Mapping_ of_Models_4_2

The document presents a comprehensive mapping of various data gathering, estimating, meeting, and other methods likely to be used across different performance domains such as stakeholders, project work, and delivery. Each method is categorized based on its applicability to specific performance domains, highlighting their relevance in project management practices. This mapping serves as a guide for project managers to select appropriate methods for effective project execution.

Uploaded by

Rakesh Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views2 pages

Mapping_ of_Models_4_2

The document presents a comprehensive mapping of various data gathering, estimating, meeting, and other methods likely to be used across different performance domains such as stakeholders, project work, and delivery. Each method is categorized based on its applicability to specific performance domains, highlighting their relevance in project management practices. This mapping serves as a guide for project managers to select appropriate methods for effective project execution.

Uploaded by

Rakesh Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Table 4-2.

Mapping of Methods Likely to Be Used in Each Performance Domain

Performance Domain

Measurement
Stakeholders

Project Work
Dev Approach
and Life Cycle

Uncertainly
Planning

Delivery
Method

Team
Data Gathering and Analysis Methods:
Alternatives analysis X X X X
Assumptions and constraints analysis X X X
Benchmarking X X
Business justification analysis X X
Payback period X X X
Internal rate of return X X
Return on investment X X
Net present value X X X X
Cost-benefit ratio X X
Check sheet X X
Cost of quality X X X
Decision tree analysis X
Earned value analysis X X
Expected monetary value X
Forecasting X
Influence diagram X
Life cycle assessment X
Make-or-buy analysis X X
Probability and impact matrix X X
Process analysis X X X X
Regression analysis X X
Root cause analysis X X
Sensitivity analysis X X X
Simulation X X
Stakeholder analysis X X X
SWOT analysis X X
Trend analysis X
Value stream mapping X X X
Variance analysis X
What-if scenario analysis X X

PMI Seventh Edition July 2021


182 PMBOK ® Guide
Table 4-2. Mapping of Methods Likely to Be Used in Each Performance Domain (cont.)

Performance Domain

Measurement
Stakeholders

Project Work
Dev Approach
and Life Cycle

Uncertainly
Planning

Delivery
Method

Team
Estimating Methods:
Affinity grouping X
Analogous estimating X
Function points X
Multipoint estimating X
Parametric estimating X
Relative estimating X
Single-point estimating X
Story point estimation X
Wideband Delphi X
Meeting and Event Methods:
Backlog refinement X X X X
Bidder conference X X X
Change control board X X
Daily standup X X
Iteration review X X X
Iteration planning X X X X
Kickoff X X X
Lessons learned X X X X
Planning X
Project closeout X X X
Project review X X X X
Release planning X X
Retrospective X X
Risk review X X
Status X X
Steering committee X X
Other Methods:
Impact mapping X X X X X
Modeling X
Net Promoter Score® X X
Prioritization schema X X
Timebox X X X X X

PMI Seventh Edition July 2021


Section 4 – Models, Methods, and Artifacts 183