0% found this document useful (0 votes)
3 views10 pages

Exercise MBA

The document contains various data including SSLC marks for students, grain center statistics, employee pay slips, assembly line hours for a company, and electricity bill calculations. It includes formulas for calculating totals, averages, grades, and deductions. Additionally, it presents performance percentages and financial summaries for different categories.

Uploaded by

nandithagowda112
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views10 pages

Exercise MBA

The document contains various data including SSLC marks for students, grain center statistics, employee pay slips, assembly line hours for a company, and electricity bill calculations. It includes formulas for calculating totals, averages, grades, and deductions. Additionally, it presents performance percentages and financial summaries for different categories.

Uploaded by

nandithagowda112
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

S S L C MARKS CARD

NAMES KAN HIND ENG MAT SCI SOC TOTAL AVG MIN
Ganesh 90 91 92 93 94 95 555 92.5 90
GOURAV 80 81 82 83 84 85 495 82.5 80
NAMOD 70 71 72 73 74 75 435 72.5 70
NAMAHA 60 61 62 63 64 65 375 62.5 60
PRASANA 50 51 52 53 54 55 315 52.5 50
LINGA 71 81 91 61 71 41 416 69.3 41
JAGAMA 99 98 97 96 95 94 579 96.5 94
SHIVA 88 87 86 85 84 83 513 85.5 83
Govind 77 76 75 74 73 72 447 74.5 72

Formulas used in SSLC Marks Card


1) Total =SUM(B3:G3)
2) Average =AVERAGE(B3:G3)
3) Minimum =MIN(B3:G3)
4) Maximum =MAX(B3:G3)
5) Result =IF(OR(B3<35,C3<35,D3<35,E3<35,F3<35,G3<35),"Fail","Pass")
6) Rank Avg =IF(J3<35,"fail",IF(I3<50,"third cls",IF(I3<60,"second cls",IF(I3<75,"First cls",IF(3<85,"Dist",IF(I3<90,"Thi
7) Rank Total =IF(J3<35,"fail",IF(H3<300,"third cls",IF(H3<360,"Second Cls",IF(H3<450,"First Cls",IF(H3<510,"Dist",IF(

condition to test if true, true statement displayed


condition to test if false, false statement displayed

if syntax
=IF(condition to test, "true statement","false statement")

Example
3 > 4 3 4 No =IF(C22>D22,"yes","No")
4 > 3 4 3 yes =IF(C23>D23,"yes","No")

=IF(A1=0,”Zero”,IF(A1>0,”Positive”,”Negative”))
-9 Negative
MAX RESULT RANK AVGRANK TOT
95 Pass Second RkSECOND RANK
85 Pass Dist DIST
75 Pass First Cls FIRST
65 Pass First Cls FIRST
55 Pass Second ClSECOND
91 Pass First Cls FIRST
99 Pass First RK FIRST RANK
88 Pass Third Rk THIRD RANK
77 Pass First Cls FIRST

",IF(3<85,"Dist",IF(I3<90,"Third Rk",IF(I3<95,Second Rk,IF(I3<=100,"first Rk"))))))))


rst Cls",IF(H3<510,"Dist",IF(H3<540,"Third Rk",IF(H3<570,"Second Rk",IF(H3<=600,"First Rk"))))))))
Kadalinvana Grain Center
Grain item Units (kg) Price Cost Commision Grade
Jola 420 8 3360 67.2 B
Barjra 150 9 1350 0 C
Ragi 920 8 7360 368 A
Maize 340 9 3060 61.2 B
Barley 100 15 1500 0 C
Wheat 750 14 10500 525 A
Pulses 960 13 12480 624 A
460 12 5520 276 A
280 10 2800 56 B
350 6 2100 42 B

680 5 3400 68 B
Total

Total Cost 53430


Maximum Cost 12480
Minimum Cost 1350
Average cost 4857.27
Average Price 9.91
Count of A 4 4
Count of B 5 5
Count of C 2 2
Count of units < 200 2 2
Count of price <> 2 11 11
Total commission of A 1793 1793
Total commission of B 294.4 294.4
Total commission of C 0 0
Total Cost of units (kg) > 200 50580 50580
No of Blank cells 4 4
Non- empty cells 62 62
Numeric cells 44 44
Statistical Function Category

1) cost = units x price =B3*C3


2) commission =if(cost<2000,cost x 0%,if(cost<5000,cost x 2
3) grade =if(cost <2000,"C",if(cost<=5000,"B","A"))

4) Total cost =sum(D3:D13)


5) Maximum cost =max(D3:D13)
6) Minimum Cost =min(D3:D13)
7) Average cost =average(D3:D13)
8) Count of A =countif(F3:F13,"A")
9) Count of B =countif(F3:F13,"B")
10) Count of C =countif(F3:F13,"C")
11) Count of units < 200 =counif(B3:B13,"<200")
12) Count of Price <> 2 =counif(C3:C13,"<>2")
13) Total commission of A =sumif(F3:F13,"A",E3:E13)
14) Total commission of B =sumif(F3:F13,"B",E3:E13)
15) Total commission of C =sumif(F3:F13,"C",E3:E13)
16) Count of blank cells =countblank(A3:F13)
17) Count of non empty cells =counta(A3:F13)
18) Count of numeric cells =count(A3:F13)
cost<5000,cost x 2%,cost x 5%))
=5000,"B","A"))
PAY SLIP
EMP No BASIC DA HRA GROSS KGID GPF LIC PT GIS
E-01 8000 4800.00 560.00 13360.00 1000 1000 800 150 200
E-02 8276 4965.60 579.32 13820.92 1100 1200 900 160 200
E-03 8550 5130.00 598.50 14278.50 1150 1000 900 150 200
E-04 8825 5295.00 617.75 14737.75 1200 1200 1000 150 200
E-05 9100 5460.00 637.00 15197.00 1300 1400 1000 180 200
E-06 9375 5625.00 656.25 15656.25 1400 1300 1200 180 200
E-07 9650 5790.00 675.50 16115.50 1500 1500 1200 180 200
E-08 9925 5955.00 694.75 16574.75 1600 1600 1050 180 200
E-09 10200 6120.00 714.00 17034.00 1700 1400 1200 180 200
E-10 10475 6285.00 733.25 17493.25 1600 1600 1200 180 200

DA 60.0% of Basic Gross = Basic + HRA + DA


HRA 7% of Basic Deductions = KGID + LIC + PT + GIS + GPF
Net = Gross - Deductions
DEDUCTIO NET
3150 ###
3560 ###
3400 ###
3750 ###
4080 ###
4280 ###
4580 ###
4630 ###
4680 ###
4780 ###

PT + GIS + GPF
Titanic Towers Pvt Ltd.
Net assembly Line Hours Figures for the West region
Periodically divided in four Quarters
Sl. No Particulars Quarter1 Quarter2 Quarter3 Quarter4 Total
1) Assembly A01 179.53 180.20 180.87 181.54 722.14
Sub A01.1 45.00 44.22 43.44 42.66
Sub A01.2 46.50 46.65 46.80 46.95
Sub A01.3 43.25 44.12 44.99 45.86
Sub A01.4 44.78 45.21 45.64 46.07
2) Assembly A02 230.95 231.07 232.89 235.20 930.11
Sub A02.1 47.80 47.00 47.80 47.80
Sub A02.2 44.00 46.65 46.80 47.80
Sub A02.3 45.55 44.12 44.99 47.80
Sub A02.4 46.60 46.65 46.65 47.80
Sub A02.5 47.00 46.65 46.65 44.00
3) Assembly A03 131.00 136.20 138.80 133.77 539.77
Sub A03.1 43.00 47.80 47.00 46.65
Sub A03.2 44.00 44.00 47.80 44.12
Sub A03.3 44.00 44.40 44.00 43.00
4) Assembly A04 85.00 90.77 91.79 88.00 355.56
Sub A04.1 41.00 46.65 46.80 45.00
Sub A04.2 44.00 44.12 44.99 43.00
Total sales for each Quarter 626.48 638.24 644.35 638.51 2547.58

Total sales for all the assembly Porducts 2547.58


Percentage performance of each Tower
Assembly 28.35%
Assembly 36.51%
Assembly 21.19%
Assembly 13.96%
Total 100.00% s
Electricity Bill
Consumer Pervious present minimum old
cader Meter no. name reading reading no units rate charge balance interest
aeh 5555 Geeta 980 1050 70 129.50 80 200 4
lt 8888 Sunny 670 980 310 806.00 50 300 6

Formulas used in Elecrticity Bill


1) No of units =Present Reading - Previous Reading =E3-D3
2) Rate =IF(No of units<30,No of units*1.2,IF(No of units<100,No of units*1.85,IF(No of units>100,No of units*2.6))) =IF(F3<30,F3*1.2,IF(F3<100,F3*1.
3) Minimum Charge =IF(Cader="aeh",80,IF(Cader="lt",50)) =IF(A3="aeh",80,IF(A3="lt",50))
4) Interest =IF(Old Balance<1000,Old Balance*2%,IF(Old Balance>=1000,Old Balance*5%)) =IF(I3<1000,I3*0.2%,IF(I3>=
5) Total =Rate + Minimum Charge =G3+H3
6) Tax =Total*5% =K3*5%
7) Grand Total =(Old Balance+Interest+Total+Tax) =(I3+J3+K3+L3)
grand
total tax total
209.50 10.48 423.98
856.00 42.80 1204.80

=IF(F3<30,F3*1.2,IF(F3<100,F3*1.85,IF(F3>100,F3*2.6)))

) =IF(I3<1000,I3*0.2%,IF(I3>=1000,I3*0.5%))

You might also like