The Research of Highway Construction Project Information
Comprehensive Management System
Hualong Cai1, Chengyu Zhu1, *, Ming Ouyang1 and Chen Peng1
1
School of Civil Engineering, Jiaying University, Meizhou, Guangdong, 514015,
China
*
Corresponding author´s email:
[email protected] Abstract. With the development strategy of "Internet + Transportation'' put forward, the paper
advances the process of the new type of transportation construction in the province. Compared
with the common highway, the freeway design speed is higher, vehicle capacity is larger, so the
quality is more strict during the construction process. This system helps highway construction
managers to understand the construction of the project at the first time, and effectively deal
with emergencies. Based on the actual situation of the project, this paper expounds the
information management system and its functions of expressway construction project.
1. Background of research
In order to implement the development strategy of "internet + traffic'', using the current internet and
internet of things network technology, the construction of information management system through
informationization and intellectualization means is used to monitor the whole process of expressway
construction projects, to realize the 100 % information-based management of newly-built highway
projects so as to meet the requirements of high quality, achieve the goal of zero mistakes in
construction and waste of materials, and improve the way of quality supervision and data-sharing.
2. System composition and functions
The system consists of five subsystems: key process construction control system, engineering
construction project website, engineering construction project management platform, office OA and
video conference. It has been shown in figure 1.
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution
of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.
Published under licence by IOP Publishing Ltd 1
ICCAPC 2021 IOP Publishing
IOP Conf. Series: Earth and Environmental Science 760 (2021) 012032 doi:10.1088/1755-1315/760/1/012032
Figure 1. System Composition
2.1 Key Process Construction Control System
The system includes five subsystems, which are Concrete Mixing Plant Production Monitoring System,
Laboratory Data Acquisition Monitoring Management System, Prestressed Construction Remote
Monitoring System, Safe Construction Video Monitoring System, and Quality Safety Assistance
System.
Concrete Mixing Plant Production Monitoring System monitors and manages the on-site concrete
mixing equipment, and at the same time connects with the roadbed construction quality data collection
platform of the Provincial Traffic Engineering Quality and Safety Supervision Administration. It has
been shown in figure 2.
Figure 2. Work Flow Chart of Concrete Mixing Plant Production Monitoring System
Laboratory Data Acquisition Monitoring Management System analyzes and judges the quality of
all kinds of engineering materials, monitors the temperature and humidity of standard breeding room
at the same time, realizes the data sharing of the three-level laboratory of the project and the
third-party testing institutions, and connects with the test and testing management platform of
Provincial Traffic Engineering Quality and Safety Supervision and Administration Bureau. It has been
shown in figure 3.
2
ICCAPC 2021 IOP Publishing
IOP Conf. Series: Earth and Environmental Science 760 (2021) 012032 doi:10.1088/1755-1315/760/1/012032
Figure 3. Work Flow Chart of Laboratory Data Acquisition Monitoring Management System
Prestressed Construction Remote Monitoring System realizes the analysis, evaluation and query of
the quality of site tensioning and grouting data, and connects with the quality control and management
platform of prestressed bridge construction of Provincial Traffic Engineering Quality and Safety
Supervision Administration. It has been shown in chart 4.
Safe Construction Video Monitoring System collects video images of key parts of the project (such
as prefabricated yard, interchange, mechanics laboratory), and managers at all levels use the
three-level monitoring center set up to monitor and store the collected video on the quality of the
on-site construction process and production safety. It has been shown in chart 5.
Quality Safety Assistance System collects the quality assessment on the construction site, and
supports the data access and download. It has been shown in chart 6.
2.2 Engineering Construction Project Website System
The system relies on the Internet to publicize the progress of the project, release a variety of public
information to the public, let the public know the situation of the project construction in time, and
carry out the public supervision.
2.3 Engineering Construction Project Management Platform System
The Engineering Construction Project Management Platform System includes ten modules, which are
Project Information Management Module, Project Contract Management Module, Project Change
Management Module, Project Progress Management Module, Project File Management Module,
Project Measurement Management Module, Project Monthly Report Management Module, Project
Quality Management Module, Project Safety Management Module and Third-party Interface Service.
Project Information Management Module allows the user to maintain and view information within
the scope of authority, such as project overview, participating company and contact book.
Project Contract Management Module records and stores all kinds of contract materials of project
participants in a standard format, and completes daily contract registration and dynamic update of
execution progress.
Project Change Management Module is designed according to different levels of engineering
changes, different approval and review processes. Combined with the approval process of engineering
design change management, it provides the functions of application, approval and distribution of
changes, and can update the bill of quantities automatically.
Project Progress Management Module can generate all kinds of charts in real time and clearly
display the original progress, progress node and other information to provide the progress information
of the project to the progress control personnel.
Project File Management Module is the classification management, induction organization and
3
ICCAPC 2021 IOP Publishing
IOP Conf. Series: Earth and Environmental Science 760 (2021) 012032 doi:10.1088/1755-1315/760/1/012032
preservation of the documents, drawings and other materials produced in the process of the
implementation of the project construction management, as the materials and documents of the project
completion acceptance.
Project Measurement Management Module performs network measurement on list measurement,
change list measurement and measurement statistics.
Project Monthly Report Management Module provides the function of compiling monthly report of
engineering, supervision and construction.
Project Quality Management Module stores and updates the national standards and project
requirements in real time, and processes, statistics and aggregates the test, inspection, evaluation and
other form data.
Project Safety Management Module is to establish and check the safety management objectives and
systems of each project department, and connect the Quality Safety Assistance System to carry out
safety management of the project.
Third-party Interface Service makes the system have good compatibility, which meets the docking
of project supervision and management units and Office OA System.
2.4 Office OA System
The system uses important sections, scrolling screen, business information label page display and
other ways to announce the notice, government information, work focus and other information.
2.5 Video Conference System
The system manages and monitors the construction of projects, and understands the construction status
of projects in its jurisdiction in real time.
3. System architecture
3.1 Software Structure
The system software is divided into three layers, which are Basic Layer, Business Logic Layer and
Data Access Layer. Base Layer includes project specific execution department and project information
upload interface. Business Logic Layer completes the core business, including project safety
management, project contract management, project quality management, project information
management, official document management, project schedule management, project financial
management and project budget management. It has been shown in figure 4.
Figure 4. Software Structure
3.2 Hardware Structure
In the context of the rapid development of the Internet, big data and 5G technology, a large number of
cloud data centers and cloud computing platforms appear on the market, which meet the requirements
of the system hardware system. The hardware structure of this system is the use of cloud service,
which stores the data of the production site, construction site, site laboratory, supervision unit, central
laboratory and owner server data center in the cloud server to facilitate the retrieval of the client. It has
4
ICCAPC 2021 IOP Publishing
IOP Conf. Series: Earth and Environmental Science 760 (2021) 012032 doi:10.1088/1755-1315/760/1/012032
been shown in figure 5.
Figure 5. Network Topology Diagram
4. System implementation
4.1 System Main Interface
The data of the user (not the system administrator) is uploaded by the background administrator
together, and the user is informed of the initialization password and other information, but not being
able to register personally. The login interface has been shown in figure 6.
Figure 6. Network Topology Diagram
When users (who are not system administrators) log in, they see that the system interface is divided
into four areas. The title bar is at the top, the functional navigation area is on the left, the content
display area is on the right, and the copyright notice area is at the bottom. It has been shown in figure
7.
5
ICCAPC 2021 IOP Publishing
IOP Conf. Series: Earth and Environmental Science 760 (2021) 012032 doi:10.1088/1755-1315/760/1/012032
Figure 7. User Interface Partition
4.2 System Main Interface
Uploading photos of the construction site based on the PHP development environment is done as
shown in the figure below (code parts):
<script type="text/javascript">
window.onload = function () {
var fileTag = document.getElementById('file');
fileTag.onchange = function () {
var file = fileTag.files[0];
if(!/image\/\w+/.test(file.type)){
alert("Note that images should be used here!");
return false;}
var fileReader = new FileReader();
fileReader.onloadend = function () {
if (fileReader.readyState == fileReader.DONE) {
document.getElementById('img').setAttribute('src', fileReader.result); }};
fileReader.readAsDataURL(file); };
};
</script>
5. Conclusions and prospects
Since the construction of highway construction project information integrated management system, in
the management, support road bridge investment company' s project strategic management and
centralized management to realize the three-level management of "roadbridge investing company,
project office, construction site''. In the operation, supports the distribution of projects, projects and
projects throughout the lifecycle management so as to promote project information-sharing, improve
operational efficiency and achieve cooperative project management.
References
[1] Yanping Wang. Construction of Gansu Provincial Expressway Comprehensive Information
Management Platform [J]. Gansu Science and Technology, 2012, 41 (05): 23-24
[2] Junmei Fu, Zhigang Deng. Baotian Expressway Project Information Management Platform
Implementation System [J]. Science and Technology Wind,2009(15):131-132
[3] Hongjun Wang. Demand analysis of expressway management information construction [J].
Chinese and foreign entrepreneurs,2019(35):74
[4] Xuewen Huang, Zening Xu, Lijun Xiao. Research on application of information platform of
expressway visual project construction management system [J]. China Traffic
6
ICCAPC 2021 IOP Publishing
IOP Conf. Series: Earth and Environmental Science 760 (2021) 012032 doi:10.1088/1755-1315/760/1/012032
Informatization,2015(03):71-74
[5] Menglu Yang. Talking about the intelligent expressway system [A]. "Construction Technology
and Management" Organizing Committee. Proceedings of the April 2016 Construction
Technology and Management Academic Exchange Conference [C]. "Construction
Technology and Management" Organizing Committee Meeting: Beijing Hengsheng Boya
International Cultural Exchange Center, 2016: 2
[6] Hongchuan Du. Design of Jilin Province Highway Comprehensive Management Information
System[D]. Jilin University, 2008.