IE&M (4361901) Question Bank

The document is a question bank for the Industrial Engineering and Management course, covering five units: Plant Engineering and Safety, Work Study, PPC and Quality Control, Principles of Management, and Recent Trends. Each unit contains various questions related to key concepts, definitions, calculations, and methodologies in industrial engineering. Topics include plant layouts, work study procedures, quality control tools, management principles, and recent trends like six sigma and product lifecycle management.

Uploaded by

i6725023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views3 pages

IE&M (4361901) Question Bank

The document is a question bank for the Industrial Engineering and Management course, covering five units: Plant Engineering and Safety, Work Study, PPC and Quality Control, Principles of Management, and Recent Trends. Each unit contains various questions related to key concepts, definitions, calculations, and methodologies in industrial engineering. Topics include plant layouts, work study procedures, quality control tools, management principles, and recent trends like six sigma and product lifecycle management.

Uploaded by

i6725023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Question Bank

Industrial Engineering and Management


Subject Code: 4361901
Unit-1 Plant engineering and Safety

1. Explain various types of Plant layouts.


2. Plant maintenance, Importance, its types; Breakdown, Preventive and Scheduled
maintenance.
3. Indian Factories Act 1948 and its provisions related to health, welfare and safety.
4. Principles of Material handling equipment.
5. Industrial disputes.
6. Which type of plant layout is required for production of standard product & for mass
production? Justify your answer.

Unit-2 Work Study.

1. Draw the symbols used for flow process chart.


2. Define work study and Write Procedure of work study.
3. Write short note on i) SIMO chart ii) Flow process chart.
4. Draw the symbols used in flow process chart and man machine chart.
5. Briefly describe Performance rating.
6. Briefly describe how to calculate standard time?
7. Explain in brief string diagram?
8. Explain in brief time measuring methods.
9. Calculate standard time from following data for one cycle: Loading time = 3min., Machining
time =8min., Unloading time =1min
10. Calculate the standard time for following data
i. machining time 8.5 minutes
ii. Inspection time 1.5 minutes
Iii.Overall Rating 90%
iv. Overall Allowance 15% of basic time.
11. Explain maximum working area and normal working area.
12. Difference between outline process chart and flow process chart.
13. Explain outline process chart with example.
14. State various steps of time study.
15. Explain advantages and disadvantages of work sampling.
16. List the types of work element and explain any two.
17. State the objectives of method study.
18. What is micro motion study and state its objectives.
19. State the advantages and disadvantages of acceptance sampling .
Unit-3 PPC and Quality control

1. Define quality, inspection, quality assurance & quality control.


2. Define statistical quality control.
3. Name the various S.Q.C. tools.
4. Differentiate between reliability and quality control and List various factors affecting the
reliability.
5. Write objective of quality control.
6. Differentiate between attribute and variable quality.
7. Compare the CPM and PERT.
8. Write phases of Production Planning and Control (PPC).
9. List the functions of PPC and explain the importance of routing.
10. Draw the network diagram based on the following details and decide critical path.
Activity A B C D E F

Time(in days) 4 4 6 4 4 5

Immediate preceding activity - A A B,C B E,D

11. Draw the network diagram based on the following details and decide critical path.

Activity A B C D E F G

Time(in days) 8 4 6 10 6 8 4

Immediate preceding activity - - - A B C D,E,F

12. Find out control limits for variable chart from following data:
Σ¯x = 4.993, Σ¯R = 0.202, No. of sample 10.for sample size of 4.A2 =0.58, D4= 2.11, D3
= 0.show your calculation.

13.In each subgroup of 150 number of products, defective products in 10 subgroup are
8,4,4,6,4,4,6,2,8,10.find control limits of fraction defective chart and state whether the
process in control or not.(p chart)

14. Eight television sets were inspected, in which defects were found as under.
T.V. 1 2 3 4 5 6 7 8
Defects 0 3 13 4 2 5 0 3
Find control limits and draw the chart. (C-chart)

15. X bar and R charts are maintained taking sample size-4 for production of I C engine,
piston. Information is that as under.
X double bar = 30 and ϭ =3. If d2=2.559, A2=0.928, D3=0 and D4= 2.785 then calculate
the control limits for X bar and R charts.
16. Explain the importance of ISO 9000.
17. Explain briefly “Measure of central tendency” and “Measure of Dispersion”.
Unit-4 Principle of management

1. Write short note on Just in Time.


2. Quality circle, zero defect concepts, 5S Concept.
3. Write short note on Re engineering
4. Give four benefits of just in time (JIT) concept.
5. Explain in brief TQM.
6. Explain concept of kaizen and its application.
7. State the advantages of centralized authority concept in industry.
8. What is difference between the Rowan plan and Halsey plan?

Unit-5 Recent trends


1. Explain the concept of six sigma
2. Explain environmental requirements of work place.
3. Explain various stage of product life cycle.
4. What is reliability?
5. What are mean time to recovery (MTTR) and mean time between failures (MTBF)?
6. Explain concept of triple bottom line (TBL).
7. Explain product lifecycle management (PLM).