Kalisindh Multi Purpose Project (Phase-Ii) Section - 2: Salient Features

The Kalisindh Multipurpose Irrigation Project Phase II is located in the Chambal river basin, spanning the states of Madhya Pradesh and Rajasthan. It aims to provide irrigation, water supply, and hydropower, with a gross command area of 12,724 hectares and an estimated project life of 50 years. The project will utilize approximately 139 million cubic meters of water annually for various purposes, including irrigation for Kharif and Rabi crops.

Uploaded by

kkodge
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views16 pages

Kalisindh Multi Purpose Project (Phase-Ii) Section - 2: Salient Features

The Kalisindh Multipurpose Irrigation Project Phase II is located in the Chambal river basin, spanning the states of Madhya Pradesh and Rajasthan. It aims to provide irrigation, water supply, and hydropower, with a gross command area of 12,724 hectares and an estimated project life of 50 years. The project will utilize approximately 139 million cubic meters of water annually for various purposes, including irrigation for Kharif and Rabi crops.

Uploaded by

kkodge
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

KALISINDH MULTI PURPOSE PROJECT (Phase-II)

Section - 2
SALIENT FEATURES
1. Name of the project KALISINDH Multipurpose
Irrigation Project-Phase II
2. Type of Project (Irrigation or Multipurpose) Multipurpose
3. Location
3.1 River Basin
(a) Name Chambal
(b) Located in
(i) State(s) M.P. & Rajasthan
(ii) Countries (if international river) N.A.
3.2 River/Tributary Kalisindh river (Chambal
basin)
3.3 State(s) District(s) Taluka(s) or Tehsils in which following Rajasthan, Jhalawar,
are located:
(a) Reservoir Rajasthan, Jhalawar,
Jhalrapatan.
(b) Headwork Rajasthan, Jhalawar,
Jhalrapatan.
(c) Command Area Rajasthan, Jhalawar & Kota,
Jhalrapatan, Khanpur, Sangod
(d) Power house N.A.
3.4 Name of village near the Head –works Bhanwarasi.
3.5 Location of Head-works
(a) Longitude 76°13’14.2’’ E
(b) Latitude 24°29’52.0’’N
(c) Lies in Earthquake Zone No. II
3.6 Project area reference to:
(a) Degree Sheets 54D-1,D-2,D-3,D-5,D-6,D-7 at
1:50000 Scale
(b) Index Plan Vol. V Appendix.
3.7 Access to the project
Name Distance from project site
(a) Airport Jaipur (350 km)
(b) Rail head Jhalawar
(c) Road head Jhalrapatan. (9 km)
(d) River port N.A.
(e) Sea port N.A.
3.8 Rail/ Road transportation limit of
(a) Weight (T) Broad Gauge Railway Rules
(b) Dimensions (Lx B x H) Broad Gauge Railway Rules
4. International / Interstate aspects of the project Interstate aspects involved.
(a) Catchments area of the basin 7547 sq. km. (M.P+
Rajasthan.)
(b) State-wise/country-wise details of catchments M.P. (6685 Sq. Km.)
area Raj. (862 Sq. Km.)
(c) Submergence due to projects
a
(i) In the state 4052 ha.
(ii) In other states Nil
(iii) In other countries Nil
(d) Water allocation for the state (if any)/country 100% water of 862 sq. km. of
Raj.+10% of catchment area
of 6685 sq. km. of M.P.
(148.11)
(e) Water allocation for other states/countries Nil
(f) Committed utilization Nil
Upstream Projects
Irrigation Water Therm Industr Hydel
supply al ial
(i) Projects completed Chauli Medium Irrigation
Project
(ii) Projects under construction Nil
(iii) Future Projects Nil
(iv) Any other Nil
Downstream Projects Nil
Irrigation Water Therm Industr Hydel
supply al ial
(i) Projects completed Nil
(ii) Projects under construction Nil
(iii) Future Projects Nil
(iv) Any other --
(g) Proposed annual utilization by the project
(i) Irrigation
- Kharif 7.16 Mcum
- Rabi 42.01 Mcum
- Hot weather Nil
Total: 49.24 Mcum
(ii) Water Supply 16.5 MCum
(iii) Hydel (evaporation losses)
(iv) Thermal power 71.28 Mcum
(v) Industrial & Horticulture College 1.0+ 0.255 Mcum
Gross annual utilization {sum of (i) to (v)} 139 MCum
(h) Minimum agreed/ proposed flow in the river for --
maintaining ecology
5. Estimated life of the project (years) 50 Years
6. Irrigation ( ha. ) By Flow
1. Gross command area (GCA) 12724 Ha.
2. Culturable command area (CCA) 10181 Ha.
3. Area under Irrigation (break up):
(i) Kharif 3054 Ha. (30%)
(ii) Rabi 13826 Ha. (85%)
(iii) Hot weather --
(iv) Two seasonal --
(v) Perennial --
(vi) Gross irrigated area (GIA)**

b
(vii)Intensity of irrigation (GIA x 100%) 115%
CCA
(viii) District (s) Benefited (if the district benefited is Jhalawar
predominantly tribal or drought prone, it may be so
indicated against each district).
** Irrigated area under Kharif, two seasonal, perennial,
Rabi and hot weather shall be indicated.
4. Cost per hectare of gross area irrigated at canal cost 68861/16624.51=4.14
Lacs/Ha
5. Cost per 1000cum of gross/live storage at canal cost 68861
/(147.69*1000000)*1000
=0.466 Lacs/1000 cum
6. Cost per 1000 cum of water delivered at the (Canal 68861/(38.08*1000000)*1000
head/outlet) (38.08 MCM) =1.81 Lacs/1000 cum
7. Water utilization 139 MCM
7. Flood control Project is not primarily a flood
control project
(a) Area protected from floods (ha) -
(b) Population protected from floods (no.) -
(c) Average annual flood damage (Rs. Million) -
(i) Without project -
(ii) With project (anticipated) -
(d) Safe carrying capacity of the river
(i) Without project 32411 cumecs
(ii) With project 32411 cumecs
8. Navigation
(a) Location of the navigable reach No Navigation Proposed from
(b) Length of the navigable reach project
(c) Minimum draft
(d) Total tonnage of goods to be carried annually
(e) Expected passenger traffic (annual)
9. Water supply
9.1 Domestic
(a) Names of towns/villages served Jhalawar district
(b) Size of population served 2,00,000
(c) Quantum of water made available (Cum) 10 MCum
(d) Quantum of water per capita (litre) 100
9.2 Industrial
(a) Name(s) {location(s)} Agro food park
(b) Quantum of water made available (Cum) 1.0 Mcum
10. Project Performance No Simulation done
Period of Simulation New Project
(a) Irrigation Rabi & Kharif
(b) Power Thermal
(c) Flood Control Nil
(d) Water Supply 12 Month
(e ) Navigation Nil
(e) Industrial 12 Months
Horticulture & Forestry 12 Months
c
11. Hydrology
11.1 Catchments
11.1.1 Catchments area at headwork site(Sq. km)
(a) Gross (Raj- 862Sq Km & MP-6685Sq Km) 7547 Sq Km
(b) Intercepted: Nil
(i) By existing projects 222 Sq. Km
(ii) By ongoing projects Nil
(iii) By contemplated projects Nil
(c) Un intercepted 7325 Sq. Km.
11.1.2 Catchments area classification according to mode of
precipitation (sq. km.)
(a) Rain fed Good
(b) Snow fed Nil
11.2 Precipitation annual 1000 mm
11.2.1 Catchments
Rainfall (weighted mm) Snowfall (mm) Annual
Annual Monsson
(June-Oct.)
(a) Average 1000 mm 900 mm -
(b) Maximum 1551 mm 1551mm -
(c) Minimum 480 mm 480 mm -
(d) Co-efficient of variation -
11.2.2 Command
Cropping Season
Annual Kharif Rabi Hot
(June-october) (Nov-Feb.) (March-May)
(a) Average - 3810 10668 -
(b) 80% dependable - - - -
(c) ETO (mm) - - - -

11.3 Annual yield calculated at the proposed site (MCum)


Gross Net
(a) Maximum 958.20 MCum (Yr.1996-97) -
(b) Minimum 51.60 MCum (Yr.2002-03) -
(c) Average 342.29 MCum -
(d) Dependable (per cent)
Annual Monssoon
(June-October)
(i) 50 - MCum - MCum
(ii) 75% 139.0 MCum 139.00 MCum
11.4 Climatic Data (Command)

11.4.1 Name of Station(s) and period of record


SI. No Names Period of Record
From To
1. Jhalawar 1971 2008
2. Jhalrapatan 1971 2008
3. Raipur 1971 2008
d
11.4.2 Data (average of all stations in Normal Maximum Minimum
command area)
(a) Air temp. (0C) 1140 F 380 F
(b) Humidity (Per cent) 91 12
(c) Wind (Km/hr) 128 kmph

11.5 Seismic Coefficients


(a) Horizontal 0.01
(b) Vertical 0.005
11.6 Utilization within the State (MCum) 148.11 MCum
11.6.1 Water availability (State’s share in case of Free catchment of Rajasthan
interstate river) (862-222)Sq. Km.+10% of
Chauli (22.2) + 10% of M.P.
668.50 = 1330.70 Sq km Say
1331.00Sqkm
11.6.2 Committed Utilization
Upstream Projects Major Medium Minor
(i) Projects completed - - -
(ii) Projects under construction - - -
(iii) Future Projects - - -
(vi) Any other - - -
Down Stream Projects
(i) Projects completed - - -
(ii) Projects under construction - - -
(iii) Future Projects 1 - -
(vi) Any other - - -
11.6.3 Proposed utilization by the project 148.11MCum
Irrigation
(i) Kharif 3562.51 Ha.
(ii) Rabi 12825.02 Ha
(iii) Hot Weather -
(iv) Perennials -
Total :- 16387.52 Ha.
(b) Water Supply 10 MCum
11.7 Flood near the headwork site 32411 Cumecs
11.7.1 Historical-Period of record form …to ……………… Location(s)
(a) Maximum water level (El-m) 1 2 3
(b) Maximum Discharge estimated (M3/s.) --
(c) Year of occurrence, date
11.7.2 Observed-period of record from …… to Location(s)
(a) Maximum water level (El-m) 1 2 3
3
(b) Maximum Discharge (M /s.) --
(c) Year of occurrence, date
11.7.3 Estimated Flood Magnitude (M3/S.)
(a) 50 year return period -
(b) 100 year return period 15402
e
(c) 1000 year project period 32411
(d) Standard project flood -
(e) Maximum probable flood 32411 Cumecs
11.7.4 Design flood (M3/s.)
(a) Dam 32411 Cumecs
(b) Weir/Barrage N.A.
(c) Construction Diversion N.A.
(d) Flood Control Works N.A.
11.7.5 River flows (minimum observed) No Gauge site data
available for this river.
(a) Water level (El-m) --
(b) Discharge (m3/s.) --
(c) Months of ‘nil’ flow, if any. --
12. Reservoir
12.1 Water levels (El-m)
(a) Maximum Water Level (MWL) 319.25 M
(b) Full Reservoir Level (FRL) 319.25 M
(c) Minimum Draw Down Level (MDDL) 306.00 M
(d) Outlet levels
(i) Irrigation --
(ii) Power --
(iii) Others (Please specify) --
(i) Dead Storage Level 306.00 M
12.2 Free board (m) 4.25 M
12.3 Wave height (m)
12.4 Live storage (Mm3)
As per FRL 147.69 MCum
Utilization 147.69 MCum
12.5 Capacity (Mm3) at:
(a) Maximum water level 147.69 MCum
(b) Full reservoir level 147.69 MCum
(c) Minimum draw down level 306.00 M
(d) Dead storage level 0.42 MCum
12.6 Flood absorption capacity (Mm3) 148.11 MCum

(a) Below FRL 148.11 MCum


(b) Between FRL & MWL Nil
12.7 Sedimentation (Mm3) and levels after Years 50 100
(a) Above MDDL
(b) Below MDDL
(c) Encroachment of live storage (per cent)
(d) New Zero elevation

12.8 Average monthly evaporation losses from the reservoir (Mm3)


Month Average Evaporation Loss (Mm3)

January
February

f
March
April
May
June
July In All yearly 13% of storage evaporation considered
August
September
October
November
December
12.9 Seepage in the reservoir New Project, Normal seepage
anticipated
13. Submergence
13.1 Land and property submerged MWL FRL
(a) Villages affected (No.) 31 No’s
(i) Fully Nil
(ii) Partially 27 Nos.
(b) Land affected (ha.) 4052 Ha.
(a) Gross 4052 Ha.
(b) Culturable 4014 Ha.
(c) Irrigated 4014 Ha.
(d) Forest 67.029 Ha.
(e) Other (specify) Govt. Land
(f) Buildings/house (No.)
(i) Private - 800
(ii) Community’s - All
(iii) Govt. - 30
(g) Wells (No.) - 320
(h) Road/rail (km) Rail = Nil Nil 10.00
Road=10.00Km Km
(i) Transmission lines (km.) 10 Km
(j) Any other Nil
13.2 Submergence ratio (with reference to culturable
command areas)
13.3 Number of families / persons affected Families Persons
(a) Total 800 3640
(b) Scheduled Castes - -
(c) Other Backwards Castes - -
(d) General - -
13.4 Anticipated back water levels at important places
along the periphery of the reservoir
S.No. Name of Place Back water level (El-m)
No -
14. Headworks
14.1 Dam
14.1.1 Embankment Dam N.A.
(a) Type of dam N.A.
(Homogenous/Zoned/Rock-fill/Concrete
g
faced
(b) Length of the dam at top (m) N.A.
(i) Right Flank N.A.
(ii) Left Flank N.A.
(c) Top which (m) N.A.
(d) Maximum Height above G.L. (m) N.A.
(i) Right Flank N.A.
(ii) Left Flank N.A.
(e) Dyke(s) N.A.
(i) Number N.A.
(ii) Total length (m) N.A.
(iii) Maximum height (m) N.A.
(f) Type of cut off and maximum depth N.A.
(Upstream blanket/open
trench/diaphragm/grout
curtain/combination of alternatives)
14.1.2 Masonry and Concrete Dam (Nov-over flow Left side Right side
section)
(a) Type of Dam Concrete
(Masonry/Concrete/Composite any other)
(b) EL of top (m) 325.00 M 325.00 M
(c) EL of deepest foundation (m) 294.50 M 294.50 M
(d) Length at the top (m) 230.00 M 118.00 M
(e) Length at the river bed (m) - -
(f) Width at top (m) 6.00 6.00
(g) Width at deepest bed level (m) 18.75 18.75
(h) Maximum height above deepest 29.00 29.00
foundation level (m)
14.1.3 Spillway (overflow section)
(a) Type of spillway Ogee
(Ogee/chute/side channel/tunnel/syphon/any
other type (specify)
(b) Full reservoir water level (EL-m) 319.25 M
(c) Maximum water level (EL-m) 319.25 M
(d) Length (m) 607.00 M
(e) Maximum height above the deepest 24.75 M
foundation (m)
(f) Crest level (El-m) 306.00 M
(g) Number of gates 33
(h) Type of gate Radial Gate
(i) Size of gate (El-m) 15 x 13.25 M
(j) Maximum discharging capacity (m3/s.) at
(i) FRL 32411 Cumecs
(ii) MWL 32411 Cumecs
(k) Flood lift (m) 13.25 M
(I) Tail water level (EL-m)
(i) Maximum 311.20 M
(ii) Minimum 302.00 M
(m) Type of energy dissipation arrangement Stilling Basin
h
(a) Type of hoisting arrangement and its
capacity
Note:- Similar details shall be furnished
for subsidiary and auxiliary spillway, if
any.
14.1.4 River sluice(s), Irrigation/Power outlet(s)
(a) Purpose Irrigation
(b) Number 3
(c) Size(M) 1.80x2.25 m
(d) Sill level (El-m) LMC I - 314.10,
RMC - 314.05 &
LMC II- 306.00
(e) Discharging capacity at (Cum /s.) 0.78 , 0.901 & 4.5771
(i) Full reservoir level 319.25 M
(ii) Minimum draw down level 306.00 M
(f) Number of gates 3 nos
(g) Type of gate Vertical
(h) Size of gate (mxm) 1.80x2.25
(i) Type of hoisting arrangement and its Vertical Hoisting
capacity
Note: The above details shall be furnished for
al the sluices provided for different purposes.
14.2 Barrage for irrigation Not Provided
14.2.1 Location with respect to dam, if any --
14.2.2 Length (m) --
14.2.3 Spillway bays
(a) Total length (m) --
(b) Full Pond level (El-m) --
(c) Maximum water level (El-m) --
(d) Maximum height of spillway crest above --
deepest foundation (m)
(e) Length of bay (m) --
(f) Crest level (El-m) --
(g) Number of gates --
(h) Type of gates --
(i) Size of gate (mxm) --
(j) Type of energy dissipation arrangement --
(k) Maximum discharging capacity (m3/s.) --
(l) Tail water level (El-m)
(i) Maximum --
(ii) Minimum --
(m) Type of hoisting arrangement and its --
capacity
14.2.4 Under Sluice Bays Left Side Right side
(a) Total length (m) Not Provided
(b) Crest level (El-m)
(c) Maximum height of under sluice crest
above deepest foundation –(m)
(d) Length of bay (m)
i
(e) Sill level (El-m)
(f) Number of gates
(g) Type of gates
(h) Size of gate (mxm)
(i) Type of energy dissipation arrangements
(j) Maximum discharging capacity of under
sluices (m3/s.)
(k) Silt excluder tunnel(s)
(i) Number
(ii) Length
(iii) Size (m)
(iv) Floor level (El-m)
(l) Type of hoisting arrangement and its
capacity
14.2.5 Guide bunds/afflux bunds Right side
Left Side
Length top level Length top level
(El-m) (El-m)
(a) Guide bunds Not Provided
(i)Upstream Nil Not Provided
(ii)Downstream Nil Not Provided
(b) Affludx bunds Not Provided
(c) Other protective works (if any) Not Provided

14.3 Weir Not Provided


Type of weir
Length of weir (m)
Deepest foundation (El-m)
Type of Energy dissipation arrangement
Crest level (El-m)
Maximum water level (El-m)
Tail water level (El-m)
(i) Maximum
(ii) Minimum
Maximum discharging (m3/sec) capacity
Note:- For gated weir, information as asked
under 14.2 Barrage shall be furnished.
14.4 Head Regulator(s)
(a) Total length (Km)
(b) Height above deepest foundation (m)
(c) Length of bay (m)
(d) Sill level (El-m)
(e) Number of gates
(f) Types of gates
(g) Size of gate
(h) Number of silt excluder bays
(i) Type of energy dissipation arrangement
(j) Type of hoisting arrangement and its
capacity
j
15. Canal System
15.1 Main Canal (Name)
15.1.2 Type
(a) Flow/lift
(b) Lined-unlined
(c) Discharging capacity of the channel
above which lining is proposed
(d) Type of lining Cement concrete lining
15.1.3 Design data
(a) Length (km)
(b) Full supply level at head/tail (El-m)
(c) Full supply depth at head/tail (El-m
(d) Bed width at head/tail (El-m
(e) Side slope at head/tail (El-m)
(f) Bed slope (range)
(g) Maximum discharging capacity at
head/tail(El-m)(m3/s.)
(h) Total number of canal structures
(i) Total assumed head losses across the
structure (m)
(j) Gross Command Area (ha)
(k) Culturable Command area (ha)
15.1.4 Distribution System
Distribution Minors Sub-minors Water Courses
(a) Number
(b) Total length (km)
15.2 Efficiencies (percent)
(a) Conveyance
(b) Field application
16. Cropping Pattern
Percentage area (CCA)
Existing Proposed
16.1 Name of crop (seasion-wise)
Kharif
(a) Maize 10%
(b) Jowar
(c) Pulses
(d)Ground Nut
(e)Soyabean 15%
(f)Others
Rabi
(a)Wheat 20%
(b)Gram 10%
(c)Mustard 30%
(d)Coriander 15%
(d) Oranges 10%
(e)Others 5%
Note: If there are different cropping patterns in
different reaches of the canal information for each
k
reach shall be given separately.
17. Power 2520 MW Thermal power
17.1 Type-Conventional /Pumped storage N.A.
17.2 Installed capacity (MW) N.A.
17.3 Load factor 0.8
17.4 Annual energy (kwh) 18322 M KWH
(a) Firm
(b) Seasonal
(c) Total
17.5 Off peak requirement for pumping N.A.
17.6 Cost per kW installed N.A.
17.7 Cost per kWh at the bus bar N.A.
17.8 Head Race Channel /Tunnel
(a) Length (m) N.A.
(b) Shape N.A.
(c) Size)m) N.A.
(d) Rock type reach-wise-RMR/Q values N.A.
(e) Rock cover reach-wise N.A.
(f) Free/Pleasure flow N.A.
(g) Lining type-PCC/RCC/Steel N.A.
(h) Reach-wise Design Internal & External N.A.
pressures
(i) Thickness of lining (m) N.A.
(j) Designed discharge (m3/s.) N.A.
(k) Invert level at (El-m) N.A.
(l) Gates-No., type & size N.A.
For pumped storage project only.

17.9 Balancing Reservoir N.A.


(a) Capacity (Mm3)
(b) Full reservoir level (El-m)
(c) Maximum Drawdown Level (El-m)
(d) Minimum Drawdown Level (El-m)
(e) Live Storage (Mm3)
(f) Balancing period (hrs.)
17.10 Forebay N.A.
Size of forebay (m)
Sill level of forebay (El-m)
Full reservoir level (El-m)
Maximum reservoir level (El-m)
Minimum drawdown level (El-m)
Duration of storage
Number of off-takes
Size of off-takes
Invert level at off-take (El-m)
Capacity of each off-take (m3/s.)
Escape arrangement
- Location
- Length

l
- Discharging capacity (m3/s.)
17.11 Intakes N.A.
(a) Upper Intake
Type & size of intake
(ii) Entry profile with details of transition
(iii) Stability of the slope/cuts around intake
(iv) Design Valocity through trash rack and bellmouth
(v) Submergence of the entry below water level
(vi) Intake gates-number, type size
(vii) Details of anti-vortex arrangements
(viii) Type of hoisting arrangement and its capacity

(b) Lower Intake (for pumped storage scheme)


(i) Type & size of intake
(ii) Entry profile with details of transition
(iii) Stability of the slope/cuts around intake
(iv) Design velocity through trash rack and bellmouth
(v) Submergence of the entry below water level
(vi) Intake gates-number type size
(vii) Details of anti-vortex arrangements
17.12 Surge tank/shaft N.A.
(a) Nos. & location (HRT/TRT or both)
(b) Type height & size
(c) Orifice – size & position (or any other relevant detail)
(d) Top level (El-m)
(e) Bottom Level (El-m)
(f) Steady state level (El-m)
(g) Capacity (Mm3)
(h) Lower expansion chamber-size & location
(i) Upper expansion chamber-size & location
(j) Maximum surge level (El-m)
(k) Minimum surge level (El-m)
(l) Size of gates and capacity of hoists
17.13 Penstocks/ pressures shafts: N.A.
(a) Number, diameter & length
(b) Inclination
(c) Liner type
(d) Grade of steel
(e) Reach wise rock cover
(f) Reach wise rock properties-RMR/Q
(g) Reach wise rock participation factors-computed &
adopted
(h) Reach wise liner thickness
(i) Necessity for heat treatment if any,
(j) Bifurcation/trifurcation
(k) Gate-Number, Type & Size
(l) Size gates and capacity of hoists
17.14 Power House: N.A.
(a) Type:- (Surface or underground)
(b) Orientation
m
(c) Rock types encountered-RMRO/Q Values
(d) Major wedge formations, if any
(e) Rock ledge dimension between cavities
(f) Maximum head (m)
(g) Minimum head (m)
(h) Average head (m)
(i) Head loss in water conductor system
(j) Design head (m
(k) Dimensions (m)
(l) Unit capacity
(m) Installed capacity (MW)
(n) Type of turbine
(o) Type of generator
(p) Type of power house crane
(q) Number and size of draft gates/bulk head and capacity
hoists
17.15 Switch yard N.A.
(a) Type
(b) Voltage level
(c) No. of incoming and outgoing bays
17.16 Transformer Cavern N.A.
Dimension
Orientation
Rock types encountered – RMR/Q Values
Major wedge formations, if any
Rock ledge-dimension between cavities
17.17 Tail Race Channel N.A.
Shape & Size
Length
Recovery slope
Side slope
Maximum tail water level (El-m)
Minimum tail water level (El-m)
Average tail water level (El-m)
Tail Water level corresponding to one unit discharge.
Tail water level corresponding to maximum flood
condition/one in thousand years flood.
HFL of recipient river channel at outfall
Draft tube gates – number, type, size
17.18 Tail Race Tunnel N.A.
(a) Number, Size and shape
Length
Reach wise rock cover
Reach wise rock properties-RMR/Q
Type of lining
Maximum tail water level (El-m)
Minimum tail water level (El-m)
Average tail water level (El-m)
Tail water level corresponding to one unit discharge.
Tail water level corresponding to maximum flood
n
condition/one in thousand year flood.
HFL of recipient river channel at outfall
Draft tube gates number, type, size
18. Construction facilities
19. Cost 1415.1 crores
19.1 Cost of the project (Rs. Lakh) Unit wise (Refer Part II Section- 214865 Lacs
3 Para 18)
19.2 Allocated cost (Rs. Lakh)
(a) Irrigation 106574 Lacs
(b)Power 93729 Lacs
(c) Flood control -
(d) Navigation -
(e) Water Supply 13131 Lacs
(f) Any other 1431.28

20. Benefits/ Revenue


20.1 Benefits
Item Benefit
Quantity Unit Price Value Rs. Lakh
Food Production (tone) -- -- 15670.81 Lacs
Power (Kwh) 2520 MW -- 78054 Lacs
Flood Protection (ha) -- -- N.A.
Navigation (tonnage) -- -- N.A.
Water supply (Population served) 10 Mcum -- 2 Lacs villagers
Any other (fisheries) -- -- Yes

20.2 Benefits
Item: Revenue
Quantity Unit Price Value Rs. Lakh
Betterment levy --
Water Rates --
Irrigation Cess --
Pisciculture rights auction -
Power Rates -
Navigation
(i) Cargo Rates -
(ii) Regd. Charges -
(iii) Passenger Tax -
Others.
Total:

21. Benefit Cost Ratio


B.C. Ratio
(i) Irrigation
-With cost of CAD works 3.33: 1
-Without cost of CAD works NA
(ii) Flood control N.A.
(iii) Power N.A.

o
Internal Rate Return (IRR)
-With cost of CAD works
-Without cost of CAD works
B.C. Ratio with discounted cash flow method Irrigation
-With cost of CAD works N.A.
-Without cost of CAD works
Financial Rate of Return (FRR) ( After 15 Yr. of completion)
-With cost of CAD works
-Without cost of CAD works NA