0% found this document useful (0 votes)
11 views3 pages

Assignment 3_SQA_7QC

This document outlines an assignment for Software Quality Assurance due on October 15, 2024, requiring individual handwritten submissions. It includes tasks such as creating a histogram, a cause and effect diagram, a flow chart of the Software Development Life Cycle, a control chart, and a scatter diagram based on provided data. Each question focuses on analyzing student grades, maintenance issues, and the relationship between study hours and marks obtained.

Uploaded by

zunaira Tariq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views3 pages

Assignment 3_SQA_7QC

This document outlines an assignment for Software Quality Assurance due on October 15, 2024, requiring individual handwritten submissions. It includes tasks such as creating a histogram, a cause and effect diagram, a flow chart of the Software Development Life Cycle, a control chart, and a scatter diagram based on provided data. Each question focuses on analyzing student grades, maintenance issues, and the relationship between study hours and marks obtained.

Uploaded by

zunaira Tariq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Page 1 of 3

Software Quality Assurance


Assignment 3
Hands in Date: Tuesday, October 08, 2024
Submission Date: Tuesday, October 15, 2024 (Before the start of the lecture)
Status: Individual and Hand written, No submission after deadline

Question 1:
Make Histogram by using following data:
In the subject of SQA, following data is reported:

Sr. Grade No of students


1 A (85 and above) 06
#
2 A - (80-84) 10

3 B+ (75-79) 12

4 B (70-74) 09

5 B- (65-69) 07

6 C+ (61-64) 15

7 C (58-60) 04

8 C- (55 -57) 10

9 D (50-54) 05

10 F (Below 50) 05

Question 2:
Make “Cause and Effect Diagram” by using following data:

Problem Statement: In maintenance phase, correction has been done beyond expectation

Main Heads and causes:


1. HR problems
a. Untrained tester
b. Weak team management
c. Over loaded
Page 2 of 3

d. Poor time management


2. Environmental problems
a. No proper offices
b. Noisy environment
3. Technology problems
a. Outdated testing applications
b. Inappropriate hardware
c. No backup for electricity failure
d. Only reactive approach, no proactive approach

Question 3:
Make flow chart of “Software Development Life Cycle” as discussed in the class lectures?

Question 4:
Ten students’ result of SQA is reported as under:

Sr. Student’s Name Marks Obtained (100)


1 Ali 85
No.
2 Aslam 40

3 Akram 60

4 Asghar 70

5 Abkbar 75

6 Zain 70

7 Usman 25

8 Murtaza 20

9 Shafique 10

10 Ashfaq 35

Upper Control Limit is 100 marks, Lower Control Limit is zero marks and average

(control limit) is 50 marks. If the marks are in between 50-100, it means that process is

in control.

Make the control chart by using above data and state the status of the process.
Page 3 of 3

Question 5:

Sr. No. Hours Studying Marks Obtained (100)

1 2 53

2 5 35

3 5 91

4 5 72

5 6 60

6 3 62

7 10 85

8 10 78

9 8 99

10 9 95

Make the scatter diagram by using above data and explain the relationship

between variables.

End of the assignment

You might also like