Kalisindh Multi Purpose Project (Phase-Ii) Section - 2: Salient Features
Kalisindh Multi Purpose Project (Phase-Ii) Section - 2: Salient Features
Section - 2
SALIENT FEATURES
1. Name of the project KALISINDH Multipurpose
Irrigation Project-Phase II
2. Type of Project (Irrigation or Multipurpose) Multipurpose
3. Location
3.1 River Basin
(a) Name Chambal
(b) Located in
(i) State(s) M.P. & Rajasthan
(ii) Countries (if international river) N.A.
3.2 River/Tributary Kalisindh river (Chambal
basin)
3.3 State(s) District(s) Taluka(s) or Tehsils in which following Rajasthan, Jhalawar,
are located:
(a) Reservoir Rajasthan, Jhalawar,
Jhalrapatan.
(b) Headwork Rajasthan, Jhalawar,
Jhalrapatan.
(c) Command Area Rajasthan, Jhalawar & Kota,
Jhalrapatan, Khanpur, Sangod
(d) Power house N.A.
3.4 Name of village near the Head –works Bhanwarasi.
3.5 Location of Head-works
(a) Longitude 76°13’14.2’’ E
(b) Latitude 24°29’52.0’’N
(c) Lies in Earthquake Zone No. II
3.6 Project area reference to:
(a) Degree Sheets 54D-1,D-2,D-3,D-5,D-6,D-7 at
1:50000 Scale
(b) Index Plan Vol. V Appendix.
3.7 Access to the project
Name Distance from project site
(a) Airport Jaipur (350 km)
(b) Rail head Jhalawar
(c) Road head Jhalrapatan. (9 km)
(d) River port N.A.
(e) Sea port N.A.
3.8 Rail/ Road transportation limit of
(a) Weight (T) Broad Gauge Railway Rules
(b) Dimensions (Lx B x H) Broad Gauge Railway Rules
4. International / Interstate aspects of the project Interstate aspects involved.
(a) Catchments area of the basin 7547 sq. km. (M.P+
Rajasthan.)
(b) State-wise/country-wise details of catchments M.P. (6685 Sq. Km.)
area Raj. (862 Sq. Km.)
(c) Submergence due to projects
a
(i) In the state 4052 ha.
(ii) In other states Nil
(iii) In other countries Nil
(d) Water allocation for the state (if any)/country 100% water of 862 sq. km. of
Raj.+10% of catchment area
of 6685 sq. km. of M.P.
(148.11)
(e) Water allocation for other states/countries Nil
(f) Committed utilization Nil
Upstream Projects
Irrigation Water Therm Industr Hydel
supply al ial
(i) Projects completed Chauli Medium Irrigation
Project
(ii) Projects under construction Nil
(iii) Future Projects Nil
(iv) Any other Nil
Downstream Projects Nil
Irrigation Water Therm Industr Hydel
supply al ial
(i) Projects completed Nil
(ii) Projects under construction Nil
(iii) Future Projects Nil
(iv) Any other --
(g) Proposed annual utilization by the project
(i) Irrigation
- Kharif 7.16 Mcum
- Rabi 42.01 Mcum
- Hot weather Nil
Total: 49.24 Mcum
(ii) Water Supply 16.5 MCum
(iii) Hydel (evaporation losses)
(iv) Thermal power 71.28 Mcum
(v) Industrial & Horticulture College 1.0+ 0.255 Mcum
Gross annual utilization {sum of (i) to (v)} 139 MCum
(h) Minimum agreed/ proposed flow in the river for --
maintaining ecology
5. Estimated life of the project (years) 50 Years
6. Irrigation ( ha. ) By Flow
1. Gross command area (GCA) 12724 Ha.
2. Culturable command area (CCA) 10181 Ha.
3. Area under Irrigation (break up):
(i) Kharif 3054 Ha. (30%)
(ii) Rabi 13826 Ha. (85%)
(iii) Hot weather --
(iv) Two seasonal --
(v) Perennial --
(vi) Gross irrigated area (GIA)**
b
(vii)Intensity of irrigation (GIA x 100%) 115%
CCA
(viii) District (s) Benefited (if the district benefited is Jhalawar
predominantly tribal or drought prone, it may be so
indicated against each district).
** Irrigated area under Kharif, two seasonal, perennial,
Rabi and hot weather shall be indicated.
4. Cost per hectare of gross area irrigated at canal cost 68861/16624.51=4.14
Lacs/Ha
5. Cost per 1000cum of gross/live storage at canal cost 68861
/(147.69*1000000)*1000
=0.466 Lacs/1000 cum
6. Cost per 1000 cum of water delivered at the (Canal 68861/(38.08*1000000)*1000
head/outlet) (38.08 MCM) =1.81 Lacs/1000 cum
7. Water utilization 139 MCM
7. Flood control Project is not primarily a flood
control project
(a) Area protected from floods (ha) -
(b) Population protected from floods (no.) -
(c) Average annual flood damage (Rs. Million) -
(i) Without project -
(ii) With project (anticipated) -
(d) Safe carrying capacity of the river
(i) Without project 32411 cumecs
(ii) With project 32411 cumecs
8. Navigation
(a) Location of the navigable reach No Navigation Proposed from
(b) Length of the navigable reach project
(c) Minimum draft
(d) Total tonnage of goods to be carried annually
(e) Expected passenger traffic (annual)
9. Water supply
9.1 Domestic
(a) Names of towns/villages served Jhalawar district
(b) Size of population served 2,00,000
(c) Quantum of water made available (Cum) 10 MCum
(d) Quantum of water per capita (litre) 100
9.2 Industrial
(a) Name(s) {location(s)} Agro food park
(b) Quantum of water made available (Cum) 1.0 Mcum
10. Project Performance No Simulation done
Period of Simulation New Project
(a) Irrigation Rabi & Kharif
(b) Power Thermal
(c) Flood Control Nil
(d) Water Supply 12 Month
(e ) Navigation Nil
(e) Industrial 12 Months
Horticulture & Forestry 12 Months
c
11. Hydrology
11.1 Catchments
11.1.1 Catchments area at headwork site(Sq. km)
(a) Gross (Raj- 862Sq Km & MP-6685Sq Km) 7547 Sq Km
(b) Intercepted: Nil
(i) By existing projects 222 Sq. Km
(ii) By ongoing projects Nil
(iii) By contemplated projects Nil
(c) Un intercepted 7325 Sq. Km.
11.1.2 Catchments area classification according to mode of
precipitation (sq. km.)
(a) Rain fed Good
(b) Snow fed Nil
11.2 Precipitation annual 1000 mm
11.2.1 Catchments
Rainfall (weighted mm) Snowfall (mm) Annual
Annual Monsson
(June-Oct.)
(a) Average 1000 mm 900 mm -
(b) Maximum 1551 mm 1551mm -
(c) Minimum 480 mm 480 mm -
(d) Co-efficient of variation -
11.2.2 Command
Cropping Season
Annual Kharif Rabi Hot
(June-october) (Nov-Feb.) (March-May)
(a) Average - 3810 10668 -
(b) 80% dependable - - - -
(c) ETO (mm) - - - -
January
February
f
March
April
May
June
July In All yearly 13% of storage evaporation considered
August
September
October
November
December
12.9 Seepage in the reservoir New Project, Normal seepage
anticipated
13. Submergence
13.1 Land and property submerged MWL FRL
(a) Villages affected (No.) 31 No’s
(i) Fully Nil
(ii) Partially 27 Nos.
(b) Land affected (ha.) 4052 Ha.
(a) Gross 4052 Ha.
(b) Culturable 4014 Ha.
(c) Irrigated 4014 Ha.
(d) Forest 67.029 Ha.
(e) Other (specify) Govt. Land
(f) Buildings/house (No.)
(i) Private - 800
(ii) Community’s - All
(iii) Govt. - 30
(g) Wells (No.) - 320
(h) Road/rail (km) Rail = Nil Nil 10.00
Road=10.00Km Km
(i) Transmission lines (km.) 10 Km
(j) Any other Nil
13.2 Submergence ratio (with reference to culturable
command areas)
13.3 Number of families / persons affected Families Persons
(a) Total 800 3640
(b) Scheduled Castes - -
(c) Other Backwards Castes - -
(d) General - -
13.4 Anticipated back water levels at important places
along the periphery of the reservoir
S.No. Name of Place Back water level (El-m)
No -
14. Headworks
14.1 Dam
14.1.1 Embankment Dam N.A.
(a) Type of dam N.A.
(Homogenous/Zoned/Rock-fill/Concrete
g
faced
(b) Length of the dam at top (m) N.A.
(i) Right Flank N.A.
(ii) Left Flank N.A.
(c) Top which (m) N.A.
(d) Maximum Height above G.L. (m) N.A.
(i) Right Flank N.A.
(ii) Left Flank N.A.
(e) Dyke(s) N.A.
(i) Number N.A.
(ii) Total length (m) N.A.
(iii) Maximum height (m) N.A.
(f) Type of cut off and maximum depth N.A.
(Upstream blanket/open
trench/diaphragm/grout
curtain/combination of alternatives)
14.1.2 Masonry and Concrete Dam (Nov-over flow Left side Right side
section)
(a) Type of Dam Concrete
(Masonry/Concrete/Composite any other)
(b) EL of top (m) 325.00 M 325.00 M
(c) EL of deepest foundation (m) 294.50 M 294.50 M
(d) Length at the top (m) 230.00 M 118.00 M
(e) Length at the river bed (m) - -
(f) Width at top (m) 6.00 6.00
(g) Width at deepest bed level (m) 18.75 18.75
(h) Maximum height above deepest 29.00 29.00
foundation level (m)
14.1.3 Spillway (overflow section)
(a) Type of spillway Ogee
(Ogee/chute/side channel/tunnel/syphon/any
other type (specify)
(b) Full reservoir water level (EL-m) 319.25 M
(c) Maximum water level (EL-m) 319.25 M
(d) Length (m) 607.00 M
(e) Maximum height above the deepest 24.75 M
foundation (m)
(f) Crest level (El-m) 306.00 M
(g) Number of gates 33
(h) Type of gate Radial Gate
(i) Size of gate (El-m) 15 x 13.25 M
(j) Maximum discharging capacity (m3/s.) at
(i) FRL 32411 Cumecs
(ii) MWL 32411 Cumecs
(k) Flood lift (m) 13.25 M
(I) Tail water level (EL-m)
(i) Maximum 311.20 M
(ii) Minimum 302.00 M
(m) Type of energy dissipation arrangement Stilling Basin
h
(a) Type of hoisting arrangement and its
capacity
Note:- Similar details shall be furnished
for subsidiary and auxiliary spillway, if
any.
14.1.4 River sluice(s), Irrigation/Power outlet(s)
(a) Purpose Irrigation
(b) Number 3
(c) Size(M) 1.80x2.25 m
(d) Sill level (El-m) LMC I - 314.10,
RMC - 314.05 &
LMC II- 306.00
(e) Discharging capacity at (Cum /s.) 0.78 , 0.901 & 4.5771
(i) Full reservoir level 319.25 M
(ii) Minimum draw down level 306.00 M
(f) Number of gates 3 nos
(g) Type of gate Vertical
(h) Size of gate (mxm) 1.80x2.25
(i) Type of hoisting arrangement and its Vertical Hoisting
capacity
Note: The above details shall be furnished for
al the sluices provided for different purposes.
14.2 Barrage for irrigation Not Provided
14.2.1 Location with respect to dam, if any --
14.2.2 Length (m) --
14.2.3 Spillway bays
(a) Total length (m) --
(b) Full Pond level (El-m) --
(c) Maximum water level (El-m) --
(d) Maximum height of spillway crest above --
deepest foundation (m)
(e) Length of bay (m) --
(f) Crest level (El-m) --
(g) Number of gates --
(h) Type of gates --
(i) Size of gate (mxm) --
(j) Type of energy dissipation arrangement --
(k) Maximum discharging capacity (m3/s.) --
(l) Tail water level (El-m)
(i) Maximum --
(ii) Minimum --
(m) Type of hoisting arrangement and its --
capacity
14.2.4 Under Sluice Bays Left Side Right side
(a) Total length (m) Not Provided
(b) Crest level (El-m)
(c) Maximum height of under sluice crest
above deepest foundation –(m)
(d) Length of bay (m)
i
(e) Sill level (El-m)
(f) Number of gates
(g) Type of gates
(h) Size of gate (mxm)
(i) Type of energy dissipation arrangements
(j) Maximum discharging capacity of under
sluices (m3/s.)
(k) Silt excluder tunnel(s)
(i) Number
(ii) Length
(iii) Size (m)
(iv) Floor level (El-m)
(l) Type of hoisting arrangement and its
capacity
14.2.5 Guide bunds/afflux bunds Right side
Left Side
Length top level Length top level
(El-m) (El-m)
(a) Guide bunds Not Provided
(i)Upstream Nil Not Provided
(ii)Downstream Nil Not Provided
(b) Affludx bunds Not Provided
(c) Other protective works (if any) Not Provided
l
- Discharging capacity (m3/s.)
17.11 Intakes N.A.
(a) Upper Intake
Type & size of intake
(ii) Entry profile with details of transition
(iii) Stability of the slope/cuts around intake
(iv) Design Valocity through trash rack and bellmouth
(v) Submergence of the entry below water level
(vi) Intake gates-number, type size
(vii) Details of anti-vortex arrangements
(viii) Type of hoisting arrangement and its capacity
20.2 Benefits
Item: Revenue
Quantity Unit Price Value Rs. Lakh
Betterment levy --
Water Rates --
Irrigation Cess --
Pisciculture rights auction -
Power Rates -
Navigation
(i) Cargo Rates -
(ii) Regd. Charges -
(iii) Passenger Tax -
Others.
Total:
o
Internal Rate Return (IRR)
-With cost of CAD works
-Without cost of CAD works
B.C. Ratio with discounted cash flow method Irrigation
-With cost of CAD works N.A.
-Without cost of CAD works
Financial Rate of Return (FRR) ( After 15 Yr. of completion)
-With cost of CAD works
-Without cost of CAD works NA