/c? Chart of a/c types? Where Is define the country
chart of a/c and group chart of a/c?
2. Fiscal year variant? Tell me how to define the system? What is the screen
in the system?
3. Field status variant? What does it controls?
4. Tell something yourself?
5. Tolerances group?
6. Account group? what does it control?
7. Tell me how to configuration in a/c payable?
8. What is the controlling area? What are configuration steps?
9. My controlling area is 1000 co code is 1000, another one co code is 2000,
co area is 2000, I want to traction to the second controlling area? How?
http://forums.sdn.sap.com/thread.jspa?threadID=2096634&tstart=0
dec 12 2011ncheck in sdn form controlling
1.I am having the one finished product that finished product I have doing the marking one
period and releasing one period is it possible for particular product? Could you please give me
a suggestion?
Hi this is possible. You can mark the SCE in one period and release in next period. It doesnt
have any impact unless you value your inventory at future price.
2.One finished product I am link given in the BOM for 123 materials. I did standard cost
estimation with quantity structure ck11n for one finished product, Now I am adding the another
material in the BOM like Raw material for same finished product, now my question is another
time std cost estimation is possible are not ?
You can run SCE as many times as you want, but you cant update a Material master once you
have already done it once.
If any new material is added as a BOM component in mid of the month, then that will go as
variance for the rest of the month.
If you delette the existing SCE, then there will be inconsistencies with the inventory which is
already been issued to the warehouse valuated at the previous price. hence deleting is not a
better option. You can wait till next month, then do the SCE again.
3.I did marking and releasing for the particular products like Finished, semi finished and Raw
material, then I will change the price in accounting 1 tab is it possible?
for the material type FERT and HALB, SAP suggests S as price indicator. When the cost
estimation is released, the standard price filed in the accounting tab also has the same price as
in the costing tab and will be graded out. Hence you can change.
But moving avg price filed fill be in editable mode but for this material types this is only a
statistical value.
For raw materials, V is the price indicator. hence updating material master with Standard cost
will not have any impact. But again the Moving avg price field in the accounting tab will be
graded out with Standard price filed in editable mode.
4.Sub contracting what is the accounting entry is passed in the system? at the time of 101, 261, 541?
101 - FG inventory Dr
GRIR CR
Valuation variant can be made plant specific or at company code level common for all the plants in the
company code/controlling area.
6.i don’t want cost for particular material ? i know the one check box in costing tab don’t costing another
check box where is
it?
If you dont want to cost a material, the check the do not cost indicator.