The document provides detailed architectural and structural plans for a residential building project in Nashik, including schedules for windows, doors, footings, and columns. It outlines specifications such as dimensions, materials, and construction standards to be followed. Additionally, it includes general notes for execution and safety measures to ensure compliance with engineering standards.

Uploaded by

Rugved Sherekar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views6 pages

Tender Drawing

The document provides detailed architectural and structural plans for a residential building project in Nashik, including schedules for windows, doors, footings, and columns. It outlines specifications such as dimensions, materials, and construction standards to be followed. Additionally, it includes general notes for execution and safety measures to ensure compliance with engineering standards.

Uploaded by

Rugved Sherekar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

0.

230
0.230
C9 C10 C11 0.230 0.150 0.230 0.230
4.300 3.690 1.130

3.930 3.610 0.760

SCHEDULE OF WINDOWS & VENTILATORS FOR TYPICAL FLOOR :

2.780
TYPE DESCRIPTION NOS. SILL LVL. LINTEL LVL. LOCATION

2.700
SIZE

2.080

3.350
3.350
FW 1.80 X 2.40 M ANODIZED 2 TRACK ALUMINUM FRENCH WINDOW 03 F.F.L 2.4 BALCONY

0.150
WITH 5mm THK CLEAR GLASS SHUTTER WITH
C8 GRANITE FRAME.

0.230
2.430 ANODIZED 3 TRACK ALUMINUM FRENCH WINDOW,
W 1.50 X 1.50 M
C7 2.870 RW1 ONE SHUTTER WITH S.S MOSQUITO NET & TWO 06 0.9 2.4 BEDROOM,
WITH 5MM THK CLEAR GLASS SHUTTER WITH KITCHEN
2.870
GRANITE FRAME.

W1 1.50 X 1.20 M ANODIZED 3 TRACK ALUMINUM FRENCH WINDOW,


1.500 RW2 02 1.2 2.4 KITCHEN
ONE SHUTTER WITH S.S MOSQUITO NET & TWO

1.500

0.230
WITH 5MM THK CLEAR GLASS SHUTTER WITH
1.440 1.800 GRANITE FRAME.
1.440 1.800 V 0.60 X 0.90 M ANODIZED ALUMINUM FRAME WITH 4mm THK. 02 1.5 2.4 TOILET

4.780
FROSTED GLASS LOUVERED VENTILATORS WITH

4.780
RW1
4.130

M.S.GRILL AT EXTERNAL SIDE & WITH EXHAUST


FAN AT THE TOP OF VENTILATOR

3.130
2.400

2.400
1.500

SCHEDULE OF DOORS FOR TYPICAL FLOOR:

0.230
0.230
C4
TYPE SIZE DESCRIPTION NOS. SILL LVL. LINTEL LVL. LOCATION
4.380
C5 2.830 D 1.00 X 2.10 M 35 mm THK BOTH SIDE LAMINATED MACHINE 01 F.F.L 2.10 LIVING
4.380 C6 PRESSED SOLID CORE SINGLE SHUTTER ENTRY
1.700
OPENABLE FLUSH DOOR WITH PEEP HOLE &
SAFETY CHAIN AND WITH TEAK WOOD DOOR
FRAME OF SIZE 125 mm x 75 mm.
D1 0.90 X 2.10 M 35 mm THK BOTH SIDE LAMINATED MACHINE 03 F.F.L 2.10 BEDROOM
PRESSED SOLID CORE SINGLE SHUTTER
3.500

3.500
OPENABLE FLUSH DOOR WITH R.C.C DOOR
A A FRAME OF SIZE 65 mm X 125 mm.

D2 0.75 X 2.10 M 35 mm THK BOTH SIDE LAMINATED MACHINE TOILET


02 F.F.L 2.10
PRESSED SOLID CORE SINGLE SHUTTER

0.230
0.230

C1 C2 C3 OPENABLE FLUSH DOOR WITH GRANITE FRAME.

2.680 3.130

0.230
0.230
1.000

1.000
3.050 1.020 1.320 3.500
0.230 0.230 0.150 0.230 0.230

PARKING FLOOR PLAN TYPICAL FLOOR PLAN


SCALE 1:100 SCALE 1:100 PROJECT CONSTRUCTION OF ONE FLOOR ONE FLAT
BUILDING FOR Mr. NYATI @ NASHIK , DIST- NASHIK

DRG. TITLE ARCHITECTURAL FLOOR PLAN

CONSULTANCY [email protected]
AURANGABAD | JAIPUR
SATARA PARISAR, AURANGABAD - 431001
DWG. NO. 2K18 - 06 REVISION R-0
SCALE NTS DATE 20-05-2018
PARAPET WALL LVL

Terrace Floor LVL

v v

BEDROOM TOILET TOILET BEDROOM


3rd Floor LVL
SUNK SUNK

v v

BEDROOM TOILET TOILET BEDROOM


2nd Floor LVL
SUNK SUNK

v v

BEDROOM TOILET TOILET BEDROOM


1st Floor LVL
SUNK SUNK

SUZU
KI
GSX
750F

SACS

SUZ
UKI

PLINTH LVL

PROJECT CONSTRUCTION OF ONE FLOOR ONE FLAT


BUILDING FOR Mr. NYATI @ NASHIK , DIST- NASHIK
SECTION A - A
DRG. TITLE SECTION VIEW

CONSULTANCY [email protected]
AURANGABAD | JAIPUR
SATARA PARISAR, AURANGABAD - 431001
DWG. NO. 2K18 - 06 REVISION R-0
SCALE NTS DATE 20-05-2018
C9 C10 C11
11900
11785
11600

C8
8855
C7
RW1
8205

LIFT RW2

6475
RW1

C4 C5 C6
3845

C1 C2 C3
115
0
4755
4830
0

300

4645

8670

9660
9845
9960
PROJECT CONSTRUCTION OF ONE FLOOR ONE FLAT
BUILDING FOR Mr. NYATI @ NASHIK , DIST- NASHIK

DRG. TITLE CENTERLINE PLAN


CENTER LINE PLAN
CONSULTANCY [email protected]
AURANGABAD | JAIPUR
SATARA PARISAR, AURANGABAD - 431001
DWG. NO. 2K18 - 06 REVISION R-0
SCALE NTS DATE 20-05-2018
LAYOUT OF FOOTINGS & COLUMN SCHEDULE

C9 C10 C11
600X230 600X230 600X230

C8
600X230
C7
600X230

LIFT

C4 C5 C6
600X230 450X230 600X230

A A
C1 C2 C3
600X230 600X230 600X230

FOUNDATION PLAN
TYP. COLUMN FOOTING PLAN

THK slab
150mm
15
THK slab

0
150mm

0 10 @ 100 C/C
15 50
8 @ 200 C/C
0

8 @ 200 C/C
0
10 @ 100 C/C 50 1560
BEAM
8 @ 200 C/C
910
10 @ 100 C/C
BEAM

10 @ 100 C/C

29
15
15
29
10 @ 100 C/C
10 @ 100 C/C

910 BEAM
8 @ 200 C/C 10 @ 100 C/C
BEAM 1560
10 @ 100 C/C 8 @ 200 C/C

SECTION 1 - 1 SECTION 2 - 2

SCHEDULE OF FOOTING AND P.C.C + 9.00

REINFORCEMENT
FOOTING FOOTING P.C.C 100THK FOOTING + 6.00
MARK TYPE 1:3:6 SIZE (L X B X D) SHORTER SIDE LONGER SIDE
+ 3.00
F-1 BOX 2800 X 2400 2600 X 2200 X 400 12T @150C/C 12T @150C/C
± 0.00
F-2 BOX 2200 X 2000 2000 X 1800 X 400 12T @150C/C 10T @150C/C

LIFT BOX 2760 X 2760 2560 X 2560 X 400 For R/F Details Refer Lift Section

GENERAL NOTES DRAWING ISSUED FOR - APPROVAL, ESTIMATION, EXECUTION, STUDY PURPOSE 13. DESHUTTERING PERIOD SHALL NOT BE LESS THAN - 18. IN NO CASE THIS DRAWING SHALL BE USED FOR ANY SIMILAR PROJECT CONSTRUCTION OF ONE FLOOR ONE FLAT
PROJECT, AT ANY OTHER PLACES
1. ALL DIMENSIONS ARE IN MM UNLESS MENTIONED OTHERWISE. 8. CLEAR COVER TO THE MAIN REINFORCEMENT SHALL BE a VERTICAL FACES OF COLUMN BEAMS & WALLS = 24 HOURS. 19. COLUMNS AND FOOTINGS ARE DESIGNED FOR PARKING + BUILDING FOR Mr. NYATI @ NASHIK , DIST- NASHIK
2. REFER THIS DRAWING ALONG WITH ARCHITECTURAL DRAWING. FOUNDATIONS - 50 MM, COLUMNS - 40 MM, BEAMS - 25 MM, SLABS - 03 FLOOR, TOTAL 4 STOREY BUILDING.
3. DO NOT SCALE THE DRAWING, REFER WRITTEN DIMENSIONS ONLY. 20 MM, RCC PARDI - 40 MM
SLAB SPANNING UPTO 3.50 M. = 7 DAYS. 20. DO NOT CAST ANY R.C.C WORK UNLESS IT IS CHECKED
4. ANY DISCREPANCY IN INFORMATION OR CO-ORDINATION IN THIS AND CONFIRMED BY ENGINEER.
9. LAP LENGTHS OR DEVELOPMENT LENGTH (LD) FOR 8T, 10T, 12T, 16T,
SLAB SPANNING OVER 3.50 M. = 14 DAYS. 21. AT DISCONTINUOUS ENDS TOP & BOTTOM BARS SHALL DRG. TITLE LAYOUT OF FOOTINGS & COLUMN SCHEDULE
DRAWING SHOULD BE BROUGHT TO THE CONSULTANTS BEFORE THE 20T, SHOULD BE 400 MM, 500 MM, 600 MM,800 MM, 1000 MM
FINAL EXECUTION OF WORKS. RESPECTIVELY. (LD=50XD) HAVE ELL BENDS.
BEAMS BOTTOM = 21 DAYS.
5. ALL WORKS SHOULD BE EXECUTED IN ACCORDANCE WITH THE GOOD 10. THE LAPS IN BARS SHALL BE STAGGERED AND AT ONE PLACE SHALL CONSULTANCY [email protected]
EXECUTION TO RELEVANT INDIAN STANDARD CODES OF PRACTICES. NOT BE MORE THAN 33.3 PERCENT AND MAXIMUM UP TO 50 16. IN BEAMS WHERE THERE ARE MORE THAN ONE LAYER OF REINF. A SPACER
6. THE GRADE OF ALL R.C.C. WORK SHALL BE M25 U.N.O. (UNLESS PERCENT. BAR SHALL BE PROVIDED BETWEEN TWO LAYER AT SPACING 1500C/C THE DIA PLEASE NOTE: CONTRACTOR/OWNER OR THEIR ENGINEER IS AURANGABAD | JAIPUR
NOTED OTHERWISE) 11. a) AVOID LAPS IN BOTTOM BARS NEAR MID SPAN. OF SUCH BARS SHALL BE EQUAL TO THE MAX. SIZE OF BAR IN THE LAYERS RESPONSIBLE FOR SITE EXECUTION AS PER STRUCTURAL DRAWINGS SATARA PARISAR, AURANGABAD - 431001
7. THE REINFORCEMENT SHALL BE T.M.T. BARS (TOR BARS) b) AVOID LAPS IN TOP BARS NEAR MID SUPPORTS. (OR) MIN. 16MM. AND FOR QUALITY OF ALL CONSTRUCTION MATERIALS AND MIX
CONFIRMING TO I.S. 1786 - FE 500. 12. ALL CONCRETE SHALL BE MACHINE MIXED AND MECHANICALLY 17. PROPER CHAIRS TO BE PROVIDED TO ENSURE SPECIFIED THICKNESS OF SLAB DESIGN USED. STRUCTURAL CONSULTANT ARE RESPONSIBLE FOR DWG. NO. 2K18 - 06 REVISION R-0
VIBRATED TO RETAIN THE TOP BARS IN PROPER POSITION & ALSO PROVIDE PROPER ONLY SAFE TRANSMITTAL OF STRUCTURAL DESIGN THOUGH THESE
COVERING & PINS FOR BEAM REINFORCEMENT DRAWINGS WITH NO FURTHER RISKS SCALE NTS DATE 20-05-2018
9960
LAYOUT OF PLINTH BEAM & DETAILS, LIFT DETAILS
C9 C10 C11
4.300 3.610 1.130

1000 1000 1000 1000 2-12 Ø 2-12 Ø


2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø
1 3 (ALTH.)
(EXTRA) (ALTH.) (EXTRA) (ALTH.) (EXTRA)

2.700

3.350

3.350
2-10 Ø
8Ø-150c/c
8Ø-150c/c

1 3 2 -16 Ø
2 -16 Ø 2 -16 Ø
(ALTH.) (ALTH.) (ALTH.)
C8 2-16 Ø 8Ø @150c/c 2-16 Ø
8Ø @150c/c 8Ø @150c/c
Section 1 - 1 Section 3 - 3
BEAM TB-3 (230X450)
4.300 C7 BEAM TB-1 (230X450)
3.240

1.500
LIFT
1000 1000 1000 1000 2-12 Ø 2-10 Ø
2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -10 Ø
2 4 (ALTH.)
(EXTRA) (ALTH.) (EXTRA) (ALTH.) (EXTRA)
4.780

11900
11900

2-10 Ø
8Ø-150c/c
8Ø-150c/c

2 -16 Ø 2 2 -16 Ø 4 3 -12 Ø

2.400
(ALTH.) (ALTH.) (ALTH.)
2-16 Ø 3-12 Ø
8Ø @150c/c 8Ø @150c/c 8Ø @150c/c
Section 2 - 2 Section 4 - 4

BEAM TB-2 (230X450) BEAM TB-4 (230X450)


C4 C5 4.970
C6

1000 1000 750 750 750 2-12 Ø 2-10 Ø


2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -10 Ø
(EXTRA) (ALTH.) 6 (EXTRA) (ALTH.) (EXTRA) 5 (ALTH.)

2-10 Ø
3.500

8Ø-150c/c
8Ø-150c/c

2 -16 Ø 6 2 -16 Ø 5 3 -12 Ø


(ALTH.) (ALTH.) (ALTH.)
2-16 Ø 3-12 Ø
8Ø @150c/c 8Ø @150c/c 8Ø @150c/c
Section 6 - 6 Section 5 - 5

C1 9.500 C3 BEAM TB-6 (230X450) BEAM TB-5 (230X450)

C2
9960

750 750 1200 1200 700 700 2-12 Ø


2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø 2 - 12 Ø + 2 -10 Ø
(EXTRA) (ALTH.) 7 (EXTRA) (ALTH.) (EXTRA) (ALTH.) (EXTRA)

2-10 Ø

8Ø-150c/c

3 -16 Ø 7 3 -16 Ø 3 -16 Ø


(ALTH.) (ALTH.) (ALTH.)
3-16 Ø
8Ø @150c/c 8Ø @150c/c 8Ø @150c/c
Section 7 - 7

BEAM TB-7 (230X450)

1000 1000 1000 1000 2-10 Ø 2-10 Ø


2 -10 Ø
2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 9
8 (ALTH.)
(EXTRA) (ALTH.) (EXTRA) (ALTH.)

2-10 Ø
8Ø-150c/c
8Ø-150c/c
8 9 3 -12 Ø
2 -16 Ø 2 -16 Ø
(ALTH.) (ALTH.) (ALTH.)
2-16 Ø 3-12 Ø
8Ø @150c/c 8Ø @150c/c 8Ø @150c/c
Section 8 - 8 Section 9 - 9

BEAM TB-8 (230X450) BEAM TB-9 (230X450)

1000 750 1200 2-12 Ø 2-10 Ø


2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø
11 (EXTRA) (ALTH.) (EXTRA) (ALTH.) 5 (ALTH.)

2-10 Ø
8Ø-150c/c
8Ø-150c/c

Foundation to Plinth Level Plinth to Terrace Level 11 3 -16 Ø


(ALTH.)
3 -16 Ø
(ALTH.)
3-16 Ø
5

8Ø @150c/c
3 -12 Ø
(ALTH.)
3-12 Ø
8Ø @150c/c 8Ø @150c/c
Section 11 - 11 Section 10 - 10

BEAM TB-11(230X450) BEAM TB-10 (230X450)

GENERAL NOTES DRAWING ISSUED FOR - APPROVAL, ESTIMATION, EXECUTION, STUDY PURPOSE 13. DESHUTTERING PERIOD SHALL NOT BE LESS THAN - 18. IN NO CASE THIS DRAWING SHALL BE USED FOR ANY SIMILAR PROJECT CONSTRUCTION OF ONE FLOOR ONE FLAT
PROJECT, AT ANY OTHER PLACES
1. ALL DIMENSIONS ARE IN MM UNLESS MENTIONED OTHERWISE. 8. CLEAR COVER TO THE MAIN REINFORCEMENT SHALL BE a VERTICAL FACES OF COLUMN BEAMS & WALLS = 24 HOURS. 19. COLUMNS AND FOOTINGS ARE DESIGNED FOR PARKING + BUILDING FOR Mr. NYATI @ NASHIK , DIST- NASHIK
2. REFER THIS DRAWING ALONG WITH ARCHITECTURAL DRAWING. FOUNDATIONS - 50 MM, COLUMNS - 40 MM, BEAMS - 25 MM, SLABS - 03 FLOOR, TOTAL 4 STOREY BUILDING.
3. DO NOT SCALE THE DRAWING, REFER WRITTEN DIMENSIONS ONLY. 20 MM, RCC PARDI - 40 MM
SLAB SPANNING UPTO 3.50 M. = 7 DAYS. 20. DO NOT CAST ANY R.C.C WORK UNLESS IT IS CHECKED
4. ANY DISCREPANCY IN INFORMATION OR CO-ORDINATION IN THIS AND CONFIRMED BY ENGINEER.
9. LAP LENGTHS OR DEVELOPMENT LENGTH (LD) FOR 8T, 10T, 12T, 16T,
SLAB SPANNING OVER 3.50 M. = 14 DAYS. 21. AT DISCONTINUOUS ENDS TOP & BOTTOM BARS SHALL DRG. TITLE COLUMN SCHEDULE & LIFT DETAILS
DRAWING SHOULD BE BROUGHT TO THE CONSULTANTS BEFORE THE 20T, SHOULD BE 400 MM, 500 MM, 600 MM,800 MM, 1000 MM
FINAL EXECUTION OF WORKS. RESPECTIVELY. (LD=50XD) HAVE ELL BENDS.
BEAMS BOTTOM = 21 DAYS.
5. ALL WORKS SHOULD BE EXECUTED IN ACCORDANCE WITH THE GOOD 10. THE LAPS IN BARS SHALL BE STAGGERED AND AT ONE PLACE SHALL CONSULTANCY [email protected]
EXECUTION TO RELEVANT INDIAN STANDARD CODES OF PRACTICES. NOT BE MORE THAN 33.3 PERCENT AND MAXIMUM UP TO 50 16. IN BEAMS WHERE THERE ARE MORE THAN ONE LAYER OF REINF. A SPACER
6. THE GRADE OF ALL R.C.C. WORK SHALL BE M25 U.N.O. (UNLESS PERCENT. BAR SHALL BE PROVIDED BETWEEN TWO LAYER AT SPACING 1500C/C THE DIA PLEASE NOTE: CONTRACTOR/OWNER OR THEIR ENGINEER IS AURANGABAD | JAIPUR
NOTED OTHERWISE) 11. a) AVOID LAPS IN BOTTOM BARS NEAR MID SPAN. OF SUCH BARS SHALL BE EQUAL TO THE MAX. SIZE OF BAR IN THE LAYERS RESPONSIBLE FOR SITE EXECUTION AS PER STRUCTURAL DRAWINGS SATARA PARISAR, AURANGABAD - 431001
7. THE REINFORCEMENT SHALL BE T.M.T. BARS (TOR BARS) b) AVOID LAPS IN TOP BARS NEAR MID SUPPORTS. (OR) MIN. 16MM. AND FOR QUALITY OF ALL CONSTRUCTION MATERIALS AND MIX
CONFIRMING TO I.S. 1786 - FE 500. 12. ALL CONCRETE SHALL BE MACHINE MIXED AND MECHANICALLY 17. PROPER CHAIRS TO BE PROVIDED TO ENSURE SPECIFIED THICKNESS OF SLAB DESIGN USED. STRUCTURAL CONSULTANT ARE RESPONSIBLE FOR DWG. NO. 2K18 - 06 REVISION R-0
VIBRATED TO RETAIN THE TOP BARS IN PROPER POSITION & ALSO PROVIDE PROPER ONLY SAFE TRANSMITTAL OF STRUCTURAL DESIGN THOUGH THESE
COVERING & PINS FOR BEAM REINFORCEMENT DRAWINGS WITH NO FURTHER RISKS SCALE NTS DATE 20-05-2018
FLOOR SLAB & BEAM DETAILS
C9 C10 C11
4.300 3.610 1.130
2-12 Ø 1000 1000 1000 1000 2-12 Ø
2 -12 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø
(ALTH.) 1 (ALTH.) (EXTRA) (ALTH.) 2 (EXTRA) (ALTH.) (EXTRA)

2.700
2-10 Ø

3.350

3.350
8Ø-150c/c 8Ø-150c/c

2 -16 Ø 1 2 -16 Ø 2 -16 Ø 2 2 -16 Ø


(ALTH.) (ALTH.) (ALTH.) (ALTH.)
C8 8Ø @150c/c
2-16 Ø
8Ø @150c/c 8Ø @150c/c
2-16 Ø

Section 1 - 1 Section 2 - 2
4.300 C7 BEAM B-1 (230X600) BEAM B-2 (230X600)
3.240

1.500
LIFT
2-10 Ø 1000 1000 1000 1000 2-12 Ø 2-10 Ø
2 -10 Ø 2 -10 Ø
3 (ALTH.) 2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø 5 (ALTH.)
4
4.780

(EXTRA) (ALTH.) (EXTRA) (ALTH.) (EXTRA)

2-10 Ø
8Ø-150c/c 8Ø-150c/c 8Ø-150c/c

3 2 -12 Ø 5 3 -12 Ø

2.400
2 -16 Ø 4 2 -16 Ø
(ALTH.) (ALTH.)
(ALTH.) (ALTH.)
2-12 Ø 2-16 Ø 3-12 Ø
8Ø @150c/c 8Ø @150c/c
8Ø @150c/c 8Ø @150c/c
Section 3 - 3 Section 4 - 4 Section 5 - 5

C4 C5 4.970
BEAM B-3 (230X600) BEAM B-4 (230X600) BEAM B-5 (230X600)
C6
3.050 2.490
3.500
0.900

2-10 Ø 2-10 Ø 1000 1000 750 750 750 2-12 Ø


1.020 1.240
2 -10 Ø 2 -10 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø
6 (ALTH.) 7 (ALTH.) (EXTRA) (ALTH.) 8 (EXTRA) (ALTH.) (EXTRA)
3.500

3.500

2-10 Ø
8Ø-150c/c
2.370

8Ø-150c/c 8Ø-150c/c

6 3 -12 Ø 7 3 -12 Ø 2 -16 Ø 8 2 -16 Ø


(ALTH.) (ALTH.) (ALTH.) (ALTH.)
Sunk Sunk 3-12 Ø 3-12 Ø 2-16 Ø
C1 350 C2 350 C3 8Ø @150c/c
Section 6 - 6
8Ø @150c/c
Section 7 - 7
8Ø @150c/c 8Ø @150c/c
Section 8 - 8
3.050 2.490 3.500 BEAM B-6 (230X600) BEAM B-7 (230X600) BEAM B-8 (230X600)
1.000

1000 750 1200


2-12 Ø 2-12 Ø
2 -12 Ø
2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 2 -12 Ø 10
9 (ALTH.)
(EXTRA) (ALTH.) (EXTRA) (ALTH.) (ALTH.)

8Ø-150c/c 8Ø-150c/c

9 10 2 -16 Ø
3 -16 Ø 3 -16 Ø 3 -16 Ø
(ALTH.)
(ALTH.) (ALTH.) (ALTH.)
3-16 Ø 2-16 Ø
8Ø @150c/c 8Ø @150c/c 8Ø @150c/c 8Ø @150c/c
Section 9 - 9 Section 10 - 10

BEAM B-9 (230X600) BEAM B-10 (230X600)

2-10 Ø 1000 1000 1000 1000 2-12 Ø 2-10 Ø


2 -10 Ø
2 -10 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø 2 -12 Ø 2 -10 Ø 13
11 12 (ALTH.)
(ALTH.) (EXTRA) (ALTH.) (EXTRA) (ALTH.) (EXTRA)

2-10 Ø
8Ø-150c/c
8Ø-150c/c 8Ø-150c/c

11 12 13 2 -12 Ø
2 -12 Ø 2 -16 Ø 2 -16 Ø
(ALTH.) (ALTH.) (ALTH.) (ALTH.)
2-12 Ø 2-16 Ø 2-12 Ø
8Ø @150c/c 8Ø @150c/c 8Ø @150c/c 8Ø @150c/c
Section 11 - 11 Section 12 - 12 Section 13 - 13

BEAM B-11 (230X600) BEAM B-12 (230X600) BEAM B-13 (230X600)

2-10 Ø 1000 1000 750 1200 2-10 Ø


2 -10 Ø 2 -10 Ø 2 -10 Ø
14 2 -10 Ø 2 -10 Ø
(ALTH.) (ALTH.) 15 (ALTH.)
(EXTRA) (EXTRA)

8Ø-150c/c 8Ø-150c/c

14 3 -12 Ø 15
3 -12 Ø 3 -12 Ø
(ALTH.) (ALTH.) (ALTH.)
3-12 Ø 3-12 Ø
8Ø @150c/c
8Ø @150c/c 8Ø @150c/c 8Ø @150c/c
Section 14 - 14 Section 9 - 9

BEAM B-14 (230X600) BEAM B-15 (230X600)

GENERAL NOTES DRAWING ISSUED FOR - APPROVAL, ESTIMATION, EXECUTION, STUDY PURPOSE 13. DESHUTTERING PERIOD SHALL NOT BE LESS THAN - 18. IN NO CASE THIS DRAWING SHALL BE USED FOR ANY SIMILAR PROJECT CONSTRUCTION OF ONE FLOOR ONE FLAT
PROJECT, AT ANY OTHER PLACES
1. ALL DIMENSIONS ARE IN MM UNLESS MENTIONED OTHERWISE. 8. CLEAR COVER TO THE MAIN REINFORCEMENT SHALL BE a VERTICAL FACES OF COLUMN BEAMS & WALLS = 24 HOURS. 19. COLUMNS AND FOOTINGS ARE DESIGNED FOR PARKING + BUILDING FOR Mr. NYATI @ NASHIK , DIST- NASHIK
2. REFER THIS DRAWING ALONG WITH ARCHITECTURAL DRAWING. FOUNDATIONS - 50 MM, COLUMNS - 40 MM, BEAMS - 25 MM, SLABS - 03 FLOOR, TOTAL 4 STOREY BUILDING.
3. DO NOT SCALE THE DRAWING, REFER WRITTEN DIMENSIONS ONLY. 20 MM, RCC PARDI - 40 MM
SLAB SPANNING UPTO 3.50 M. = 7 DAYS. 20. DO NOT CAST ANY R.C.C WORK UNLESS IT IS CHECKED
4. ANY DISCREPANCY IN INFORMATION OR CO-ORDINATION IN THIS AND CONFIRMED BY ENGINEER.
9. LAP LENGTHS OR DEVELOPMENT LENGTH (LD) FOR 8T, 10T, 12T, 16T,
SLAB SPANNING OVER 3.50 M. = 14 DAYS. 21. AT DISCONTINUOUS ENDS TOP & BOTTOM BARS SHALL DRG. TITLE LAYOUT OF FLOOR BEAM & SLAB DETAILS
DRAWING SHOULD BE BROUGHT TO THE CONSULTANTS BEFORE THE 20T, SHOULD BE 400 MM, 500 MM, 600 MM,800 MM, 1000 MM
FINAL EXECUTION OF WORKS. RESPECTIVELY. (LD=50XD) HAVE ELL BENDS.
BEAMS BOTTOM = 21 DAYS.
5. ALL WORKS SHOULD BE EXECUTED IN ACCORDANCE WITH THE GOOD 10. THE LAPS IN BARS SHALL BE STAGGERED AND AT ONE PLACE SHALL CONSULTANCY [email protected]
EXECUTION TO RELEVANT INDIAN STANDARD CODES OF PRACTICES. NOT BE MORE THAN 33.3 PERCENT AND MAXIMUM UP TO 50 16. IN BEAMS WHERE THERE ARE MORE THAN ONE LAYER OF REINF. A SPACER
6. THE GRADE OF ALL R.C.C. WORK SHALL BE M25 U.N.O. (UNLESS PERCENT. BAR SHALL BE PROVIDED BETWEEN TWO LAYER AT SPACING 1500C/C THE DIA PLEASE NOTE: CONTRACTOR/OWNER OR THEIR ENGINEER IS AURANGABAD | JAIPUR
NOTED OTHERWISE) 11. a) AVOID LAPS IN BOTTOM BARS NEAR MID SPAN. OF SUCH BARS SHALL BE EQUAL TO THE MAX. SIZE OF BAR IN THE LAYERS RESPONSIBLE FOR SITE EXECUTION AS PER STRUCTURAL DRAWINGS SATARA PARISAR, AURANGABAD - 431001
FRAMING PLAN AT COLUMN FOOTING

7. THE REINFORCEMENT SHALL BE T.M.T. BARS (TOR BARS) b) AVOID LAPS IN TOP BARS NEAR MID SUPPORTS. (OR) MIN. 16MM. AND FOR QUALITY OF ALL CONSTRUCTION MATERIALS AND MIX
CONFIRMING TO I.S. 1786 - FE 500. 12. ALL CONCRETE SHALL BE MACHINE MIXED AND MECHANICALLY 17. PROPER CHAIRS TO BE PROVIDED TO ENSURE SPECIFIED THICKNESS OF SLAB DESIGN USED. STRUCTURAL CONSULTANT ARE RESPONSIBLE FOR DWG. NO. 2K18 - 06 REVISION R-0
VIBRATED TO RETAIN THE TOP BARS IN PROPER POSITION & ALSO PROVIDE PROPER ONLY SAFE TRANSMITTAL OF STRUCTURAL DESIGN THOUGH THESE
COVERING & PINS FOR BEAM REINFORCEMENT DRAWINGS WITH NO FURTHER RISKS SCALE NTS DATE 20-05-2018