0% found this document useful (0 votes)
19 views96 pages

Dpr Electrical

The progress report for the 400/230kV Karur Substation outlines the status of various tasks related to structure erection, equipment installation, earthing works, stringing work, cabling, and fire fighting systems. Most tasks are either completed or have a balance of items yet to be finished, with specific details provided for each equipment type and installation phase. Overall, the report indicates significant progress with some outstanding tasks remaining across different categories.

Uploaded by

Saikumar Illa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views96 pages

Dpr Electrical

The progress report for the 400/230kV Karur Substation outlines the status of various tasks related to structure erection, equipment installation, earthing works, stringing work, cabling, and fire fighting systems. Most tasks are either completed or have a balance of items yet to be finished, with specific details provided for each equipment type and installation phase. Overall, the report indicates significant progress with some outstanding tasks remaining across different categories.

Uploaded by

Saikumar Illa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 96

ytfuftftgvnmbkhbgvbybnmb

Progress Reports at 400/230kv Karur Substation


Status
Total
Sl. No. Task Name UOM
Qty. Completed Balance

I Structure Erection
A Tower & Beam erection

a 400 kV Tower & Beam


4TA (06 Nos.) - 15 Mtr. Nos. 6 6 0
4TB (06 Nos.) - 31 Mtr. Nos. 6 6 0
4TC (03 Nos.) - 31 Mtr. Nos. 3 3 0
4TD (06 Nos.) - 31 Mtr. Nos. 6 6 0
4G1 (06 Nos.) Nos. 6 6 0
4G2 (06 Nos.) Nos. 6 6 0
4G3 (06 Nos.) Nos. 6 6 0

b 230kv Tower & Beam


2CA (3Nos)-20.2Mtr. Nos. 3 3 0
2CB (4Nos)-20.2Mtr. Nos. 4 4 0
2CC (3Nos)-20.2Mtr. Nos. 3 3 0
2CD (2Nos)-20.2Mtr. Nos. 2 0 2
2CTA (2Nos)-20.2Mtr. Nos. 2 0 2
2CTB (3Nos)-20.2Mtr. Nos. 3 0 3
2CTG (4Nos)-20.2Mtr. Nos. 4 0 4
2CTH (3Nos)-20.2Mtr. Nos. 3 0 3
2B1(11Nos)-16Mtr Nos. 11 11
2BG1(8Nos)-16 Mtr Nos. 8 0 8
10 -10
B Equipment Structure Erection 0
a 400 kV Equipments 0
CB (12 Set) Set 12 12 0
CT (36 Nos.) Nos. 36 35 1
CVT (18 Nos.) Nos. 18 18 0
Isolator (32 Nos. 3 Ph.) Set 32 10 22
Surge Arrester (24 Nos.) Nos. 24 24 0
Bus Post Insulators Nos. 16 16 0
Wave Trap (08 Set) Set 8 8 0
146 123 23
b 230 kV Equipments 0
CB (8 Set) Set 8 8 0
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 8 121
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT Nos. 1 0 1
PT Nos. 1 0 1
d 33KV DP STRUCTURE (3 ph) Nos. 1 0 1
Marshaling Box Erection (CT,PT ,BMK 0
d
,ISO MB
400kV CT Junction box Nos. 12 12 0
400kV CVT Junction box Nos. 6 6 0
400kv BMK Nos. 8 3 5
400kv Isolator M.B Box Nos. 198 60 138
220kv CT Junction box Nos. 8 0 8
230kv CVT Junction box Nos. 6 0 6
220kv isolater M.B Box Nos. 66 0 66
304 81 223
II Outdoor Installation 0
A Equipment's Installation 0
a 400 kV Equipments 0
CB (012 Set) Set 12 0 12
11 CT (36 Nos.) Nos. 36 18 18
CVT (18 Nos.) Nos. 18 12 6
Isolator (32 Nos. 3 Ph.) Nos. 32 3 29
Surge Arrester (24 Nos.) Nos. 24 12 12
Bus Post Insulators Nos. 16 14 2
Wave Trap (08 Nos) Nos. 8 8 0
b 230 kV Equipments 146 67 79
CB (8 Set) Set 8 0 8
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 0 129
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT (03 Nos.) Nos. 3 0 3
PT (03 Nos.) Nos. 3 0 3
Surge Arrester (03 Nos.) Nos. 3 0 3
d LT Transformer 11 0 11
33 kV LT Transformer for Tertiary 1
Nos. 1 0
connection
22 kV LT Transformer for SEB 1
Nos. 1 0
Connection
e 500 kVA DG Set Nos. 1 1
III.a 400kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 8000 6200 1800
Riser 40mm dia MS rod Mtr 3000 2428 572
75x12mm GI Flat for Equipment & 125
Nos. 185 60
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 300
Mtr 700 400
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 66 0 66
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & M.B box Earthing
Cable Trench Angle welding (400kv) Nos. 1115 454 661
Auxiliary Earthmat Nos. 198 42 156
### 9584 4192
III.b 230kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 5500 5189 311
Riser 40mm dia MS rod Mtr 3280 2351 929
75x12mm GI Flat for Equipment & 234
Nos. 234 0
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 600
Mtr 600 0
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & Equipment Structure Earthing
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 76 0 76
Cable Trench Angle welding Nos. 565 188 377
Auxiliary Earthmat Nos. 80 0 80
### 7728 3119
B Stringing Work 0
i 400 kV Mtr ### 9888 5212
0
Main Bus-I (02 Spans) Mtr 1200 1200 0
Main Bus-II (02 Spans) Mtr 1200 1200 0
Jack Bus - Dia 01 (BR-Tie-Iine 01) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 02 (BR-Tie-Iine 02)
Mtr 1872 1872 0
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-3) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-4) 0
Mtr 1872 1872
(2Spans)
Equipment's Jumpering Mtr 5212 1815 3397
15100 11703 3397
ii 220KV Mtr 8550 0 8550
Main Bus-I Mtr 0
Main Bus-II Mtr 0
Transfer Bus Mtr 0
230kv ICT Bay Mtr 630 630 0
230kv Line Bay Mtr 0
230kv Bus Coupler Bay Mtr 0
230kv TBC Bay Mtr 0
Equipment Interconnection
C including Clamps & Connectors, IPS 0
Al. Tube & Jumpering
ASDFGHJ 0
Dia 01 (BR-I-Tie-Line I) Lot 1 0 1
Dia 02 (BR-II-Tie-Line II) Lot 1 0 1
Dia 03 (ICT-I-Tie-Line III) Lot 1 0 1
Dia 04 (ICT-II-Tie-Line IV) Lot 1 0 1
230 kV 0
230kv ICT Bay Lot 1 0 1
230kv Line Bay Lot 1 0 1
230kv Bus Coupler Bay Lot 1 0 1
230kv TBC Bay Lot 1 0 1
72.5 kV & 22 kV 0
For 33 kV system through Tertiary of 1
Lot 1 0
ICT
For 22 kV SEB supply connection Lot 1 0 1
D Cabling Works 0
Control Cable kM 70 0 70
Power cable kM 30 0 30
FO Cable kM 5.5 0 5.5
0
Cable Termination Lot 1 0 1
0
0
E Outdoor Illumination System 0
Fitting of lighting fixtures Lot 1 0 1
Outdoor Lighting Panels Lot 1 0 1
Cable Connections Lot 1 0 1
III Indoor Installation 0
SAS Installation Lot 1 0 1
CRP Installation Lot 1 0 1
PLCC Installation Lot 1 0 1
FOTE Lot 1 0 1
Airconditioning System Lot 1 0 1
Illumination System Lot 1 0 1
AC DB / DC DB / LDB Installation Lot 1 0 1
Battery & Charger Installation Lot 1 0 1
Lighting Panel Lot 1 0 1
VCB Panel Nos. 1 0 1
IV Fire Fighting System 0
A Installation of Fire fighting Pumps 0
Horizontal centrifugal type Motor driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith motor and other accessories
Horizontal centrifugal type Engine driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith engine and other accessories.
Jockey pump motor driven of capacity
10.8 M3/hr, 80 MWC alongwith motor and Nos. 2 0 2
other accessories.
B Erection of Control Panels 0
Local Control Panel for Motor Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Diesel Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Jockey Pump Nos. 1 0 1
Annunciation Panel for Pump House Nos. 1 0 1
Annunciation Panel for Control Room Nos. 1 0 1
DC Distribution Board Nos. 1 0 1
AC Distribution Board Nos. 1 0 1
C Installation of Hydrant System 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation of Emulsifier System Nos. 2 0 2
0
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation of Emulsifier System Nos. 2 0 2
0
4 Fire Detection and Alarm System 0
At Control Room Lot 1 0 1
At Kiosk Lot 1 0 1
At FFPH Lot 1 0 1
V 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
VII Pre-commissioning *** 0
0
Outdoor Equipment's Testing 0
Equipment's Testing *** 0
Indoor Equipment's Testing 0
Control, Relay & Protection Panel Testing 0
***
& Relay Setting
SAS Configuration 0
PLCC & FOTE Testing (Readiness of 0
Transmission Line)
VII System commissioning completed 0
Date:16/05/2023

Remarks

Completed

Some 230kv
Tower & Beam
structure
Materials not
received at site

Some equipment
structure
Materials not
received at site

230kv Equipment
structure
Materials not
received at site
230kv Equipment
structure
Materials not
received at site

72.5 kv
Equipment
structure
Materials not
received at site
started 23/5/2023
started 27/5/2023

Completed

works in progress
Lighting Fixture
not received at
site

Control room
building not reday
& CRP panel not
received at site

Fire Fighting
Pump house not
Reday
Fire Fighting
Pump house not
Reday

Fire Fighting
Pump house not
Reday

Transformer not
Received at site

Reactor not
Received at site
ytfuftftgvnmbkhbgvbybnmb
Progress Reports at 400/230kv Karur Substati
Status
Total
Sl. No. Task Name UOM
Qty. Completed Balance

I Structure Erection
A Tower & Beam erection

a 400 kV Tower & Beam


4TA (06 Nos.) - 15 Mtr. Nos. 6 6 0
4TB (06 Nos.) - 31 Mtr. Nos. 6 6 0
4TC (03 Nos.) - 31 Mtr. Nos. 3 3 0
4TD (06 Nos.) - 31 Mtr. Nos. 6 6 0
4G1 (06 Nos.) Nos. 6 6 0
4G2 (06 Nos.) Nos. 6 6 0
4G3 (06 Nos.) Nos. 6 6 0

b 230kv Tower & Beam


2CA (3Nos)-20.2Mtr. Nos. 3 3 0
2CB (4Nos)-20.2Mtr. Nos. 4 4 0
2CC (3Nos)-20.2Mtr. Nos. 3 3 0
2CD (2Nos)-20.2Mtr. Nos. 2 0 2
2CTA (2Nos)-20.2Mtr. Nos. 2 0 2
2CTB (3Nos)-20.2Mtr. Nos. 3 0 3
2CTG (4Nos)-20.2Mtr. Nos. 4 0 4
2CTH (3Nos)-20.2Mtr. Nos. 3 0 3
2B1(11Nos)-16Mtr Nos. 11 11
2BG1(8Nos)-16 Mtr Nos. 8 0 8
10
B Equipment Structure Erection 0
a 400 kV Equipments 0
CB (12 Set) Set 12 12 0
CT (36 Nos.) Nos. 36 35 1
CVT (18 Nos.) Nos. 18 18 0
Isolator (32 Nos. 3 Ph.) Set 32 10 22
Surge Arrester (24 Nos.) Nos. 24 24 0
Bus Post Insulators Nos. 16 16 0
Wave Trap (08 Set) Set 8 8 0
146 123 23
b 230 kV Equipments 0
CB (8 Set) Set 8 8 0
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 8 121
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT Nos. 1 0 1
PT Nos. 1 0 1
d 33KV DP STRUCTURE (3 ph) Nos. 1 0 1
Marshaling Box Erection (CT,PT ,BMK 0
d
,ISO MB
400kV CT Junction box Nos. 12 12 0
400kV CVT Junction box Nos. 6 6 0
400kv BMK Nos. 8 3 5
400kv Isolator M.B Box Nos. 198 60 138
220kv CT Junction box Nos. 8 0 8
230kv CVT Junction box Nos. 6 0 6
220kv isolater M.B Box Nos. 66 0 66
304 81 223
II Outdoor Installation 0
A Equipment's Installation 0
a 400 kV Equipments 0
CB (012 Set) Set 12 0 12
11 CT (36 Nos.) Nos. 36 18 18
CVT (18 Nos.) Nos. 18 12 6
Isolator (32 Nos. 3 Ph.) Nos. 32 3 29
Surge Arrester (24 Nos.) Nos. 24 12 12
Bus Post Insulators Nos. 16 14 2
Wave Trap (08 Nos) Nos. 8 8 0
b 230 kV Equipments 146 67 79
CB (8 Set) Set 8 0 8
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 0 129
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT (03 Nos.) Nos. 3 0 3
PT (03 Nos.) Nos. 3 0 3
Surge Arrester (03 Nos.) Nos. 3 0 3
d LT Transformer 11 0 11
33 kV LT Transformer for Tertiary 1
Nos. 1 0
connection
22 kV LT Transformer for SEB 1
Nos. 1 0
Connection
e 500 kVA DG Set Nos. 1 1
III.a 400kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 8000 6200 1800
Riser 40mm dia MS rod Mtr 3000 2428 572
75x12mm GI Flat for Equipment & 125
Nos. 185 60
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 300
Mtr 700 400
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 66 0 66
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & M.B box Earthing
Cable Trench Angle welding (400kv) Nos. 1115 454 661
Auxiliary Earthmat Nos. 198 42 156
### 9584 4192
III.b 230kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 5500 5189 311
Riser 40mm dia MS rod Mtr 3280 2351 929
75x12mm GI Flat for Equipment & 234
Nos. 234 0
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 600
Mtr 600 0
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & Equipment Structure Earthing
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 76 0 76
Cable Trench Angle welding Nos. 565 188 377
Auxiliary Earthmat Nos. 80 0 80
### 7728 3119
B Stringing Work 0
i 400 kV Mtr ### 9888 5212
0
Main Bus-I (02 Spans) Mtr 1200 1200 0
Main Bus-II (02 Spans) Mtr 1200 1200 0
Jack Bus - Dia 01 (BR-Tie-Iine 01) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 02 (BR-Tie-Iine 02)
Mtr 1872 1872 0
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-3) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-4) 0
Mtr 1872 1872
(2Spans)
Equipment's Jumpering Mtr 5212 1815 3397
15100 11703 3397
ii 220KV Mtr 8550 0 8550
Main Bus-I Mtr 0
Main Bus-II Mtr 0
Transfer Bus Mtr 0
230kv ICT Bay Mtr 630 630 0
230kv Line Bay Mtr 0
230kv Bus Coupler Bay Mtr 0
230kv TBC Bay Mtr 0
Equipment Interconnection
C including Clamps & Connectors, IPS 0
Al. Tube & Jumpering
ASDFGHJ 0
Dia 01 (BR-I-Tie-Line I) Lot 1 0 1
Dia 02 (BR-II-Tie-Line II) Lot 1 0 1
Dia 03 (ICT-I-Tie-Line III) Lot 1 0 1
Dia 04 (ICT-II-Tie-Line IV) Lot 1 0 1
230 kV 0
230kv ICT Bay Lot 1 0 1
230kv Line Bay Lot 1 0 1
230kv Bus Coupler Bay Lot 1 0 1
230kv TBC Bay Lot 1 0 1
72.5 kV & 22 kV 0
For 33 kV system through Tertiary of 1
Lot 1 0
ICT
For 22 kV SEB supply connection Lot 1 0 1
D Cabling Works 0
Control Cable kM 70 0 70
Power cable kM 30 0 30
FO Cable kM 5.5 0 5.5
0
Cable Termination Lot 1 0 1
0
0
E Outdoor Illumination System 0
Fitting of lighting fixtures Lot 1 0 1
Outdoor Lighting Panels Lot 1 0 1
Cable Connections Lot 1 0 1
III Indoor Installation 0
SAS Installation Lot 1 0 1
CRP Installation Lot 1 0 1
PLCC Installation Lot 1 0 1
FOTE Lot 1 0 1
Airconditioning System Lot 1 0 1
Illumination System Lot 1 0 1
AC DB / DC DB / LDB Installation Lot 1 0 1
Battery & Charger Installation Lot 1 0 1
Lighting Panel Lot 1 0 1
VCB Panel Nos. 1 0 1
IV Fire Fighting System 0
A Installation of Fire fighting Pumps 0
Horizontal centrifugal type Motor driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith motor and other accessories
Horizontal centrifugal type Engine driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith engine and other accessories.
Jockey pump motor driven of capacity
10.8 M3/hr, 80 MWC alongwith motor and Nos. 2 0 2
other accessories.
B Erection of Control Panels 0
Local Control Panel for Motor Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Diesel Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Jockey Pump Nos. 1 0 1
Annunciation Panel for Pump House Nos. 1 0 1
Annunciation Panel for Control Room Nos. 1 0 1
DC Distribution Board Nos. 1 0 1
AC Distribution Board Nos. 1 0 1
C Installation of Hydrant System 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation of Emulsifier System Nos. 2 0 2
0
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation of Emulsifier System Nos. 2 0 2
0
4 Fire Detection and Alarm System 0
At Control Room Lot 1 0 1
At Kiosk Lot 1 0 1
At FFPH Lot 1 0 1
V 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
VII Pre-commissioning *** 0
0
Outdoor Equipment's Testing 0
Equipment's Testing *** 0
Indoor Equipment's Testing 0
Control, Relay & Protection Panel Testing 0
***
& Relay Setting
SAS Configuration 0
PLCC & FOTE Testing (Readiness of 0
Transmission Line)
VII System commissioning completed 0
kv Karur Substation Date:16/05/2023

WEEK-1 6/1/2023 6/2/2023 6/3/2023 Remarks

Completed

Some 230kv
Tower & Beam
structure
4 2 1 1
Materials not
5 3 1 1 received at site

Some equipment
structure
Materials not
received at site

230kv Equipment
structure
Materials not
received at site
230kv Equipment
structure
Materials not
received at site

72.5 kv
Equipment
structure
Materials not
received at site
started 23/5/2023
started 27/5/2023

Completed

works in progress
Lighting Fixture
not received at
site

Control room
building not reday
& CRP panel not
received at site

Fire Fighting
Pump house not
Reday
Fire Fighting
Pump house not
Reday

Fire Fighting
Pump house not
Reday

Transformer not
Received at site

Reactor not
Received at site
ytfuftftgvnmbkhbgvbybnmb
Progress Reports at 40
Status
Total
Sl. No. Task Name UOM
Qty. Completed Balance

I Structure Erection
A Tower & Beam erection

a 400 kV Tower & Beam


4TA (06 Nos.) - 15 Mtr. Nos. 6 6 0
4TB (06 Nos.) - 31 Mtr. Nos. 6 6 0
4TC (03 Nos.) - 31 Mtr. Nos. 3 3 0
4TD (06 Nos.) - 31 Mtr. Nos. 6 6 0
4G1 (06 Nos.) Nos. 6 6 0
4G2 (06 Nos.) Nos. 6 6 0
4G3 (06 Nos.) Nos. 6 6 0

b 230kv Tower & Beam


2CA (3Nos)-20.2Mtr. Nos. 3 3 0
2CB (4Nos)-20.2Mtr. Nos. 4 4 0
2CC (3Nos)-20.2Mtr. Nos. 3 3 0
2CD (2Nos)-20.2Mtr. Nos. 2 0 2
2CTA (2Nos)-20.2Mtr. Nos. 2 0 2
2CTB (3Nos)-20.2Mtr. Nos. 3 0 3
2CTG (4Nos)-20.2Mtr. Nos. 4 0 4
2CTH (3Nos)-20.2Mtr. Nos. 3 0 3
2B1(11Nos)-16Mtr Nos. 11 11
2BG1(8Nos)-16 Mtr Nos. 8 0 8
10 -10
B Equipment Structure Erection 0
a 400 kV Equipments 0
CB (12 Set) Set 12 12 0
CT (36 Nos.) Nos. 36 35 1
CVT (18 Nos.) Nos. 18 18 0
Isolator (32 Nos. 3 Ph.) Set 32 10 22
Surge Arrester (24 Nos.) Nos. 24 24 0
Bus Post Insulators Nos. 16 16 0
Wave Trap (08 Set) Set 8 8 0
146 123 23
b 230 kV Equipments 0
CB (8 Set) Set 8 8 0
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 8 121
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT Nos. 1 0 1
PT Nos. 1 0 1
d 33KV DP STRUCTURE (3 ph) Nos. 1 0 1
Marshaling Box Erection (CT,PT ,BMK 0
d
,ISO MB
400kV CT Junction box Nos. 12 12 0
400kV CVT Junction box Nos. 6 6 0
400kv BMK Nos. 8 3 5
400kv Isolator M.B Box Nos. 198 60 138
220kv CT Junction box Nos. 8 0 8
230kv CVT Junction box Nos. 6 0 6
220kv isolater M.B Box Nos. 66 0 66
304 81 223
II Outdoor Installation 0
A Equipment's Installation 0
a 400 kV Equipments 0
CB (012 Set) Set 12 0 12
11 CT (36 Nos.) Nos. 36 18 18
CVT (18 Nos.) Nos. 18 12 6
Isolator (32 Nos. 3 Ph.) Nos. 32 3 29
Surge Arrester (24 Nos.) Nos. 24 12 12
Bus Post Insulators Nos. 16 14 2
Wave Trap (08 Nos) Nos. 8 8 0
b 230 kV Equipments 146 67 79
CB (8 Set) Set 8 0 8
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 0 129
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT (03 Nos.) Nos. 3 0 3
PT (03 Nos.) Nos. 3 0 3
Surge Arrester (03 Nos.) Nos. 3 0 3
d LT Transformer 11 0 11
33 kV LT Transformer for Tertiary 1
Nos. 1 0
connection
22 kV LT Transformer for SEB 1
Nos. 1 0
Connection
e 500 kVA DG Set Nos. 1 1
III.a 400kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 8000 6200 1800
Riser 40mm dia MS rod Mtr 3000 2428 572
75x12mm GI Flat for Equipment & 125
Nos. 185 60
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 300
Mtr 700 400
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 66 0 66
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & M.B box Earthing
Cable Trench Angle welding (400kv) Nos. 1115 454 661
Auxiliary Earthmat Nos. 198 42 156
### 9584 4192
III.b 230kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 5500 5189 311
Riser 40mm dia MS rod Mtr 3280 2351 929
75x12mm GI Flat for Equipment & 234
Nos. 234 0
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 600
Mtr 600 0
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & Equipment Structure Earthing
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 76 0 76
Cable Trench Angle welding Nos. 565 188 377
Auxiliary Earthmat Nos. 80 0 80
### 7728 3119
B Stringing Work 0
i 400 kV Mtr ### 9888 5212
0
Main Bus-I (02 Spans) Mtr 1200 1200 0
Main Bus-II (02 Spans) Mtr 1200 1200 0
Jack Bus - Dia 01 (BR-Tie-Iine 01) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 02 (BR-Tie-Iine 02)
Mtr 1872 1872 0
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-3) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-4) 0
Mtr 1872 1872
(2Spans)
Equipment's Jumpering Mtr 5212 1815 3397
15100 11703 3397
ii 220KV Mtr 8550 0 8550
Main Bus-I Mtr 0
Main Bus-II Mtr 0
Transfer Bus Mtr 0
230kv ICT Bay Mtr 630 630 0
230kv Line Bay Mtr 0
230kv Bus Coupler Bay Mtr 0
230kv TBC Bay Mtr 0
Equipment Interconnection
C including Clamps & Connectors, IPS 0
Al. Tube & Jumpering
ASDFGHJ 0
Dia 01 (BR-I-Tie-Line I) Lot 1 0 1
Dia 02 (BR-II-Tie-Line II) Lot 1 0 1
Dia 03 (ICT-I-Tie-Line III) Lot 1 0 1
Dia 04 (ICT-II-Tie-Line IV) Lot 1 0 1
230 kV 0
230kv ICT Bay Lot 1 0 1
230kv Line Bay Lot 1 0 1
230kv Bus Coupler Bay Lot 1 0 1
230kv TBC Bay Lot 1 0 1
72.5 kV & 22 kV 0
For 33 kV system through Tertiary of 1
Lot 1 0
ICT
For 22 kV SEB supply connection Lot 1 0 1
D Cabling Works 0
Control Cable kM 70 0 70
Power cable kM 30 0 30
FO Cable kM 5.5 0 5.5
0
Cable Termination Lot 1 0 1
0
0
E Outdoor Illumination System 0
Fitting of lighting fixtures Lot 1 0 1
Outdoor Lighting Panels Lot 1 0 1
Cable Connections Lot 1 0 1
III Indoor Installation 0
SAS Installation Lot 1 0 1
CRP Installation Lot 1 0 1
PLCC Installation Lot 1 0 1
FOTE Lot 1 0 1
Airconditioning System Lot 1 0 1
Illumination System Lot 1 0 1
AC DB / DC DB / LDB Installation Lot 1 0 1
Battery & Charger Installation Lot 1 0 1
Lighting Panel Lot 1 0 1
VCB Panel Nos. 1 0 1
IV Fire Fighting System 0
A Installation of Fire fighting Pumps 0
Horizontal centrifugal type Motor driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith motor and other accessories
Horizontal centrifugal type Engine driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith engine and other accessories.
Jockey pump motor driven of capacity
10.8 M3/hr, 80 MWC alongwith motor and Nos. 2 0 2
other accessories.
B Erection of Control Panels 0
Local Control Panel for Motor Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Diesel Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Jockey Pump Nos. 1 0 1
Annunciation Panel for Pump House Nos. 1 0 1
Annunciation Panel for Control Room Nos. 1 0 1
DC Distribution Board Nos. 1 0 1
AC Distribution Board Nos. 1 0 1
C Installation of Hydrant System 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation of Emulsifier System Nos. 2 0 2
0
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation of Emulsifier System Nos. 2 0 2
0
4 Fire Detection and Alarm System 0
At Control Room Lot 1 0 1
At Kiosk Lot 1 0 1
At FFPH Lot 1 0 1
V 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
VII Pre-commissioning *** 0
0
Outdoor Equipment's Testing 0
Equipment's Testing *** 0
Indoor Equipment's Testing 0
Control, Relay & Protection Panel Testing 0
***
& Relay Setting
SAS Configuration 0
PLCC & FOTE Testing (Readiness of 0
Transmission Line)
VII System commissioning completed 0
ess Reports at 400/230kv Karur Substation

WEEK-2 6/4/2023 6/5/2023 6/6/2023 6/7/2023 6/8/2023

4 2 1 1
5 3 1 1
Date:16/05/2023

6/9/2023 6/10/2023
Remarks

Completed

Some 230kv
Tower & Beam
structure
Materials not
received at site

Some equipment
structure
Materials not
received at site

230kv Equipment
structure
Materials not
received at site
230kv Equipment
structure
Materials not
received at site

72.5 kv
Equipment
structure
Materials not
received at site
started 23/5/2023
started 27/5/2023

Completed

works in progress
Lighting Fixture
not received at
site

Control room
building not reday
& CRP panel not
received at site

Fire Fighting
Pump house not
Reday
Fire Fighting
Pump house not
Reday

Fire Fighting
Pump house not
Reday

Transformer not
Received at site

Reactor not
Received at site
ytfuftftgvnmbkhbgvbybnmb
Progress Reports at 40
Status
Total
Sl. No. Task Name UOM
Qty. Completed Balance

I Structure Erection
A Tower & Beam erection

a 400 kV Tower & Beam


4TA (06 Nos.) - 15 Mtr. Nos. 6 6 0
4TB (06 Nos.) - 31 Mtr. Nos. 6 6 0
4TC (03 Nos.) - 31 Mtr. Nos. 3 3 0
4TD (06 Nos.) - 31 Mtr. Nos. 6 6 0
4G1 (06 Nos.) Nos. 6 6 0
4G2 (06 Nos.) Nos. 6 6 0
4G3 (06 Nos.) Nos. 6 6 0

b 230kv Tower & Beam


2CA (3Nos)-20.2Mtr. Nos. 3 3 0
2CB (4Nos)-20.2Mtr. Nos. 4 4 0
2CC (3Nos)-20.2Mtr. Nos. 3 3 0
2CD (2Nos)-20.2Mtr. Nos. 2 0 2
2CTA (2Nos)-20.2Mtr. Nos. 2 0 2
2CTB (3Nos)-20.2Mtr. Nos. 3 0 3
2CTG (4Nos)-20.2Mtr. Nos. 4 0 4
2CTH (3Nos)-20.2Mtr. Nos. 3 0 3
2B1(11Nos)-16Mtr Nos. 11 11
2BG1(8Nos)-16 Mtr Nos. 8 0 8
10 -10
B Equipment Structure Erection 0
a 400 kV Equipments 0
CB (12 Set) Set 12 12 0
CT (36 Nos.) Nos. 36 35 1
CVT (18 Nos.) Nos. 18 18 0
Isolator (32 Nos. 3 Ph.) Set 32 10 22
Surge Arrester (24 Nos.) Nos. 24 24 0
Bus Post Insulators Nos. 16 16 0
Wave Trap (08 Set) Set 8 8 0
146 123 23
b 230 kV Equipments 0
CB (8 Set) Set 8 8 0
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 8 121
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT Nos. 1 0 1
PT Nos. 1 0 1
d 33KV DP STRUCTURE (3 ph) Nos. 1 0 1
Marshaling Box Erection (CT,PT ,BMK 0
d
,ISO MB
400kV CT Junction box Nos. 12 12 0
400kV CVT Junction box Nos. 6 6 0
400kv BMK Nos. 8 3 5
400kv Isolator M.B Box Nos. 198 60 138
220kv CT Junction box Nos. 8 0 8
230kv CVT Junction box Nos. 6 0 6
220kv isolater M.B Box Nos. 66 0 66
304 81 223
II Outdoor Installation 0
A Equipment's Installation 0
a 400 kV Equipments 0
CB (012 Set) Set 12 0 12
11 CT (36 Nos.) Nos. 36 18 18
CVT (18 Nos.) Nos. 18 12 6
Isolator (32 Nos. 3 Ph.) Nos. 32 3 29
Surge Arrester (24 Nos.) Nos. 24 12 12
Bus Post Insulators Nos. 16 14 2
Wave Trap (08 Nos) Nos. 8 8 0
b 230 kV Equipments 146 67 79
CB (8 Set) Set 8 0 8
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 0 129
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT (03 Nos.) Nos. 3 0 3
PT (03 Nos.) Nos. 3 0 3
Surge Arrester (03 Nos.) Nos. 3 0 3
d LT Transformer 11 0 11
33 kV LT Transformer for Tertiary 1
Nos. 1 0
connection
22 kV LT Transformer for SEB 1
Nos. 1 0
Connection
e 500 kVA DG Set Nos. 1 1
III.a 400kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 8000 6200 1800
Riser 40mm dia MS rod Mtr 3000 2428 572
75x12mm GI Flat for Equipment & 125
Nos. 185 60
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 300
Mtr 700 400
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 66 0 66
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & M.B box Earthing
Cable Trench Angle welding (400kv) Nos. 1115 454 661
Auxiliary Earthmat Nos. 198 42 156
### 9584 4192
III.b 230kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 5500 5189 311
Riser 40mm dia MS rod Mtr 3280 2351 929
75x12mm GI Flat for Equipment & 234
Nos. 234 0
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 600
Mtr 600 0
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & Equipment Structure Earthing
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 76 0 76
Cable Trench Angle welding Nos. 565 188 377
Auxiliary Earthmat Nos. 80 0 80
### 7728 3119
B Stringing Work 0
i 400 kV Mtr ### 9888 5212
0
Main Bus-I (02 Spans) Mtr 1200 1200 0
Main Bus-II (02 Spans) Mtr 1200 1200 0
Jack Bus - Dia 01 (BR-Tie-Iine 01) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 02 (BR-Tie-Iine 02)
Mtr 1872 1872 0
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-3) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-4) 0
Mtr 1872 1872
(2Spans)
Equipment's Jumpering Mtr 5212 1815 3397
15100 11703 3397
ii 220KV Mtr 8550 0 8550
Main Bus-I Mtr 0
Main Bus-II Mtr 0
Transfer Bus Mtr 0
230kv ICT Bay Mtr 630 630 0
230kv Line Bay Mtr 0
230kv Bus Coupler Bay Mtr 0
230kv TBC Bay Mtr 0
Equipment Interconnection
C including Clamps & Connectors, IPS 0
Al. Tube & Jumpering
ASDFGHJ 0
Dia 01 (BR-I-Tie-Line I) Lot 1 0 1
Dia 02 (BR-II-Tie-Line II) Lot 1 0 1
Dia 03 (ICT-I-Tie-Line III) Lot 1 0 1
Dia 04 (ICT-II-Tie-Line IV) Lot 1 0 1
230 kV 0
230kv ICT Bay Lot 1 0 1
230kv Line Bay Lot 1 0 1
230kv Bus Coupler Bay Lot 1 0 1
230kv TBC Bay Lot 1 0 1
72.5 kV & 22 kV 0
For 33 kV system through Tertiary of 1
Lot 1 0
ICT
For 22 kV SEB supply connection Lot 1 0 1
D Cabling Works 0
Control Cable kM 70 0 70
Power cable kM 30 0 30
FO Cable kM 5.5 0 5.5
0
Cable Termination Lot 1 0 1
0
0
E Outdoor Illumination System 0
Fitting of lighting fixtures Lot 1 0 1
Outdoor Lighting Panels Lot 1 0 1
Cable Connections Lot 1 0 1
III Indoor Installation 0
SAS Installation Lot 1 0 1
CRP Installation Lot 1 0 1
PLCC Installation Lot 1 0 1
FOTE Lot 1 0 1
Airconditioning System Lot 1 0 1
Illumination System Lot 1 0 1
AC DB / DC DB / LDB Installation Lot 1 0 1
Battery & Charger Installation Lot 1 0 1
Lighting Panel Lot 1 0 1
VCB Panel Nos. 1 0 1
IV Fire Fighting System 0
A Installation of Fire fighting Pumps 0
Horizontal centrifugal type Motor driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith motor and other accessories
Horizontal centrifugal type Engine driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith engine and other accessories.
Jockey pump motor driven of capacity
10.8 M3/hr, 80 MWC alongwith motor and Nos. 2 0 2
other accessories.
B Erection of Control Panels 0
Local Control Panel for Motor Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Diesel Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Jockey Pump Nos. 1 0 1
Annunciation Panel for Pump House Nos. 1 0 1
Annunciation Panel for Control Room Nos. 1 0 1
DC Distribution Board Nos. 1 0 1
AC Distribution Board Nos. 1 0 1
C Installation of Hydrant System 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation of Emulsifier System Nos. 2 0 2
0
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation of Emulsifier System Nos. 2 0 2
0
4 Fire Detection and Alarm System 0
At Control Room Lot 1 0 1
At Kiosk Lot 1 0 1
At FFPH Lot 1 0 1
V 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
VII Pre-commissioning *** 0
0
Outdoor Equipment's Testing 0
Equipment's Testing *** 0
Indoor Equipment's Testing 0
Control, Relay & Protection Panel Testing 0
***
& Relay Setting
SAS Configuration 0
PLCC & FOTE Testing (Readiness of 0
Transmission Line)
VII System commissioning completed 0
ess Reports at 400/230kv Karur Substation

WEEK-3 6/11/2023 6/12/2023 6/13/2023 6/14/2023 6/15/2023

4 2 1 1
5 3 1 1
Date:16/05/2023

6/16/2023 6/17/2023
Remarks

Completed

Some 230kv
Tower & Beam
structure
Materials not
received at site

Some equipment
structure
Materials not
received at site

230kv Equipment
structure
Materials not
received at site
230kv Equipment
structure
Materials not
received at site

72.5 kv
Equipment
structure
Materials not
received at site
started 23/5/2023
started 27/5/2023

Completed

works in progress
Lighting Fixture
not received at
site

Control room
building not reday
& CRP panel not
received at site

Fire Fighting
Pump house not
Reday
Fire Fighting
Pump house not
Reday

Fire Fighting
Pump house not
Reday

Transformer not
Received at site

Reactor not
Received at site
ytfuftftgvnmbkhbgvbybnmb
Progress Reports at 40
Status
Total
Sl. No. Task Name UOM
Qty. Completed Balance

I Structure Erection
A Tower & Beam erection

a 400 kV Tower & Beam


4TA (06 Nos.) - 15 Mtr. Nos. 6 6 0
4TB (06 Nos.) - 31 Mtr. Nos. 6 6 0
4TC (03 Nos.) - 31 Mtr. Nos. 3 3 0
4TD (06 Nos.) - 31 Mtr. Nos. 6 6 0
4G1 (06 Nos.) Nos. 6 6 0
4G2 (06 Nos.) Nos. 6 6 0
4G3 (06 Nos.) Nos. 6 6 0

b 230kv Tower & Beam


2CA (3Nos)-20.2Mtr. Nos. 3 3 0
2CB (4Nos)-20.2Mtr. Nos. 4 4 0
2CC (3Nos)-20.2Mtr. Nos. 3 3 0
2CD (2Nos)-20.2Mtr. Nos. 2 0 2
2CTA (2Nos)-20.2Mtr. Nos. 2 0 2
2CTB (3Nos)-20.2Mtr. Nos. 3 0 3
2CTG (4Nos)-20.2Mtr. Nos. 4 0 4
2CTH (3Nos)-20.2Mtr. Nos. 3 0 3
2B1(11Nos)-16Mtr Nos. 11 11
2BG1(8Nos)-16 Mtr Nos. 8 0 8
10 -10
B Equipment Structure Erection 0
a 400 kV Equipments 0
CB (12 Set) Set 12 12 0
CT (36 Nos.) Nos. 36 35 1
CVT (18 Nos.) Nos. 18 18 0
Isolator (32 Nos. 3 Ph.) Set 32 10 22
Surge Arrester (24 Nos.) Nos. 24 24 0
Bus Post Insulators Nos. 16 16 0
Wave Trap (08 Set) Set 8 8 0
146 123 23
b 230 kV Equipments 0
CB (8 Set) Set 8 8 0
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 8 121
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT Nos. 1 0 1
PT Nos. 1 0 1
d 33KV DP STRUCTURE (3 ph) Nos. 1 0 1
Marshaling Box Erection (CT,PT ,BMK 0
d
,ISO MB
400kV CT Junction box Nos. 12 12 0
400kV CVT Junction box Nos. 6 6 0
400kv BMK Nos. 8 3 5
400kv Isolator M.B Box Nos. 198 60 138
220kv CT Junction box Nos. 8 0 8
230kv CVT Junction box Nos. 6 0 6
220kv isolater M.B Box Nos. 66 0 66
304 81 223
II Outdoor Installation 0
A Equipment's Installation 0
a 400 kV Equipments 0
CB (012 Set) Set 12 0 12
11 CT (36 Nos.) Nos. 36 18 18
CVT (18 Nos.) Nos. 18 12 6
Isolator (32 Nos. 3 Ph.) Nos. 32 3 29
Surge Arrester (24 Nos.) Nos. 24 12 12
Bus Post Insulators Nos. 16 14 2
Wave Trap (08 Nos) Nos. 8 8 0
b 230 kV Equipments 146 67 79
CB (8 Set) Set 8 0 8
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 0 129
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT (03 Nos.) Nos. 3 0 3
PT (03 Nos.) Nos. 3 0 3
Surge Arrester (03 Nos.) Nos. 3 0 3
d LT Transformer 11 0 11
33 kV LT Transformer for Tertiary 1
Nos. 1 0
connection
22 kV LT Transformer for SEB 1
Nos. 1 0
Connection
e 500 kVA DG Set Nos. 1 1
III.a 400kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 8000 6200 1800
Riser 40mm dia MS rod Mtr 3000 2428 572
75x12mm GI Flat for Equipment & 125
Nos. 185 60
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 300
Mtr 700 400
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 66 0 66
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & M.B box Earthing
Cable Trench Angle welding (400kv) Nos. 1115 454 661
Auxiliary Earthmat Nos. 198 42 156
### 9584 4192
III.b 230kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 5500 5189 311
Riser 40mm dia MS rod Mtr 3280 2351 929
75x12mm GI Flat for Equipment & 234
Nos. 234 0
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 600
Mtr 600 0
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & Equipment Structure Earthing
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 76 0 76
Cable Trench Angle welding Nos. 565 188 377
Auxiliary Earthmat Nos. 80 0 80
### 7728 3119
B Stringing Work 0
i 400 kV Mtr ### 9888 5212
0
Main Bus-I (02 Spans) Mtr 1200 1200 0
Main Bus-II (02 Spans) Mtr 1200 1200 0
Jack Bus - Dia 01 (BR-Tie-Iine 01) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 02 (BR-Tie-Iine 02)
Mtr 1872 1872 0
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-3) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-4) 0
Mtr 1872 1872
(2Spans)
Equipment's Jumpering Mtr 5212 1815 3397
15100 11703 3397
ii 220KV Mtr 8550 0 8550
Main Bus-I Mtr 0
Main Bus-II Mtr 0
Transfer Bus Mtr 0
230kv ICT Bay Mtr 630 630 0
230kv Line Bay Mtr 0
230kv Bus Coupler Bay Mtr 0
230kv TBC Bay Mtr 0
Equipment Interconnection
C including Clamps & Connectors, IPS 0
Al. Tube & Jumpering
ASDFGHJ 0
Dia 01 (BR-I-Tie-Line I) Lot 1 0 1
Dia 02 (BR-II-Tie-Line II) Lot 1 0 1
Dia 03 (ICT-I-Tie-Line III) Lot 1 0 1
Dia 04 (ICT-II-Tie-Line IV) Lot 1 0 1
230 kV 0
230kv ICT Bay Lot 1 0 1
230kv Line Bay Lot 1 0 1
230kv Bus Coupler Bay Lot 1 0 1
230kv TBC Bay Lot 1 0 1
72.5 kV & 22 kV 0
For 33 kV system through Tertiary of 1
Lot 1 0
ICT
For 22 kV SEB supply connection Lot 1 0 1
D Cabling Works 0
Control Cable kM 70 0 70
Power cable kM 30 0 30
FO Cable kM 5.5 0 5.5
0
Cable Termination Lot 1 0 1
0
0
E Outdoor Illumination System 0
Fitting of lighting fixtures Lot 1 0 1
Outdoor Lighting Panels Lot 1 0 1
Cable Connections Lot 1 0 1
III Indoor Installation 0
SAS Installation Lot 1 0 1
CRP Installation Lot 1 0 1
PLCC Installation Lot 1 0 1
FOTE Lot 1 0 1
Airconditioning System Lot 1 0 1
Illumination System Lot 1 0 1
AC DB / DC DB / LDB Installation Lot 1 0 1
Battery & Charger Installation Lot 1 0 1
Lighting Panel Lot 1 0 1
VCB Panel Nos. 1 0 1
IV Fire Fighting System 0
A Installation of Fire fighting Pumps 0
Horizontal centrifugal type Motor driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith motor and other accessories
Horizontal centrifugal type Engine driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith engine and other accessories.
Jockey pump motor driven of capacity
10.8 M3/hr, 80 MWC alongwith motor and Nos. 2 0 2
other accessories.
B Erection of Control Panels 0
Local Control Panel for Motor Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Diesel Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Jockey Pump Nos. 1 0 1
Annunciation Panel for Pump House Nos. 1 0 1
Annunciation Panel for Control Room Nos. 1 0 1
DC Distribution Board Nos. 1 0 1
AC Distribution Board Nos. 1 0 1
C Installation of Hydrant System 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation of Emulsifier System Nos. 2 0 2
0
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation of Emulsifier System Nos. 2 0 2
0
4 Fire Detection and Alarm System 0
At Control Room Lot 1 0 1
At Kiosk Lot 1 0 1
At FFPH Lot 1 0 1
V 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
VII Pre-commissioning *** 0
0
Outdoor Equipment's Testing 0
Equipment's Testing *** 0
Indoor Equipment's Testing 0
Control, Relay & Protection Panel Testing 0
***
& Relay Setting
SAS Configuration 0
PLCC & FOTE Testing (Readiness of 0
Transmission Line)
VII System commissioning completed 0
ess Reports at 400/230kv Karur Substation

WEEK-4 6/18/2023 6/19/2023 6/20/2023 6/21/2023 6/22/2023

4 2 1 1
5 3 1 1
Date:16/05/2023

6/23/2023 6/24/2023
Remarks

Completed

Some 230kv
Tower & Beam
structure
Materials not
received at site

Some equipment
structure
Materials not
received at site

230kv Equipment
structure
Materials not
received at site
230kv Equipment
structure
Materials not
received at site

72.5 kv
Equipment
structure
Materials not
received at site
started 23/5/2023
started 27/5/2023

Completed

works in progress
Lighting Fixture
not received at
site

Control room
building not reday
& CRP panel not
received at site

Fire Fighting
Pump house not
Reday
Fire Fighting
Pump house not
Reday

Fire Fighting
Pump house not
Reday

Transformer not
Received at site

Reactor not
Received at site
ytfuftftgvnmbkhbgvbybnmb
Progress Reports at 400/230
Status
Total
Sl. No. Task Name UOM
Qty. Completed Balance

I Structure Erection
A Tower & Beam erection

a 400 kV Tower & Beam


4TA (06 Nos.) - 15 Mtr. Nos. 6 6 0
4TB (06 Nos.) - 31 Mtr. Nos. 6 6 0
4TC (03 Nos.) - 31 Mtr. Nos. 3 3 0
4TD (06 Nos.) - 31 Mtr. Nos. 6 6 0
4G1 (06 Nos.) Nos. 6 6 0
4G2 (06 Nos.) Nos. 6 6 0
4G3 (06 Nos.) Nos. 6 6 0

b 230kv Tower & Beam


2CA (3Nos)-20.2Mtr. Nos. 3 3 0
2CB (4Nos)-20.2Mtr. Nos. 4 4 0
2CC (3Nos)-20.2Mtr. Nos. 3 3 0
2CD (2Nos)-20.2Mtr. Nos. 2 0 2
2CTA (2Nos)-20.2Mtr. Nos. 2 0 2
2CTB (3Nos)-20.2Mtr. Nos. 3 0 3
2CTG (4Nos)-20.2Mtr. Nos. 4 0 4
2CTH (3Nos)-20.2Mtr. Nos. 3 0 3
2B1(11Nos)-16Mtr Nos. 11 11
2BG1(8Nos)-16 Mtr Nos. 8 0 8
10 -10
B Equipment Structure Erection 0
a 400 kV Equipments 0
CB (12 Set) Set 12 12 0
CT (36 Nos.) Nos. 36 35 1
CVT (18 Nos.) Nos. 18 18 0
Isolator (32 Nos. 3 Ph.) Set 32 10 22
Surge Arrester (24 Nos.) Nos. 24 24 0
Bus Post Insulators Nos. 16 16 0
Wave Trap (08 Set) Set 8 8 0
146 123 23
b 230 kV Equipments 0
CB (8 Set) Set 8 8 0
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 8 121
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT Nos. 1 0 1
PT Nos. 1 0 1
d 33KV DP STRUCTURE (3 ph) Nos. 1 0 1
Marshaling Box Erection (CT,PT ,BMK 0
d
,ISO MB
400kV CT Junction box Nos. 12 12 0
400kV CVT Junction box Nos. 6 6 0
400kv BMK Nos. 8 3 5
400kv Isolator M.B Box Nos. 198 60 138
220kv CT Junction box Nos. 8 0 8
230kv CVT Junction box Nos. 6 0 6
220kv isolater M.B Box Nos. 66 0 66
304 81 223
II Outdoor Installation 0
A Equipment's Installation 0
a 400 kV Equipments 0
CB (012 Set) Set 12 0 12
11 CT (36 Nos.) Nos. 36 18 18
CVT (18 Nos.) Nos. 18 12 6
Isolator (32 Nos. 3 Ph.) Nos. 32 3 29
Surge Arrester (24 Nos.) Nos. 24 12 12
Bus Post Insulators Nos. 16 14 2
Wave Trap (08 Nos) Nos. 8 8 0
b 230 kV Equipments 146 67 79
CB (8 Set) Set 8 0 8
CT (24 Nos.) Nos. 24 0 24
CVT (18 Nos.) Nos. 18 0 18
Isolator (29 set. 3 Ph.) Nos. 29 0 29
Surge Arrester (18 Nos.) Nos. 18 0 18
Bus Post Insulators Nos. 24 0 24
Wave Trap (08 Nos) Nos. 8 0 8
c LT Equipments (72.5 kV) 129 0 129
CB (01 No.) Nos. 1 0 1
Isolator Nos. 1 0 1
CT (03 Nos.) Nos. 3 0 3
PT (03 Nos.) Nos. 3 0 3
Surge Arrester (03 Nos.) Nos. 3 0 3
d LT Transformer 11 0 11
33 kV LT Transformer for Tertiary 1
Nos. 1 0
connection
22 kV LT Transformer for SEB 1
Nos. 1 0
Connection
e 500 kVA DG Set Nos. 1 1
III.a 400kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 8000 6200 1800
Riser 40mm dia MS rod Mtr 3000 2428 572
75x12mm GI Flat for Equipment & 125
Nos. 185 60
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 300
Mtr 700 400
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 66 0 66
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & M.B box Earthing
Cable Trench Angle welding (400kv) Nos. 1115 454 661
Auxiliary Earthmat Nos. 198 42 156
### 9584 4192
III.b 230kv Earthing Works 0
Main Grid 40mm dia MS rod Mtr 5500 5189 311
Riser 40mm dia MS rod Mtr 3280 2351 929
75x12mm GI Flat for Equipment & 234
Nos. 234 0
Structure Earthing
50X6 mm MS Flat for Earthing on Cable 600
Mtr 600 0
Trenc
Pipe Electrod -40mm dia 3Mtr Long G.S 12
Nos. 12 0
Flat
50X6 mm GI Flat for Earthing on Cable 500
Mtr 500 0
Trenc & Equipment Structure Earthing
40mm dia 3 Mtr Long M.S Rod Electrod Nos. 76 0 76
Cable Trench Angle welding Nos. 565 188 377
Auxiliary Earthmat Nos. 80 0 80
### 7728 3119
B Stringing Work 0
i 400 kV Mtr ### 9888 5212
0
Main Bus-I (02 Spans) Mtr 1200 1200 0
Main Bus-II (02 Spans) Mtr 1200 1200 0
Jack Bus - Dia 01 (BR-Tie-Iine 01) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 02 (BR-Tie-Iine 02)
Mtr 1872 1872 0
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-3) 0
Mtr 1872 1872
(2Spans)
Jack Bus - Dia 03 (ICT-1-Tie-Line-4) 0
Mtr 1872 1872
(2Spans)
Equipment's Jumpering Mtr 5212 1815 3397
15100 11703 3397
ii 220KV Mtr 8550 0 8550
Main Bus-I Mtr 0
Main Bus-II Mtr 0
Transfer Bus Mtr 0
230kv ICT Bay Mtr 630 630 0
230kv Line Bay Mtr 0
230kv Bus Coupler Bay Mtr 0
230kv TBC Bay Mtr 0
Equipment Interconnection
C including Clamps & Connectors, IPS 0
Al. Tube & Jumpering
ASDFGHJ 0
Dia 01 (BR-I-Tie-Line I) Lot 1 0 1
Dia 02 (BR-II-Tie-Line II) Lot 1 0 1
Dia 03 (ICT-I-Tie-Line III) Lot 1 0 1
Dia 04 (ICT-II-Tie-Line IV) Lot 1 0 1
230 kV 0
230kv ICT Bay Lot 1 0 1
230kv Line Bay Lot 1 0 1
230kv Bus Coupler Bay Lot 1 0 1
230kv TBC Bay Lot 1 0 1
72.5 kV & 22 kV 0
For 33 kV system through Tertiary of 1
Lot 1 0
ICT
For 22 kV SEB supply connection Lot 1 0 1
D Cabling Works 0
Control Cable kM 70 0 70
Power cable kM 30 0 30
FO Cable kM 5.5 0 5.5
0
Cable Termination Lot 1 0 1
0
0
E Outdoor Illumination System 0
Fitting of lighting fixtures Lot 1 0 1
Outdoor Lighting Panels Lot 1 0 1
Cable Connections Lot 1 0 1
III Indoor Installation 0
SAS Installation Lot 1 0 1
CRP Installation Lot 1 0 1
PLCC Installation Lot 1 0 1
FOTE Lot 1 0 1
Airconditioning System Lot 1 0 1
Illumination System Lot 1 0 1
AC DB / DC DB / LDB Installation Lot 1 0 1
Battery & Charger Installation Lot 1 0 1
Lighting Panel Lot 1 0 1
VCB Panel Nos. 1 0 1
IV Fire Fighting System 0
A Installation of Fire fighting Pumps 0
Horizontal centrifugal type Motor driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith motor and other accessories
Horizontal centrifugal type Engine driven
pump of capacity 410 M 3 /hr, 70 MWC Nos. 1 0 1
alongwith engine and other accessories.
Jockey pump motor driven of capacity
10.8 M3/hr, 80 MWC alongwith motor and Nos. 2 0 2
other accessories.
B Erection of Control Panels 0
Local Control Panel for Motor Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Diesel Engine 1
Nos. 1 0
Driven Fire Water Pump
Local Control Panel for Jockey Pump Nos. 1 0 1
Annunciation Panel for Pump House Nos. 1 0 1
Annunciation Panel for Control Room Nos. 1 0 1
DC Distribution Board Nos. 1 0 1
AC Distribution Board Nos. 1 0 1
C Installation of Hydrant System 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation of Emulsifier System Nos. 2 0 2
0
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation of Emulsifier System Nos. 2 0 2
0
4 Fire Detection and Alarm System 0
At Control Room Lot 1 0 1
At Kiosk Lot 1 0 1
At FFPH Lot 1 0 1
V 0
1 500 MVA 400/230 kV ICT (02 Nos.) 0
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
125 MVAr 400 kV Bus Reactor (3 0
2
Ph.)
Installation Nos. 2 0 2
Vacuum Nos. 2 0 2
Oil fillteration Nos. 2 0 2
Testing & Commissioning Nos. 2 0 2
VII Pre-commissioning *** 0
0
Outdoor Equipment's Testing 0
Equipment's Testing *** 0
Indoor Equipment's Testing 0
Control, Relay & Protection Panel Testing 0
***
& Relay Setting
SAS Configuration 0
PLCC & FOTE Testing (Readiness of 0
Transmission Line)
VII System commissioning completed 0
eports at 400/230kv Karur Substation

WEEK-5 6/25/2023 6/26/2023 6/27/2023 6/28/2023 6/29/2023

4 2 1 1
5 3 1 1
Date:16/05/2023

6/30/2023
Remarks

Completed

Some 230kv
Tower & Beam
structure
Materials not
received at site

Some equipment
structure
Materials not
received at site

230kv Equipment
structure
Materials not
received at site
230kv Equipment
structure
Materials not
received at site

72.5 kv
Equipment
structure
Materials not
received at site
started 23/5/2023
started 27/5/2023

Completed

works in progress
Lighting Fixture
not received at
site

Control room
building not reday
& CRP panel not
received at site

Fire Fighting
Pump house not
Reday
Fire Fighting
Pump house not
Reday

Fire Fighting
Pump house not
Reday

Transformer not
Received at site

Reactor not
Received at site

You might also like