TW AO MB51300 10KW EU Single Phase
TW AO MB51300 10KW EU Single Phase
TW-AO-MB51200-10KW Series
TW-AO-MB51300-10KW Series
TW-AO-MB51400-10KW Series
[键入文字]
Contents
1. Instruction .................................................................................. 7
1.1 How to use this manual ............................................................... 7
1.2 Symbols in this manual ................................................................ 7
1.3 Safety instructions ........................................................................7
2. Production Instructions .............................................................. 8
2.1 Instructions ......................................................................................8
2.2 Features ...........................................................................................8
2.3 System connection diagram ............................................................9
2.4 Production Overview .......................................................................9
3. Inspections before Installation ................................................. 10
3.1 Inspection of outer package ..........................................................10
3.2 Inspection of deliverables ............................................................. 10
3.3 Preparation of Tools and Meters .................................................. 11
4. Installation ................................................................................11
4.1 Select the mount location ............................................................. 11
5. Connection ............................................................................... 12
5.1 Single-phase output ...................................................................... 12
5.2 Schematic diagram of parallel connection in single phase ...........14
5.3 Cable & circuit breaker requirement ............................................ 16
5.4 AC input & output connection ...................................................... 17
5.5 PV connection ............................................................................... 17
5.6 Dry contact connection ................................................................. 18
5.7 Grounding connection ...................................................................18
5.8 Final assembly ............................................................................... 19
5.9 Start up the inverter ......................................................................19
6. Operation ................................................................................. 19
6.1 Operation and display panel ......................................................... 19
6.2 AC output mode ............................................................................ 31
6.3 Battery charging mode ..................................................................33
6.4 Time-slot charging/discharging function ...................................... 36
6.5 Battery parameter .........................................................................37
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
5
7. Communication ........................................................................ 38
7.1 Overview ....................................................................................... 38
7.2 Inverter Communication Interface ................................................39
7.2.1 RS485-1 Port ........................................................................................... 39
7.2.2 USB-B Port ...............................................................................................40
7.2.3 CAN/RS485-2 Port ...................................................................................40
7.2.4 Dry contact ..............................................................................................41
7.3 Battery Communication Interface .................................................42
7.3.1 LED Indicator ........................................................................................... 42
7.3.2 SOC capacity indicator ............................................................................ 42
7.3.3 Status indicator ....................................................................................... 42
7.3.4 Communication area ...............................................................................43
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
6
1. Instruction
This manual contains important information、 guidelines、 operation and maintenance for the
following products:TW-AO-MB51300-10KW,TW-AO-MB51400-10KW,TW-AO-MB51200-
10KW.
The manual must be followed during installation and maintenance.
1.2 Symbols in this manual
Symbol Description
DANGER indicates a hazardous situations which
if not avoided will result in death or serious
injury.
WARING indicates a hazardous situations which
if not avoided could result in death or serious
injury.
CAUTION indicates a hazardous situations which
if not avoided could result in minor or moderate
injury.
NOTICE provide some tips on operation of
products.
• This chapter contains important safety instructions. Read and keep this manual for future
reference.
• Be sure to comply the local requirements and regulation to install this inverter.
• Beware of high voltage. Please turn off the switch of each power sources before and during the
installation to avoid electric shock.
• For optimum operation of this product, please follow required specification to select
appropriate cable size and necessary protective device.
• Do not connect or disconnect any connections when the inverter is working.
• Do not open the terminal cover when the inverter working.
• Make sure the inverter is well grounding.
• Never cause AC output and DC input short circuited.
• Do not disassembly this unit, for all repair and maintenance, please take it to the professional
service center.
• Never charge a frozen battery.
• Please keep children away from touching or mishandling the inverter.
• Please make sure that this inverter is the only input power source for the load, do not use it in
parallel with other input AC power sources to avoid damage.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
7
2. Production Instructions
2.1 Instructions
2.2 Features
• Using the lithium iron phosphate battery cell technology process, with higher safety, 80% DOD
charging and discharging under standard conditions, over 6000 cycles.
• Integrated serial port IC, high voltage accuracy (≤ 20mV), high current accuracy (≤ 2% @ FS).
• Short circuit protection function, adjustable overcurrent protection, multiple sleep and
wake-up modes, low power consumption.
• Dual RS485 communication, adjustable parameter settings, buzzer alarm function, LED
status indication function, and charging equalization function
• Wide temperature range: -20 ℃~60 ℃.
• With a dual activation function when the li-ion battery is dormant; either mains/photovoltaic
power supply access can trigger the activation of the li-ion battery.
• Support split-phase and single-phase pure sine wave output.
• Supports four different voltage levels of 200\208\220\230\240Vac per phase.
• Supports two solar inputs and simultaneous tracking of two solar maximum power
charging/carrying capacity functions.
• Dual MPPT with 99.9% efficiency and maximum 22A current in a single circuit, perfectly
adapted to high power modules.
• 4charging modes are available: solar only, mains priority, solar priority, and mixed mains/PV
charging.
• With the time-slot charging and discharging setting function, you can set the time period for
cutting in/out of mains charging and switch the time period between battery discharging and
mains bypass power supply mode.
• Energy saving mode function to reduce no-load energy losses.
• With two output modes of utility bypass and inverter output, with uninterrupted power supply
function.
• LCD large screen dynamic flow diagram design, easy to understand the system data and
operation status.
• 360° protection with complete short circuit protection, over current protection, over under
voltage protection, overload protection, backfill protection, etc.
• Support CAN, USB, and RS485 communication.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
8
2.3 System connection diagram
The diagram below shows the system application scenario of this product. A complete system consists
of the following components:
1. PV modules: converts light energy into DC energy, which can be used to charge the battery via
an inverter or directly inverted into AC power to supply the load.
2. Utility grid or generator: connected to the AC input, it can supply the load and charge the
battery at the same time. The system can also operate generally without the mains or
generator when the battery and the PV module power the load.
3. Battery: The role of the battery is to ensure the regular power supply of the system load when
the solar energy is insufficient and there is no mains power.
4. Home load: Various household and office loads can be connected, including refrigerators,
lamps, televisions, fans, air conditioners, and other AC loads.
5. Inverter: The energy conversion device of the whole system.
The actual application scenario determines the specific system wiring method.
Communicati
on Interface
Battery Connector
Miniature
AC Connector
circuit
breaker
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
9
3. Inspections before Installation
Before opening outer package of the all-in-one machine, check if there is any visible damage on the
outer package, such as holes, cracks or other signs of possible internal damage, and check the type of
all-in-one machine. If there is any abnormality on the package or model of the all-in-one machine is
inconsistent, do not open it and contact us as soon as possible.
After opening outer package of the all-in-one machine, check if the deliverable is complete and
whether there is any visible external damage. If any items are missing or damaged, please contact us.
No. Picture Item Quantity Specification
All-in-one
1 1
machine
Inverter parallel
2 communication 1 Current sharing detection line
line
Inverter parallel
3 communication 1 Parallel communication line
line
Three hole AC
4 2 Connect AC power
plug
Disassembly and
assembly tools
6 1
for solar panel
connectors
7 Product Manual 1
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
10
3.3 Preparation of Tools and Meters
4. Installation
TW-AO series are designed for INDOOR USE ONLY (IP20). Please consider the followings before
selecting the location.
• Adequate heat dissipation space must be provided for the product.
• The ambient temperature should be between-10~55℃ (14~131℉) to ensure optimal operation.
• Do not install the inverter where highly flammable materials are near by.
• Do not install the inverter in potential explosive areas.
• Do not install the inverter with lead-acid batteries in a confined space.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
11
5. Connection
Items Description
TW-AO-MB51300- TW-AO-MB51400- TW-AO-MB51200-
Applicable Model
10KW 10KW 10KW
Output Voltage Range
200~240Vac, 230Vac default
(L-N)
Notice:
Users can change the output phase mode and output voltage by setup menu. Please read the chapter
5.2 Setting.
Output phase mode corresponds parameter 39 , when option is 180 indicates split-phase, when
option is 0 indicates single-phase.
Output voltage corresponds parameter 38 , the output voltage can be set from 200V to 240V.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
12
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
13
5.2 Schematic diagram of parallel connection in single phase
In case of parallel operation with multiple inverters, the schematic diagram of parallel connection is as
follows:
a) Two all-in-one machines of the system connected in parallel:
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
14
c) Four all-in-one machines of the system connected in parallel:
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
15
5.3 Cable & circuit breaker requirement
• PVINPUT
Models Cable Diameter Max. PV Input Current Circuit Breaker Spec
• AC INPUT
Models Output mode Max. Input Current Cable diameter Circuit Breaker Spec
• BATTERY
Maximum charge
Models Cable Diameter Circuit Breaker Spec
current
• AC OUTPUT
Models Output mode Max. Input Current Cable diameter Circuit Breaker Spec
The wire diameter is for reference only. If the distance between the PV array and the inverter or
between the inverter and the battery is long, using a thicker wire will reduce the voltage drop and
improve the performance of the system.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
16
5.4 AC input & output connection
Connect the live, neutral and ground wires according to the cables’ position and order shown in the
diagram below.
• Before connecting AC inputs and outputs, the circuit breaker must be opened to avoid the risk
of electric shock and must not be operated with electricity.
• Please check that the cable used is sufficient for the requirements, too thin, poor quality cables
are a serious safety hazard.
5.5 PV connection
Connect the positive and negative wires of the two strings of PV according to the diagram below.
• Before connecting PV, the circuit breaker must be opened to avoid the risk of electric shock and
must not be operated with electricity.
Please make sure that the open circuit voltage of the PV modules in series does not exceed the Max.
Open Circuit Voltage of the product (this value is 500V), otherwise the inverter maybe damaged.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
17
5.6 Dry contact connection
Use a small screwdriver to push back the direction indicated by the arrow, then insert the
communication cable into the dry junction port. (Communication cable diameter 0.2~1.5mm²)
Please make sure the grounding terminal connect to the Grounding Bar.
• The grounding cable should have a diameter of not less than 4 mm² and be as close as possible
to the grounding point.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
18
5.8 Final assembly
After ensuring that the wiring is reliable and the wire sequence is correct, install the terminal
protection cover in place.
• Step 1: Press the switch on the bottom of inverter , close the circuit breaker of the battery.
• Step 2:Press the switch on the bottom of inverter, the screen and indicators light up to
indicate that the inverter has been activated.
• Step 3:Sequential close of the circuit breakers for PV, AC input and AC output.
• Step 4:Start the loads one by one in order of power from small to large.
6. Operation
Button Description:
MENU: enter the management system.
ENTER: enter the submenu.
DOWN: moves the cursor down or to the
next page.
ESC: returns to the previous one
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
19
Press “MENU” to enter the main menu
Note:“》”indicates that there is a submenu. Press ”enter” to enter the submenu
Analog Info 》
BMS Status 》
Para Setting 》
Sys Setting 》
Pack V
Im
Temperature 》
Cell Voltage 》
CellCapacity 》
Move the cursor to "temperature" and press "enter" to check the battery temperature information,
then press "down" to turn the page
T1 XX℃
T2 XX℃
T3 XX℃
T4 XX℃
PCB-T XX℃
ENV-T XX℃
Move the cursor to "cell voltage" and press "enter" to check the battery voltage information, then
press "down" to turn the page
Cell 01 xxxxmV
Cell 02 xxxxmV
Cell 03 xxxxmV
Cell 04 xxxxmV
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
20
Move the cursor to “CellCapacity” and press Enter to check the battery capacity information
SOC X%
FCC XAH
Rm XAH
CC 0
Move the cursor to “BMS Status”, press Enter to check the battery status, and press “▼” to turn the
page
Status
Record 》
BMS Status 》
Move the cursor to "Record", then press "Enter" to check the battery alarm information, then press
"DOWN" to turn the page.
SCP
0/UTP
0CP
UVP
0VP
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
21
Move the cursor to "BMS Status", then press "Enter" to check the battery protection information, and
then press "DOWN" to turn the page.
UV Y/N
UVP Y/N
OC Y/N
OCP Y/N
OT Y/N
Move the cursor to "Para Setting" and press OTP Y/N
“Enter”to check the gyroscope information, then
press "▼" to turn the page. OV Y/N
OVP Y/N
SCP Y/N
Failure Y/N
Move the cursor to "Para Setting and press “Enter to check the gyroscope information, then press
"▼" to turn the page.
Move the cursor to "Sys Setting", then press Enter to check the version information, and then press
"▼" to turn the page.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
23
• Display panel
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
24
Indicates load power
Indicates battery SOC 60%~79%
60%~79%
Indicates system
Indicates system under-voltage
communication error
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
25
• View real-time data
In the main screen, press the UP/DOWN keys to view the real-time data of the inverter during
operation.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
26
• Setting
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
29
Max. utility charging
Setting range: 0~120A.
current
RS485 address RS485addresssettingrange:1~254.
Enabling PC and remote monitoring protocols
RS485
Enabling BMS communication based on RS485
communication
Enabling BMS communication based on CAN.
When item 32 is set to 485 or CAN, the corresponding
communication protocol must be selected in item 33.
BMS communication PAC=PACE, RDA=Ritar, AOG=ALLGRANDBATTERY, OLT=OLITER,
HWD=SUNWODA, DAQ=DAKING, WOW=SRNE, PYL=PYLONTECH,
UOL=WEILAN
Disable this function.
Hybrid output mode When parameter 01=UTI,
the solar energy is prioritized to charge the
Feed back & hybrid batteries and any excess energy will be used to
output function power the load. With an anti-backflow function,
the PV energy is not feed back into the grid.
On-grid function When parameter 01=UTI, solar
energy will feed back into the grid when battery
is full or disconnected.
Battery recover discharge from under voltage
Battery under voltage
protection when voltage above this value.
recover point
Setting range: 44V~54V.
Inverter stops charging when the battery is full.
Battery full recharge Inverter resumes charging when the battery
voltage point voltage below this value. Setting range:
44V~54V.
AC output voltage Setting range: 200/208/220/230/240Vac.
1 slot start charging
st
Setting range: 00:00:00-23:59:00
1st slot end charging Setting range: 00:00:00-23:59:00
2nd slot start charging Setting range: 00:00:00-23:59:00
2nd slot end charging Setting range: 00:00:00-23:59:00
3rd slot start charging Setting range: 00:00:00-23:59:00
3 slot end charging
rd
Setting range: 00:00:00-23:59:00
Disable this function.
Time slot charging Enable this function, AC output source mode
function will switch to SbU, utility charging the battery
and carry load only in charging time slot which
user set or the battery is under voltage.
1st slot start
Setting range: 00:00:00-23:59:00
discharging
1st slot end
Setting range: 00:00:00-23:59:00
discharging
2nd slot start
Setting range: 00:00:00-23:59:00
discharging
2nd slot end
Setting range: 00:00:00-23:59:00
discharging
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
30
3rd slot start
Setting range: 00:00:00-23:59:00
discharging
3rd slot end
Setting range: 00:00:00-23:59:00
discharging
Disable this function.
Time slot discharging Enable this function, AC output source mode
function will switch to UTI, battery discharging only in
discharging time slot which user set or utility is
not available.
YY/MM/DD.
Local date
Setting range: 00:01:01-99:12:31
Local time Setting range: 00:00:00-23:59:59
Charging stops when the charging current is less
Stop charging current
than the set value (unit: amp)
Discharging alarm Triggers an alarm when the battery SOC is less
SOC than the set value (unit: %)
Discharging cutoff Stops discharging when the battery SOC is less
SOC than the set value (unit: %)
Stops charging when the battery SOC is touch
Charging cutoff SOC
the set value(unit: %)
Switching to utility Switch to utility power when the battery SOC is
SOC less than this setting (unit: %)
Switching to inverter Switches to inverter output mode when SOC is
SOC greater than this setting (unit: %)
N-PE bonding Allow automatic switching of N-PE bonding
automatic switching
function Prohibit automatic switching of N-PE bonding
The AC output mode corresponds to parameter setting item 01 and 34, which allows the user to set
the AC output power source manually.
Utility Priority Output 01 UTI (default)
Utility at first priority, utility and solar provide power to load at the same time when solar is available,
battery will provide power to load only when utility power is not available.(Priority:
utility>solar>battery)
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
31
Solar and Utility Hybrid Output 34 MIX LOD
In UTI mode, when not connected to the battery or when the battery is full, the solar and the utility
supply power to the load at the same time.(Priority: solar>utility>battery)
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
32
6.3 Battery charging mode
The charging mode corresponds to parameter setting item 06, which allows the user to set the
charging mode manually.
Hybrid Charging SNU(default)
Solar and utility charging the battery at the same time, solar at the first priority, utility power as a
supplement when solar power is not sufficient. This is the fastest way to charge and is suitable for
areas with low power supply, providing customers with sufficient back-up power.(Source priority:
solar>utility)
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
33
Only Solar Charging OSO
Solar charging only, no mains charging is activated. This is the most energy-efficient method, with all
the battery power coming from solar energy, and is usually used in areas with good radiation
conditions.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
34
Hybrid energy storage application
Model Item Option Meaning Electric energy use priority Characteristic
Represents the closing of hybrid energy storage applications, and the system
DIS
is switched to the application of the network by default.
You can feed the excess
power or battery energy
ON storage to the power
Grid mode
GRD grid to help users obtain
power generation
income
Output mode 34 Anti -countercurrents
Can be used by 46, 53, and 71
can realize mixed -
items
loading of municipal
electricity and
MIX Hybrid output
photovoltaic, support
LOD mode
the use of battery -free,
help users reduce the
cost of electricity
consumption,
DIS Turn off this function, the city power does not charge the battery
After enabling this function,
users can set a time period of
40-45 items. Within the set
time period, if there is
Power photovoltaic energy, priority
Open the
charging and should be given to using Utilize peak and valley
power charging
loading photovoltaic energy for electricity prices to store
46 and load
functions ENA charging; When the photovoltaic energy and
function of the
during the photovoltaic energy is valley price electricity in
time period of
time period insufficient, the municipal energy storage batteries
the time period
electricity will be mixed
charged, and when there is
no photovoltaic energy, the
municipal electricity will be
charged.
Turn off this function, the battery power cannot be fed back to the power
DIS
grid or loaded
After enabling this function, Peak and valley
users can set a time period electricity prices can be
Time division
between 47 and 52 items. utilized to reduce the
battery Enable phased
53 During the set time period, if use of electricity during
discharge battery
ENA the photovoltaic energy is peak periods, or to feed
function discharge
insufficient to load or connect battery energy storage
function
to the grid at full power, it is back into the grid,
allowed to use battery energy thereby obtaining higher
for load or grid connection grid connection benefits
It is possible to maintain
If this option is selected,
the battery level as
Priority photovoltaic energy will be
emergency energy
charging of charged first. After the
CHG storage and connect the
photovoltaic battery is fully charged,
remaining photovoltaic
energy residual electricity can be
energy to the grid or
Priority of connected to the grid
load it
photovoltaic 71
If this option is selected,
energy
photovoltaic energy will give
Priority grid Not storing battery
priority to feeding back
connection of energy to help users gain
LOD energy to the grid. If the
photovoltaic more power generation
energy is sufficient, the
energy benefits
excess energy will charge the
battery
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
35
6.4 Time-slot charging/discharging function
Before using this function for the first time, please set the local time in parameter items 54, 55, then
the user can set the corresponding time slot according to the local peak and valley tariff charges.
With 3 definable periods, the user can freely set With 3 definable time periods, users can freely
the mains charging/carrying time within the range set the battery discharge time within the range
of 00:00 to 23:59. During the time period set by of 00:00 to 23:59. During the time period set by
the user, if PV energy is available, PV energy will the user, the inverter will give priority to the
be used first, and if PV energy is not available or battery inverter to carry the load, and if the
insufficient, utility energy will be used as a battery power is insufficient, the inverter will
supplement. automatically switch to mains power to ensure
stable operation of the load.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
36
6.5 Battery parameter
Li-ion battery
User-
LFP
Parameter/Battery type defined
L16 L15 L14 USER
Over-voltage cut-off
60V 60V 60V 60v
voltage
Equalization charging 40~60V
- - -
voltage settable
40~60V
Bulk charging voltage 56.8V 53.2V 49.2V
settable
40~60V
Float charging voltage 56.8V 53.2V 49.2V
settable
Under-voltage alarm 40~60V
49.6V 46.4V 43.2V
voltage settable
Under-voltage cut-off 40~60V
48.8V 45.6V 42V
voltage settable
40~60V
Discharging limit voltage 46.4V 43.6V 40.8V
settable
1~30s
Over-discharge delay time 30s 30s 30s
settable
Equalization charging 0~600min
- - -
duration settable
Equalization charging 0~250d
- - -
interval settable
10~600min
Bulk charging duration 120min settable 120min settable 120min settable
settable
If no BMS is connected, the inverter will charge according to the battery voltage with a preset charging
curve. When the inverter communicates with the BMS, it will follow the BMS instructions to perform a
more complex stage charging process.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
37
7. Communication
7.1 Overview
②
③
④ ⑤ ⑥ ⑦ ⑧ ⑨ ⑩ ⑪ ⑫
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
38
③CAN/RS485-2
①RS485-1 port ②USB-B port
Inverter Communication port
interface ④Parallel connection port ⑤Dry contact port
(reserved port, this model does not support parallel connection)
⑫RS485/RS485
(connect to computer)
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
39
7.2.2 USB-B Port
The user can read and modify device parameters through this port by using the host software. Please
contact us for the host software installation package if you require one.
If you use a normal RJ45 network cable, please check the pin
assignment, pin 1 & pin 2 usually need to be cut off for
normal use.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
40
7.2.4 Dry contact
Dry contact port with 4 functions: 1. Remote switch on/off; 2. Switching signal output; 3. Battery
temperature sampling; 4. Generator remote start/ stop
If you need to use the remote start/stop function of the generator with dry contact, ensure that the
generator has ATS and supports remote start/stop.
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
41
7.3 Battery Communication Interface
Four green capacity indicators, a red alarm indicator, a green running indicator and a switch indicator.
If there is no
mains supply,
Overcharge
ON ON OFF ON ON ON ON the indicator
Protection
turns to
standby
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
42
Temperature,ov
er
ON OFF ON OFF OFF OFF OFF Stop charging
current,failure,
protection
Flash
Normal ON OFF
3
Flash Flash
Warning ON
3 3
UVLO ON OFF OFF OFF OFF OFF OFF Stop charging
discharge Temperature,
over current,
short out,
ON OFF ON OFF OFF OFF OFF Stop discharge
reversed
polarity ,FAIL-
SAFE
Stop charging
Invalid OFF OFF ON OFF OFF OFF OFF
and discharging
1. RS232: BMS can communicate with upper computer through RS232 interface, so as to monitor
various information of battery, including battery voltage, current, temperature, status and battery
production information, etc. the default baud rate is 9600bps.
2. RS485: with dual RS485 interface, you can view the information of pack. The default baud rate is
9600bps.If it is necessary to communicate with the monitoring equipment through RS485, the
monitoring equipment is used as the host, polling data according to the address, and the address
setting range is 1 ~ 15.
3. CAN: CAN communication, baud rate 9600bps.
4. DCT: dry contact interface.
5. Rst: reset button.
6. ADS: dial switch
7. Interface diagram
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
43
8. Definition of electrical interface
RS232 -- 6P6C vertical RJ11 plug
RJ11 pin Definition Description
2 NC
3 TX(Single board)
4 RX(Single board)
5 GND
RS485 - 8P8C vertical RJ45 socket CAN - 8P8C vertical RJ45 socket
RJ45 pin Definition Description RJ45 pin Definition Description
9、10、11、14、
1、8 RS485-B1 NC
16
2、7 RS485-A1 12 CANL
3、6 GND 13 CANH
4、5 NC 15 GND
Table 1RS485 and CAN Interface
RS485 - 8P8C vertical RJ45 socket RS485 - 8P8C vertical RJ45 socket
4、5 NC 12、13 NC
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
44
8. Fault and Remedy
Fault
Meaning Causality Remedy
Code
Closing the circuit breaker.
No power input, or in
/ Screen no display Ensure the rocker switch is ON. Push any
sleep mode.
button on the panel to exit sleep mode
The battery voltage is Charge the battery and wait until the
Battery under-
01 lower than the value battery voltage is higher than the value
voltage
set in parameter [14]. set in the parameter item [14].
Check whether the battery is reliably
The battery is not
connected; check whether the circuit
Battery not connected, or the
03 breaker of the battery is not closed;
connected BMS in discharge
ensure that the BMS of the Li-ion battery
protection
can communicate properly.
The battery voltage is Manual reset: Power off and restart.
Battery over- lower than the value Automatic reset: charge the battery so
04
discharge set in the parameter that the battery voltage is higher than the
[12]. value set in the parameter item [35].
Manually power off and restart.
Battery over-voltage Battery is in over-
06 Check to see if the battery voltage exceeds
when charging voltage condition.
the limit. If it exceeds, the battery needs
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
46
to be discharged until the voltage is below
the battery's over-voltage recovery point.
Bypass output power
Bypass over-load or output current
13
(software detection) overload for a certain
period of time. Reduce the load power and restart the
Inverter output device. Please refer to item 11 of the
power or output protection features for more details.
Inverter over- load
14 current overload for a
(software detection)
certain period of
time.
Heat sink of PV input Heat sink of PV input
19 over-temperature temperature exceeds Resume normal charge and discharge
(software detection) 90℃ for 3s. when the temperature of the heat sink
Heat sink of inversion Heat sink of inversion has cooled to below the over-temperature
20 over-temperature temperature exceeds recovery temperature.
(software detection) 90℃ for 3s.
Fan failure detects by Manually toggle the fan after switching off
21 Fan failure
hardware for 3s. to check for blockage by foreign objects.
Manually power off and restart; if the
AC Input relay short- Relay for AC input fault reappears after restarting, You need
26
circuit sticking to contact the after-sales service to repair
the machine.
Ensure that the phase of the AC input is
AC input phase does
Utility input phase the same as the phase of the AC output,
28 not coincide with AC
fault e.g. if the output is in split-phase mode,
output phase
the input must also be in split-phase.
If you encounter a fault with the product that cannot be solved by the methods in the table above,
please contact our after-sales service for technical support and do not disassemble the equipment
yourself.
9.2 Maintenance
To maintain optimum and long-lasting working performance, we recommend that the following items
are checked twice a year.
1. Ensure that the airflow around the product is not blocked and remove any dirt or debris from the
radiator.
2. Check that all exposed conductors are not damaged by sunlight, friction with other surrounding
objects, dry rot, insect or rodent damage, etc. The conductors need to be repaired or replaced if
necessary.
3. Verify that the indications and displays are consistent with the operation of the equipment, note
any faults or incorrect displays and take corrective action if necessary.
4. Check all terminals for signs of corrosion, insulation damage, high temperatures or
burning/discolouration and tighten terminal screws.
5. Check for dirt, nesting insects and corrosion, clean anti insects net as required. 6. If the lightning
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
48
arrester has failed, replace the failed arrester in time to prevent lightning damage to the inverter or
other equipment of the user.
Make sure that the product is disconnected from all power sources and that the capacitors are fully
discharged before carrying out any checks or operations to avoid the risk of electric shock.
10. Datasheet
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
49
Max. Peak Power 20000W
Rated Output Voltage 230Vac(single-phase L/N/PE )
Load Capacity of Motors 6HP
Rated AC Frequency 50/60Hz
Waveform Pure Sine Wave
Switch Time 10ms(typical)
Parallel capacity
BATTERY INVERTER OUTPUT
Rated Output Power 10000W
Maximum Peak Power 20KVA
Power Factor 1
Rated Output Voltage (Vac) 230Vac
Frequency 50Hz ± 0.3Hz/60Hz ± 0.3Hz
Auto Switch Period <15ms
THD <3%
GENERAL DATA
Protection Degree IP20,Indoor Only
Operating Temperature Range -15~55℃,>45℃ derated
Noise <60dB
Cooling Method Internal Fan
Warranty 2 Years
COMMUNICATION
Embedded Interfaces Rs485 / CAN / USB / Dry contact
External Modules (Optional) Wi-Fi / GPRS
CERTIFICATION UN38.3,MSDS
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
50
11. Optional function
1. Active equilibrium module
Add: Building A, Xinida Industrial Park, Junzibu Village,Guanlan Stree, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
51