Showcase Huawei Full Deck 20210826 Post Production
Showcase Huawei Full Deck 20210826 Post Production
recording
1
3
4
5
AFSIA ACTIVITIES HIGHLIGHTS - 2021
(LONGi)
Trina Jinko 1 SEP 28 OCT
Solar Studer SustainSolar Segen Antaisolar
Solar
Innotec MG Asset Solar trackers
Financing Portal
Innovative Sun C&I in PV-diesel TBD 2-3-4 14 DEC
14 SEP
Webinar
Irrigation Solar f or
f inancing meets SADC hybrids in NOV EV+PV in
solaire health Small things(LONGi)
f or Af rican Water countries Nigeria Focus on Af rica
(FR) care that make a
solar (Segen (Elum ) Storage
big diff erence
Solar)
in solar
JAN-21 FEB-21 MAR-21 APR-21 MAY-21 JUN-21 JUL-21 AUG-21 SEP-21 OCT-21 NOV-21 DEC-21 JAN-22
9th HOMER
External
10 Huawei Confidential
South Africa 100MW License Threshold Policy
Lack of Power, Load-shedding a lot Statement of 100MW License Threshold Policy
Level1 2.5H Level2 5H
400 8%
66%
“Activities with a capacity of no more than 100MW,
121 127
200
0
exempt from licensing and require registration”
2014 2015 2018 2019 2020
L1 L2 L3 L4
Renewable Energy Development Planning in South Africa
Emergency power procurement of 4,000 MW in 2021/22. The target for embedded generation investment will be 800 – 1,000 MWh battery storage procured by
Procurement of 3,200MW of renewable IPPs in one increased from 4,000 to 5,000 MW. 2023/24, of which 513 MWh battery storage
window in 2021. procured by 2022.
Procurement of 10,000MW of renewable IPPs in one
window in 2022.
Challenges this capacity and growth rate presents the market
Speed and ease of deployment Guaranteed yields and reliability More sites requiring management
End to end – Ecosystem String Solutions more mainstream in Larger deployments Larger capacity sites
Simplistic plant design – Modular Higher plant availability Larger number of sites
8000.0
7000.0
6000.0
5000.0
4000.0
3000.0
2000.0
1000.0
0.0
6/14/2019
6/16/2019
5/1/2019
5/7/2019
5/11/2019
5/17/2019
5/25/2019
6/2/2019
6/8/2019
6/10/2019
6/12/2019
6/18/2019
5/5/2019
5/15/2019
5/23/2019
5/29/2019
7/4/2019
7/6/2019
5/3/2019
5/9/2019
7/2/2019
7/8/2019
5/13/2019
5/19/2019
5/31/2019
6/22/2019
6/24/2019
6/26/2019
6/30/2019
7/10/2019
7/12/2019
5/21/2019
5/27/2019
6/4/2019
6/6/2019
6/20/2019
6/28/2019
01 The 100MW
Opportunity 02 Huawei “who are we”
03 Huawei C&I
Smart PV Solution 04 Huawei Utility
Smart PV Solution
14 Huawei Confidential
Huawei Digital Power
Vision
Launch First 5G
network with
2020
Built Open Lab and RAIN in Africa
launched New
2017: Huawei Office Park
1st LTE-A Commercial Office Park 2019
launch in SA Built Innovation
Entered main Center
2017
carrier market
2014 2015 2016
…
Continuously Creating Values for Customers
Achieving Sustainable Business Growth
Sustainable business growth with large operation 2020H1 Sales Revenue US$65.7 Billion
scale & diversed business groups YoY increased by 13.1%
96,000+ 14
Research institutes/
No.5 in
R&D employees In R&D Investment
labs/centers 2013 2014 2015 2016 2017 2018 2019 2020H1
Smart PV: All-scenario PV & Storage Solution
Smart String Solution Covering from Residential, C&I to Utility
Smart ESS Smart Energy Smart PV Smart Data Logger Smart PV Smart PV Smart PV
Smart PV Optimizer Smart PV Inverter Smart Transformer Station
Center Management System Management System Inverter Management System
Huawei Confidential
Continuous Innovation, Leading Solar Industry Development
String solution has been FusionSolar Smart PV 175GW
the MAINSTREAM in utility Accumulative Global Shipment
by July 2021
Central String
61%
NO.1
59%
57%
53%
51%
Huawei Confidential
01 The 100MW
Opportunity 02 Huawei
“who are we” 03 Huawei C & I
Smart PV Solution 04 Huawei Utility
Smart PV Solution
20 Huawei Confidential
FusionSolar DGCommercial
FusionSolar Smart PV Solution Overview
& Industrial Smart PV Solution Overview
WLAN/FE/4G/3G/2G
FusionSolar Smart PV
Smart PV Inverter Management system
C&I
No Optimizer
RS485
Smart Dongle Smart Power Sensor
RS485
…
增加一页C&I 100kw以
Full Optimizer
Smart PV Inverter
SUN2000-12/15/17/20KTL-M2
内组网图及产品组合 Smart PV Optimizer
SUN2000-450W-P
Monitoring Portal
FusionSolar Cloud & App
Energy Storage
Without Optimizer
With Optimizer
SUN2000-12-20KTL-M2 SUN2000-20-40KTL-M3
0V
2. During maintenance or emergency, when the inverter or AC
connection is shutdown
Meets the most advanced safety standards, NEC 2014 & 2017, 0V Voltage
Rapid Shutdown Compliant
Quick shutdown
Dc Arc Detection Of PV System(AFCI )
TUV Technical Reports (IEC 63027 Draft)
Adaptable Maximum Arc Shutdown Arc Arc Detection Pinpoint Arc Fault
Comparison Arcing Detection Range
Current Time Energy Accuracy Positioning
IEC Standard 80m Imax(only 318V) < 2.5 S 750 J 100% Not Require
SUN2000-10-20KTL-M2
<40 sec
Steps Solution Solutions
Note: for a typical 100kw system with 400 optimizers
2D barcode Same Same
Saving 95% configuration time
paste on template
Online Smart I-V Conventional Offline Diagnosis Online Smart I-V Curve Diagnosis
Manual data analysis & report writing Auto diagnosis report generated in 10min
*Applicable for inverter only (without optimizers)
Smart I-V Curve Diagnosis with 7 GW+ Application Worldwide
Top 4
• 3.44MW, Ningbo, Zhejiang 3.20%
12.90%
• R brand PV Module: 280 W
• Huawei inverter: 50KTL-C1 PV Module Failure
• Total strings: 528, failed strings: 62
40.30%
String Short Circuit
.
① AI Powered Active Arcing Protection
Online Smart I-V Curve
Diagnosis, Module Touch Free ⑧ .
. Module-level Voltage
② 0V
Shutdown, Touch Safe
Safety
Experience
No Fuse & Other Quick-wear
Parts, Mature Nature Cooling ⑦ . ③ C&I. Tailored Enhanced Active Arcing Protection
(200m/26A)
Yields
<40 sec Module Auto-Mapping ⑥ . ④ Up. to 30% More Energy by Optimizing Each Module
Saving 95% configuration time Performance
⑤ .
Built-in PID Recovery,
Secure Better Module Performance
Huawei Solution
S Solution
Other Solutions
01 The 100MW
Opportunity 02 Huawei
“who are we” 03 Huawei C&I
Smart PV Solution 04 Huawei Utility
Smart PV Solution
34 Huawei Confidential
FusionSolar 6.0+ Utility Smart PV Solution Overview
MBUS
Bifacial + Trackers Smart String Inverter Smart Transformer Step-up Grid FusionSolar Smart
Station Station PV Mgmt. System
Huawei Confidential
Higher Yields
MPPT 3
2 PV strings per MPPT 6.30%
MPPT 4
1 MPPT 6.0% 100 PV strings per MPPT
MPPT 5
! !
MPPT 6
MPPT 7
5.0%
-3.1%
MPPT 8
4.0%
VS
1st Year Yields of Central Solution 1st Year Yields of FusionSolar 3.20%
2333 kWh/kWp 2403 kWh/kWp 3.0%
2.10%
2.0% -1.1%
0.30%
0.0%
Mono System Bifacial System Bifacial System
First Year First Year 25 Years
Simulation Location: Seville, Spain
Huawei Confidential
Higher Yields
!
DC Combiner ! ! ! ! !
!
!
Huawei Confidential
Higher Yields
Inverter T1+T2+…+Tn
= (1 - ) x 100%
Availability NxT
“ Inverter Availability is an important target to assess the quality of products and services…” Inverter Installed Running Annual Inverter
Model volume days failure rate Availability
Integrated
Industry-proven string Only inverter vendor with Quick onsite replacement
134+ SUN2000-40KTL 1790 sets 207 days 0.390% 99.996%
Product Global Spare Parts
solution in utility projects 100GW+ string shipment & Service response
Development Centers
SUN2000-50KTL 700 sets Commissioning Period during this Assessment
Huawei Confidential
Safe & Reliable
Fuse-free IP66 and MBUS Design make system Safe and Reliable
Fuse-free Design IP66 Fully Sealed Design MBUS, No RS485 Cable, Easy O&M
1
2
Only 2 strings into 1 MPPT
1
No Fuse Safe & reliable,
2 No fuse, simpler O&M
39 Huawei Confidential
Smart O&M
30-min
Quick Replacement
Common Labors
Onsite
1 Accurate detection & less mal-alarm with <0.5% high-accuracy data of each string
2 Auto-alarm & O&M advice generation, well-prepared for on-site failures
3 Instant failure locating & recovery based on logical & physical location of strings
40 Huawei Confidential