0% found this document useful (0 votes)
15 views41 pages

Showcase Huawei Full Deck 20210826 Post Production

The document outlines the activities and highlights of AFSIA in 2021, focusing on renewable energy developments in Africa, particularly the new 100MW licensing threshold in South Africa. It discusses various initiatives, events, and technological advancements in solar energy, including partnerships with companies like Huawei. Additionally, it emphasizes the importance of innovation and safety in solar installations, particularly through AI-powered technologies.

Uploaded by

tan yang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views41 pages

Showcase Huawei Full Deck 20210826 Post Production

The document outlines the activities and highlights of AFSIA in 2021, focusing on renewable energy developments in Africa, particularly the new 100MW licensing threshold in South Africa. It discusses various initiatives, events, and technological advancements in solar energy, including partnerships with companies like Huawei. Additionally, it emphasizes the importance of innovation and safety in solar installations, particularly through AI-powered technologies.

Uploaded by

tan yang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 41

recording

recording

1
3
4
5
AFSIA ACTIVITIES HIGHLIGHTS - 2021

Green Latest POSTPON


Launch
Prime

Hydrogen tech EDConf ere


Annual 26 AUG
opportunity updates nce: DRC
Outlook Optimize 20 SEP 16 NOV 18 JAN
f or Af rica f or large- Solar Trade
Report ROI with AFSIA AFSIA Launch Annual
scale Mission SA 100MW Solar Solar Outlook Report
solar
threshold Quiz Awards
Showcase

(LONGi)
Trina Jinko 1 SEP 28 OCT
Solar Studer SustainSolar Segen Antaisolar
Solar
Innotec MG Asset Solar trackers
Financing Portal
Innovative Sun C&I in PV-diesel TBD 2-3-4 14 DEC
14 SEP
Webinar

Irrigation Solar f or
f inancing meets SADC hybrids in NOV EV+PV in
solaire health Small things(LONGi)
f or Af rican Water countries Nigeria Focus on Af rica
(FR) care that make a
solar (Segen (Elum ) Storage
big diff erence
Solar)
in solar
JAN-21 FEB-21 MAR-21 APR-21 MAY-21 JUN-21 JUL-21 AUG-21 SEP-21 OCT-21 NOV-21 DEC-21 JAN-22

9th HOMER
External

Solar Af rica WAPECC


Power in Energy Microgrid and W orld Future
Af rica Hybrid Conf erence Energy Summit
Indaba Af rica Microgrid Global Af rica Energy Abu Dhabi
UL MEA Inf rastructure Innovation Forum Forum
Conf erence
06.
7
• Founder of HearablesSa

• 17years experience in Sales

• 5 years experience in Renewable Sectors

Scott Corry • He is committed to build customer and industry


New Business and Sales Management Relationship continuously working towards growth
South Africa and sustainability.
Optimize Your Solar ROI and Guarantee Safety
in the Context of South Africa's New 100MW Threshold
01 The 100MW
Opportunity 02 Huawei
“who are we” 03 Huawei C&I
Smart PV Solution 04 Huawei Utility
Smart PV Solution

10 Huawei Confidential
South Africa 100MW License Threshold Policy
Lack of Power, Load-shedding a lot Statement of 100MW License Threshold Policy
Level1 2.5H Level2 5H

 12 Aug 2021:Minister Gwede Mantashe of


Mineral Resources and Energy on amendment to
Schedule Two of the Electricity Regulation Act,
Government Gazette 44989
Level1 停1段,2.5H
Level4 7.5H Level8 13.5H

Load-shedding Hours Different Level Percentage


1000 852 859 in 2020
800 19% 7%
600 530

400 8%
66%
“Activities with a capacity of no more than 100MW,
121 127
200
0
exempt from licensing and require registration”
2014 2015 2018 2019 2020
L1 L2 L3 L4
Renewable Energy Development Planning in South Africa

 Emergency power procurement of 4,000 MW in 2021/22.  The target for embedded generation investment will be  800 – 1,000 MWh battery storage procured by
 Procurement of 3,200MW of renewable IPPs in one increased from 4,000 to 5,000 MW. 2023/24, of which 513 MWh battery storage
window in 2021. procured by 2022.
 Procurement of 10,000MW of renewable IPPs in one
window in 2022.
Challenges this capacity and growth rate presents the market

Speed and ease of deployment Guaranteed yields and reliability More sites requiring management
 End to end – Ecosystem  String Solutions more mainstream in Larger deployments  Larger capacity sites

 Simplistic plant design – Modular  Higher plant availability  Larger number of sites

 Lowering BOS  Quicker recovery time  Nationally based sites

 Third Party Integration  Dispersed teams

8000.0

7000.0

6000.0

5000.0

4000.0

3000.0

2000.0

1000.0

0.0

6/14/2019
6/16/2019
5/1/2019

5/7/2019

5/11/2019

5/17/2019

5/25/2019

6/2/2019

6/8/2019
6/10/2019
6/12/2019

6/18/2019
5/5/2019

5/15/2019

5/23/2019

5/29/2019

7/4/2019
7/6/2019
5/3/2019

5/9/2019

7/2/2019

7/8/2019
5/13/2019

5/19/2019

5/31/2019

6/22/2019
6/24/2019
6/26/2019

6/30/2019

7/10/2019
7/12/2019
5/21/2019

5/27/2019

6/4/2019
6/6/2019

6/20/2019

6/28/2019
01 The 100MW
Opportunity 02 Huawei “who are we”
03 Huawei C&I
Smart PV Solution 04 Huawei Utility
Smart PV Solution

14 Huawei Confidential
Huawei Digital Power

Carbon neutrality is the In June 2021, Huawei Digital Power


Technologies Co., Ltd. was established.
shared mission of the entire world.

Vision

Integrate digital and power electronics


technologies to drive energy revolution
for a better, greener future
Huawei South Africa Development Milestones
Using technology to
fight epidemics with
government

Launch First 5G
network with
2020
Built Open Lab and RAIN in Africa
launched New
2017: Huawei Office Park
1st LTE-A Commercial Office Park 2019
launch in SA Built Innovation
Entered main Center
2017
carrier market
2014 2015 2016

2005 2007 Comprehensive FTTH deployment for


Built Training Center Telkom, MTN, Vodacom.
1998 Huawei SA
founded 2016: Innovation Center
We serve:


Continuously Creating Values for Customers
Achieving Sustainable Business Growth

Sustainable business growth with large operation 2020H1 Sales Revenue US$65.7 Billion
scale & diversed business groups YoY increased by 13.1%

170+ 49 in 194,000 US$ billion 120.9


105.2
Countries and regions Fortune Global 500 Employee 92.5
63.1 75.1 65.7
s 46.7
39.3

96,000+ 14
Research institutes/
No.5 in
R&D employees In R&D Investment
labs/centers 2013 2014 2015 2016 2017 2018 2019 2020H1
Smart PV: All-scenario PV & Storage Solution
Smart String Solution Covering from Residential, C&I to Utility

Residential Commercial & Industry Utility


Smart PV Solution Smart PV Solution Smart PV Solution

Smart ESS Smart Energy Smart PV Smart Data Logger Smart PV Smart PV Smart PV
Smart PV Optimizer Smart PV Inverter Smart Transformer Station
Center Management System Management System Inverter Management System

Huawei Confidential
Continuous Innovation, Leading Solar Industry Development
String solution has been FusionSolar Smart PV 175GW
the MAINSTREAM in utility Accumulative Global Shipment
by July 2021
Central String

61%

NO.1
59%
57%
53%
51%

Global Inverter Shipment


50%
38%

2015 – 2016 – 2017 – 2018 – 2019 -2020

2016 2017 2018 2019 2020 2021 2022

Huawei Confidential
01 The 100MW
Opportunity 02 Huawei
“who are we” 03 Huawei C & I
Smart PV Solution 04 Huawei Utility
Smart PV Solution

20 Huawei Confidential
FusionSolar DGCommercial
FusionSolar Smart PV Solution Overview
& Industrial Smart PV Solution Overview

WLAN/FE/4G/3G/2G

FusionSolar Smart PV
Smart PV Inverter Management system
C&I
No Optimizer

RS485
Smart Dongle Smart Power Sensor
RS485

增加一页C&I 100kw以
Full Optimizer

Smart Dongle supports up to 10 devices

Smart PV Inverter
SUN2000-12/15/17/20KTL-M2
内组网图及产品组合 Smart PV Optimizer
SUN2000-450W-P
Monitoring Portal
FusionSolar Cloud & App

Energy Storage

Smart PV Inverter Smart Dongle Smart Power Sensor


SUN2000-29.9/30/36/40KTL-M3 Smart Dongle WLAN-FE (Optional) DTSU666-H 250A/50mA
Smart Dongle 4G (Optional)

Smart Power Sensor


Single phase: DDSU666-H * Compatible Solution
Three phase: DTSU666-H 250A Available 2020
Vent Air conditioner Fencing Base Station Billboard
Up to 30%
More Energy by
Optimizing Each Module
Performance

Without Optimizer

Weak modules reduce the performance of


all modules in the string

With Optimizer

If any shading on the rooftop, install


Smart PV Optimizer optimizers
Allows to install more modules and other modules’ performance is
not impacted
More Modules
with Long & Flexible String Design

· Lower BoS Cost


Up to 10kW per string allows for more modules per string, this leads
to fewer strings per inverter and therefore less wiring and connectors

SUN2000-12-20KTL-M2 SUN2000-20-40KTL-M3

Maximum DC power per string 10,000 W 10,000 W

Reduction in BoS cost · Higher DC/AC Oversizing


Smart PV Optimizer & Reduced risk of failure 28
28 DC/AC oversizing ratio: 196%
…… SUN2000-20KTL-M2
String 1: 28 × 350W Module
String 2: 28 × 350W Module
String 3: 28 × 350W Module
String 4: 28 × 350W Module

* Take JAM72S01-350/SC/1000V module as reference


Electric Arcing Is
Threatening the Safety
of PV System &
Underlying Buildings
What is it?
-electrical breakdown of air that produces
an prolonged electrical discharge

What causes Electric Arcing?


- Unreliable soldered joints within modules
- Broken PV cables
- Loosen PV connectors

What is the harm?


Arc Detection Challenges
Can reach temperature of over ….
3000°C & easily start a fire Arc noise is generally weak and only accounts for 0.1% Inverter/Loads/Grid interference signals, as
of the normal current signal, it is difficult to detect and well as spectral overlay with normal current
often leads to missing detection signal leads to faulty detection
AI Powered
Active Arcing Protection

What is AI Powered AFCI?


- HUAWEI inverter keeps self-learning new arc feature to accurately protect
system from arc fault, even under complex noise

Self-learning new arc features


with AI model

Accurate arc fault detection via


local neural network algorithm

Speedy arc fault protection by


inverter shutdown in 0.5s
0V Module-level
Voltage Shutdown,
Touch Safe
*Full optimizer required

The output voltage of each module will be reduced to 0V in below


cases:
1. During installation, when string is disconnected from inverter,
or the inverter is turned off

0V
2. During maintenance or emergency, when the inverter or AC
connection is shutdown

Provide highest safety for installers,


maintenance personnel and firefighters

Meets the most advanced safety standards, NEC 2014 & 2017, 0V Voltage
Rapid Shutdown Compliant
Quick shutdown
Dc Arc Detection Of PV System(AFCI )
TUV Technical Reports (IEC 63027 Draft)
Adaptable Maximum Arc Shutdown Arc Arc Detection Pinpoint Arc Fault
Comparison Arcing Detection Range
Current Time Energy Accuracy Positioning

IEC Standard 80m Imax(only 318V) < 2.5 S 750 J 100% Not Require

80 m (Single Phase) Imax(All Voltage


Huawei 200 m (Three Phase) Range)
< 0.5 S 500 J 100% Support*

SUN2000-10-20KTL-M2

1) Meets the IEC 63027 Drafts (TUV Technical Reports).


Huawei AFCI Performance Test Results 2) Meets the UL 1699B-2018 Standard.

Projects Results Projects Results

SUN2000-100KTL-M1 Detectable Arc Type Series Arc 80 M (Single Phase)


Arcing Detection Range
200 M (Three Phase)
Detectable Arc Fault Adaptable Maximum Arc
All Range Imax
Position Current

Arc Detection Accuracy 100%


System Mode With Or Without Optimizer

Pinpoint Arc Fault Arc Energy < 500 J


Support*
Positioning
Shutdown Time 0.5 S
* With Optimizer
Leading Technologies Brings Better Experience

Module Inverter Module


Auto-mapping Maintenance Free Smart Diagnosis

AI Technology Power Electronics Natural Cooling Comm. Tech Big Data


Operating HUAWEI Other

<40 sec
Steps Solution Solutions
Note: for a typical 100kw system with 400 optimizers
2D barcode Same Same
Saving 95% configuration time
paste on template

Module Auto-Mapping Physical layout creation 40sec


(AI powered)
30min
(manual) compared with other solutions
Total configuration time <1min 30min
No Fuse or Other Quick-wear Parts, Natural Cooling Verified by Telecom & Solar
Inverter Touch Free Application*

No Fuse No LCD No Button

* For 12–60KTL inverter models

TUV verified: annual failure rate < 0.5%


Inverter availability up to 99.996%
Station Phase Ⅱ, Station Phase Ⅲ, Station Phase IV,
200 units, 963 running days 4939 units, 583 running days 1790 units, 207 running days

Failure Rate: Failure Rate: Failure Rate:

0.189% 0.252% 0.390%


2-min fault locating through 10min diagnosis report auto Accurate diagnosis of
2
min
remote one-click scanning, 10
min
generation for a typical 14 14 types of module faults,
no need onsite inspection MW-level PV plant with 0.5% sensor accuracy

Hot Spot PID Degradation Diode Short Circuit

Online Smart I-V Conventional Offline Diagnosis Online Smart I-V Curve Diagnosis

Curve Diagnosis, Onsite diagnosis by experts in 1day Online diagnosis in 2min

Module Touch Free 1%-10% sample scanning 100% string scanning

Manual data analysis & report writing Auto diagnosis report generated in 10min
*Applicable for inverter only (without optimizers)
Smart I-V Curve Diagnosis with 7 GW+ Application Worldwide

Accurate Failure Diagnosis &


3.44 MW Failure Rate 11.7%
Recovery Suggestion Case Study

• Solartron Rooftop Project

Top 4
• 3.44MW, Ningbo, Zhejiang 3.20%
12.90%
• R brand PV Module: 280 W
• Huawei inverter: 50KTL-C1 PV Module Failure
• Total strings: 528, failed strings: 62
40.30%
String Short Circuit

43.50% Abnormal Output Current


String Current Mismatch
String Voltage Abnormal

How to Solve How to Solve


String Short Circuit Abnormal Output Current
Step 1 - Inspect modules. Step 1 - Inspect modules. If there are shades, eliminate
them.
Step 2 - If burning happens in connection points, replace
Step 2 - If not, check if there is dirt on the surface
the module.
Step 3 - If not, check if any module has a broken glass
Step 3 - If not, use IR camera to find internal failures. panel.
… …
Eight Innovations to Support Optimal Electricity Cost

.
① AI Powered Active Arcing Protection
Online Smart I-V Curve
Diagnosis, Module Touch Free ⑧ .
. Module-level Voltage
② 0V
Shutdown, Touch Safe
Safety

Experience
No Fuse & Other Quick-wear
Parts, Mature Nature Cooling ⑦ . ③ C&I. Tailored Enhanced Active Arcing Protection
(200m/26A)
Yields

<40 sec Module Auto-Mapping ⑥ . ④ Up. to 30% More Energy by Optimizing Each Module
Saving 95% configuration time Performance
⑤ .
Built-in PID Recovery,
Secure Better Module Performance

Huawei Solution

S Solution

Other Solutions
01 The 100MW
Opportunity 02 Huawei
“who are we” 03 Huawei C&I
Smart PV Solution 04 Huawei Utility
Smart PV Solution

34 Huawei Confidential
FusionSolar 6.0+ Utility Smart PV Solution Overview

Smart Array Controller

MBUS
Bifacial + Trackers Smart String Inverter Smart Transformer Step-up Grid FusionSolar Smart
Station Station PV Mgmt. System

Smart PV Inverter Smart Array Controller Smart Transformer Smart PV


SUN2000-185KTL-H1 SmartACU2000D
Station Mgmt. System
*SmartPower1000A01 (Optional) STS-6000K-H1 NetEco1000S

Higher Yields Smart O&M Safe & Reliable Grid Supporting

Huawei Confidential
Higher Yields

Multi-MPPT Design, 3% more Yields


Effectively Minimizing the Mismatch of Bifacial
Central Solution Smart PV Solution 6.3MW Block, 324 MPPTs vs. 2 MPPTs
MPPT 1
7.0%
MPPT 2

MPPT 3
2 PV strings per MPPT 6.30%
MPPT 4
1 MPPT 6.0% 100 PV strings per MPPT
MPPT 5
! !
MPPT 6

MPPT 7

5.0%
-3.1%
MPPT 8

Non-uniform illumination Non-uniform illumination MPPT 9

4.0%
VS
1st Year Yields of Central Solution 1st Year Yields of FusionSolar 3.20%
2333 kWh/kWp 2403 kWh/kWp 3.0%

2.10%
2.0% -1.1%

1.10% -0.8% 1.00%


1.0%

0.30%

0.0%
Mono System Bifacial System Bifacial System
First Year First Year 25 Years
Simulation Location: Seville, Spain

Huawei Confidential
Higher Yields

Availability, the Key to Measuring Power Generation


Top Three Factors Effecting Availability

1 Technology Route 2 Failure Rate 3 Recovery Time


FusionSolar superior to Central FusionSolar lower than Central FusionSolar less than Central
No Combiners, 200kW vs. 3125kW <0.5% lower than 2% 0.5 day vs. 2~15 days

Central Solution Smart PV Solution

!
DC Combiner ! ! ! ! !

!
!

Huawei Confidential
Higher Yields

TUV-verified >99.996% High Availability of Smart PV Solution

Availability decides Power Generation

Inverter T1+T2+…+Tn
= (1 - ) x 100%
Availability NxT

Tn: the amount of down-time of No. ‘n’ inverter


=…
N: the total amount of inverter used
T: the total of normal operation time

“ Inverter Availability is an important target to assess the quality of products and services…” Inverter Installed Running Annual Inverter
Model volume days failure rate Availability

SUN2000-20KTL 200 sets 963 days 0.189% 99.998%


Lower Failure Rate Less Recovery Time
SUN2000-28KTL 4939 sets 583 days 0.252% 99.996%

Integrated
Industry-proven string Only inverter vendor with Quick onsite replacement
134+ SUN2000-40KTL 1790 sets 207 days 0.390% 99.996%
Product Global Spare Parts
solution in utility projects 100GW+ string shipment & Service response
Development Centers
SUN2000-50KTL 700 sets Commissioning Period during this Assessment

Huawei Confidential
Safe & Reliable

Fuse-free IP66 and MBUS Design make system Safe and Reliable

Fuse-free Design IP66 Fully Sealed Design MBUS, No RS485 Cable, Easy O&M

IP66, Complete Dust/waterproof


More reliable for outdoor application
& OPEX saving

1
2
Only 2 strings into 1 MPPT
1
No Fuse Safe & reliable,
2 No fuse, simpler O&M

39 Huawei Confidential
Smart O&M

String-level Management and Quick Fault Recovery

String-level Management Quick Fault Recovery, No need of Experts

Plug & Play, Rip & Replace

30-min
Quick Replacement

Common Labors
Onsite

1 Accurate detection & less mal-alarm with <0.5% high-accuracy data of each string
2 Auto-alarm & O&M advice generation, well-prepared for on-site failures
3 Instant failure locating & recovery based on logical & physical location of strings
40 Huawei Confidential

You might also like