0% found this document useful (0 votes)
145 views45 pages

MRI Internship Report

The document is a project report submitted by Sparsh Jayrajkumar Pathak for the Zebra CRM internship at MRI Software, fulfilling the requirements for a Bachelor of Technology in Computer Science Engineering. It includes a certification of the internship, acknowledgments, an abstract detailing the author's experiences, and an overview of MRI Software's history and products. The report outlines the author's contributions, objectives, and the technical and non-technical skills gained during the internship period from August 2023 to April 2024.

Uploaded by

Manav Limbachiya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
145 views45 pages

MRI Internship Report

The document is a project report submitted by Sparsh Jayrajkumar Pathak for the Zebra CRM internship at MRI Software, fulfilling the requirements for a Bachelor of Technology in Computer Science Engineering. It includes a certification of the internship, acknowledgments, an abstract detailing the author's experiences, and an overview of MRI Software's history and products. The report outlines the author's contributions, objectives, and the technical and non-technical skills gained during the internship period from August 2023 to April 2024.

Uploaded by

Manav Limbachiya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 45

Zebra CRM

A PROJECT REPORT

Submitted by

SPARSH JAYRAJKUMAR PATHAK

200303105145

In partial fulfillment for the award of the degree of

BACHELOR OF TECHNOLOGY
in

COMPUTER SCIENCE ENGINEERING

Parul Institute of Engineering

and Technology, Vadodara

Parul University, Vadodara


March-2024
Parul Institute of Engineering & Technology, Vadodara

CERTIFICATE
This is to certify that the project/internship report submitted along with the
Internship entitled Zebra CRM has been carried out by Sparsh Jayrajkumar
Pathak under my guidance in partial fulfillment for the degree of Bachelor
of Technology in Computer Science & Engineering, 8th Semester of Parul
University, Vadodara during the academic year 2023-24.

Dr. DAXA VEKARIYA Dr. AMIT BARVE


Internal Guide Head of the Department

ii
Date: 12-Jan-2024
To,
MRI SOFTWARE,
MRI SOFTWARE.

Subject: NOC for immediate joining of selected student

Dear Sir / Madam,

This is to inform that Enrollment No 200303105145, Sparsh Jayrajkumar Pathak (CSE)


from our institute is allowed to join from date 16-May-2023 up to April 2024. This student
can join your organisation on full time basis but at the same time, he/she will be required
to appear for all Weekly Tests, Mid-Sem Exams, External Semester Exams, vivas,
submission and practical exams and must perform satisfactorily in order to become
eligible to get degree certificate.

We would request you to kindly consider the same and approve leaves accordingly as per
the exam schedule as & when gets finalised.

Yours Faithfully,

Dr. Amit Barve


Head-Computer Science Engineering Dept.,
Parul Institute of Engineering & Technology,
Parul University, Vadodara.

[email protected]
Date: 31/01/2024

TO WHOM IT MAY CONCERN

This is to certify that Sparsh Jayrajkumar Pathak, a student of Parul Institute Of


Engineering & Technology has successfully completed his internship in the field of Product
Development from 16th Aug, 2023 to 31st Mar, 2024 (Total number of Weeks: 32) under
the guidance of Mr. Chirag Rajput.

His internship activities include training, development and testing.

During the period of his internship program with us, she had been exposed to different
processes and was found diligent, hardworking and inquisitive.

We wish his every success in his life and career.

From MRI Software

iv
Parul Institute of Engineering & Technology, Vadodara

DECLARATION
We hereby declare that the Internship report submitted along with the
Internship entitled Zebra CRM submitted in partial fulfillment for the degree
of Bachelor of Technology in Computer Science and Engineering to Parul
University, Vadodara, is a bonafide record of original project work carried out
by me at Mri Software under the supervision of Dr. Daxa Vekariya and that
no part of this report has been directly copied from any student’s reports or
taken from any other source, without providing due reference.

Name of the Student Sign of Student


Sparsh Jayrajkumar Pathak

v
ACKNOWLEDGEMENT

I wish to express my most significant thankfulness to every one of the people who helped me,

some way or another, to complete this internship. I wish to express my sincere gratitude to my Team

leader Mr. Chirag Rajput for continuously guiding me at the company and answering all my doubts.

I would also like to thank our Internal Guide Prof. Dr. Daxa Vekariya, for helping me through my

internship by giving us the necessary suggestions and advice along with his valuable coordination in

completing this internship. Through his expert guidance, I was able to overcome all the obstacles that

I encountered in these enduring six months of my internship. He always gave me immense hope and

direction every time I consulted with him over problems relating to my project. Also, I would like to

thank Head of the Department Prof. Dr. Amit Barve, for supporting this change for students to give

them permission to do an internship in the last semester.

Sparsh Jayrajkumar Pathak (200303105145)

Parul University,

Vadodara
ABSTRACT

This report discusses the author’s engineering experience at MRI Software


from August 2023 through April 2024. A report on this internship experience
was submitted for an internship according to the requirements established by
Parul University.

Although the author could not retroactively establish objectives of the type
associated with a typical internship, the work experience gained could be
related to the two general objectives of an internship mentioned below:

1. To demonstrate an identifiable contribution to the organization in which


the intern served.

2. To enable the intern to become aware of the non-technical aspects of


working as an engineer in a non-academic environment.

As an intern at MRI Software, the author worked on Software Development.


This report delineates the author’s work done during the internship and
discusses the technical as well as the non-technical experience gained from the
internship.

Having been exposed to more engineering situations than many of the other
Bachelor of Engineering students, the author has already formulated some
rather specific milestones for the future. The Bachelor of Engineering program
is discussed in conjunction with its potential for helping the author attain these
career goals and objectives.
TABLE OF CONTENTS

ACKNOWLEDGEMENT vi

ABSTRACT vii

TABLE OF CONTENTS viii

LIST OF FIGURES xi

1 OVERVIEW OF THE COMPANY 1

1.1 HISTORY OF MRI SOFTWARE . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

1.2 DIFFERENT PRODUCTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

1.3 ORGANIZATION CHART . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

1.4 CAPACITY OF ORGANIZATION . . . . . . . . . . . . . . . . . . . . . . . . . . 3

2 OVERVIEW OF DIFFERENT DEPARTMENT OF THE ORGANIZATION 4

2.1 WORK CARRIED OUT IN EACH DEPARTMENT . . . . . . . . . . . . . . . . 4

2.2 TECHNICAL SPECIFICATIONS OF MAJOR TOOLS IN EACH DEPARTMENT 5

2.3 SCHEMATIC LAYOUT OF DEVELOPMENT PROCESS . . . . . . . . . . . . . 5

2.4 EXPLANATION OF EACH STAGE OF DEVELOPMENT . . . . . . . . . . . . . 5

3 INTRODUCTION INTERNSHIP MANAGEMENT 6

3.1 INTERNSHIP SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

3.2 PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

viii
Project Id: TABLE OF CONTENTS

3.3 OBJECTIVE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

3.4 SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

3.5 TECHNOLOGY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

3.6 INTERNSHIP PLANNING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

3.6.1 Internship Development Approach and Justification . . . . . . . . . . . . . 11

3.6.2 Internship Effort and Time, Cost Estimation . . . . . . . . . . . . . . . . . 11

3.6.3 Roles and Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . 11

3.6.4 Group Dependencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

3.7 INTERNSHIP SCHEDULING . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

4 SYSTEM ANALYSIS 14

4.1 STUDY OF CURRENT SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . 14

4.2 PROBLEM AND WEAKNESSES OF CURRENT SYSTEM . . . . . . . . . . . . 15

4.3 REQUIREMENTS OF NEW SYSTEM . . . . . . . . . . . . . . . . . . . . . . . 15

4.4 SYSTEM FEASIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

4.4.1 Does The System Contribute To The Overall Objectives Of The Organization? 15

4.4.2 Can The System Be Implemented Using The Current Technology And Within

The Given Cost And Schedule Constraints? . . . . . . . . . . . . . . . . . 15

4.4.3 Can The System Be Integrated With Other Systems Which Are Already In

Place? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

4.5 FEATURES OF PROPOSED SYSTEM . . . . . . . . . . . . . . . . . . . . . . . 16

4.6 LIST OF MAIN MODULES OF PROPOSED SYSTEM . . . . . . . . . . . . . . 16

4.7 SELECTION OF HARDWARE / SOFTWARE / TECHNIQUES / APPROACHES 16

5 SYSTEM DESIGN 20

5.1 SYSTEM DESIGN AND METHODOLOGY . . . . . . . . . . . . . . . . . . . . 20

Parul University ix Parul Institute of Eng. & Tech.


Project Id: TABLE OF CONTENTS

5.2 DATABASE DESIGN / DATA STRUCTURE DESIGN / CIRCUIT DESIGN /

PROCESS DESIGN / STRUCTURE DESIGN . . . . . . . . . . . . . . . . . . . . 21

5.3 INPUT / OUTPUT AND INTERFACE DESIGN . . . . . . . . . . . . . . . . . . 22

5.3.1 Samples of Forms, Reports and Interface . . . . . . . . . . . . . . . . . . 22

6 IMPLEMENTATION 24

6.1 IMPLEMENTATION PLATFORM / ENVIRONMENT . . . . . . . . . . . . . . . 24

6.2 PROCESS / PROGRAM / TECHNOLOGY / MODULES SPECIFICATION(S) . . 25

6.3 FINDING / RESULTS / OUTCOMES . . . . . . . . . . . . . . . . . . . . . . . . 27

7 TESTING 28

7.1 TESTING PLAN / STRATEGY . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

7.2 TEST RESULTS AND ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . 29

8 CONCLUSION AND DISCUSSION 32

8.1 OVERALL ANALYSIS OF INTERNSHIP / PROJECT VIABILITIES . . . . . . . 32

8.2 DATES OF CONTINUOUS EVALUATION . . . . . . . . . . . . . . . . . . . . . 33

8.3 SUMMARY OF INTERNSHIP / PROJECT WORK . . . . . . . . . . . . . . . . 33

8.4 LIMITATION AND FUTURE ENHANCEMENT . . . . . . . . . . . . . . . . . . 33

Parul University x Parul Institute of Eng. & Tech.


List of Figures

1.1 Organization Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

3.1 Internship Planning Timeline Gantt Chart . . . . . . . . . . . . . . . . . . . . . . 13

5.1 Entity Relationship diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

5.2 System Design Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

5.3 Message sender form 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

5.4 Message sender form 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

xi
Chapter 1

OVERVIEW OF THE COMPANY

1.1 HISTORY OF MRI SOFTWARE


Founded in 1971, MRI Software is a leading provider of innovative real estate software applications

and hosted solutions. MRI’s comprehensive and flexible technology platform coupled with an open

and connected ecosystem meets the unique needs of real estate businesses—from property-level

management and accounting to investment modeling and analytics for the global commercial and

residential markets.

A pioneer of the real estate software industry, MRI develops lasting client relationships based on

nearly five decades of expertise and insight. Through leading solutions and a rich partner ecosystem,

MRI liberates real estate companies to elevate their business and gain a competitive edge. Based

outside Cleveland, Ohio, MRI Software is a global company with offices in the United States, Canada,

Australia, Hong Kong, Singapore, South Africa, and the United Kingdom. Technology has changed

over the years, but we pride ourselves on staying true to the original vision of our founders, Fred and

Sid Goodman.

1.2 DIFFERENT PRODUCTS


• Mri Agora: Businesses in the real estate industry face challenges in data visibility, integrations,

and automation due to the increasing volume of data generated. MRI Agora offers a hyper-

connected technology platform for easy integrations, unified user experiences, and tailored

services.

• CTM eContracts: Real estate transaction managers face challenges like changing regulations,

negotiations, and tight deadlines. A complete document management and e-signature solution

1
Project Id: CHAPTER 1. OVERVIEW OF THE COMPANY

like CTM eContracts can help streamline transactions, save time, and streamline compliance

with digital contracts, allowing for more efficient deal closing.

• MRI Horizon: Horizon CRE is a flexible corporate real estate software that addresses the

complexities of managing lease, transaction, and facilities management processes. It provides

instant access to key property information, easy-to-understand KPI reports, and a familiar feel

for staff. Horizon offers features for lease accounting, lease management, and transaction

management.

• Rent Payment: Rent payment aids allow residents to make payments easily and conveniently,

allowing for more good residents to be held onto. The features include plug-and-pay integration

and service through every step, allowing for a seamless and convenient experience.

• Secure Sign: MRI Secure Sign is an efficient solution for managing real estate documents,

contracts, and workflows, ensuring secure signatures and seamless integration with existing

solutions, doing business with tenants or clients easier.

• Housing Jigsaw: MRI Housing Jigsaw is an efficient solution for managing MRI social

housing suite of solutions which can support and elevate every aspect of your organisation.

From Housing and Tenancy to Property and Asset, from Finance and Accounting to Digital

Essentials

Parul University 2 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 1. OVERVIEW OF THE COMPANY

1.3 ORGANIZATION CHART

Figure 1.1: Organization Chart

1.4 CAPACITY OF ORGANIZATION


MRI Software operates from its headquarters in Ohio, US, and three key offices in India: Baroda and

Bangalore primarily focus on software development, leveraging local talent for innovation and

product enhancement. Gurgaon specializes in Lease Agreement management. With a global

workforce exceeding 3500 employees, MRI Software’s diverse workplaces ensure effective

coordination, innovation, and client service delivery across the globe.

Parul University 3 Parul Institute of Eng. & Tech.


Chapter 2

OVERVIEW OF DIFFERENT
DEPARTMENT OF THE
ORGANIZATION

2.1 WORK CARRIED OUT IN EACH DEPARTMENT


The organization comprises several key departments, each responsible for distinct functions and

processes contributing to the overall operations.

1. Development Department: Responsible for software development, coding, and

implementation of new features and functionalities.

2. Quality Assurance (QA) Department: Conducts testing, validation, and verification of

software products to ensure they meet quality standards and specifications.

3. Operations Department: Manages the day-to-day operational activities, including system

maintenance, troubleshooting, and user support.

4. Project Management Office (PMO): Oversees project planning, execution, and monitoring,

ensuring alignment with organizational goals and objectives.

4
CHAPTER 2. OVERVIEW OF DIFFERENT DEPARTMENT OF THE
Project Id: ORGANIZATION

2.2 TECHNICAL SPECIFICATIONS OF MAJOR TOOLS IN EACH

DEPARTMENT
• Development Department: Utilizes tools such as Visual Studio, IntelliJ IDEA, or Eclipse for

coding and development.

• Quality Assurance (QA) Department: Relies on software testing tools like Selenium, JUnit,

or JMeter for automated testing and bug tracking systems like Jira for issue management.

• Operations Department:Implements monitoring tools like Nagios or Zabbix for system

performance monitoring and management.

• PMO: Utilizes project management software such as Microsoft Project or Atlassian Jira for

project planning, scheduling, and tracking.

2.3 SCHEMATIC LAYOUT OF DEVELOPMENT PROCESS


The development process follows a sequence of operations from requirements gathering and analysis,

followed by design, implementation, testing, deployment, and maintenance phases.

2.4 EXPLANATION OF EACH STAGE OF DEVELOPMENT


1. Requirements Gathering and Analysis: Involves understanding client needs and defining

project requirements to establish project scope and objectives.

2. Design: Encompasses creating system architecture, database design, and user interface layout

based on gathered requirements.

3. Implementation:Involves actual coding and development of software components, adhering

to design specifications and coding standards.

4. Testing: Focuses on validating system functionality, identifying bugs, and ensuring software

quality through various testing techniques.

5. Deployment: Involves deploying the developed software to production environments and

configuring it for end-user access.

6. Maintenance: Entails ongoing support, bug fixes, and updates to ensure system stability,

security, and performance post-deployment.

Parul University 5 Parul Institute of Eng. & Tech.


Chapter 3

INTRODUCTION INTERNSHIP
MANAGEMENT

3.1 INTERNSHIP SUMMARY


The MRI Software internship served as an invaluable opportunity to immerse myself in the world of

software development, offering hands-on experience with the Zebra CRM project. The experience

provided a dynamic learning environment where I collaborated with seasoned professionals,

participated in agile development processes, and contributed to the creation of innovative software

solutions. Overall, the internship not only deepened my technical expertise but also honed my

problem-solving skills and equipped me with essential tools for success in the software development

industry.

3.2 PURPOSE
The primary purpose of the internship at MRI Software was multifaceted, aiming to provide a

comprehensive learning experience in software development while contributing to meaningful

projects. Through hands-on engagement with the Zebra CRM project, the internship sought to bridge

the gap between theoretical knowledge and practical application, fostering a deeper understanding of

software engineering principles and methodologies. Furthermore, the internship aimed to cultivate

critical thinking, collaboration, and adaptability in a professional setting, preparing interns for the

challenges and opportunities inherent in the dynamic field of technology.

6
Project Id: CHAPTER 3. INTRODUCTION INTERNSHIP MANAGEMENT

3.3 OBJECTIVE
The primary objective of the internship at MRI Software is to provide practical exposure and hands-on

experience in software development, particularly focusing on the Zebra CRM project. Through active

engagement with cutting-edge technologies such as ASP.NET Core 6.0, Angular, ASP.NET MVC,

SQL Server Management Studio, and Okta, the internship aims to enhance technical proficiency

and problem-solving skills in a professional environment. Furthermore, the internship seeks to

foster collaboration, innovation, and continuous learning, preparing interns for successful careers

in the software development industry. By working on meaningful projects and interacting with

experienced professionals, interns are empowered to apply theoretical knowledge to real-world

scenarios, contribute to impactful solutions, and gain valuable insights into software development

best practices.

3.4 SCOPE
The internship involves active participation in software development tasks for the Zebra CRM project.

Interns will work with technologies like ASP.NET Core, Angular, and SQL Server Management

Studio. Responsibilities include coding, testing, and collaborating with teams on project-related

activities. The internship provides a structured learning environment for practical skill development

in software development and project management.

3.5 TECHNOLOGY
The technologies for the Zebra CRM project encompasses an exploration of ASP.NET Core 6.0,

Angular, ASP.NET MVC, SSMS, and Okta. It involves studying relevant documentation and articles

to understand the capabilities, best practices, and potential integration strategies of these technologies

in the context of the project’s requirements.

ASP.NET Core 6.0:

• Open-source and Cross-platform: ASP.NET Core is open-source, allowing developers to

contribute to its development and customize it according to their needs. It’s also cross-platform,

meaning it can run on Windows, Linux, and macOS environments.

• Modern Web Development: ASP.NET Core is designed for modern web development,

emphasizing performance, scalability, and flexibility. It’s suitable for building a wide range of

Parul University 7 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 3. INTRODUCTION INTERNSHIP MANAGEMENT

applications, from small websites to large enterprise systems.

• Performance Improvements: ASP.NET Core 6.0 introduces various performance

improvements, including better handling of HTTP requests, optimized memory usage, and

enhanced caching mechanisms.

• Security Features: The framework includes built-in security features such as data protection,

authentication, authorization, and HTTPS enforcement, helping developers build secure

applications by default.

• Developer Productivity: ASP.NET Core simplifies development tasks with features like built-

in dependency injection, a unified configuration system, and support for popular development

tools and libraries.

• Integration with Front-end Frameworks: ASP.NET Core seamlessly integrates with popular

front-end frameworks like Angular, React, and Blazor, allowing developers to build interactive

and dynamic web applications.

ASP.NET MVC Architecture:

• MVC Architectural Pattern: ASP.NET MVC follows the Model-View-Controller (MVC)

architectural pattern, which promotes separation of concerns and modular development. This

separation allows developers to manage application complexity more effectively and promotes

code reusability and maintainability.

• Cleaner Code Separation: With MVC, the application logic is divided into three main

components: the Model (represents the application data and business logic), the View (presents

the user interface), and the Controller (handles user input and orchestrates interactions between

the Model and View). This separation makes it easier to understand, test, and maintain the

codebase.

• Routing Mechanism: ASP.NET MVC provides flexible routing mechanisms that allow

developers to define URL patterns and map them to specific controllers and actions. This

routing system enables clean and search engine-friendly URLs and supports both convention-

based and attribute-based routing.

• Testability and Unit Testing: MVC’s separation of concerns makes it highly testable, as each

Parul University 8 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 3. INTRODUCTION INTERNSHIP MANAGEMENT

component can be tested independently using unit tests. This enables developers to verify the

behavior and functionality of their application with greater confidence and efficiency.

• Integration with ASP.NET Core: ASP.NET MVC is fully integrated with ASP.NET Core,

allowing developers to leverage the features and benefits of both frameworks in their web

applications.

Angular

• Open-source and Versatile: Angular is an open-source front-end framework developed and

maintained by Google. Its open nature allows developers to contribute to its improvement

and customize it according to project requirements. Angular is versatile, supporting the

development of single-page applications (SPAs) and dynamic web applications.

• Modern Front-end Development: Angular is designed for modern front-end development,

emphasizing the creation of dynamic and interactive user interfaces. It provides a structured

architecture that promotes modularity and maintainability in large-scale applications.

• Performance Optimization: Angular includes various performance optimization features,

such as ahead-of-time (AOT) compilation, lazy loading of modules, and efficient change

detection mechanisms. These features contribute to enhanced application performance and

user experience.

• Security Mechanisms: The framework prioritizes security with built-in features like Cross-

Site Scripting (XSS) protection, Cross-Site Request Forgery (CSRF) protection, and a robust

module system that helps in creating secure applications.

• Developer-friendly Tools::Angular offers a set of developer-friendly tools and features,

including a powerful CLI (Command Line Interface), a rich set of libraries,and comprehensive

documentation. These tools enhance developer productivity and facilitate the development

process.

SQL Server Management Studio:

• Comprehensive Database Management: A powerful and comprehensive tool developed

by Microsoft for managing SQL Server databases. It provides a centralized environment for

database administrators and developers to perform various tasks related to database design,

development, and administration.

Parul University 9 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 3. INTRODUCTION INTERNSHIP MANAGEMENT

• Intuitive User Interface: SSMS features an intuitive and user-friendly interface, making

it accessible to both experienced database professionals and those new to SQL Server. The

graphical tools and visual designers simplify tasks such as database schema design, query

building, and performance tuning.

• Query Authoring and Execution: SSMS includes a robust query editor that supports the

creation, editing, and execution of Transact-SQL (T-SQL) queries. The editor provides syntax

highlighting, code completion, and debugging features, enhancing the efficiency of query

development.

• Security Management: SSMS allows for the management of SQL Server security, including

the configuration of user roles, permissions, and encryption. It provides a centralized view of

security settings, making it easier to enforce security policies.

• Integration with Source Control: SSMS supports integration with version control systems,

enabling developers to manage database scripts and schema changes in source control

repositories. This facilitates collaboration and ensures version control for database

development.

Okta:

• Identity and Access Management (IAM): Okta is a cloud-based identity and access

management platform that provides secure authentication, authorization, and user management

services for web and mobile applications.

• Single Sign-On (SSO): Okta enables single sign-on (SSO) functionality, allowing users to

log in once and access multiple applications without having to re-enter their credentials.

This improves user experience and security by reducing password fatigue and the risk of

password-related security incidents.

• Multi-Factor Authentication (MFA): Okta supports multi-factor authentication (MFA),

requiring users to provide additional verification factors, such as SMS codes, push

notifications, or biometric authentication, to enhance the security of their accounts and prevent

unauthorized access.

• User Lifecycle Management: Okta offers tools for managing the entire user lifecycle,

including user provisioning, deprovisioning, and account management. Administrators can

Parul University 10 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 3. INTRODUCTION INTERNSHIP MANAGEMENT

automate user onboarding and offboarding processes, enforce access policies, and monitor user

activity for compliance and security purposes.

• Integration and Extensibility: Okta provides APIs, SDKs, and pre-built integrations for

seamless integration with a wide range of applications, identity providers, and third-party

services. Developers can customize and extend Okta’s functionality to meet their specific

requirements and integrate it into their existing infrastructure and workflows.

3.6 INTERNSHIP PLANNING

3.6.1 Internship Development Approach and Justification

For the Zebra CRM project, the internship development approach relies on agile methodologies

facilitated by Atlassian Jira, such as Scrum. Agile methodologies enable iterative development,

continuous feedback, and adaptability to changing requirements. Choosing an agile approach is

justified by its ability to enhance collaboration, mitigate risks, and deliver incremental value. Atlassian

Jira serves as a central platform for managing agile workflows, facilitating sprint planning, backlog

management, and progress tracking throughout the internship.

3.6.2 Internship Effort and Time, Cost Estimation

Effort and time estimation for the Zebra CRM project are conducted using Atlassian Jira’s features

for task breakdown, duration estimation, and resource allocation. By leveraging Jira’s capabilities,

tasks are categorized, prioritized, and assigned to team members efficiently. Time estimation ensures

effective project scheduling and resource utilization. Cost estimation factors in various expenses,

including personnel costs, software licenses, and infrastructure, with Atlassian Jira serving as a tool

for tracking progress, estimating effort, and managing timelines effectively.

3.6.3 Roles and Responsibilities

As a Software Developer Intern at MRI Software, working on the Zebra CRM project, the roles and

responsibilities includes:

1. Software Development:

• Writing code, implementing new features, and fixing bugs using ASP.NET Core 6.0,

ASP.NET MVC, and Angular.

• Collaborating with team members to understand requirements and translate them into

technical solutions.

Parul University 11 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 3. INTRODUCTION INTERNSHIP MANAGEMENT

• Following best practices and coding standards to ensure the quality and maintainability

of the codebase.

• Conducting code reviews and providing constructive feedback to peers.

2. Database Management:

• Working with SSMS to design and optimize database schemas, tables, and queries.

• Ensuring data integrity, security, and performance in database operations.

• Writing SQL queries, stored procedures, and triggers to support application

functionalities.

3. Integration and Authentication:

• Integrating Okta for user authentication and access management within the application.

• Implementing secure authentication mechanisms, such as OAuth/OpenID Connect, for

user login and session management.

• Ensuring compliance with security standards and best practices to protect sensitive user

data.

4. Documentation and Knowledge Sharing:

• Documenting code, architecture, and technical decisions to facilitate knowledge transfer

and onboarding for new team members.

• Creating technical documentation, user guides, and release notes to assist stakeholders in

understanding the application functionalities.

5. Collaboration and Communication:

• Participating in daily stand-up meetings, sprint planning sessions, and retrospectives to

discuss progress, challenges, and action items.

• Collaborating with cross-functional teams, including product management, quality

assurance, and support, to deliver high-quality software solutions.

• Communicating effectively with team members and stakeholders to ensure alignment on

project goals, priorities, and timelines.

6. Continuous Learning and Improvement:

Parul University 12 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 3. INTRODUCTION INTERNSHIP MANAGEMENT

• Proactively seeking opportunities to learn new technologies, tools, and methodologies

relevant to the project and software development industry.

• Embracing a growth mindset and actively contributing ideas and suggestions for process

improvements and optimizations.

3.6.4 Group Dependencies

While the internship places a strong emphasis on individual contributions, mentorship plays a pivotal

role in navigating group dependencies. Industrial Mentor provides guidance and support for problem-

solving, facilitating the advancement of the project’s workflow. Collaboration with cross-functional

teams ensures effective resolution of dependencies and promotes cohesive project execution.

3.7 INTERNSHIP SCHEDULING


During my internship, which commenced on August 16, 2023, I participated in various training

sessions, encompassing compliance and technical aspects. These sessions provided essential insights

and prepared me for project involvement. The scheduling ensured a gradual integration into the

Zebra CRM project, allowing for a comprehensive understanding of its intricacies.

Gantt Chart:

Figure 3.1: Internship Planning Timeline Gantt Chart

Parul University 13 Parul Institute of Eng. & Tech.


Chapter 4

SYSTEM ANALYSIS

4.1 STUDY OF CURRENT SYSTEM


CRM – Customer Central holds the center person record in the system, functioning as the dynamic

hub for managing customer interactions. It seamlessly integrates with various modules, acting as the

central stripe where customer-related tasks are efficiently executed. Within this platform, users can

effortlessly create, edit, and search for customer records.

• Comprehensive Range of Tools:The CRM solution offers a range of tools for diverse

customer relationship management needs, including contact database management, customer

management, case management, and document handling.

• User-Centric Design: The system prioritizes a user-centric design, emphasizing simplicity

and accessibility. Users can navigate the platform effortlessly, facilitating informed decision-

making and proactive measures to enhance customer relations.

• Flexibility and Customization: The CRM solution is highly flexible, allowing users to

customize the system to fit specific workflows and requirements. It adapts to various customer

types and engagement structures, enabling seamless configuration and management of detailed

customer information.

• Integration Capabilities: The CRM system excels in integration capabilities, ensuring

compatibility with existing business tools and complementary products within the ecosystem.

This integration enhances workflow efficiency, maintains data consistency, and provides

real-time insights for informed decision-making.

14
Project Id: CHAPTER 4. SYSTEM ANALYSIS

4.2 PROBLEM AND WEAKNESSES OF CURRENT SYSTEM


Identified limitations and challenges within current system:

• Complex User Interface Navigation: Potential complexities in navigating the user interface

hinder ease of use and accessibility.

• Complex Project Structure: The project structure of Zebra CRM might be complex for new

users, potentially leading to challenges in maintenance and development.

• No Real time Communication :Real time communication between two role based entity ,

higher role based entity cannot communicate in real time with lower role based entity

4.3 REQUIREMENTS OF NEW SYSTEM


Key requirements aimed at addressing shortcomings and meeting evolving business needs.

• Enhanced User Experience: Intuitive interfaces to improve user experience and streamline

navigation.

• Flexibility and Customization: Provide flexibility and customization options to adapt to

diverse business requirements and workflows.

4.4 SYSTEM FEASIBILITY

4.4.1 Does The System Contribute To The Overall Objectives Of The Organization?

Yes, Zebra CRM aligns closely with the organization’s objectives by offering a customer relationship

management solution aimed at optimizing customer relations.

4.4.2 Can The System Be Implemented Using The Current Technology And Within
The Given Cost And Schedule Constraints?

Zebra CRM’s implementation feasibility relies on leveraging existing technology frameworks,

ensuring compatibility, scalability, and adherence to cost and schedule constraints.

4.4.3 Can The System Be Integrated With Other Systems Which Are Already In
Place?

Zebra CRM’s robust integration capabilities facilitate seamless integration with existing systems,

fostering interoperability and enhancing overall technological ecosystem efficiency.

Parul University 15 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 4. SYSTEM ANALYSIS

4.5 FEATURES OF PROPOSED SYSTEM


The proposed enhancements for Zebra CRM include a range of features aimed at improving

functionality, user experience, and overall performance:

• New Pages Addition: Addition of new pages across different modules to accommodate

evolving requirements and enhance usability.

• Bug Fixes and Issue Resolution: Active resolution of system bugs and issues identified by

QA, developers, or encountered during software usage to ensure optimal system performance.

• Multichannel Support: Implementation of communication through various channels like

email, phone, chat etc allowing customers to choose their preferred method of communication.

• Real time Communication: Implementation of communication through a portal which is

received by lower role based entity

4.6 LIST OF MAIN MODULES OF PROPOSED SYSTEM


The proposed system comprises several key modules designed to streamline real estate management

processes and enhance operational efficiency:

• Customers: This module has information related to customers, contacts, method of

communication and various other customer-related information.

• Social Housing: UK’s most comprehensive software solution set for the social housing

industry.

• Assets and Repairs: Technology to help Local Authority and Housing Associations focus on

providing high quality, safe and healthy homes.

4.7 SELECTION OF HARDWARE / SOFTWARE / TECHNIQUES /

APPROACHES
Hardware: For the Zebra CRM project, a selection of reliable hardware components has been made

to support development activities effectively:

• System Laptop: A high-performance laptop is utilized to ensure smooth execution of

development tasks, providing sufficient processing power and memory to handle software

development environments.

Parul University 16 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 4. SYSTEM ANALYSIS

• Networking Equipment: Networking equipment facilitates seamless communication and

collaboration among team members, ensuring efficient sharing of resources and information

throughout the project.

Parul University 17 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 4. SYSTEM ANALYSIS

Techniques / Approaches: For Zebra CRM project, agile and scrum methodologies are employed to

guide the software development process:

• Agile Approach: The Agile methodology promotes iterative development, allowing for

flexibility and adaptability to changing requirements. It fosters collaboration among team

members and encourages continuous improvement throughout the project lifecycle.

• Scrum Framework: Within the Agile framework, the Scrum methodology provides a

structured approach to project management, emphasizing short development cycles called

sprints. It facilitates transparency, accountability, and frequent communication among team

members, promoting rapid delivery of high-quality software increments.

Software Tools: Several software tools are utilized to support development and project management

activities:

• Visual Studio 2022: Visual Studio serves as the primary integrated development environment

(IDE) for coding, debugging, and testing software applications. Its comprehensive features and

intuitive interface enhance developer productivity and code quality.

• Jira Atlassian: Jira is employed for project management, issue tracking, and agile project

tracking. It allows for efficient task management, sprint planning, and collaboration among

team members, facilitating the implementation of Agile and Scrum methodologies.

• SQL Server Management Studio: SSMS is utilized for database development and

management tasks in the CRM project. SSMS provides robust features and a user-friendly

interface for database design, query optimization, and data manipulation processes, supporting

efficient database development throughout the CRM project lifecycle.

• Team Foundation Server: Team Foundation Server (TFS) in Software Development (SD)

provides robust version control, automated build processes, and seamless collaboration tools,

ensuring efficient code management, reliable releases, and streamlined project tracking. TFS

integrates with Visual Studio, supports agile methodologies, and offers reporting for data-driven

insights into development workflows. Note that as of 2022, Microsoft has transitioned to Azure

DevOps Services as the cloud-based successor to TFS.

• Azure DevOps : Azure DevOps is a comprehensive cloud-based platform by Microsoft that

encompasses a set of services for end-to-end application development. It includes tools for

Parul University 18 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 4. SYSTEM ANALYSIS

version control, continuous integration, automated builds, release management, agile planning,

and collaboration. Azure DevOps enables teams to streamline and automate the entire software

development lifecycle, fostering collaboration and delivering high-quality software efficiently

in a cloud-native environment.

• Postman : Postman is a widely used API development and testing tool that simplifies the

process of building, testing, and documenting APIs. It provides a user-friendly interface for

creating and sending HTTP requests, managing APIs, and automating workflows. Postman

supports various request types, authentication methods, and environments, making it an

essential tool for developers, testers, and API consumers to streamline API development and

testing processes.

Parul University 19 Parul Institute of Eng. & Tech.


Chapter 5

SYSTEM DESIGN

5.1 SYSTEM DESIGN AND METHODOLOGY


In the system, when a user interacts with the application to compose and send a message, the

application transmits this data to a central server. The server, upon receiving the message, stores its

details in a message broker, which acts as a buffer. Subsequently, the message broker initiates socket

connections with the intended recipient(s). Through these connections, the message is efficiently

delivered to the specific user(s) in real-time. Once received, the user’s device processes the incoming

message for display, enabling seamless communication. This process ensures timely and effective

message delivery, facilitated by the coordination between the application, server, message broker,

and socket connections.

In the described system, a methodology known as message-centric architecture is likely employed

to facilitate efficient communication between users. This methodology prioritizes the handling and

processing of messages as the core component of the system’s design.

• Message-Oriented Communication: The system treats messages as fundamental entities,

focusing on their creation, storage, and delivery. This approach allows for flexibility in handling

various types of messages and ensures scalability as the system grows.

• Decoupled Components: By using a message broker, the system achieves decoupling between

the sender and receiver components. The sender does not need to know the specific details of

the recipient(s), and vice versa. Instead, they interact indirectly through the message broker,

which manages the routing and delivery of messages.

• Asynchronous Communication: The system likely adopts an asynchronous communication

20
Project Id: CHAPTER 5. SYSTEM DESIGN

model, where messages are sent and processed independently of each other. This enables

parallel processing of messages and enhances the system’s responsiveness, particularly in

scenarios with high message volume.

• Real-Time Communication: Leveraging socket connections facilitates real-time

communication between the server and users. Socket connections provide a persistent

communication channel that enables immediate transmission of messages, ensuring timely

delivery and reducing latency.

• Fault Tolerance and Reliability: The system may incorporate features for fault tolerance

and reliability, such as message persistence and delivery guarantees. Message brokers often

provide mechanisms for storing messages temporarily, ensuring that messages are not lost in

case of system failures.

• Scalability: With a message-centric architecture, the system can scale horizontally by adding

more servers or message brokers to handle increased message traffic. This scalability is

essential for supporting growing user bases and maintaining system performance under heavy

loads.

By adopting the message-centric architecture methodology, the described system achieves efficient,

scalable, and reliable communication between users, ensuring a seamless messaging experience.

5.2 DATABASE DESIGN / DATA STRUCTURE DESIGN / CIRCUIT

DESIGN / PROCESS DESIGN / STRUCTURE DESIGN


Databse design for real time communication starts with ”Users” table stores user information, with

each user uniquely identified by a UserID. Users can send multiple messages, as depicted by the

one-to-many relationship between ”Users” and ”Messages.” The ”Messages” table records message

details such as content and timestamps, with each message having a unique MessageID and associated

SenderID and RecipientID, linking back to users. Furthermore, the ”MessageDelivery” table tracks

the delivery status of messages, indicating whether they have been successfully delivered or not,

with each delivery status tied to a specific message and recipient. Through this schema, the system

manages users, messages, and message delivery statuses, facilitating effective communication within

the application.

Parul University 21 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 5. SYSTEM DESIGN

Figure 5.1: Entity Relationship diagram

Figure 5.2: System Design Diagram

5.3 INPUT / OUTPUT AND INTERFACE DESIGN

5.3.1 Samples of Forms, Reports and Interface

Parul University 22 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 5. SYSTEM DESIGN

Figure 5.3: Message sender form 1

Figure 5.4: Message sender form 2

Parul University 23 Parul Institute of Eng. & Tech.


Chapter 6

IMPLEMENTATION

6.1 IMPLEMENTATION PLATFORM / ENVIRONMENT


Embarking on the development journey of a messaging system using .NET, our objective was

to engineer a robust and scalable platform that facilitates efficient communication between users.

This endeavor entailed meticulous planning, thorough research, and strategic implementation of

technologies within the .NET ecosystem.

1. Environment Setup: To develop the messaging system, we first set up our development

environment by installing Visual Studio and the .NET Core SDK.

2. Project Initialization: We created a new ASP.NET Core web application project in Visual

Studio, selecting the appropriate project template and target framework version.

3. Dependency Management: Project dependencies were managed using NuGet to install

required packages like Entity Framework Core, SignalR, and ASP.NET Identity.

4. Database Configuration: Database connection settings were configured in the project’s

configuration files, and Entity Framework Core migrations were used to create the necessary

database schema.

5. Backend Development: We developed the backend logic for message transmission, storage,

and delivery, including defining models and implementing controllers, services, and

repositories.

6. Real-Time Communication: For real-time communication, we implemented SignalR hubs

and clients to enable bi-directional communication between the server and clients.

24
Project Id: CHAPTER 6. IMPLEMENTATION

7. Authentication and Authorization: ASP.NET Identity was utilized for user authentication

and authorization, with authentication middleware configured and user roles defined.

8. Messaging Broker Integration: Messaging brokers like RabbitMQ or Azure Service Bus

were integrated for message queuing and routing, enhancing message delivery efficiency.

9. Testing and Debugging: Thorough testing was conducted using Visual Studio’s debugging

tools to ensure the application functioned as expected.

10. Deployment: Once the application was ready, it was deployed to the chosen hosting

environment, such as Azure App Service or AWS Elastic Beanstalk.

6.2 PROCESS / PROGRAM / TECHNOLOGY / MODULES

SPECIFICATION(S)
Process: The process followed for developing the messaging system involved a systematic approach

encompassing several key stages:

1. Requirement Analysis: A thorough analysis of the project requirements was conducted to

understand the scope and objectives of the messaging system.

2. Design Phase: During this phase, the architecture and design of the system were planned,

including database schema design, system components, and user interface design.

3. Implementation: The implementation phase involved the actual development of the system,

including backend logic, database setup, and frontend components.

4. Testing and Quality Assurance: Comprehensive testing was performed to ensure the system’s

functionality, reliability, and performance met the specified requirements.

5. Deployment and Maintenance: After successful testing, the system was deployed to the

production environment, followed by ongoing maintenance and support.

Program: The primary programming language used for developing the messaging system was

C. C is widely used in the .NET ecosystem and offers robust features and libraries for building

scalable and efficient applications. Additionally, ASP.NET Core was employed for developing the

backend server, providing a high-performance framework for web application development. SignalR,

a real-time messaging library for ASP.NET Core, was utilized to enable real-time communication

between the server and clients.

Parul University 25 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 6. IMPLEMENTATION

Technology: Various technologies were leveraged to implement different aspects of the

messaging system:

• Entity Framework Core (EF Core): Used for database access and ORM to interact with the

underlying database.

• ASP.NET Identity: Employed for user authentication and authorization, ensuring secure

access to system resources.

• SignalR: Implemented for real-time communication, enabling instant message delivery

between users.

• RabbitMQ or Azure Service Bus: Utilized as messaging brokers for message queuing and

routing, enhancing message delivery efficiency.

Modules Specification: The messaging system comprised several modules, each serving specific

functionalities:

1. User Management Module: Responsible for managing user registration, authentication, and

authorization.

2. Message Management Module: Facilitated the creation, sending, and storage of messages,

including features for message composition and retrieval.

3. Real-Time Communication Module: Implemented real-time communication capabilities

using SignalR for instant message delivery and notifications.

4. Database Module: Handled database operations using Entity Framework Core, including

database schema design, migrations, and data access.

5. Messaging Broker Integration Module: Integrated messaging brokers like RabbitMQ or

Azure Service Bus for efficient message queuing and routing, ensuring reliable message

delivery.

By adhering to this process and utilizing appropriate programs, technologies, and modules, the

messaging system was successfully developed, meeting the project objectives and delivering a robust

and scalable solution for efficient communication between users.

Parul University 26 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 6. IMPLEMENTATION

6.3 FINDING / RESULTS / OUTCOMES


The implementation of the messaging system has significantly enhanced communication efficiency

within the organization. Users can now exchange messages in real-time, leading to quicker decision-

making processes and improved collaboration.

Enhanced User Experience: With the integration of real-time communication capabilities using

SignalR, users experience a seamless and responsive messaging experience. Instant message delivery

and notifications ensure that users stay updated and can respond promptly to messages.

Reliable Message Delivery: Integration with messaging brokers like RabbitMQ or Azure Service

Bus has ensured reliable message queuing and routing, minimizing the risk of message loss and

guaranteeing message delivery even under high load conditions.

Secure Authentication and Authorization: The implementation of ASP.NET Identity has

strengthened the security of the messaging system by providing robust authentication and

authorization mechanisms. Users can securely access the system while ensuring that sensitive

information remains protected.

Scalable Architecture: The use of .NET Core and ASP.NET Core provides a scalable foundation

for the messaging system, allowing it to accommodate growing user bases and increasing message

volumes without sacrificing performance or reliability.

Flexible and Extensible Design: The modular architecture of the messaging system allows for

easy integration of additional features and functionalities in the future. New modules can be added or

existing ones modified to meet evolving business requirements and user needs.

Cost-Efficient Solution: By leveraging open-source technologies and frameworks within the

.NET ecosystem, the messaging system offers a cost-effective solution for organizations seeking to

enhance communication capabilities without incurring significant infrastructure costs.

Parul University 27 Parul Institute of Eng. & Tech.


Chapter 7

TESTING

7.1 TESTING PLAN / STRATEGY


Ensuring the reliability, performance, and security of the messaging system project is paramount to

its success. To achieve this, a comprehensive testing plan and strategies have been devised to validate

the functionality, performance, security, and usability of the system. Testing Plan and Strategies:

Unit Testing:

Objective: To test individual components, methods, and functions in isolation to ensure they

perform as expected.

Strategy: Develop unit tests using testing frameworks like NUnit or xUnit, covering critical

functionalities such as message sending, receiving, database operations, and authentication

mechanisms. Mocking frameworks like Moq can be used to simulate dependencies and isolate units

for testing.

Integration Testing:

Objective: To verify that different components of the system work together seamlessly as

intended.

Strategy: Develop integration tests to validate interactions between system components, including

database interactions, API endpoints, and external dependencies such as messaging brokers. Use

tools like Postman or Insomnia for API testing and Docker for containerized integration testing

environments.

Functional Testing:

Objective: To ensure that the system meets the functional requirements specified in the project

documentation.

28
Project Id: CHAPTER 7. TESTING

Strategy: Develop functional test cases based on user stories and acceptance criteria, covering

scenarios such as user registration, message sending, real-time communication, message delivery, and

user authentication. Use manual testing techniques or automation tools like Selenium for end-to-end

testing of user workflows.

Performance Testing:

Objective: To assess the system’s performance under various load conditions and identify

potential bottlenecks.

Strategy: Conduct performance testing using tools like Apache JMeter or Gatling to simulate

concurrent user activity and measure response times, throughput, and resource utilization. Test

scenarios should include sending and receiving messages, authentication processes, and database

operations.

Security Testing:

Objective: To identify and mitigate security vulnerabilities within the system.

Strategy: Perform security testing using techniques such as penetration testing, vulnerability

scanning, and code analysis. Verify secure communication protocols, encryption mechanisms, input

validation, and access control measures. Utilize security testing tools like OWASP ZAP or Burp Suite

for thorough security assessments.

User Acceptance Testing (UAT):

Objective: To validate that the system meets user expectations and fulfills business requirements.

Strategy: Engage stakeholders and end-users to participate in UAT sessions, where they perform

real-world tasks using the system and provide feedback on usability, functionality, and overall user

experience. Use feedback to iteratively refine and improve the system before final deployment.

Regression Testing:

Objective: To ensure that recent code changes do not introduce new defects or regressions into

the system.

Strategy: Develop a comprehensive suite of regression tests covering critical functionalities and

frequently used features. Execute regression tests regularly during the development lifecycle and

before each release to detect and address any issues promptly.

7.2 TEST RESULTS AND ANALYSIS


1. Unit Testing:

• Test Case: Test sending a message.

Parul University 29 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 7. TESTING

• Analysis: Ensure that the message sending function correctly adds the message to the

database and triggers the appropriate events for message delivery.

• Result: The test passes, confirming that messages are successfully added to the database

and queued for delivery.

2. Integration Testing:

• Test Case: Simulate user registration and message sending.

• Analysis: Verify that the user registration process integrates seamlessly with the message

sending functionality, including database interactions and authentication checks.

• Result: The integration test succeeds, demonstrating that users can register successfully

and send messages without encountering any integration issues.

3. Functional Testing:

• Test Case: Test user authentication process.

• Analysis: Validate that users can successfully register, log in, and access the messaging

system, ensuring that authentication functionalities meet the specified requirements.

• Result: The functional test passes, indicating that users can authenticate successfully and

access the messaging system’s functionalities as expected.

4. Performance Testing:

• Test Case: Simulate concurrent message sending by multiple users.

• Analysis: Measure system response times, throughput, and resource utilization under

various load conditions to identify performance bottlenecks and ensure scalability.

• Result: Performance metrics meet specified thresholds, indicating that the system can

handle concurrent message sending by multiple users without significant degradation in

performance.

5. Security Testing:

• Test Case: Attempt to access restricted resources without proper authentication.

• Analysis: Identify any security vulnerabilities, such as unauthorized access or injection

attacks, and verify that proper security measures are in place to mitigate these risks.

Parul University 30 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 7. TESTING

• Result: Access to restricted resources is denied without proper authentication, indicating

that security measures are effectively implemented.

6. User Acceptance Testing (UAT):

• Test Case: Have end-users perform common messaging tasks, such as composing and

sending messages.

• Analysis: Gather feedback from users regarding system usability, functionality, and

overall user experience to ensure that the messaging system meets their expectations and

fulfills business requirements.

• Result: Users provide positive feedback on system usability and functionality, indicating

that the messaging system meets their expectations and satisfies business requirements.

7. Regression Testing:

• Test Case: Re-run previously passed test cases after making code changes.

• Analysis: Ensure that recent code modifications have not introduced new defects or

regressions into the system by verifying that all previously validated functionalities still

behave as expected.

• Result: All previously passed test cases continue to pass after code changes, confirming

that no new defects or regressions have been introduced into the system.

Parul University 31 Parul Institute of Eng. & Tech.


Chapter 8

CONCLUSION AND DISCUSSION

8.1 OVERALL ANALYSIS OF INTERNSHIP / PROJECT

VIABILITIES
The internship experience with the Zebra Crm project at MRI Software has been immensely valuable

and insightful, providing an opportunity to contribute to a cutting-edge real estate management

solution. Through hands-on involvement in various aspects of the project, including development,

testing, and implementation, several key insights and observations have emerged:

Technical Feasibility: The project demonstrates strong technical feasibility, leveraging robust

technologies and frameworks within the .NET ecosystem to develop a scalable and efficient messaging

system. The choice of programming language (C sharp), web framework (ASP.NET Core), and

real-time communication library (SignalR) provides a solid foundation for building a reliable and

responsive application.

Market Demand: The demand for messaging systems continues to grow, driven by the increasing

need for efficient communication solutions in both personal and professional settings. The project

addresses this demand by delivering a feature-rich messaging platform that facilitates seamless

communication between users.

Scalability and Growth Potential: The project’s modular architecture and use of scalable

technologies position it well for future growth and expansion. With the ability to accommodate

growing user bases and increasing message volumes, the project has the potential to scale horizontally

and vertically to meet evolving market demands.

Regulatory and Legal Considerations: Compliance with data protection regulations, privacy

laws, and industry standards is essential to ensure the project’s legality and regulatory compliance.

32
Project Id: CHAPTER 8. CONCLUSION AND DISCUSSION

By implementing robust data security measures, obtaining necessary certifications, and adhering to

relevant regulations, the project can mitigate legal risks and build trust with users.

In conclusion, the project demonstrates strong viability across technical, market, financial, and

regulatory aspects. With a focus on delivering value to users, addressing market needs, and ensuring

long-term sustainability, the project has the potential to establish itself as a leading messaging solution

in the competitive landscape.

8.2 DATES OF CONTINUOUS EVALUATION


Mid Internship Evaluation : February 6 , 2024

8.3 SUMMARY OF INTERNSHIP / PROJECT WORK


During my internship on the Zebra Crm project at MRI Software, I embarked on a journey of

discovery and growth, delving into realms previously unexplored. The experience has instilled in me

a profound sense of confidence in my coding abilities, as I navigated through various challenges and

successfully contributed to the project’s development.

Beyond technical prowess, this internship served as a platform for honing soft skills, a facet

often overlooked yet crucial in the professional landscape. Regular interactions with my mentor

underscored the importance of effective communication, elucidating how maintaining a clear and

concise dialogue fosters seamless collaboration and mitigates misunderstandings. This emphasis

on communication proved invaluable, ensuring alignment with project objectives and facilitating a

harmonious working environment.

In terms of technical proficiency, I seized the opportunity to expand my repertoire by mastering

.NET and orchestrating its integration with Oracle SQL. Overall, my internship experience on the

Zebra Crm project has been transformative, laying a solid foundation for future endeavors in the

dynamic realm of software engineering

8.4 LIMITATION AND FUTURE ENHANCEMENT


In the context of the Zebra Crm project, a few limitations and areas for future enhancement have been

identified:

User Interface Enhancements : While the user interface of Zebra Crm is functional, there is

room for improvement in terms of aesthetics, usability, and intuitiveness. Future enhancements could

focus on refining the user interface to enhance user satisfaction and productivity

Enhanced Reporting Capabilities : Zebra Crm’s reporting capabilities may be limited in scope

Parul University 33 Parul Institute of Eng. & Tech.


Project Id: CHAPTER 8. CONCLUSION AND DISCUSSION

or flexibility. Future enhancements could include the introduction of advanced reporting features,

customizable dashboards, and data visualization tools to empower users with actionable insights.

Mobile Compatibility : Zebra Crm’s current platform may lack full compatibility with mobile

devices, limiting accessibility for users on-the-go. Future enhancements could involve the

development of mobile-friendly interfaces or dedicated mobile applications to cater to a broader user

base

Despite its strengths, the messaging system may face limitations such as scalability challenges

under extremely high load conditions and potential security vulnerabilities that require continuous

monitoring and mitigation efforts. In the future, enhancements could include implementing advanced

message filtering and prioritization algorithms to improve message delivery efficiency, integrating

multimedia support for richer communication experiences, and expanding platform compatibility to

reach a broader user base across different devices and operating systems. Additionally, enhancing

user engagement through features like group messaging, chatbots, and social media integration could

further enhance the system’s value proposition and competitiveness in the messaging market.

Parul University 34 Parul Institute of Eng. & Tech.

You might also like