Airtel Site Acceptance Testing Report

The document outlines the details of a telecommunications project, including site specifications, equipment types, and installation checkpoints for a base station in Kanarkhi, UP East. It includes information on tower height, technology used, and various installation requirements and checks for equipment and media. The project is planned for completion with specific acceptance testing scheduled for January 3, 2025.

Uploaded by

Vivek Shukla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views73 pages

Airtel Site Acceptance Testing Report

The document outlines the details of a telecommunications project, including site specifications, equipment types, and installation checkpoints for a base station in Kanarkhi, UP East. It includes information on tower height, technology used, and various installation requirements and checks for equipment and media. The project is planned for completion with specific acceptance testing scheduled for January 3, 2025.

Uploaded by

Vivek Shukla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

SR No (Uniq Project Site type New Built /

Sr No Physical Site ID Tech ID Technology / Band


Ref) Sharing

1 AIR924076 UEKANA01227ID22 920950 FDD/ Sharing


Airtel Planned Airtel Planned AGL (In Meter)
Project Type (NT /
Upgrade / Sector Tower type (As
Tower Height Building Height
Addition / Twin Beam mentioned in (In Meter) (In Meter)
AGL (In Meter) A B C D
DPR)

Twin Beam GBT 40 0 38 0 0 0


(In Meter) Airtel Planned Azimuth Airtel Pla

E F A B C D E F A

0 0 120 0 0 0 0 0 2
Airtel Planned Mechanical Tilt Airtel Planned Electrical Tilt

B C D E F A B C D

0 0 0 0 0 2 0 0 0
ctrical Tilt

E F

0 0
S.No Site Acceptance Testing - Basic Information

1 Circle UP East

2 Name of OEM/TSP Nokia

3 BTS Manufacturer (OEM) Nokia

4 Site ID KANA01

5 Base Site ID/2G Site ID KANA01

6 Site Detail Physical Site ID UEKANA01227ID22

7 Latitude 27.36168

8 Longitude 81.35149

9 Site Name Kanarkhi

Mewa Lal S/O Late Brajmohan, Krom No: 255, Gjasara No: 611, Village:
10 Site Address Karnarki, Pargana: Koradi South, Tehsil: Mehmoodabad, District:
Sitapur(U.P), PIN: 261204, Post: Ram Pur Mathura , Milestone: NA ,
Highway: NA , Chauki:Bhagautipur , Thana:
11 Site Type (IM/OM/SC/FC etc) OM

16 SR / UNIQUE Project ID AIR924076

17 Activity (NTTUFUSCFTBTTBFSATSAMMIMOSWAPL2100L900 etc.) FTB


Activity

18 Layer planned & offered( G900/L900/G1800/L1800/L2100/L2300) L1800

19 Number of Logical cells 1

22 SM Type ACOC+AMIA

20 Hardware RRU Type (Model -Band) AHEC-1800

21 MMIMO Power configuration ( Tx Port - 1T/1R2T/2R) 2T2R

25 Type of Media (Fiber/MW/FTTH/Copper/Iwan/UBR). MW

23 MW Link ID NA
Media

24 Media RA Number EXISTING

26 MW Link AT Status (Operational/Project) Operational


27 Site TOCO Name (Indus/Infratel/ATC etc..) ATC

31 EB Availability ( Y/N) Yes

32 DG Availability (Y/N) Yes

33 Tower Type (GBT/RTT/RTP/IBS/GBM/ECOLITE/ECO/MONOPOLE) GBT


Power & Tower

28 Tower Height ( In Meter) 40

29 Building Height ( In Meter) 0

30 Invertor Make and Model (Small Cell) NA

34 RFI check status (Accepted/Rejeted) Accepted

Date of AT offer /Reoffer 03-Jan-2025


Name VIVEK SHUKLA
Remarks If Any OK
Email ID
Contact number
m No: 255, Gjasara No: 611, Village:
hsil: Mehmoodabad, District:
m Pur Mathura , Milestone: NA ,
, Thana:
03-Jan-2025
VIVEK SHUKLA
Installation checkpoints

OEM to fill details


S.No
Activity

1-Rack & Cabinet


1.1.01 Cabinet is grouted/mounted firmly on ground/wall/pole and accessible to technician
1.1.02 IP 55 Cabinet Filter( wherever applicable) are in place and properly
1.1.03 IP 55 cabinet fans are working properly
1.1.04 IP 55 cabinet alarms are extended
2. Base station

2.1.01 No of RF Module- Technology wise


2.1.02 No of Baseband Units- Technology wise
2.1.03 BBU Card upgraded
2.1.04 Base Station is securely installed
2.1.05 Base Station is securely installed & is perfect at Horizontal/Vertical position (not tilted)
2.1.06 IP seals /plugs must be installed in all module
2.1.07 RRUs are securely installed
3-Power and grounding cable

3.1.01 Tower DG and Shelter grounding connected to earth pit.

3.1.02 Potential between Earth to Neutral is zero (Yes/No)

3.1.03 1.MCB for BBU and RF Unit meets the design specifications. (Amp)

3.1.04 2.MCB for BBU and RF Unit meets the design specifications. (Amp)
3.1.05 3.MCB for BBU and RF Unit meets the design specifications. (Amp)

3.1.06 4.MCB for BBU and RF Unit meets the design specifications. (Amp)

3.1.07 BBU and DCDU are grounded to EGB (Yes/No)

3.1.08 1.All Power cable should be as per specification (Sqmm)

3.1.09 2.All Power cable should be as per specification (Sqmm)

3.1.10 3.All Power cable should be as per specification (Sqmm)

3.1.11 4.All Power cable should be as per specification (Sqmm)

3.1.12 All the power cables and protection ground cables are connected firmly with correct polarity (Yes/No)
RF Unit is grounded & grounding cables fixed to the earth strip/tower leg in downward direction. (ensure that paint is removed at touching portion of clamp to
3.1.13
tower member before fixing). (Yes/No)
3.1.14 RF Unit power cables are arranged in neat and straight way without any crossing. (Yes/No)

3.1.15 IGB is properly grounded to earth pit (Yes/No)

3.1.16 OGB is properly installed & grounded to earth-pit

4. Media Cable
4.1.01 The Optical / Ethernet Lan cables are routed and connected securely at BBU. (Yes/No)
4.1.02 QOS Implementation as per-guideline
4.1.03 CPRI cables of RF Unit are arranged in neat and straight way without any crossing (Yes/No)
4.1.04 The fixing clips of the CPRI cables of RF Unit are spaced evenly and secured and oriented in the same direction. (Yes/No)
4.1.05 CPRI - FO Cable looped in ring should be done neatly and tied properly. (Yes/No)
4.1.06 Any visible stretch/Cut/damage on FO Cable. (Yes/No)
4.1.07 Cables are routed properly inside and outside the cabinet and bound with ties with uniform spacing & moderate tightness. (Yes/No)
4.1.08 Correct CPRI Cable / SFP Port is there as per FDD-1000/TDD-10G/5G-10G/25G Recommendation (Yes/No)
4.1.09 Fibre cable routing properly (Yes/No)
4.1.10 Conduit used for Fibre cable properly (Yes/No/NA)
4.1.11 Feeder should be traced for Swap / Cyclic Swap / Proper Mapping (Yes/No/NA)
5. Clock
5.1.01 GPS antenna and cable installed properly (Yes/
5.1.02 BTS Clock Configuration
5.1.03 BTS Clock Configuration-S

6. Antenna System Details

Sector/ Cell

6.1.01 Antenna Make..

6.1.02 Antenna Type.

6.1.03 Antenna ports

6.1.04 Antenna Quantity.

6.1.05 RET cable connected with RRU

6.1.06 TMA/Combiner/Duplexer/Triplexer

6.1.07 FDD/TDD Antenna should be in same direction

6.1.08 Antenna should be free of any obstruction to allow movement for optimization (+/-30 Degree)

6.1.09 Antenna Clamp should not be damaged/Up Tilted

6.1.10 Antenna should not be damaged

7 Cable Return loss Cable Loss & VSWR Measurements : (<1.5)

Sector/ Cell
7.1.02 Every RF Port
7.1.03 Path Imbalance for FDD / TDD Ports
8. Weather Proofing

Sector/ Cell

8.1.01 Weather proofing on all-joints


9. Active Alarm

9.1.01 Active alarm


9.1.02 Any fluctuating alarm in last 24
9.1.03 Last 24 H
10. Labelling

10.1.01 For All BTS Cabinet (Yes/No)

10.1.02 For all Cables & Accessories (Yes/No)

10.1.03 For Antenna (Yes/No)

10.1.04 Labelling of DDF modules is done according to specifications. (External alarm number marking on Wire & index of alarms stick beside DDF Box) (Yes/No/NA)

10.1.05 For TMAs/ Duplexer/Combiner/Triplexer.


11. BTS Infra Alarm Verification (2G/SRAN/ Standalone sites) on actual basis

11.1.01 DG Fails to Start


11.1.02 Rectifer Fail
11.1.03 Mains Fail
11.1.04 High Temperature
11.1.05 Site on DG
11.1.06 Site on Battery
12-Site Hygiene

12.1.01 Site is cleaned properly & housekeeping


12.1.02 Any project left over material lying
12.1.03 Site access is safe and as p
12.1.04 EMF Signage
12.1.05 As Infra Provider given declaration that Pole mount is within 600 mm from to
13. CATS Lables (Y/N)

13.1.01 CATS Labels

Date : 04-Jan-2025

*Kindly mention NA where ever planned values is not required.


Wherever NA is not applicable, Yes/No to be filled in Actual Column
OEM to fill details
Activity UoM Planned

routed/mounted firmly on ground/wall/pole and accessible to technician Yes/No/NA NA


et Filter( wherever applicable) are in place and properly Yes/No/NA NA
et fans are working properly Yes/No/NA NA
et alarms are extended Yes/No/NA NA

odule- Technology wise Number 1_AHEC


band Units- Technology wise Number 1_ACOC+AMIA
(EXISTING)
pgraded Yes/No/NA NA
n is securely installed Yes/No/NA Existing
n is securely installed & is perfect at Horizontal/Vertical position (not tilted) Yes/No/NA NA
ugs must be installed in all module Yes/No/NA Yes
curely installed Yes/No/NA Yes

d Shelter grounding connected to earth pit. Yes/No/NA Yes

ween Earth to Neutral is zero (Yes/No) Yes/No/NA Yes

BU and RF Unit meets the design specifications. (Amp) Ampere

BU and RF Unit meets the design specifications. (Amp) Ampere N/A


BU and RF Unit meets the design specifications. (Amp) Ampere

BU and RF Unit meets the design specifications. (Amp) Ampere

DU are grounded to EGB (Yes/No) EGB/Tower/NA

able should be as per specification (Sqmm) Sq mm

able should be as per specification (Sqmm) Sq mm

able should be as per specification (Sqmm) Sq mm N/A


able should be as per specification (Sqmm) Sq mm

r cables and protection ground cables are connected firmly with correct polarity (Yes/No) Yes/No/NA
unded & grounding cables fixed to the earth strip/tower leg in downward direction. (ensure that paint is removed at touching portion of clamp to
Yes/No/NA
er before fixing). (Yes/No)
er cables are arranged in neat and straight way without any crossing. (Yes/No) Yes/No/NA

ly grounded to earth pit (Yes/No) Yes/No/NA

rly installed & grounded to earth-pit Yes/No/NA

/ Ethernet Lan cables are routed and connected securely at BBU. (Yes/No) Yes/No/NA Existing
mentation as per-guideline Yes/No/NA Yes
of RF Unit are arranged in neat and straight way without any crossing (Yes/No) Yes/No/NA Yes
ips of the CPRI cables of RF Unit are spaced evenly and secured and oriented in the same direction. (Yes/No) Yes/No/NA Yes
able looped in ring should be done neatly and tied properly. (Yes/No) Yes/No/NA Yes
stretch/Cut/damage on FO Cable. (Yes/No) Yes/No/NA No
outed properly inside and outside the cabinet and bound with ties with uniform spacing & moderate tightness. (Yes/No) Yes/No/NA Yes
I Cable / SFP Port is there as per FDD-1000/TDD-10G/5G-10G/25G Recommendation (Yes/No) Yes/No/NA Yes
routing properly (Yes/No) Yes/No/NA Yes
ed for Fibre cable properly (Yes/No/NA) Yes/No/NA NA
uld be traced for Swap / Cyclic Swap / Proper Mapping (Yes/No/NA) Yes/No/NA NA
2G
a and cable installed properly (Yes/ Yes/NO/NA Existing
onfiguration GPS/IP/Top/TDM/NTP GPS
onfiguration-S GPS/IP/Top/TDM/NTP NA

Sector 1
Planned

ake.. Make ACE

MA-2L4M-
pe. Part Code 45F8-A12
P-A
rts Number 8

uantity. Number 1

onnected with RRU Yes/No/NA Yes

iner/Duplexer/Triplexer Type NA

ntenna should be in same direction Yes/No/NA Yes

ould be free of any obstruction to allow movement for optimization (+/-30 Degree) Yes/No/NA Yes

amp should not be damaged/Up Tilted Yes/No/NA Yes

ould not be damaged Yes/No/NA Yes

SWR Measurements : (<1.5)

NA Sector 1
Actual Actual
rt Value NA
ance for FDD / TDD Ports <=2 dB NA

Sector 1
Actual
oofing on all-joints Yes/No/NA Yes

m Yes/No/NA No
ting alarm in last 24 Yes/No/NA No
Yes/No/NA No

abinet (Yes/No) Yes/No/NA NA


s & Accessories (Yes/No) Yes/No/NA Yes
(Yes/No) Yes/No/NA Yes
DDF modules is done according to specifications. (External alarm number marking on Wire & index of alarms stick beside DDF Box) (Yes/No/NA) Yes/No/NA NA
uplexer/Combiner/Triplexer. Yes/No/NA NA
G/SRAN/ Standalone sites) on actual basis

Start Yes/No/NA NA
Yes/No/NA NA
Yes/No/NA NA
erature Yes/No/NA NA
Yes/No/NA NA
ery Yes/No/NA NA

ed properly & housekeeping Yes/No/NA Yes


left over material lying Yes/No/NA No
s safe and as p Yes/No/NA NA
e Yes/No/NA NA
vider given declaration that Pole mount is within 600 mm from to Yes/No/NA Yes

s Yes/No/NA Yes

nned values is not required.


No to be filled in Actual Column
MS Remarks ( Ok/ Punch Point Details)
Planned Actual

NA NA
NA NA
NA NA
NA NA

1_AHEC 1_AHEC
1_ACOC+AMIA 1_ACOC+AMIA
(EXISTING) (EXISTING)
NA NA
Existing Existing
NA NA
Yes Yes
Yes Yes

Yes Yes
Yes Yes

N/A N/A
N/A N/A

Existing N/A
Yes Yes
Yes N/A
Yes N/A
Yes N/A
No No
Yes N/A
Yes N/A
Yes N/A
NA NA
NA NA
3G FD TD
NA NA NA
NA NA NA N/A
NA NA NA

Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6


Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6


Remark Actual Remark Actual Remark Actual Remark Actual Remark Actual Remark
Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6
Remark Actual Remark Actual Remark Actual Remark Actual Remark Actual Remark

No No
No No
No No

NA NA
Yes Yes
Yes Yes
NA NA
NA NA

NA NA
NA NA
NA NA
NA NA
NA NA
NA NA

Yes Yes
No No
NA N/A
NA N/A
Yes Yes

Yes Y
42 67
Checking method
Snap Count Severity

S1 1 Major
S2 1 Critical

Declaration Critical
Declaration Major

Declaration Major
Declaration Minor
Declaration Minor
S3 1 Major
S3 1 Minor
S4 2 Critical
S5,S6,S7 3 Major

Declaration Major
Declaration Major
Declaration Critical
S8 1 Critical
Declaration Major
Declaration Major
Declaration Major
Declaration Major
Declaration Major
Declaration Major
S9,S10,S11 3 Major
S12 2 Major
Declaration Critical
Declaration Critical

S15 2 Minor
Declaration Major
S16,S17,S18 3 Minor
S16,S17,S18 3 Minor
S13 3 Minor
Declaration Critical
S19 2 Minor
S15 Critical
S15 Major
S20 1 Major
Declaration Major
S21 1 Critical
Declaration Critical
Declaration Critical

Declaration Minor

Declaration Minor

Declaration Minor

Declaration Minor

Declaration Major

S31,S32,S33 3 Minor

Declaration Critical

S34,S35,S36 3 Critical

Declaration Critical

Declaration Critical
Declaration Major
Declaration Major

S37,S38,S39 6 Critical

Declaration Critical
Declaration Critical
Declaration Critical

Snap As above Minor


Snap As above Minor
Snap As above Minor
Declaration Minor
Snap As above Minor

Declaration Major
Declaration Major
Declaration Major
Declaration Critical
Declaration Major
Declaration Major

Declaration Minor
Declaration Minor
S40 1 Critical
S41 1 Critical

Declaration Major
* Lat/long, Date & time, Site ID,ASP name stamp should be all photographs.
* All photogrphs should be latest physical status of site

S1: Cabinet is properly mounted & S2: IP 55 Cabinet Filter( where ever S3.a : Base Station is securely S3.b : Base Station is securely
secured on wall /pole and appicable) are in place and installed & is perfect at installed & is perfect at
accessible to technician. properly cleaned Horizontal/vertical position. Horizontal/vertical position.

S5.a : RRU Installation for 1st S5.b : RRU Installation for 1st
S4.a : IP seals /plugs must be Sector Showing GND Jumper Sector Showing GND Jumper
installed in all module S4.b : . Clamping Weather Proofing & Clamping Weather Proofing &
Labeling. Labeling.
S5.c : RRU Installation for 1st S5.d : RRU Installation for 1st S5.e : RRU Installation for 1st S5.f : RRU Installation for 1st
Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper
Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing &
Labeling. Labeling. Labeling. Labeling.
S6.a : RRU Installation for 2nd S6.b : RRU Installation for 2nd S6.c : RRU Installation for 2nd S6.d : RRU Installation for 2nd
Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper
Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing &
Labeling. Labeling. Labeling. Labeling.

S6.e : RRU Installation for 2nd S6.f : RRU Installation for 2nd S7.a : RRU Installation for 3rd S7.b : RRU Installation for 3rd
Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper
Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing &
Labeling. Labeling. Labeling. Labeling.
S7.c : RRU Installation for 3rd S7.d : RRU Installation for 3rd S7.e : RRU Installation for 3rd S7.f : RRU Installation for 3rd
Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper Sector Showing GND Jumper
Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing & Clamping Weather Proofing &
Labeling. Labeling. Labeling. Labeling.

S8.a : BBU and DCDU are S8.b : BBU and DCDU are
S8.c:
grounded to EGB or Tower leg. grounded to EGB or Tower leg.
S9.a : 1st sector RRU is grounded and the grounding cable of S9.b : 1st sector RRU is grounded and the grounding cable of S9.c : 1st sector RRU is grounded and the grounding cable of
RRUs are extended downward and fixed to the tower RRUs are extended downward and fixed to the tower RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S9.d : 1st sector RRU is grounded and the grounding cable of S9.e : 1st sector RRU is grounded and the grounding cable of S9.f : 1st sector RRU is grounded and the grounding cable of
RRUs are extended downward and fixed to the tower RRUs are extended downward and fixed to the tower RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)

S10.a : 2nd sector RRU is grounded and the grounding cable S10.b : 2nd sector RRU is grounded and the grounding cable S10.c : 2nd sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S10.d : 2nd sector RRU is grounded and the grounding cable S10.e : 2nd sector RRU is grounded and the grounding cable S10.f : 2nd sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S11.a : 3rd sector RRU is grounded and the grounding cable S11.b : 3rd sector RRU is grounded and the grounding cable of S11.c : 3rd sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion of nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) clamp to tower member before fixing) of clamp to tower member before fixing)

S11.d : 3rd sector RRU is grounded and the grounding cable S11.e : 3rd sector RRU is grounded and the grounding cable S11.f : 3rd sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S12.a : RRU power cables are arranged in neat S12.b : RRU power cables are arranged in neat S12.c : RRU power cables are arranged in neat
and straight way without any crossing. and straight way without any crossing. and straight way without any crossing.
S13.a:CPRI - FO Cable looped in ring at least 2-3 S13.b:CPRI - FO Cable looped in ring at least 2-3
times at RRU end. times at RRU end.

S13.c:CPRI - FO Cable looped in ring at least 2-3 S13.d:CPRI - FO Cable looped in ring at least 2-3 S13.e:CPRI - FO Cable looped in ring at least 2-3
times at RRU end. times at RRU end. times at RRU end.
S13.f:CPRI - FO Cable looped in ring at least 2-3 S15:The E1 / Ethernet Lan cables are routed and
times at RRU end. S14 :Invertor Make and Model (Small Cell). connected securely at BBU
S16.a :CPRI cables of 1st sector RRU are arranged in neat S16.b :CPRI cables of 1st sector RRU are arranged in neat S16.c :CPRI cables of 1st sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.

S17.a :CPRI cables of 2nd sector RRU are arranged in neat S17.b :CPRI cables of 2nd sector RRU are arranged in neat S17.c :CPRI cables of 2nd sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.
S18.a :CPRI cables of 3rd sector RRU are arranged in neat S18.b :CPRI cables of 3rd sector RRU are arranged in neat S18.c :CPRI cables of 3rd sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.
S19.a : Cables are routed properly inside and outside the S19.b : Cables are routed properly inside and outside the
cabinet and bound with ties with uniform spacing & cabinet and bound with ties with uniform spacing & S20:Conduit used for Fiber cable properly.
moderate tightness moderate tightness

S21: GPS antenna and cable installed properly.


S31.a : TMA/Combiner/Duplexer/Triplexer. S31.b : TMA/Combiner/Duplexer/Triplexer. S32.a : TMA/Combiner/Duplexer/Triplexer.
S32.b : TMA/Combiner/Duplexer/Triplexer.

S33.a : S33.b : S34.a : Obstructions if any ( Optimization S34. b : Obstructions if any ( Optimization
purpose) Antenna Clamp should not be purpose) Antenna Clamp should not be
TMA/Combiner/Duplexer/Tripl TMA/Combiner/Duplexer/Tripl blocked to allow Antenna for proper blocked to allow Antenna for proper
exer. exer. optimization (+/-30 Degree). optimization (+/-30 Degree).
S35.a : Obstructions if any ( Optimization S35.b : Obstructions if any ( Optimization S36.a : Obstructions if any ( Optimization S36. b : Obstructions if any ( Optimization
purpose) Antenna Clamp should not be purpose) Antenna Clamp should not be purpose) Antenna Clamp should not be purpose) Antenna Clamp should not be
blocked to allow Antenna for proper blocked to allow Antenna for proper blocked to allow Antenna for proper blocked to allow Antenna for proper
optimization (+/-30 Degree). optimization (+/-30 Degree). optimization (+/-30 Degree). optimization (+/-30 Degree).

S37.a : GSM Installation for 1st Sector S37.b : GSM Installation for 1st S38.a : GSM Installation for 2nd
Showing Jumper Weather Proofing & Sector Showing Jumper Weather Sector Showing Jumper Weather
Labeling. Proofing & Labeling. Proofing & Labeling.
S38.b : GSM Installation for 2nd S39.a : GSM Installation for 3rd S39.b : GSM Installation for 3rd S40.a : Site access is safe and as per
Sector Showing Jumper Weather Sector Showing Jumper Weather Sector Showing Jumper Weather OHS.
Proofing & Labeling. Proofing & Labeling. Proofing & Labeling.
S40.b : Site access is safe and as per OHS. S40.c : Site access is safe and as per OHS. S40.d : Site access is safe and as per OHS. S41: EMF Signage Board.

S42.a: Submit Photograph of Alarm patch S42.b: Submit Photograph of Alarm patch S42.c: Submit Photograph of Alarm patch
panel showing alarm extension ( Both cable panel showing alarm extension ( Both cable panel showing alarm extension ( Both cable
from BTS and INFRA and interconnection) from BTS and INFRA and interconnection) from BTS and INFRA and interconnection)
and labelling on both side in Physical AT and labelling on both side in Physical AT and labelling on both side in Physical AT
S43.a : RRU Installation for 2G/FD 4th Sector S43.b : RRU Installation for 2G/FD 4th Sector S43.c : RRU Installation for 2G/FD 4th Sector
Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather
Proofing & Labeling. Proofing & Labeling. Proofing & Labeling.

S43.d : RRU Installation for 2G/FD 4th Sector S43.e : RRU Installation for 2G/FD 4th Sector
S43.f : RRU Installation for 2G/FD 4th Sector Showing GND
Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather Jumper Clamping Weather Proofing & Labeling.
Proofing & Labeling. Proofing & Labeling.
S44.a : RRU Installation for 2G/FD 5th Sector S44.b : RRU Installation for 2G/FD 5th Sector S44.c : RRU Installation for 2G/FD 5th Sector
Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather
Proofing & Labeling. Proofing & Labeling. Proofing & Labeling.
S44.d : RRU Installation for 2G/FD 5th Sector S44.e : RRU Installation for 2G/FD 5th Sector S44.f : RRU Installation for 2G/FD 5th Sector
Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather
Proofing & Labeling. Proofing & Labeling. Proofing & Labeling.

S45.a : RRU Installation for 2G/FD 6th Sector S45.b : RRU Installation for 2G/FD 6th Sector
S45.c : RRU Installation for 2G/FD 6th Sector Showing GND
Showing GND Jumper Clamping Weather Showing GND Jumper Clamping Weather Jumper Clamping Weather Proofing & Labeling.
Proofing & Labeling. Proofing & Labeling.
S45.d : RRU Installation for 2G/FD 6th Sector Showing GND S45.e : RRU Installation for 2G/FD 6th Sector Showing GND S45.f : RRU Installation for 2G/FD 6th Sector Showing GND
Jumper Clamping Weather Proofing & Labeling. Jumper Clamping Weather Proofing & Labeling. Jumper Clamping Weather Proofing & Labeling.
S46.a : 4th sector RRU is grounded and the grounding cable S46.b : 4th sector RRU is grounded and the grounding cable S46.c : 4th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)

S46.d : 4th sector RRU is grounded and the grounding cable S46.e : 4th sector RRU is grounded and the grounding cable S46.f : 4th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S47.a : 5th sector RRU is grounded and the grounding cable S47.b : 5th sector RRU is grounded and the grounding cable S47.c : 5th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S47.d : 5th sector RRU is grounded and the grounding cable S47.e : 5th sector RRU is grounded and the grounding cable S47.f : 5th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)

S48.a : 6th sector RRU is grounded and the grounding cable S48.b : 6th sector RRU is grounded and the grounding cable S48.c : 6th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S48.d : 6th sector RRU is grounded and the grounding cable S48.e : 6th sector RRU is grounded and the grounding cable S48.f : 6th sector RRU is grounded and the grounding cable
of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower of RRUs are extended downward and fixed to the tower
nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion nearby(ensure that paints are removed at touching portion
of clamp to tower member before fixing) of clamp to tower member before fixing) of clamp to tower member before fixing)
S49.a:CPRI - FO Cable looped in ring at least 2-3 times at S49.b:CPRI - FO Cable looped in ring at least 2-3 times at S49.c:CPRI - FO Cable looped in ring at least 2-3 times at RRU
RRU end. RRU end. end.

S49.d:CPRI - FO Cable looped in ring at least 2-3 times at S49.e:CPRI - FO Cable looped in ring at least 2-3 times at S49.f:CPRI - FO Cable looped in ring at least 2-3 times at RRU
RRU end. RRU end. end.
S50.a :CPRI cables of 4th sector RRU are arranged in neat S50.b :CPRI cables of 4th sector RRU are arranged in neat S50.c :CPRI cables of 4th sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.

NA NA NA
S51.a :CPRI cables of 5th sector RRU are arranged in neat S51.b :CPRI cables of 5th sector RRU are arranged in neat S51.c :CPRI cables of 5th sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.

S52.a :CPRI cables of 6th sector RRU are arranged in neat S52.b :CPRI cables of 6th sector RRU are arranged in neat S52.c :CPRI cables of 6th sector RRU are arranged in neat
and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the and straight way without any crossing The fixing clips of the
CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and CPRI cables of RRU are spaced evenly and secured and
oriented in thesame direction. oriented in thesame direction. oriented in thesame direction.
S53.a : TMA/Combiner/Duplexer/Triplexer (4th Sector). S53.b : TMA/Combiner/Duplexer/Triplexer (4th Sector). S54.a : TMA/Combiner/Duplexer/Triplexer (5th Sector).
S54.b : TMA/Combiner/Duplexer/Triplexer (5th Sector). S55.a : TMA/Combiner/Duplexer/Triplexer (6th Sector). S55.b : TMA/Combiner/Duplexer/Triplexer (6th Sector).

S56.a : Obstructions if any ( Optimization purpose)Antenna S56.b : Obstructions if any ( Optimization purpose)Antenna S57.a : Obstructions if any ( Optimization purpose)Antenna
Clamp should not be blocked to allow Antenna for proper Clamp should not be blocked to allow Antenna for proper Clamp should not be blocked to allow Antenna for proper
optimization (+/-30 Degree). optimization (+/-30 Degree). optimization (+/-30 Degree).
S57.b :Obstructions if any ( Optimization purpose)Antenna S58.a :Obstructions if any ( Optimization purpose)Antenna S58.b :Obstructions if any ( Optimization purpose)Antenna
Clamp should not be blocked to allow Antenna for proper Clamp should not be blocked to allow Antenna for proper Clamp should not be blocked to allow Antenna for proper
optimization (+/-30 Degree). optimization (+/-30 Degree). optimization (+/-30 Degree).
S59.a : GSM Installation for 4th Sector Showing S59.b : GSM Installation for 4th Sector Showing S60.a : GSM Installation for 5th Sector Showing
Jumper Weather Proofing & Labeling. Jumper Weather Proofing & Labeling. Jumper Weather Proofing & Labeling.

S60.b : GSM Installation for 5th Sector Showing S61.a : GSM Installation for 6th Sector Showing S61.b : GSM Installation for 6th Sector Showing
Jumper Weather Proofing & Labeling. Jumper Weather Proofing & Labeling. Jumper Weather Proofing & Labeling.
S62.a: 1st Sector GSM Installation Make and Model. S62.b: 1st Sector GSM Installation Make and Model. S63.a: 2nd Sector GSM Installation Make and Model.
S63.b: 2nd Sector GSM Installation Make and Model. S64.a: 3rd Sector GSM Installation Make and Model. S64.b: 3rd Sector GSM Installation Make and Model.

S65.a: 4th Sector GSM Installation Make and Model. S65.b: 4th Sector GSM Installation Make and Model. S66.a: 5th Sector GSM Installation Make and Model.
S66.b: 5th Sector GSM Installation Make and Model. S67.a: 6th Sector GSM Installation Make and Model. S67.b: 6th Sector GSM Installation Make and Model.
S68.a: CPRI/eCPRI - All FO Cable extra length kept/fixed S68.b: CPRI/eCPRI - All FO Cable extra length kept/fixed S68.c: CPRI/eCPRI - All FO Cable extra length kept/fixed
safely (Sector-01) safely (Sector-02) safely (Sector-03)

S68.d: CPRI/eCPRI - All FO Cable extra length kept/fixed S68.e: CPRI/eCPRI - All FO Cable extra length kept/fixed S68.f: CPRI/eCPRI - All FO Cable extra length kept/fixed
safely (Sector-04) safely (Sector-05) safely (Sector-06)
S71. : Cable entry FODA end (Closed View Labelling should
S69. : CPRI/eCPRI Routing at AMOB/ACOC end S70. : CPRI/eCPRI connectivity at ABIx end in AMOB/AMIA
be clearly Visible)
S72. : Cable connectivity inside FODA (Open View) S73: S74:

S75: S76: S77:


S78: S79: S80:
S81. : S82. :