TW AO MB51300 10KW EU Single Phase

The document provides a comprehensive manual for the TW-AO-MB51200-10KW, TW-AO-MB51300-10KW, and TW-AO-MB51400-10KW inverter control machines, detailing installation, operation, and maintenance instructions. It includes safety guidelines, system connection diagrams, and specifications for cable and circuit breaker requirements. The manual emphasizes the importance of following the outlined procedures to ensure optimal performance and safety during use.

Uploaded by

Pedro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
200 views48 pages

TW AO MB51300 10KW EU Single Phase

The document provides a comprehensive manual for the TW-AO-MB51200-10KW, TW-AO-MB51300-10KW, and TW-AO-MB51400-10KW inverter control machines, detailing installation, operation, and maintenance instructions. It includes safety guidelines, system connection diagrams, and specifications for cable and circuit breaker requirements. The manual emphasizes the importance of following the outlined procedures to ensure optimal performance and safety during use.

Uploaded by

Pedro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 48

Inverter Control All-in-one Machine

TW-AO-MB51200-10KW Series
TW-AO-MB51300-10KW Series
TW-AO-MB51400-10KW Series

[键入文字]
Contents
1. Instruction .................................................................................. 7
1.1 How to use this manual ............................................................... 7
1.2 Symbols in this manual ................................................................ 7
1.3 Safety instructions ........................................................................7
2. Production Instructions .............................................................. 8
2.1 Instructions ......................................................................................8
2.2 Features ...........................................................................................8
2.3 System connection diagram ............................................................9
2.4 Production Overview .......................................................................9
3. Inspections before Installation ................................................. 10
3.1 Inspection of outer package ..........................................................10
3.2 Inspection of deliverables ............................................................. 10
3.3 Preparation of Tools and Meters .................................................. 11
4. Installation ................................................................................11
4.1 Select the mount location ............................................................. 11
5. Connection ............................................................................... 12
5.1 Single-phase output ...................................................................... 12
5.2 Schematic diagram of parallel connection in single phase ...........14
5.3 Cable & circuit breaker requirement ............................................ 16
5.4 AC input & output connection ...................................................... 17
5.5 PV connection ............................................................................... 17
5.6 Dry contact connection ................................................................. 18
5.7 Grounding connection ...................................................................18
5.8 Final assembly ............................................................................... 19
5.9 Start up the inverter ......................................................................19
6. Operation ................................................................................. 19
6.1 Operation and display panel ......................................................... 19
6.2 AC output mode ............................................................................ 31
6.3 Battery charging mode ..................................................................33
6.4 Time-slot charging/discharging function ...................................... 36
6.5 Battery parameter .........................................................................37
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
5
7. Communication ........................................................................ 38
7.1 Overview ....................................................................................... 38
7.2 Inverter Communication Interface ................................................39
7.2.1 RS485-1 Port ........................................................................................... 39
7.2.2 USB-B Port ...............................................................................................40
7.2.3 CAN/RS485-2 Port ...................................................................................40
7.2.4 Dry contact ..............................................................................................41
7.3 Battery Communication Interface .................................................42
7.3.1 LED Indicator ........................................................................................... 42
7.3.2 SOC capacity indicator ............................................................................ 42
7.3.3 Status indicator ....................................................................................... 42
7.3.4 Communication area ...............................................................................43

8. Fault and Remedy .....................................................................45


8.1 Fault code ...................................................................................... 45
8.2 Troubleshooting ............................................................................ 46
9. Protection and Maintenance .................................................... 47
9.1 Protection features ....................................................................... 47
9.2 Maintenance ................................................................................. 48
10. Datasheet ............................................................................... 49
11. Optional function....................................................................51

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
6
1. Instruction

1.1 How to use this manual

 This manual contains important information、 guidelines、 operation and maintenance for the
following products:TW-AO-MB51300-10KW,TW-AO-MB51400-10KW,TW-AO-MB51200-
10KW.
 The manual must be followed during installation and maintenance.
1.2 Symbols in this manual

Symbol Description
DANGER indicates a hazardous situations which
if not avoided will result in death or serious
injury.
WARING indicates a hazardous situations which
if not avoided could result in death or serious
injury.
CAUTION indicates a hazardous situations which
if not avoided could result in minor or moderate
injury.
NOTICE provide some tips on operation of
products.

1.3 Safety instructions

• This chapter contains important safety instructions. Read and keep this manual for future
reference.
• Be sure to comply the local requirements and regulation to install this inverter.
• Beware of high voltage. Please turn off the switch of each power sources before and during the
installation to avoid electric shock.
• For optimum operation of this product, please follow required specification to select
appropriate cable size and necessary protective device.
• Do not connect or disconnect any connections when the inverter is working.
• Do not open the terminal cover when the inverter working.
• Make sure the inverter is well grounding.
• Never cause AC output and DC input short circuited.
• Do not disassembly this unit, for all repair and maintenance, please take it to the professional
service center.
• Never charge a frozen battery.
• Please keep children away from touching or mishandling the inverter.
• Please make sure that this inverter is the only input power source for the load, do not use it in
parallel with other input AC power sources to avoid damage.

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
7
2. Production Instructions

2.1 Instructions

2.2 Features

• Using the lithium iron phosphate battery cell technology process, with higher safety, 80% DOD
charging and discharging under standard conditions, over 6000 cycles.
• Integrated serial port IC, high voltage accuracy (≤ 20mV), high current accuracy (≤ 2% @ FS).
• Short circuit protection function, adjustable overcurrent protection, multiple sleep and
wake-up modes, low power consumption.
• Dual RS485 communication, adjustable parameter settings, buzzer alarm function, LED
status indication function, and charging equalization function
• Wide temperature range: -20 ℃~60 ℃.
• With a dual activation function when the li-ion battery is dormant; either mains/photovoltaic
power supply access can trigger the activation of the li-ion battery.
• Support split-phase and single-phase pure sine wave output.
• Supports four different voltage levels of 200\208\220\230\240Vac per phase.
• Supports two solar inputs and simultaneous tracking of two solar maximum power
charging/carrying capacity functions.
• Dual MPPT with 99.9% efficiency and maximum 22A current in a single circuit, perfectly
adapted to high power modules.
• 4charging modes are available: solar only, mains priority, solar priority, and mixed mains/PV
charging.
• With the time-slot charging and discharging setting function, you can set the time period for
cutting in/out of mains charging and switch the time period between battery discharging and
mains bypass power supply mode.
• Energy saving mode function to reduce no-load energy losses.
• With two output modes of utility bypass and inverter output, with uninterrupted power supply
function.
• LCD large screen dynamic flow diagram design, easy to understand the system data and
operation status.
• 360° protection with complete short circuit protection, over current protection, over under
voltage protection, overload protection, backfill protection, etc.
• Support CAN, USB, and RS485 communication.

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
8
2.3 System connection diagram

The diagram below shows the system application scenario of this product. A complete system consists
of the following components:
1. PV modules: converts light energy into DC energy, which can be used to charge the battery via
an inverter or directly inverted into AC power to supply the load.
2. Utility grid or generator: connected to the AC input, it can supply the load and charge the
battery at the same time. The system can also operate generally without the mains or
generator when the battery and the PV module power the load.
3. Battery: The role of the battery is to ensure the regular power supply of the system load when
the solar energy is insufficient and there is no mains power.
4. Home load: Various household and office loads can be connected, including refrigerators,
lamps, televisions, fans, air conditioners, and other AC loads.
5. Inverter: The energy conversion device of the whole system.
The actual application scenario determines the specific system wiring method.

2.4 Production Overview

Inverter Display Battery Display


PV Connector

Communicati
on Interface
Battery Connector

Miniature
AC Connector
circuit
breaker

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
9
3. Inspections before Installation

3.1 Inspection of outer package

Before opening outer package of the all-in-one machine, check if there is any visible damage on the
outer package, such as holes, cracks or other signs of possible internal damage, and check the type of
all-in-one machine. If there is any abnormality on the package or model of the all-in-one machine is
inconsistent, do not open it and contact us as soon as possible.

3.2 Inspection of deliverables

After opening outer package of the all-in-one machine, check if the deliverable is complete and
whether there is any visible external damage. If any items are missing or damaged, please contact us.
No. Picture Item Quantity Specification

All-in-one
1 1
machine

Inverter parallel
2 communication 1 Current sharing detection line
line

Inverter parallel
3 communication 1 Parallel communication line
line

Three hole AC
4 2 Connect AC power
plug

Photovoltaic Solar panel connecting wire


5 2
connectors terminal

Disassembly and
assembly tools
6 1
for solar panel
connectors
7 Product Manual 1

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
10
3.3 Preparation of Tools and Meters

4. Installation

4.1 Select the mount location

TW-AO series are designed for INDOOR USE ONLY (IP20). Please consider the followings before
selecting the location.
• Adequate heat dissipation space must be provided for the product.
• The ambient temperature should be between-10~55℃ (14~131℉) to ensure optimal operation.

• Do not install the inverter where highly flammable materials are near by.
• Do not install the inverter in potential explosive areas.
• Do not install the inverter with lead-acid batteries in a confined space.

• Do not install the inverter in direct sunlight.


• Do not install or use the inverter in a humid environment.

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
11
5. Connection

5.1 Single-phase output

Items Description
TW-AO-MB51300- TW-AO-MB51400- TW-AO-MB51200-
Applicable Model
10KW 10KW 10KW
Output Voltage Range
200~240Vac, 230Vac default
(L-N)
Notice:
Users can change the output phase mode and output voltage by setup menu. Please read the chapter
5.2 Setting.
Output phase mode corresponds parameter 39 , when option is 180 indicates split-phase, when
option is 0 indicates single-phase.
Output voltage corresponds parameter 38 , the output voltage can be set from 200V to 240V.

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
12
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
13
5.2 Schematic diagram of parallel connection in single phase

In case of parallel operation with multiple inverters, the schematic diagram of parallel connection is as
follows:
a) Two all-in-one machines of the system connected in parallel:

b) Three all-in-one machines of the system connected in parallel:

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
14
c) Four all-in-one machines of the system connected in parallel:

d) Five all-in-one machines of the system connected in parallel:

e) Six all-in-one machines of the system connected in parallel:

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
15
5.3 Cable & circuit breaker requirement

• PVINPUT
Models Cable Diameter Max. PV Input Current Circuit Breaker Spec

TW-AO-MB51300-10KW 5mm²/10AWG 22A 2P-25A

TW-AO-MB51400-10KW 5mm²/10AWG 22A 2P-25A

• AC INPUT

Models Output mode Max. Input Current Cable diameter Circuit Breaker Spec

TW-AO-MB51300-10KW Split-phase 63A(L/N) 13mm²/6AWG 2P-63A

TW-AO-MB51400-10KW Split-phase 63A(L/N) 13mm²/6AWG 2P-63A

• BATTERY
Maximum charge
Models Cable Diameter Circuit Breaker Spec
current

TW-AO-MB51300-10KW 42mm²/1AWG 220A 2P-250A

TW-AO-MB51400-10KW 42mm²/1AWG 220A 2P-250A

• AC OUTPUT

Models Output mode Max. Input Current Cable diameter Circuit Breaker Spec

TW-AO-MB51300-10KW Split-phase 63A(L/N) 13mm²/6AWG 2P-63A

TW-AO-MB51400-10KW Split-phase 63A(L/N) 13mm²/6AWG 2P-63A

• PVINPUT、AC INPUT、AC OUTPUT、BATTERY


1. Use a stripper to remove the 6~8mm insulation of the cable.
2. Fixing cable lugs that supply with the box at the end of the cable.

The wire diameter is for reference only. If the distance between the PV array and the inverter or
between the inverter and the battery is long, using a thicker wire will reduce the voltage drop and
improve the performance of the system.

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
16
5.4 AC input & output connection

Connect the live, neutral and ground wires according to the cables’ position and order shown in the
diagram below.

• Before connecting AC inputs and outputs, the circuit breaker must be opened to avoid the risk
of electric shock and must not be operated with electricity.
• Please check that the cable used is sufficient for the requirements, too thin, poor quality cables
are a serious safety hazard.

5.5 PV connection

Connect the positive and negative wires of the two strings of PV according to the diagram below.

• Before connecting PV, the circuit breaker must be opened to avoid the risk of electric shock and
must not be operated with electricity.
Please make sure that the open circuit voltage of the PV modules in series does not exceed the Max.
Open Circuit Voltage of the product (this value is 500V), otherwise the inverter maybe damaged.

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
17
5.6 Dry contact connection

Use a small screwdriver to push back the direction indicated by the arrow, then insert the
communication cable into the dry junction port. (Communication cable diameter 0.2~1.5mm²)

5.7 Grounding connection

Please make sure the grounding terminal connect to the Grounding Bar.

• The grounding cable should have a diameter of not less than 4 mm² and be as close as possible
to the grounding point.

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
18
5.8 Final assembly

After ensuring that the wiring is reliable and the wire sequence is correct, install the terminal
protection cover in place.

5.9 Start up the inverter

• Step 1: Press the switch on the bottom of inverter , close the circuit breaker of the battery.
• Step 2:Press the switch on the bottom of inverter, the screen and indicators light up to
indicate that the inverter has been activated.
• Step 3:Sequential close of the circuit breakers for PV, AC input and AC output.
• Step 4:Start the loads one by one in order of power from small to large.

6. Operation

6.1 Operation and display panel

6.1.1 Battery display

Button Description:
MENU: enter the management system.
ENTER: enter the submenu.
DOWN: moves the cursor down or to the
next page.
ESC: returns to the previous one

Battery protection status:


Overvoltage: OV
Low voltage: LV
Overtemperature: OTt
Low temperature: IT
Over current: OC
Short circuit: SC
Note: when the battery is protected, the
corresponding protection status will be displayed;
otherwise, the protection status will not be
displayed as the protection state

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
19
Press “MENU” to enter the main menu
Note:“》”indicates that there is a submenu. Press ”enter” to enter the submenu

Analog Info 》

BMS Status 》

Para Setting 》

Sys Setting 》

Move the cursor to Analog info and press enter

Pack V

Im

Temperature 》

Cell Voltage 》

CellCapacity 》

Move the cursor to "temperature" and press "enter" to check the battery temperature information,
then press "down" to turn the page
T1 XX℃

T2 XX℃

T3 XX℃

T4 XX℃

PCB-T XX℃

ENV-T XX℃

Move the cursor to "cell voltage" and press "enter" to check the battery voltage information, then
press "down" to turn the page

Cell 01 xxxxmV

Cell 02 xxxxmV

Cell 03 xxxxmV

Cell 04 xxxxmV

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
20
Move the cursor to “CellCapacity” and press Enter to check the battery capacity information

SOC X%

FCC XAH

Rm XAH

CC 0

Move the cursor to “BMS Status”, press Enter to check the battery status, and press “▼” to turn the
page

Status

Record 》

BMS Status 》

Move the cursor to "Record", then press "Enter" to check the battery alarm information, then press
"DOWN" to turn the page.

SCP

0/UTP

0CP

UVP

0VP

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
21
Move the cursor to "BMS Status", then press "Enter" to check the battery protection information, and
then press "DOWN" to turn the page.
UV Y/N
UVP Y/N
OC Y/N
OCP Y/N
OT Y/N
Move the cursor to "Para Setting" and press OTP Y/N
“Enter”to check the gyroscope information, then
press "▼" to turn the page. OV Y/N
OVP Y/N
SCP Y/N
Failure Y/N

Move the cursor to "Para Setting and press “Enter to check the gyroscope information, then press
"▼" to turn the page.

Move the cursor to "Sys Setting", then press Enter to check the version information, and then press
"▼" to turn the page.

6.1.2 Inverter display


Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
22
 The INVENTER DISPLAY
The operation and display panel is as shown below, including 1 LCD screen, 3 indicators and 4 operation
buttons.

• Operation buttons introduction


Function
Description
buttons
SET To enter/exit the setting menu
UP To next selection
DOWN To last selection
ENT To confirm/enter the selection in setting menu
• LED Indicators
Indicators Colors Description
Continued: utility grid by-pass output
AC/INV Green
Flash: inverter output
Continued: charging complete
CHARGE Yellow
Flash: charging
FAULT Red Flash: error occur

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
23
• Display panel

Icons Functions Icons Functions

Indicates the PV panel Indicates the utility grid

Indicates the battery Indicates the generator

Indicates the inverter is


Indicates the home load
working

Indicates the inverter is


communicating with data Indicates the buzzer muted
collector

Indicates the direction of energy flow

Indicates the inverter is Indicates the inverter is working


standby normally

Indicates error occur Indicates setting

Indicates load power Indicates battery SOC


80%~100% 80%~100%

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
24
Indicates load power
Indicates battery SOC 60%~79%
60%~79%

Indicates load power


Indicates battery SOC 40%~59%
40%~59%

Indicates load power


Indicates battery SOC 20%~39%
20%~39%

Indicates load power


Indicates battery SOC 5%~19%
5%~19%

Indicates battery under-


Indicates battery discharge
voltage

Indicates over-load Indicates BMS fault

Indicates system
Indicates system under-voltage
communication error

Indicates system over- Indicates system under-


voltage temperature

Indicates battery is full Indicates system over-current

Indicates sealed lead-acid


Indicates user defined battery
battery
Indicates gel lead-acid Indicates flooded lead-acid
battery battery

Indicates LFP li-ion battery Indicates energy-saving mode

Indicates PV energy is Indicates PV energy is charging


carrying the load the battery

Indicates ACIN energy is Indicates the inverter output


charging the battery mode is mains power first

Indicates the inverter output Indicates the inverter output


mode is bypass mode is solar first

Indicates the inverter output


mode is battery first

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
25
• View real-time data
In the main screen, press the UP/DOWN keys to view the real-time data of the inverter during
operation.

Page PV side BAT side AC IN side LOAD side General


Single phase
1 PV voltage Batt Voltage AC in voltage Current Time
voltage
Single phase
2 PV current Batt Current AC in current Current Date
Current
Total AC charging Single phase
3 PV power Batt Voltage PV Total kWh
power active power
PV today kWh Today AC Single phase
4 Batt Current Load Total kWh
sink charging kWh apparent power
PV side heat INV Heat Sink AC output
5 AC frequency RS485 Address
temperature Temperature frequency
Batt Rated AC output rated
6 PV rated voltage Busbar voltage Software Version
Voltage power
Max. PV charging Max. Batt Max. AC charging Total AC output
7 /
current charging current Current active power
Total AC output
8 / /
apparent power

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
26
• Setting

ID Parameter Meaning Options Description


Exit Exit the setup menu.
Utility at first priority, utility and solar provide
power to load at the same time when solar is
available, battery will provide power to load
only when utility power is not available.
Solar power and battery at first priority, Utility
AC output source will provide power to load when solar power is
priority not available and the battery voltage below
parameter [04] value.
Solar power at first priority, Utility will provide
power to load when solar power is not available
and the battery voltage below parameter [04]
value .
AC output frequency will adaptive utility
AC output frequency frequency in bypass mode. Otherwise the
output default will follow the preset value.
When output range is 120/110V, input voltage
AC input voltage range 90~140V.
range When output range is 100/105V, input voltage
range 85~140V.
When parameter , output source
Voltage point of
will switch to utility from battery when the
battery switch to
battery voltage below the preset value. Setting
utility
range:40~60V
Voltage point of When parameter ,output source will
utility switch to switch to battery from utility when the battery
battery voltage above the preset value. Range:40~60V
Battery charging Solar and utility charging the battery at the
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
27
mode same time, solar at the first priority, utility
power as a supplement when solar power is not
sufficient. Notice: Solar and utility charging the
battery at the same time only in bypass mode,
only solar charging can be used when the invert
circuit is in operation.
Utility is the first priority in charging, Solar
charging the battery only when utility is not
available.
Solar is the first priority in charging, Utility
charging the battery only when solar is not
available.
Only solar charging the battery.
Battery charging
Current setting range: 0~200A.
current
User-defined, user can set all battery parameter
Sealed lead-acid battery.
Flooded lead-acid battery.
Battery type
Gel lead-acid battery.
LFP li-ion battery, 14\15\16 corresponds battery
cells number in series.
Ternary li-ion battery.
Setting range: 48V~58.4V, increment of each
Battery bulk charging
click is 0.4V, parameter can be set only when
voltage
battery type is and
Indicates the duration when battery voltage
reached parameter 09 value in bulk charging
Battery bulk charging procession, Setting range: 5min~900min,
delay time increment of each click is 5min, parameter can
be set only when battery type is USER and
L14/15/16, N13/14.
Setting range: 48V~58.4V, parameters cannot
Battery float charging
be set only after successful BMS
voltage
communication.
When the battery voltage falls below this
voltage point and parameter 13 value is
Battery over-
reached, the inverter output will be switched
discharge voltage
off. Setting range: 40V~48V, increment of each
(delay off)
click is 0.4V, parameter can be set only when
battery type is USER and L14/15/16, N13/14.
Indicates the duration when battery voltage
reached parameter 12 value in over-voltage
Battery over-
procession. Setting range: 5s~50s, increment of
discharge voltage
each click is 5s, parameter can be set only when
delay time
battery type is USER and LFP14/15/16,
NCM13/14.
When the battery voltage falls below this
voltage point, alarm will be displayed on the
Battery under-
screen and indicator. Setting range: 40V~52V,
voltage alarm
increment of each click is 0.4V, parameter can
be set only when battery type is USER and
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
28
L14/15/16, N13/14.
When the battery voltage falls below this
voltage point, the inverter output is switched
Battery under-voltage off immediately. Setting range is 40V~52V,
limit voltage increment of each click is 0.4V, parameter can
be set only when battery type is USER and
L14/15/16, N13/14.
Disable equalization charging.
Battery equalization
charging Enable equalization charging, parameter can be
set only when battery type is FLd\SLd\USER.
Setting range: 48V~58V, increment of each click
Battery equalization
is 0.4V, parameter can be set only when battery
charging voltage
type is FLd\SLd\USER.
Setting range: 5min~900min, increment of each
Battery equalization
click is 5min, parameter can be set only when
charging duration
battery type is FLd\SLd\USER.
Setting range: 5min~900min, increment of each
Battery equalization
click is 5min, parameter can be set only when
charging delay time
battery type is FLd\SLd\USER.
Setting range: 0~30days, increment of each click
Battery equalization
is 1day, parameter can be set only when battery
charging interval
type is FLd\SLd\USER.
Battery equalization Stop equalization charging immediately.
charging stop-start Start equalization charging immediately.
Disable power saving mode.
Enable power saving mode, When the load
Power saving mode power below 50W, the inverter output will
switch off after a 5min delay. When the load is
more than 50W, the inverter automatic restart.
When overload occurs and the output is
switched off, the machine will not restart.
When overload occurs and the output is
Over-load restart
switched off, the machine will restart after a
delay of 3minutes. After it reaches 5 cumulative
time, the machine will not restart automatically.
When over temperature occurs and the output
is switched off, the machine will not restart.
Over-temperature
When overload occurs and the output is
restart
switched off, the machine will restart when the
temperature drops.
Disable buzzer alarm.
Buzzer alarm
Enable buzzer alarm.
Disable reminder when the status of the input
Power source power source changes.
switching reminder Enable reminder when the status of the input
power source changes.
Disable switch to the bypass when the inverter
Inverter overload is overload.
switch to bypass Enable switch to the bypass when the inverter is
overload.

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
29
Max. utility charging
Setting range: 0~120A.
current
RS485 address RS485addresssettingrange:1~254.
Enabling PC and remote monitoring protocols
RS485
Enabling BMS communication based on RS485
communication
Enabling BMS communication based on CAN.
When item 32 is set to 485 or CAN, the corresponding
communication protocol must be selected in item 33.
BMS communication PAC=PACE, RDA=Ritar, AOG=ALLGRANDBATTERY, OLT=OLITER,
HWD=SUNWODA, DAQ=DAKING, WOW=SRNE, PYL=PYLONTECH,
UOL=WEILAN
Disable this function.
Hybrid output mode When parameter 01=UTI,
the solar energy is prioritized to charge the
Feed back & hybrid batteries and any excess energy will be used to
output function power the load. With an anti-backflow function,
the PV energy is not feed back into the grid.
On-grid function When parameter 01=UTI, solar
energy will feed back into the grid when battery
is full or disconnected.
Battery recover discharge from under voltage
Battery under voltage
protection when voltage above this value.
recover point
Setting range: 44V~54V.
Inverter stops charging when the battery is full.
Battery full recharge Inverter resumes charging when the battery
voltage point voltage below this value. Setting range:
44V~54V.
AC output voltage Setting range: 200/208/220/230/240Vac.
1 slot start charging
st
Setting range: 00:00:00-23:59:00
1st slot end charging Setting range: 00:00:00-23:59:00
2nd slot start charging Setting range: 00:00:00-23:59:00
2nd slot end charging Setting range: 00:00:00-23:59:00
3rd slot start charging Setting range: 00:00:00-23:59:00
3 slot end charging
rd
Setting range: 00:00:00-23:59:00
Disable this function.
Time slot charging Enable this function, AC output source mode
function will switch to SbU, utility charging the battery
and carry load only in charging time slot which
user set or the battery is under voltage.
1st slot start
Setting range: 00:00:00-23:59:00
discharging
1st slot end
Setting range: 00:00:00-23:59:00
discharging
2nd slot start
Setting range: 00:00:00-23:59:00
discharging
2nd slot end
Setting range: 00:00:00-23:59:00
discharging

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
30
3rd slot start
Setting range: 00:00:00-23:59:00
discharging
3rd slot end
Setting range: 00:00:00-23:59:00
discharging
Disable this function.
Time slot discharging Enable this function, AC output source mode
function will switch to UTI, battery discharging only in
discharging time slot which user set or utility is
not available.
YY/MM/DD.
Local date
Setting range: 00:01:01-99:12:31
Local time Setting range: 00:00:00-23:59:59
Charging stops when the charging current is less
Stop charging current
than the set value (unit: amp)
Discharging alarm Triggers an alarm when the battery SOC is less
SOC than the set value (unit: %)
Discharging cutoff Stops discharging when the battery SOC is less
SOC than the set value (unit: %)
Stops charging when the battery SOC is touch
Charging cutoff SOC
the set value(unit: %)
Switching to utility Switch to utility power when the battery SOC is
SOC less than this setting (unit: %)
Switching to inverter Switches to inverter output mode when SOC is
SOC greater than this setting (unit: %)
N-PE bonding Allow automatic switching of N-PE bonding
automatic switching
function Prohibit automatic switching of N-PE bonding

6.2 AC output mode

The AC output mode corresponds to parameter setting item 01 and 34, which allows the user to set
the AC output power source manually.
 Utility Priority Output 01 UTI (default)
Utility at first priority, utility and solar provide power to load at the same time when solar is available,
battery will provide power to load only when utility power is not available.(Priority:
utility>solar>battery)

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
31
 Solar and Utility Hybrid Output 34 MIX LOD
In UTI mode, when not connected to the battery or when the battery is full, the solar and the utility
supply power to the load at the same time.(Priority: solar>utility>battery)

 Solar Priority Output 01 SOL


Solar provides power to the loads as first priority. If solar is not available, the utility will be used as a
supplement to provide power to the loads. This mode maximises solar energy while maintaining
battery power and is suitable for areas with relatively stable power grids.(Priority: solar>utility>battery)

 Inverter Priority Output 01 SBU


Solar provides power to the loads as first priority. If solar is not sufficient or not available, the battery
will be used as a supplement to provide power to the loads. When the battery voltage reaches the
value of parameter 04 (Voltage point of battery switch to utility ) will switch to utility to provide power
to the load, This model makes maximum use of DC energy and is used in areas where the grid is stable.
(Priority: solar>battery>utility)

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
32
6.3 Battery charging mode

The charging mode corresponds to parameter setting item 06, which allows the user to set the
charging mode manually.
 Hybrid Charging SNU(default)
Solar and utility charging the battery at the same time, solar at the first priority, utility power as a
supplement when solar power is not sufficient. This is the fastest way to charge and is suitable for
areas with low power supply, providing customers with sufficient back-up power.(Source priority:
solar>utility)

 Utility Priority Charging CUB


The utility power gives priority to charging the battery, and PV charging is only activated when the
utility power is not available.(Source priority: utility>solar)

 Solar Priority Charging CSO


Solar priority charging, with utility charging only activated when the solar fails. By making full use of
solar power during the day and switching to utility charging at night, battery power can be maintained
and is suitable for applications in areas where the grid is relatively stable and electricity prices are
more expensive.(Source priority: solar>utility)

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
33
 Only Solar Charging OSO
Solar charging only, no mains charging is activated. This is the most energy-efficient method, with all
the battery power coming from solar energy, and is usually used in areas with good radiation
conditions.

 Divide grid mold settings


Electric energy use
Model Item Option Meaning Characteristic
priority
This mode is maximized and available,
while maintaining it at the same time
Municipal Power Municipal Electric-
Holding the battery power as an
UTI Priority Output Photovoltaic-
emergency energy storage, it is
Mode Battery
suitable for power supply
Stable area
This uses photovoltaic energy to the
Output Photovoltaic Photovoltaic-
01 greatest extent, while maintaining
mode SOL priority output Municipal Electric-
battery power as emergency energy
mode Battery
storage
This model uses DC electricity to the
Photovoltaic- greatest extent to reduce the cost of
Reverse priority
SBU Battery-City electricity consumption. It is suitable
output mode
Electricity for areas with expensive electricity but
stable power supply.
Photovoltaic-
Municipal Electric
Mixed Charging-
SNU Phrase Mixed The fastest charging speed
Municipal
Charging Mode
Electricity
Municipal Power
Municipal Electric- Starting photovoltaic charging when
CUB Priority Charging
Charging Photovoltaic the municipal power is not available
06 Mode
mode
When photovoltaic failure, start the
Photovoltaic
Photovoltaic- city power charging, suitable for the
CSO priority charging
Municipal Electric grid
mode
Stable and more expensive areas
Only photovoltaic Only photovoltaic charging, not using
OSO Photovoltaic
charge mode city power charging

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
34
 Hybrid energy storage application
Model Item Option Meaning Electric energy use priority Characteristic
Represents the closing of hybrid energy storage applications, and the system
DIS
is switched to the application of the network by default.
You can feed the excess
power or battery energy
ON storage to the power
Grid mode
GRD grid to help users obtain
power generation
income
Output mode 34 Anti -countercurrents
Can be used by 46, 53, and 71
can realize mixed -
items
loading of municipal
electricity and
MIX Hybrid output
photovoltaic, support
LOD mode
the use of battery -free,
help users reduce the
cost of electricity
consumption,
DIS Turn off this function, the city power does not charge the battery
After enabling this function,
users can set a time period of
40-45 items. Within the set
time period, if there is
Power photovoltaic energy, priority
Open the
charging and should be given to using Utilize peak and valley
power charging
loading photovoltaic energy for electricity prices to store
46 and load
functions ENA charging; When the photovoltaic energy and
function of the
during the photovoltaic energy is valley price electricity in
time period of
time period insufficient, the municipal energy storage batteries
the time period
electricity will be mixed
charged, and when there is
no photovoltaic energy, the
municipal electricity will be
charged.
Turn off this function, the battery power cannot be fed back to the power
DIS
grid or loaded
After enabling this function, Peak and valley
users can set a time period electricity prices can be
Time division
between 47 and 52 items. utilized to reduce the
battery Enable phased
53 During the set time period, if use of electricity during
discharge battery
ENA the photovoltaic energy is peak periods, or to feed
function discharge
insufficient to load or connect battery energy storage
function
to the grid at full power, it is back into the grid,
allowed to use battery energy thereby obtaining higher
for load or grid connection grid connection benefits
It is possible to maintain
If this option is selected,
the battery level as
Priority photovoltaic energy will be
emergency energy
charging of charged first. After the
CHG storage and connect the
photovoltaic battery is fully charged,
remaining photovoltaic
energy residual electricity can be
energy to the grid or
Priority of connected to the grid
load it
photovoltaic 71
If this option is selected,
energy
photovoltaic energy will give
Priority grid Not storing battery
priority to feeding back
connection of energy to help users gain
LOD energy to the grid. If the
photovoltaic more power generation
energy is sufficient, the
energy benefits
excess energy will charge the
battery

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
35
6.4 Time-slot charging/discharging function

The TW-AO-10KW series is equipped with a time-slot


charging and discharging function, which allows users to set different charging and discharging periods
according to the local peak and valley tariffs, so that the utility power and PV energy can be used
rationally.
When mains electricity is expensive, the battery inverter is used to carry the load; when the
mains electricity is cheap, the mains electricity is used to carry the load and charge, which can help
customers to save electricity costs to the greatest extent.
The user can turn on/off the time-slot charging/discharging function in setup menu parameter 46
and 53.and set charging and discharging slot in parameter 40-45, 47-52. Below are examples for users
to understand the function.

Before using this function for the first time, please set the local time in parameter items 54, 55, then
the user can set the corresponding time slot according to the local peak and valley tariff charges.

With 3 definable periods, the user can freely set With 3 definable time periods, users can freely
the mains charging/carrying time within the range set the battery discharge time within the range
of 00:00 to 23:59. During the time period set by of 00:00 to 23:59. During the time period set by
the user, if PV energy is available, PV energy will the user, the inverter will give priority to the
be used first, and if PV energy is not available or battery inverter to carry the load, and if the
insufficient, utility energy will be used as a battery power is insufficient, the inverter will
supplement. automatically switch to mains power to ensure
stable operation of the load.

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
36
6.5 Battery parameter

Li-ion battery
User-
LFP
Parameter/Battery type defined
L16 L15 L14 USER
Over-voltage cut-off
60V 60V 60V 60v
voltage
Equalization charging 40~60V
- - -
voltage settable
40~60V
Bulk charging voltage 56.8V 53.2V 49.2V
settable
40~60V
Float charging voltage 56.8V 53.2V 49.2V
settable
Under-voltage alarm 40~60V
49.6V 46.4V 43.2V
voltage settable
Under-voltage cut-off 40~60V
48.8V 45.6V 42V
voltage settable
40~60V
Discharging limit voltage 46.4V 43.6V 40.8V
settable
1~30s
Over-discharge delay time 30s 30s 30s
settable
Equalization charging 0~600min
- - -
duration settable
Equalization charging 0~250d
- - -
interval settable
10~600min
Bulk charging duration 120min settable 120min settable 120min settable
settable

If no BMS is connected, the inverter will charge according to the battery voltage with a preset charging
curve. When the inverter communicates with the BMS, it will follow the BMS instructions to perform a
more complex stage charging process.

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
37
7. Communication

7.1 Overview


④ ⑤ ⑥ ⑦ ⑧ ⑨ ⑩ ⑪ ⑫

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
38
③CAN/RS485-2
①RS485-1 port ②USB-B port
Inverter Communication port
interface ④Parallel connection port ⑤Dry contact port
(reserved port, this model does not support parallel connection)

⑥LED Indicator ⑦RST ⑧ADS


Battery Communication ⑩RS485/CAN
⑨DCT ⑪RS232
interface (connect to inventer)

⑫RS485/RS485
(connect to computer)

7.2 Inverter Communication Interface

7.2.1 RS485-1 Port


The RS485-1 port is used to connect to the Wi-Fi/GPRS data acquisition module, which allows the user
to view the operating status and parameters of the inverter via the mobile phone APP.

The Wi-Fi/GPRS data acquisition module need to be purchased


separately. User can scan the QR code to download the mobile APP.
SU

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
39
7.2.2 USB-B Port

The user can read and modify device parameters through this port by using the host software. Please
contact us for the host software installation package if you require one.

7.2.3 CAN/RS485-2 Port


The RS485-2 port is used to connect to the BMS of Li ion battery.

If you use a normal RJ45 network cable, please check the pin
assignment, pin 1 & pin 2 usually need to be cut off for
normal use.

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
40
7.2.4 Dry contact
Dry contact port with 4 functions: 1. Remote switch on/off; 2. Switching signal output; 3. Battery
temperature sampling; 4. Generator remote start/ stop

If you need to use the remote start/stop function of the generator with dry contact, ensure that the
generator has ATS and supports remote start/stop.

7.2.5 Parallel connection port


Introduction:
1. Maximum six all-in-one solar charger inverters can be used for parallel operation.
When using the parallel operation function, the following connecting lines (package accessories) shall
be firmly and reliably connected:

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
41
7.3 Battery Communication Interface

7.3.1 LED Indicator

Four green capacity indicators, a red alarm indicator, a green running indicator and a switch indicator.

7.3.2 SOC capacity indicator


Condition Charge Discharge
Capacity indicator
L1 L2 L3 L4 L1 L2 L3 L4
lamp
0~25% Flash 2 OFF OFF OFF ON OFF OFF OFF
power 25~50% ON Flash 2 OFF OFF ON ON OFF OFF
(%) 50~75% ON ON Flash 2 OFF ON ON ON OFF
75~100~ ON ON ON Flash 2 ON ON ON ON
Running indicator
ON Flash 3
light

7.3.3 Status indicator


ON/
Warning/Normal Run Alert LED Battery Level Indicator
Status OFF Explain
/Protection
● ● ● ● ● ● ●
Shut
Sleep mode ON OFF OFF OFF OFF OFF OFF Light off
down
Flash
Normal ON OFF Standby mode
1
According to the electricity
Standby
indication
Flash Flash Module low
Warning ON
1 3 voltage
Normal ON ON OFF
The maximum
power LED
According to the power flashes (flash
Flash indicator (the maximum LED of 2),and the
Warning ON ON
3 the power indicator flashes 2) ALM does not
flash during
charge
the overshoot.

If there is no
mains supply,
Overcharge
ON ON OFF ON ON ON ON the indicator
Protection
turns to
standby

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
42
Temperature,ov
er
ON OFF ON OFF OFF OFF OFF Stop charging
current,failure,
protection
Flash
Normal ON OFF
3
Flash Flash
Warning ON
3 3
UVLO ON OFF OFF OFF OFF OFF OFF Stop charging
discharge Temperature,
over current,
short out,
ON OFF ON OFF OFF OFF OFF Stop discharge
reversed
polarity ,FAIL-
SAFE
Stop charging
Invalid OFF OFF ON OFF OFF OFF OFF
and discharging

LED flashing description

Flashing mode ON OFF


Flash 1 0.25s 3.75s
Flash 2 0.5s 0.5S
Flash 3 0.5s 1.5s

7.3.4 Communication area

1. RS232: BMS can communicate with upper computer through RS232 interface, so as to monitor
various information of battery, including battery voltage, current, temperature, status and battery
production information, etc. the default baud rate is 9600bps.
2. RS485: with dual RS485 interface, you can view the information of pack. The default baud rate is
9600bps.If it is necessary to communicate with the monitoring equipment through RS485, the
monitoring equipment is used as the host, polling data according to the address, and the address
setting range is 1 ~ 15.
3. CAN: CAN communication, baud rate 9600bps.
4. DCT: dry contact interface.
5. Rst: reset button.
6. ADS: dial switch

7. Interface diagram
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
43
8. Definition of electrical interface
RS232 -- 6P6C vertical RJ11 plug
RJ11 pin Definition Description
2 NC
3 TX(Single board)
4 RX(Single board)
5 GND

RS485 - 8P8C vertical RJ45 socket CAN - 8P8C vertical RJ45 socket
RJ45 pin Definition Description RJ45 pin Definition Description
9、10、11、14、
1、8 RS485-B1 NC
16
2、7 RS485-A1 12 CANL
3、6 GND 13 CANH
4、5 NC 15 GND
Table 1RS485 and CAN Interface

RS485 - 8P8C vertical RJ45 socket RS485 - 8P8C vertical RJ45 socket

RJ45 pin Definition Description RJ45 pin Definition Description

1、8 RS485-B 9、16 RS485-B

2、7 RS485-A 10、15 RS485-A

3、6 GND 11、14 GND

4、5 NC 12、13 NC

Table 2 Parallel communication port

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
44
8. Fault and Remedy

8.1 Fault code

Does it Affect the


Fault Code Meaning Instructions
outputs
01 BatVoltLow Yes Battery under-voltage alarm
Battery discharge over-
02 BatOverCurrSw Yes
current, software protection
03 BatOpen Yes Battery disconnected alarm
Battery under-voltage stop
04 BatLowEod Yes
discharging alarm
Battery over-current hardware
05 BatOverCurrHw Yes
protection
Battery over-voltage
06 BatOverVolt Yes
protection
Busbar over-voltage hardware
07 BusOverVoltHw Yes
protection
Busbar over-voltage software
08 BusOverVoltSw Yes
protection
PV input over-voltage
09 PvVoltHigh Yes
protection
Boost circuit over-current
10 PvBoostOCSw No
software protection
Boost circuit over-current
11 PvBoostOCHw No
hardware protection
Master-slave chip SPI
12 SpiCommErr Yes
communication failure
13 OverloadBypass Yes Bypass overload protection
14 OverloadInverter Yes Inverter overload protection
Inverter over-current
15 AcOverCurrHw Yes
hardware protection
Slave chip request switch off
16 AuxDSpReqOffPWM Yes
failure
Inverter short-circuit
17 InvShort Yes
protection
Inverter busbar soft start
18 Bussoftfailed Yes
failed
MPPT heat sink over-
19 OverTemperMppt No
temperature protection
20 OverTemperInv Yes Inverter heat sink over-
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
45
temperature protection
21 FanFail Yes Fan failure
22 EEPROM Yes Reservoir failure
23 ModelNumErr Yes Wrong model
24 Busdif Yes Busbar voltage imbalance
25 BusShort Yes Busbar short circuit
Inverter output back flow to
26 Rlyshort Yes
bypass
28 LinePhaseErr Yes Utility input phase fault
Busbar under-voltage
29 BusVoltLow Yes
protection
Battery SOC below 10% alarm
30 BatCapacityLow1 No
(Only enable BMS take effect)
Battery SOC below 5% alarm
31 BatCapacityLow2 No
(Only enable BMS take effect)
Battery dead (Only enable
32 BatCapacityLowStop Yes
BMS take effect)
58 BMSComErr No BMS communication failure
59 BMSErr No BMS failures occur
BMS under-temperature alarm
60 BMSUnderTem No
(Only enable BMS take effect)
BMS over-temperature alarm
61 BMSOverTem No
(Only enable BMS take effect)
BMS over-current alarm (Only
62 BMSOverCur No
enable BMS take effect)
BMS under-voltage alarm
63 BMSUnderVolt No
(Only enable BMS take effect)
BMS over-voltage alarm(Only
64 BMSOverVolt No
enable BMS take effect)
8.2 Troubleshooting

Fault
Meaning Causality Remedy
Code
Closing the circuit breaker.
No power input, or in
/ Screen no display Ensure the rocker switch is ON. Push any
sleep mode.
button on the panel to exit sleep mode
The battery voltage is Charge the battery and wait until the
Battery under-
01 lower than the value battery voltage is higher than the value
voltage
set in parameter [14]. set in the parameter item [14].
Check whether the battery is reliably
The battery is not
connected; check whether the circuit
Battery not connected, or the
03 breaker of the battery is not closed;
connected BMS in discharge
ensure that the BMS of the Li-ion battery
protection
can communicate properly.
The battery voltage is Manual reset: Power off and restart.
Battery over- lower than the value Automatic reset: charge the battery so
04
discharge set in the parameter that the battery voltage is higher than the
[12]. value set in the parameter item [35].
Manually power off and restart.
Battery over-voltage Battery is in over-
06 Check to see if the battery voltage exceeds
when charging voltage condition.
the limit. If it exceeds, the battery needs

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
46
to be discharged until the voltage is below
the battery's over-voltage recovery point.
Bypass output power
Bypass over-load or output current
13
(software detection) overload for a certain
period of time. Reduce the load power and restart the
Inverter output device. Please refer to item 11 of the
power or output protection features for more details.
Inverter over- load
14 current overload for a
(software detection)
certain period of
time.
Heat sink of PV input Heat sink of PV input
19 over-temperature temperature exceeds Resume normal charge and discharge
(software detection) 90℃ for 3s. when the temperature of the heat sink
Heat sink of inversion Heat sink of inversion has cooled to below the over-temperature
20 over-temperature temperature exceeds recovery temperature.
(software detection) 90℃ for 3s.
Fan failure detects by Manually toggle the fan after switching off
21 Fan failure
hardware for 3s. to check for blockage by foreign objects.
Manually power off and restart; if the
AC Input relay short- Relay for AC input fault reappears after restarting, You need
26
circuit sticking to contact the after-sales service to repair
the machine.
Ensure that the phase of the AC input is
AC input phase does
Utility input phase the same as the phase of the AC output,
28 not coincide with AC
fault e.g. if the output is in split-phase mode,
output phase
the input must also be in split-phase.

If you encounter a fault with the product that cannot be solved by the methods in the table above,
please contact our after-sales service for technical support and do not disassemble the equipment
yourself.

9. Protection and Maintenance

9.1 Protection features

No Protection Feature Instruction


When the charging current or power of the PV array configured
PV input current/power
1 exceeds the PV input rated value, the inverter will limit the input
limiting protection
power and charge at the rated.
If the PV voltage exceeds the maximum value allowed by the
2 PV input over-voltage hardware, the machine will report a fault and stop the PV boost
to output a sinusoidal AC wave.
At night, the battery is prevented from discharging through the
PV night reverse current
3 PV module because the battery voltage is greater than the
protection
voltage of PV module.
When the AC input voltage of each phase exceeds 140V, the
AC input over-voltage
4 mains charging will be stopped and switched to the inverter
protection
mode.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
47
AC input under-voltage When the AC input voltage of each phase below 90V, the utility
5
protection charging will be stopped and switched to the inverter mode.
When the battery voltage reaches the over-voltage cut-off point,
Battery over-voltage
6 the PV and the utility will automatically stop charging to prevent
protection
the battery from being overcharged and damaged.
When the battery voltage reaches the under-voltage cut-off
Battery under-voltage
7 point, the inverter will automatically stop the battery discharge to
protection
prevent damage from over-discharging the battery.
After a period when the battery current exceeds that allowed by
Battery over-current
8 the hardware, the machine will switch off the output and stop
protection
discharging the battery.
When a short-circuit fault occurs at the load output terminal, the
AC output is immediately turned off and turned on after 1
AC output short-circuit second. If the output load terminal is still short-circuited after 3
9
protection attempts, the inverter must be manually restarted after first
removing the short- circuit fault from the load before the normal
output can be restored.
When the internal temperature of the inverter is too high, the
Heat sink over- inverter will stop charging and discharging; when the
10
temperature protection temperature returns to normal, the inverter will resume charging
and discharging.
After triggering the overload protection the inverter will resume
output after 3 minutes, 5 consecutive overloads will switch off
Inverter over-load the output until the inverter is restarted.
11
protection (102%<load< load < 125%) ±10%: error and output shutdown
after 10s. Load > 125% ±10%: error reported and output switched
off after 5s.
Prevents AC back flow from the battery inverter to the bypass AC
12 AC output reverse
input.
Bypass over-current
13 Built-in AC input over-current protection circuit breaker.
protection
When the phase of the bypass input and the phase of the inverter
Bypass phase
split do not match, the inverter disables switching to the bypass
14 inconsistency
output to prevent the load from dropping out or short-circuiting
protection
when switching to the bypass.

9.2 Maintenance

To maintain optimum and long-lasting working performance, we recommend that the following items
are checked twice a year.
1. Ensure that the airflow around the product is not blocked and remove any dirt or debris from the
radiator.
2. Check that all exposed conductors are not damaged by sunlight, friction with other surrounding
objects, dry rot, insect or rodent damage, etc. The conductors need to be repaired or replaced if
necessary.
3. Verify that the indications and displays are consistent with the operation of the equipment, note
any faults or incorrect displays and take corrective action if necessary.
4. Check all terminals for signs of corrosion, insulation damage, high temperatures or
burning/discolouration and tighten terminal screws.
5. Check for dirt, nesting insects and corrosion, clean anti insects net as required. 6. If the lightning

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
48
arrester has failed, replace the failed arrester in time to prevent lightning damage to the inverter or
other equipment of the user.

Make sure that the product is disconnected from all power sources and that the capacitors are fully
discharged before carrying out any checks or operations to avoid the risk of electric shock.

The Company shall not be liable for damage caused by:


1. Damage caused by improper use or use in a wrong location.
2. Photovoltaic modules with an open circuit voltage exceeding the maximum permissible voltage.
3. Damage caused by the operating temperature exceeding the restricted operating temperature
range
4. Dismantling and repair of the inverter by unauthorised persons.
5. Damage caused by force majeure: damage during transport or handling of the product.

10. Datasheet

TW-AO-MB51300- TW-AO-MB51400- TW-AO-MB51200-


10KW 10KW 10KW
BATTERY TECHNICAL SPECIFICATION
Battery model TW-MB51300- TW-MB51400- TW-MB51200-
200A-HWB 200A-HWB 200A-HWB
Number of batteries 1 1 1
Battery Energy 15.36kWh 20.48kWh 10.24kWh
Battery Capacity 300AH 400AH 200AH
Weight 161.5kg 233kg 131kg
Dimension L× D× H (mm) 700×660×470 900×600×470 600×660×470
Battery Type LiFePO4
Battery Rated Voltage 51.2V
Battery Working Voltage Range 44.8 ~ 57.6V
Maximum Charging Current 200A
Maximum Discharging Current 200A
DOD 80%
Designed Life-span >6000 Cycles @ 0.2C/25℃ Charging/Discharging at 80%DOD, Until
80% Capacity.
INVERTER TECHNICAL SPECIFICATION
Inverter model TW-ASF48100S200-H
PV CHARGE
Solar Charge Type MPPT
Maximum Output Power 5500W+5500W
PV Charging Current Range 22A+22A
PV Operating Voltage Range 500Vdc+500Vdc
MPPT Voltage Range 125〜425Vdc
AC CHARGE
AC Charging Current Range 0〜120A
Frequency Range 50/60Hz
Input Voltage Range 90~270Vac
Bypass Overload Current 32A
AC OUTPUT
Rated Output Power 10000W

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
49
Max. Peak Power 20000W
Rated Output Voltage 230Vac(single-phase L/N/PE )
Load Capacity of Motors 6HP
Rated AC Frequency 50/60Hz
Waveform Pure Sine Wave
Switch Time 10ms(typical)
Parallel capacity
BATTERY INVERTER OUTPUT
Rated Output Power 10000W
Maximum Peak Power 20KVA
Power Factor 1
Rated Output Voltage (Vac) 230Vac
Frequency 50Hz ± 0.3Hz/60Hz ± 0.3Hz
Auto Switch Period <15ms
THD <3%
GENERAL DATA
Protection Degree IP20,Indoor Only
Operating Temperature Range -15~55℃,>45℃ derated
Noise <60dB
Cooling Method Internal Fan
Warranty 2 Years
COMMUNICATION
Embedded Interfaces Rs485 / CAN / USB / Dry contact
External Modules (Optional) Wi-Fi / GPRS
CERTIFICATION UN38.3,MSDS

Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
50
11. Optional function
1. Active equilibrium module

2. Fire extinguishing equipment

Add: Building A, Xinida Industrial Park, Junzibu Village,Guanlan Stree, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537