0% found this document useful (0 votes)
133 views46 pages

Water Audit 2023-24 Proforma Sheets

The document presents a comprehensive water audit of a river sub-basin, detailing total water resources, utilization across various sectors such as agriculture, domestic, industrial, livestock, and aquaculture, as well as losses and residual storage. It includes data on rainfall, canal releases, water requirements for different uses, and groundwater extraction and recharge. The audit aims to assess the water balance and management within the basin for the year 2023-24.

Uploaded by

Gangadhar Kunja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
133 views46 pages

Water Audit 2023-24 Proforma Sheets

The document presents a comprehensive water audit of a river sub-basin, detailing total water resources, utilization across various sectors such as agriculture, domestic, industrial, livestock, and aquaculture, as well as losses and residual storage. It includes data on rainfall, canal releases, water requirements for different uses, and groundwater extraction and recharge. The audit aims to assess the water balance and management within the basin for the year 2023-24.

Uploaded by

Gangadhar Kunja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 46

Comprehensive water audit of River Sub basin

Area of the basin ha

I Total resources ha-m mm Explanation


S.No Different sources
a water recived by basin from precipitation Rain fall received x area of basin
Canal releases for the registered ayacut
b Water recived by basin from canals area in tha basin collected from water
resources dept.
Extraction for all uses ,Taken from GEC-
c Water extracted by means of bore wells
2023.
d Other resources No other sources
e Water Recieved from other Basin
f Water recieved from LI scheme Canals
Total resources
II Utilisation ha-m mm Explanation
S.No Different uses

Calculated based on Crop water


a Agriculture requirements for Paddy and Non- Paddy
crops @ 1.2 m and 0.6 m respectively.

Population X percapita demand i.e 135


b Domestic
lpcd.

c Industrial No. Of industries X AVG daily usage.


Animal population X daily need. From
d Live stock
animal husbandary.
Extent of Aquaculture multiplied with 1 m
e Aquaculture
water column and 3 crops per year.

Total Utilisation
III Losses ha-m mm
S.No Different means
Measured daily discharge, at the out let by
a Out flow discharge of the basin
float Method
b Ground water recharge Recharge from all sources as per GEC-2023
c Soil moisture From AP WRIMS
d Evapotranspiration Traditional method of 40% of available water
e subsurface outflow
Total losses
IV Residual storage in basin ha-m mm
S.No Different water storages
a Reservoirs
b MI tanks
It is estimated that there is no change in
c Check dams
storage of these structures.
d Others
Total residual storage

ha-m mm
Total resources
Utilisation in basin
Losses G.W recharge and out let discharge
storage change
Difference ###
Sub Basin Rainfall(in mm) 2023-24 (Source: Directorate of E
June July August September October November

S. No MANDAL Actual Actual Actual Actual Actual Actual

10

11

12

13

14

15

16

17

18

19
20

21
22
23
24
25
26

27
24 (Source: Directorate of Economics and Statistics)
December January February March April May Total

Actual Actual Actual Actual Actual Actual Actual


Canal releases during 2023-24 (Source:Water

S.N Canal 1 Canal 2 Canal 3 Canal 4 Canal 5 Canal 6


Date
o (Name) (Name) (Name) (Name) (Name) (Name)
(Source:Water resources dept)

Canal 7 Canal 8 Canal 9 Canal 10


(Name) (Name) (Name) (Name)

cumes cumes/day
0 0
Ha.m
0
Crop area particulars 2023-24
(Source:Village w
Planning dept)

Kharif (ha)
S.No Mandal Village Paddy
Total in Ha

Total Area (ha)


(Kharif+Rabi)

Paddy
Non Paddy
(Source:Village wise data obtained from
Planning dept)

Kharif (ha) Rabi (ha)


Non Paddy Paddy Non Paddy
water
requirment
(Ha.m) Total Ha.m
Domestic water usage in sub-basin
( source: Census data 2011, projected to 2024)

Mandal Village Name


2011 2023
2563323 2901682
n
projected to 2024)

Population
0

Litres
142980362614
Industrial water usage
(source: District manager Industries
Dept)
Water
Total no .of Total water usage
S.no Type of Industry requirment @ for year
industries in ha-m
kld
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Water
Total no .of Total water usage
S.no Type of Industry requirment for year
industries in ha-m
@10 kld
1 632 Granite cutting and polishing 6320 2306800 230.68
Ha.m
Livestock Water Requirement t (Source: JD Animal Husbadry)

% of Mandal
area covered
No of Large No of Small in
S. No Mandal Name Poultry _____basin/
Animals Animals
In _____ sub
Basin

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Total water requirment


JD Animal Husbadry)

@75 lpd @10 lpd @0.7 lpd

Large Animals
Total Water
Water No of Small
Poultry Requirement
Requirement(m Animals
for the year
cube)
0 cum
0.000 Ha.m
Village wise aquaculture water usage
(Source: Emastyakar site)
1m@3 water
S.No Mandal Village Acres ha times a usage in
year ha-m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
River sub basin out let discharges of ________ Sub Basin
Name of the stream

Month Total Month Discharge in cum


S.No
RESERVOIR DATA

Reservoir Level and Storage Inflows and Outflows

Current
Current Inflow Outflow
Date Storage Date
Level (m) (Cusecs) (Cusecs)
(T.M.C)
Inflow
(Cusecs)
ft^3
Cumec
In Ha.m
TMC
Outflow
MI Tanks Data
Storage As on Storage As on may-
S.No District Mandal Tank Name Total storage Capacity
June-23(mcft) 24 (mcft)

Basin Total
Change on
Storage in cum
MI Tanks

Total no.of MI Tanks Present in th basin

Total Capacity of the MI Tanks

Storage Capacity of the MI Tanks as on june 2022

Storage Capacity of the MI Tanks as on May 2023

Change in storage capacity of the MI Tanks


Total
Mcft

Mcft

Mcft

Mcft
HaM
Village wise Ground water extraction and rech
(Source: Ground wa

Watershe Total Geogr


Rainfall (mm)
S.No STATE DISTRICT VILLAGE d/ Recharge Worthy Ar
District C NC PQ Total C
1 2 3 4 5 6 7 8 9 10
action and recharge as per GEC-2023
(Source: Ground water Dept)

Total Geographical Area (ha) Ground Water Recharge (ham)


Recharge Worthy Area (ha) Rainfall Recharge Canals
Hilly Area Total
NC PQ Total C NC PQ Total C
11 12 13 14 15 16 17 18 19 20
Canals Surface Water Irrigation Ground Water Irrigation
NC PQ Total C NC PQ Total C NC PQ
21 22 23 24 25 26 27 28 29 30
Annual Ground water Rec
ter Irrigation Tanks and Ponds Water Conservation Structure
Total C NC PQ Total C NC PQ Total C
31 32 33 34 35 36 37 38 39 44
Annual Ground water Recharge (ham) Environmental Flows (ham) Annual Extractable Ground water Resource (ham)

NC PQ Total C NC PQ Total C NC PQ
45 46 47 48 49 50 51 52 53 54
Ground Water Extraction for all uses (ha.m)
und water Resource (ham)
Domestic Industrial Irrigation
Total C NC PQ Total C NC PQ Total C
55 56 57 58 59 60 61 62 63 64
m)
C NC PQ Total
Irrigation
NC PQ Total
65 66 67 68 69 70 71

You might also like