Assignment 3_SQA_7QC
Assignment 3_SQA_7QC
Question 1:
Make Histogram by using following data:
In the subject of SQA, following data is reported:
3 B+ (75-79) 12
4 B (70-74) 09
5 B- (65-69) 07
6 C+ (61-64) 15
7 C (58-60) 04
8 C- (55 -57) 10
9 D (50-54) 05
10 F (Below 50) 05
Question 2:
Make “Cause and Effect Diagram” by using following data:
Problem Statement: In maintenance phase, correction has been done beyond expectation
Question 3:
Make flow chart of “Software Development Life Cycle” as discussed in the class lectures?
Question 4:
Ten students’ result of SQA is reported as under:
3 Akram 60
4 Asghar 70
5 Abkbar 75
6 Zain 70
7 Usman 25
8 Murtaza 20
9 Shafique 10
10 Ashfaq 35
Upper Control Limit is 100 marks, Lower Control Limit is zero marks and average
(control limit) is 50 marks. If the marks are in between 50-100, it means that process is
in control.
Make the control chart by using above data and state the status of the process.
Page 3 of 3
Question 5:
1 2 53
2 5 35
3 5 91
4 5 72
5 6 60
6 3 62
7 10 85
8 10 78
9 8 99
10 9 95
Make the scatter diagram by using above data and explain the relationship
between variables.