Airtel Site Acceptance Testing Report
Airtel Site Acceptance Testing Report
E F A B C D E F A
0 0 120 0 0 0 0 0 2
Airtel Planned Mechanical Tilt Airtel Planned Electrical Tilt
B C D E F A B C D
0 0 0 0 0 2 0 0 0
ctrical Tilt
E F
0 0
S.No Site Acceptance Testing - Basic Information
1 Circle UP East
4 Site ID KANA01
7 Latitude 27.36168
8 Longitude 81.35149
Mewa Lal S/O Late Brajmohan, Krom No: 255, Gjasara No: 611, Village:
10 Site Address Karnarki, Pargana: Koradi South, Tehsil: Mehmoodabad, District:
Sitapur(U.P), PIN: 261204, Post: Ram Pur Mathura , Milestone: NA ,
Highway: NA , Chauki:Bhagautipur , Thana:
11 Site Type (IM/OM/SC/FC etc) OM
22 SM Type ACOC+AMIA
23 MW Link ID NA
Media
3.1.03 1.MCB for BBU and RF Unit meets the design specifications. (Amp)
3.1.04 2.MCB for BBU and RF Unit meets the design specifications. (Amp)
3.1.05 3.MCB for BBU and RF Unit meets the design specifications. (Amp)
3.1.06 4.MCB for BBU and RF Unit meets the design specifications. (Amp)
3.1.12 All the power cables and protection ground cables are connected firmly with correct polarity (Yes/No)
RF Unit is grounded & grounding cables fixed to the earth strip/tower leg in downward direction. (ensure that paint is removed at touching portion of clamp to
3.1.13
tower member before fixing). (Yes/No)
3.1.14 RF Unit power cables are arranged in neat and straight way without any crossing. (Yes/No)
4. Media Cable
4.1.01 The Optical / Ethernet Lan cables are routed and connected securely at BBU. (Yes/No)
4.1.02 QOS Implementation as per-guideline
4.1.03 CPRI cables of RF Unit are arranged in neat and straight way without any crossing (Yes/No)
4.1.04 The fixing clips of the CPRI cables of RF Unit are spaced evenly and secured and oriented in the same direction. (Yes/No)
4.1.05 CPRI - FO Cable looped in ring should be done neatly and tied properly. (Yes/No)
4.1.06 Any visible stretch/Cut/damage on FO Cable. (Yes/No)
4.1.07 Cables are routed properly inside and outside the cabinet and bound with ties with uniform spacing & moderate tightness. (Yes/No)
4.1.08 Correct CPRI Cable / SFP Port is there as per FDD-1000/TDD-10G/5G-10G/25G Recommendation (Yes/No)
4.1.09 Fibre cable routing properly (Yes/No)
4.1.10 Conduit used for Fibre cable properly (Yes/No/NA)
4.1.11 Feeder should be traced for Swap / Cyclic Swap / Proper Mapping (Yes/No/NA)
5. Clock
5.1.01 GPS antenna and cable installed properly (Yes/
5.1.02 BTS Clock Configuration
5.1.03 BTS Clock Configuration-S
Sector/ Cell
6.1.06 TMA/Combiner/Duplexer/Triplexer
6.1.08 Antenna should be free of any obstruction to allow movement for optimization (+/-30 Degree)
Sector/ Cell
7.1.02 Every RF Port
7.1.03 Path Imbalance for FDD / TDD Ports
8. Weather Proofing
Sector/ Cell
10.1.04 Labelling of DDF modules is done according to specifications. (External alarm number marking on Wire & index of alarms stick beside DDF Box) (Yes/No/NA)
Date : 04-Jan-2025
r cables and protection ground cables are connected firmly with correct polarity (Yes/No) Yes/No/NA
unded & grounding cables fixed to the earth strip/tower leg in downward direction. (ensure that paint is removed at touching portion of clamp to
Yes/No/NA
er before fixing). (Yes/No)
er cables are arranged in neat and straight way without any crossing. (Yes/No) Yes/No/NA
/ Ethernet Lan cables are routed and connected securely at BBU. (Yes/No) Yes/No/NA Existing
mentation as per-guideline Yes/No/NA Yes
of RF Unit are arranged in neat and straight way without any crossing (Yes/No) Yes/No/NA Yes
ips of the CPRI cables of RF Unit are spaced evenly and secured and oriented in the same direction. (Yes/No) Yes/No/NA Yes
able looped in ring should be done neatly and tied properly. (Yes/No) Yes/No/NA Yes
stretch/Cut/damage on FO Cable. (Yes/No) Yes/No/NA No
outed properly inside and outside the cabinet and bound with ties with uniform spacing & moderate tightness. (Yes/No) Yes/No/NA Yes
I Cable / SFP Port is there as per FDD-1000/TDD-10G/5G-10G/25G Recommendation (Yes/No) Yes/No/NA Yes
routing properly (Yes/No) Yes/No/NA Yes
ed for Fibre cable properly (Yes/No/NA) Yes/No/NA NA
uld be traced for Swap / Cyclic Swap / Proper Mapping (Yes/No/NA) Yes/No/NA NA
2G
a and cable installed properly (Yes/ Yes/NO/NA Existing
onfiguration GPS/IP/Top/TDM/NTP GPS
onfiguration-S GPS/IP/Top/TDM/NTP NA
Sector 1
Planned
MA-2L4M-
pe. Part Code 45F8-A12
P-A
rts Number 8
uantity. Number 1
iner/Duplexer/Triplexer Type NA
ould be free of any obstruction to allow movement for optimization (+/-30 Degree) Yes/No/NA Yes
NA Sector 1
Actual Actual
rt Value NA
ance for FDD / TDD Ports <=2 dB NA
Sector 1
Actual
oofing on all-joints Yes/No/NA Yes
m Yes/No/NA No
ting alarm in last 24 Yes/No/NA No
Yes/No/NA No
Start Yes/No/NA NA
Yes/No/NA NA
Yes/No/NA NA
erature Yes/No/NA NA
Yes/No/NA NA
ery Yes/No/NA NA
s Yes/No/NA Yes
NA NA
NA NA
NA NA
NA NA
1_AHEC 1_AHEC
1_ACOC+AMIA 1_ACOC+AMIA
(EXISTING) (EXISTING)
NA NA
Existing Existing
NA NA
Yes Yes
Yes Yes
Yes Yes
Yes Yes
N/A N/A
N/A N/A
Existing N/A
Yes Yes
Yes N/A
Yes N/A
Yes N/A
No No
Yes N/A
Yes N/A
Yes N/A
NA NA
NA NA
3G FD TD
NA NA NA
NA NA NA N/A
NA NA NA
No No
No No
No No
NA NA
Yes Yes
Yes Yes
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
Yes Yes
No No
NA N/A
NA N/A
Yes Yes
Yes Y
42 67
Checking method
Snap Count Severity
S1 1 Major
S2 1 Critical
Declaration Critical
Declaration Major
Declaration Major
Declaration Minor
Declaration Minor
S3 1 Major
S3 1 Minor
S4 2 Critical
S5,S6,S7 3 Major
Declaration Major
Declaration Major
Declaration Critical
S8 1 Critical
Declaration Major
Declaration Major
Declaration Major
Declaration Major
Declaration Major
Declaration Major
S9,S10,S11 3 Major
S12 2 Major
Declaration Critical
Declaration Critical
S15 2 Minor
Declaration Major
S16,S17,S18 3 Minor
S16,S17,S18 3 Minor
S13 3 Minor
Declaration Critical
S19 2 Minor
S15 Critical
S15 Major
S20 1 Major
Declaration Major
S21 1 Critical
Declaration Critical
Declaration Critical
Declaration Minor
Declaration Minor
Declaration Minor
Declaration Minor
Declaration Major
S31,S32,S33 3 Minor
Declaration Critical
S34,S35,S36 3 Critical
Declaration Critical
Declaration Critical
Declaration Major
Declaration Major
S37,S38,S39 6 Critical
Declaration Critical
Declaration Critical
Declaration Critical
Declaration Major
Declaration Major
Declaration Major
Declaration Critical
Declaration Major
Declaration Major
Declaration Minor
Declaration Minor
S40 1 Critical
S41 1 Critical
Declaration Major
* Lat/long, Date & time, Site ID,ASP name stamp should be all photographs.
* All photogrphs should be latest physical status of site
S1: Cabinet is properly mounted & S2: IP 55 Cabinet Filter( where ever S3.a : Base Station is securely S3.b : Base Station is securely
secured on wall /pole and appicable) are in place and installed & is perfect at installed & is perfect at
accessible to technician. properly cleaned Horizontal/vertical position. Horizontal/vertical position.
S5.a : RRU Installation for 1st S5.b : RRU Installation for 1st
S4.a : IP seals /plugs must be Sector Showing GND Jumper Sector Showing GND Jumper
installed in all module S4.b : . Clamping Weather Proofing & Clamping Weather Proofing &
Labeling. Labeling.
S5.c : RRU Installation for 1st S5.d : RRU Installation for 1st S5.e : RRU Installation for 1st S5.f : RRU Installation for 1st
Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper
Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing &
Labeling. Labeling. Labeling. Labeling.
S6.a : RRU Installation for 2nd S6.b : RRU Installation for 2nd S6.c : RRU Installation for 2nd S6.d : RRU Installation for 2nd
Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper
Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing &
Labeling. Labeling. Labeling. Labeling.
S6.e : RRU Installation for 2nd S6.f : RRU Installation for 2nd S7.a : RRU Installation for 3rd S7.b : RRU Installation for 3rd
Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper
Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing &
Labeling. Labeling. Labeling. Labeling.
S7.c : RRU Installation for 3rd S7.d : RRU Installation for 3rd S7.e : RRU Installation for 3rd S7.f : RRU Installation for 3rd
Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper
Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing &
Labeling. Labeling. Labeling. Labeling.
S8.a : BBU and DCDU are S8.b : BBU and DCDU are
S8.c:
grounded to EGB or Tower leg. grounded to EGB or Tower leg.
S9.a : 1st sector RRU is grounded and the grounding cable of S9.b : 1st sector RRU is grounded and the grounding cable of S9.c : 1st sector RRU is grounded and the grounding cable of
RRUs are extended downward and fixed to the tower RRUs are extended downward and fixed to the tower RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S9.d : 1st sector RRU is grounded and the grounding cable of S9.e : 1st sector RRU is grounded and the grounding cable of S9.f : 1st sector RRU is grounded and the grounding cable of
RRUs are extended downward and fixed to the tower RRUs are extended downward and fixed to the tower RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S10.a : 2nd sector RRU is grounded and the grounding cable S10.b : 2nd sector RRU is grounded and the grounding cable S10.c : 2nd sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S10.d : 2nd sector RRU is grounded and the grounding cable S10.e : 2nd sector RRU is grounded and the grounding cable S10.f : 2nd sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S11.a : 3rd sector RRU is grounded and the grounding cable S11.b : 3rd sector RRU is grounded and the grounding cable of S11.c : 3rd sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion of nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) clamp to tower member before fixing) of clamp to tower member before fixing)
S11.d : 3rd sector RRU is grounded and the grounding cable S11.e : 3rd sector RRU is grounded and the grounding cable S11.f : 3rd sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S12.a : RRU power cables are arranged in neat S12.b : RRU power cables are arranged in neat S12.c : RRU power cables are arranged in neat
and straight way without any crossing. and straight way without any crossing. and straight way without any crossing.
S13.a:CPRI - FO Cable looped in ring at least 2-3 S13.b:CPRI - FO Cable looped in ring at least 2-3
times at RRU end. times at RRU end.
S13.c:CPRI - FO Cable looped in ring at least 2-3 S13.d:CPRI - FO Cable looped in ring at least 2-3 S13.e:CPRI - FO Cable looped in ring at least 2-3
times at RRU end. times at RRU end. times at RRU end.
S13.f:CPRI - FO Cable looped in ring at least 2-3 S15:The E1 / Ethernet Lan cables are routed and
times at RRU end. S14 :Invertor Make and Model (Small Cell). connected securely at BBU
S16.a :CPRI cables of 1st sector RRU are arranged in neat S16.b :CPRI cables of 1st sector RRU are arranged in neat S16.c :CPRI cables of 1st sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.
S17.a :CPRI cables of 2nd sector RRU are arranged in neat S17.b :CPRI cables of 2nd sector RRU are arranged in neat S17.c :CPRI cables of 2nd sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.
S18.a :CPRI cables of 3rd sector RRU are arranged in neat S18.b :CPRI cables of 3rd sector RRU are arranged in neat S18.c :CPRI cables of 3rd sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.
S19.a : Cables are routed properly inside and outside the S19.b : Cables are routed properly inside and outside the
cabinet and bound with ties with uniform spacing & cabinet and bound with ties with uniform spacing & S20:Conduit used for Fiber cable properly.
moderate tightness moderate tightness
S33.a : S33.b : S34.a : Obstructions if any ( Optimization S34. b : Obstructions if any ( Optimization
purpose) Antenna Clamp should not be purpose) Antenna Clamp should not be
TMA/Combiner/Duplexer/Tripl TMA/Combiner/Duplexer/Tripl blocked to allow Antenna for proper blocked to allow Antenna for proper
exer. exer. optimization (+/-30 Degree). optimization (+/-30 Degree).
S35.a : Obstructions if any ( Optimization S35.b : Obstructions if any ( Optimization S36.a : Obstructions if any ( Optimization S36. b : Obstructions if any ( Optimization
purpose) Antenna Clamp should not be purpose) Antenna Clamp should not be purpose) Antenna Clamp should not be purpose) Antenna Clamp should not be
blocked to allow Antenna for proper blocked to allow Antenna for proper blocked to allow Antenna for proper blocked to allow Antenna for proper
optimization (+/-30 Degree). optimization (+/-30 Degree). optimization (+/-30 Degree). optimization (+/-30 Degree).
S37.a : GSM Installation for 1st Sector S37.b : GSM Installation for 1st S38.a : GSM Installation for 2nd
Showing Jumper Weather Proofing & Sector Showing Jumper Weather Sector Showing Jumper Weather
Labeling. Proofing & Labeling. Proofing & Labeling.
S38.b : GSM Installation for 2nd S39.a : GSM Installation for 3rd S39.b : GSM Installation for 3rd S40.a : Site access is safe and as per
Sector Showing Jumper Weather Sector Showing Jumper Weather Sector Showing Jumper Weather OHS.
Proofing & Labeling. Proofing & Labeling. Proofing & Labeling.
S40.b : Site access is safe and as per OHS. S40.c : Site access is safe and as per OHS. S40.d : Site access is safe and as per OHS. S41: EMF Signage Board.
S42.a: Submit Photograph of Alarm patch S42.b: Submit Photograph of Alarm patch S42.c: Submit Photograph of Alarm patch
panel showing alarm extension ( Both cable panel showing alarm extension ( Both cable panel showing alarm extension ( Both cable
from BTS and INFRA and interconnection) from BTS and INFRA and interconnection) from BTS and INFRA and interconnection)
and labelling on both side in Physical AT and labelling on both side in Physical AT and labelling on both side in Physical AT
S43.a : RRU Installation for 2G/FD 4th Sector S43.b : RRU Installation for 2G/FD 4th Sector S43.c : RRU Installation for 2G/FD 4th Sector
Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather
Proofing & Labeling. Proofing & Labeling. Proofing & Labeling.
S43.d : RRU Installation for 2G/FD 4th Sector S43.e : RRU Installation for 2G/FD 4th Sector
S43.f : RRU Installation for 2G/FD 4th Sector Showing GND
Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather Jumper Clamping Weather Proofing & Labeling.
Proofing & Labeling. Proofing & Labeling.
S44.a : RRU Installation for 2G/FD 5th Sector S44.b : RRU Installation for 2G/FD 5th Sector S44.c : RRU Installation for 2G/FD 5th Sector
Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather
Proofing & Labeling. Proofing & Labeling. Proofing & Labeling.
S44.d : RRU Installation for 2G/FD 5th Sector S44.e : RRU Installation for 2G/FD 5th Sector S44.f : RRU Installation for 2G/FD 5th Sector
Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather
Proofing & Labeling. Proofing & Labeling. Proofing & Labeling.
S45.a : RRU Installation for 2G/FD 6th Sector S45.b : RRU Installation for 2G/FD 6th Sector
S45.c : RRU Installation for 2G/FD 6th Sector Showing GND
Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather Jumper Clamping Weather Proofing & Labeling.
Proofing & Labeling. Proofing & Labeling.
S45.d : RRU Installation for 2G/FD 6th Sector Showing GND S45.e : RRU Installation for 2G/FD 6th Sector Showing GND S45.f : RRU Installation for 2G/FD 6th Sector Showing GND
Jumper Clamping Weather Proofing & Labeling. Jumper Clamping Weather Proofing & Labeling. Jumper Clamping Weather Proofing & Labeling.
S46.a : 4th sector RRU is grounded and the grounding cable S46.b : 4th sector RRU is grounded and the grounding cable S46.c : 4th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S46.d : 4th sector RRU is grounded and the grounding cable S46.e : 4th sector RRU is grounded and the grounding cable S46.f : 4th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S47.a : 5th sector RRU is grounded and the grounding cable S47.b : 5th sector RRU is grounded and the grounding cable S47.c : 5th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S47.d : 5th sector RRU is grounded and the grounding cable S47.e : 5th sector RRU is grounded and the grounding cable S47.f : 5th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S48.a : 6th sector RRU is grounded and the grounding cable S48.b : 6th sector RRU is grounded and the grounding cable S48.c : 6th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S48.d : 6th sector RRU is grounded and the grounding cable S48.e : 6th sector RRU is grounded and the grounding cable S48.f : 6th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S49.a:CPRI - FO Cable looped in ring at least 2-3 times at S49.b:CPRI - FO Cable looped in ring at least 2-3 times at S49.c:CPRI - FO Cable looped in ring at least 2-3 times at RRU
RRU end. RRU end. end.
S49.d:CPRI - FO Cable looped in ring at least 2-3 times at S49.e:CPRI - FO Cable looped in ring at least 2-3 times at S49.f:CPRI - FO Cable looped in ring at least 2-3 times at RRU
RRU end. RRU end. end.
S50.a :CPRI cables of 4th sector RRU are arranged in neat S50.b :CPRI cables of 4th sector RRU are arranged in neat S50.c :CPRI cables of 4th sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.
NA NA NA
S51.a :CPRI cables of 5th sector RRU are arranged in neat S51.b :CPRI cables of 5th sector RRU are arranged in neat S51.c :CPRI cables of 5th sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.
S52.a :CPRI cables of 6th sector RRU are arranged in neat S52.b :CPRI cables of 6th sector RRU are arranged in neat S52.c :CPRI cables of 6th sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.
S53.a : TMA/Combiner/Duplexer/Triplexer (4th Sector). S53.b : TMA/Combiner/Duplexer/Triplexer (4th Sector). S54.a : TMA/Combiner/Duplexer/Triplexer (5th Sector).
S54.b : TMA/Combiner/Duplexer/Triplexer (5th Sector). S55.a : TMA/Combiner/Duplexer/Triplexer (6th Sector). S55.b : TMA/Combiner/Duplexer/Triplexer (6th Sector).
S56.a : Obstructions if any ( Optimization purpose)Antenna S56.b : Obstructions if any ( Optimization purpose)Antenna S57.a : Obstructions if any ( Optimization purpose)Antenna
Clamp should not be blocked to allow Antenna for proper Clamp should not be blocked to allow Antenna for proper Clamp should not be blocked to allow Antenna for proper
optimization (+/-30 Degree). optimization (+/-30 Degree). optimization (+/-30 Degree).
S57.b :Obstructions if any ( Optimization purpose)Antenna S58.a :Obstructions if any ( Optimization purpose)Antenna S58.b :Obstructions if any ( Optimization purpose)Antenna
Clamp should not be blocked to allow Antenna for proper Clamp should not be blocked to allow Antenna for proper Clamp should not be blocked to allow Antenna for proper
optimization (+/-30 Degree). optimization (+/-30 Degree). optimization (+/-30 Degree).
S59.a : GSM Installation for 4th Sector Showing S59.b : GSM Installation for 4th Sector Showing S60.a : GSM Installation for 5th Sector Showing
Jumper Weather Proofing & Labeling. Jumper Weather Proofing & Labeling. Jumper Weather Proofing & Labeling.
S60.b : GSM Installation for 5th Sector Showing S61.a : GSM Installation for 6th Sector Showing S61.b : GSM Installation for 6th Sector Showing
Jumper Weather Proofing & Labeling. Jumper Weather Proofing & Labeling. Jumper Weather Proofing & Labeling.
S62.a: 1st Sector GSM Installation Make and Model. S62.b: 1st Sector GSM Installation Make and Model. S63.a: 2nd Sector GSM Installation Make and Model.
S63.b: 2nd Sector GSM Installation Make and Model. S64.a: 3rd Sector GSM Installation Make and Model. S64.b: 3rd Sector GSM Installation Make and Model.
S65.a: 4th Sector GSM Installation Make and Model. S65.b: 4th Sector GSM Installation Make and Model. S66.a: 5th Sector GSM Installation Make and Model.
S66.b: 5th Sector GSM Installation Make and Model. S67.a: 6th Sector GSM Installation Make and Model. S67.b: 6th Sector GSM Installation Make and Model.
S68.a: CPRI/eCPRI - All FO Cable extra length kept/fixed S68.b: CPRI/eCPRI - All FO Cable extra length kept/fixed S68.c: CPRI/eCPRI - All FO Cable extra length kept/fixed
safely (Sector-01) safely (Sector-02) safely (Sector-03)
S68.d: CPRI/eCPRI - All FO Cable extra length kept/fixed S68.e: CPRI/eCPRI - All FO Cable extra length kept/fixed S68.f: CPRI/eCPRI - All FO Cable extra length kept/fixed
safely (Sector-04) safely (Sector-05) safely (Sector-06)
S71. : Cable entry FODA end (Closed View Labelling should
S69. : CPRI/eCPRI Routing at AMOB/ACOC end S70. : CPRI/eCPRI connectivity at ABIx end in AMOB/AMIA
be clearly Visible)
S72. : Cable connectivity inside FODA (Open View) S73: S74: