0% found this document useful (0 votes)
19 views38 pages

DASS 3phase - MANUAL V0.9 - ENG

The document is an installation manual for the DASS Grid-connected Photovoltaic Inverter (DSP-33xxxK Series). It includes safety precautions, product outlines, installation instructions, operational guidelines, maintenance tips, and specifications. The manual emphasizes the importance of following safety protocols and proper installation procedures to ensure safe and efficient operation of the inverter.

Uploaded by

nathyndoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views38 pages

DASS 3phase - MANUAL V0.9 - ENG

The document is an installation manual for the DASS Grid-connected Photovoltaic Inverter (DSP-33xxxK Series). It includes safety precautions, product outlines, installation instructions, operational guidelines, maintenance tips, and specifications. The manual emphasizes the importance of following safety protocols and proper installation procedures to ensure safe and efficient operation of the inverter.

Uploaded by

nathyndoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 38

Installation Manual

DASS Grid-connected
Photovoltaic Inverter
(3-Phase Power Conditioning System)

DSP-33xxxK Series ver1.8

0
Contents

1. Caution for Safety................................................................1

2. Outline of Products ...............................................................5

2.1 Basic data ..................................................................5


2.2 External dimension ..........................................................8
2.3 Names and Functions of Each Parts............................................11

3. Installation......................................................................11

3.1 Place of installation........................................................16


3.2 Connection Contacts and their installation..................................16
3.3 Wiring of Web Communications Module (Monitoring)............................21

4. Operations.........................................................................22

4.1 Running and Resting (Stopping)...............................................22


4.2 Explanation of the Functions on the Keypad. .................................24
4.3 Basic Condition Indicated Modes (4 Lines) ...................................25
4.4 Displayed Screen of 200 ~ 250k Series........................................26

5. Maintenance & Repair...............................................................28

5.1 Initialization & Measure against Any Error...................................28


5.2 Buzzer and Fault.............................................................28
5.3 Symptoms of Failure..........................................................29
5.4 ASKING FOR A/S...............................................................30

6. Specification of Products..........................................................31

7. Quality Guaranteed.................................................................33
7.1 Quality Liaison..............................................................33

0
1. Caution for Safety

 Cautions for safety must be kept under any circumstances in order to prevent accident or
dangers for safe and right use

 Read the installation manual very carefully before you install, operate or maintain the
products.

 There are two types of caution in the manual- warning and attention as below.

It possibly causes SERIOUS INJURY or DEATH when


Warning violated.

It possibly causes minor injury or product damages when


Attention violated.

 Symbols in the manual indicate as follows.

Indicates that you must be careful for possible danger under certain conditions

Indicates that you must be careful for electric shock under certain conditions.

 Keep the manual in place that anyone can read it anytime.

 Read the manual carefully in order to understand DSP series

 The manual is subject to change without notice.

 Contact us anytime when you lose or damage the manual.

 The repair, check-up, part-changes for inverters must be performed by only certified
engineer. The engineers must have the following qualifications.

1. The engineer must be trained and certified in performing electric power


authorization, electric power removal, danger removal, wiring and electric
instruments attachment and ground connection.
2. There must be proper safety equipments for engineers such as insulated glove, safety
helmet, protective goggles, face protector, and safety clothes
3. Take emergency measures when needed.

W Warning
 Do not touch outside terminal any time when you install or operate product.
Main terminal with electric power on makes inner parts and inner circuits flow electric
current. This current is very dangerous and it could cause severe injury or death when you
touch the currents.

 Do not operate when cover is open.


It could cause electric shock as high voltage terminal or electric charging is exposed
outside

1
 Do not operate switch when your hands are wet.
It could cause electric shock.

 Do not open cover when power is on or in operation.


Stop operation or wait until the power is off when you need to open the cover.

 Do not open cover even when power is off except for regular check-up.
Inverter is still charged even if power is off due to the long-time charging, which could
cause electric shock.

 Shut off the power and wait more than 10 minutes to confirm complete discharging to
VOM from inverter when doing wiring work or regular check-up.
Inverter is still charged even if power is off, which could cause electric shock.

 Do not use damaged wire.


Stop operation and contact us right away.

 Do not put any heavy items on the wire.


It could damage insulated wire.

Attention
 Keep away from inflammables.

If installed on or nearcombustible material, it could cause fire. When there is fire


or smell, stop operation immediately and contact us right away.

 Shut off output power (solar cell) and input power (AC power) immediately when
inverter malfunctions.
Otherwise, it could lead to fire by subsequent accidents.

 Do not touch inverter within 10 minutes even if power is off.


Inverter is very hot and it could cause burn on your body.

 Do not input power even if you finish installation when inverter or parts are
damaged.
It could cause electric shock.

 Be careful not to get any screw, metals, water, oil, etc. inside inverter.
It could cause fire.

2
Directions
(1) transportation

 Please transport by proper means according to product weight.


 Please check external conditions.
 Do not pile up. Follow the loading regulation.
 Do not open the cover while transported.
 Do not drop or damage with shock.

(2) applications

 It automatically operates when auto-operation function is initially set.


 You can operate or stop with run/stop key on key pad
 Reset troubled items, and then it automatically operates after waiting time.
 Do not remodel at your convenience.
 Reset to the required value when initialized, otherwise it automatically reset to the
predefined value.

(3) Trouble-shooting

 Install additional safety device such as emergency brake just in case that inverter is
damaged and out of control.
(4) Maintenance and Repair

 Don’t perform mega-test (for electric insulation and resistance) for inverter control
circuit. It could cause malfunctions or damages.
 Refer chapter 6 for detailed explanations.
(5) Disposal

 Dispose as general industrial waste.

(6) Others

 The pictures occasionally drop the explanations for cover or breaker. However, you must
strictly follow the guidelines in the manual for cover and breaker installation.

3
Directions for Installation
 Installation

 Follow the instructions in the installation manual.


 This product must be installed indoor. Be careful not to expose to external
circumstances directly.
 Keep away from place – wet, dusty, direct ray of light or high temperature.
 Install in a spacious place. Please secure the space at least 20cm from the top and
bottom for model DSP-3310K, and minimum 50 cm from ventilating opening in the back for
model DSP-3320K~33250K.
 Installation must be performed by technical experts.
 Do not place any heavy items on the inverter.
 Keep away from any inflammable materials.
 Installation direction must be set followed by the guidelines in the manual.
 Do not drop or damage inverters.
 Do 3-class grounding construction(200V, grounding resistance under 100Ω) and special 3
class(400V, grounding resistance under 10Ω)
 Don’t place other home appliances. Any fault or noise of home appliances may happen.
 Before install an inverter, turn off the power and be careful of connecting the
electric wire.
 Especially, after confirming the circuit breaker of solar cell (DC), install an
inverter, and after completing the installation and turning on the power, run the
appliance. If you install the inverter when the power of solar cell (DC) is“On”, any
serious damage may happen.

 Wiring
 As this equipment is expensive, the expert should perform wiring work or inspection in
person.
 Wire with the wire more than allowable current applied by capacity.
 After install the inverter body, perform wiring work.
 If you connect wrong contacts, damage may happen on the inverter.
 Especially, in case the polarities (+/-) of DC power, damage may happen on the inverter
or any accident may occur.

 Adjustment while performing trial run


 While performing trial run, follow the basic order of running

4
 Make sure of the present condition of displayed screen.

2. Outline of Products
2.1 Basic data
2.1.1 Contents you should know before using the appliance
Thank you for purchasing our products. To use the appliance right, it’s important for you
to understand the function of the inverter and how to use it through the manual. If you
misuse the inverter, it is operated abnormally or its performance may be depreciated.
Especially, as the inverter might be broken or damage might impair the body seriously, use
the inverter after understanding the application or installation manual enough in using
the inverter.

2.1.2 Confirmation of Products


After removing packing, check up the ratio nameplate on the front body. Also, make sure
that the form and ratio power of the inverter correspond to ordered inverter.

(1) Form of the Inverter (Model Classifying Code)

DSP - 3 3 XXX K
Mark Name Mark Capacity
DSP Das PCS 10K 10 kW
20K 20 kW
Name of
Mark 30K 30 kW
Series
Single
1 50K 50 kW
Phase
3 3 Phase 100K 100 kW
200k 200 kW
Output
Mark 250K 250 kW
Power
2 220 V
3 380 V

(2) Components – Installation manual, test result

2.1.3 Preparing devices or components for running


As the preparations for running may be changed according to the installed environment more
or less, prepare necessary materials & members and tools for wiring.

2.1.4 Installation Environment


To prevent lifetime or performance of the inverter from being depreciated, install the
appliance exactly, considering its installed position or direction, or peripheral space.

5
2.1.5 Wiring
Connect power and running signal (signal for control) to the block of terminal. If you
don’t connect them, the inverter or peripheral add-ons may be damaged, so be careful of
wiring. Especially, watch out the polarity of input power (DC)

2.1.6 Characteristic of Products

(1) Conversion of High Efficient Power


The inverter performs the conversion of high efficient power with IGBT and high
efficient characteristic more than 96% is presented in the rated power.

(2) Digital Controlling


It’s easy to control the system through digital control of high performance. You can
confirm the system through LCD. LCD screen presents the present condition of operation,
input and output, any abnormality of the inverter and its operation is stopped if any
error happens. It senses the power (DC) of solar cells to operate or stop the inverter
automatically.

(3) Active Parallel Running (Only for the model of 200~250Kw)


As algorithm performing Master(Module1) and Slave(Module2) parallel running was applied
to Photovoltaic Inverter model of 200~250kW according to the radiation to convert high
efficient power, it converts high efficient power with active response in accordance
with the radiation.
Master (Module1) is operated in the first running. Next, Slave (Module2) is operated if
the power is generated more than 70% of rated capacity after the radiation increases.
If the radiation decreases to 30% of the inverter’s rated capacity, Slave (Module2) is
stopped.

(4) Non-transformer Typed Inverter


DSP series inverter is non-transformer type and is suitable for the decentralized power
system designed to meet industrial and commercial generating need.

(5) Decentralized Power System and Economical Efficiency


In case of photovoltaic power generation, you can install the system to the places
wherever the sun shines. As you can establish the decentralized power by the unit of a
building, housing complex and photovoltaic generating plant, economic utility is
possible.

(6) MPPT (Maximum Power Point Tracking)


As the uneven direct current occurs according to ambient temperature, humidity, climate,
environment and radiation for the characteristic of solar cells, the inverter makes the
solar cells tracks maximum power point through MPPT.

6
(7) Easy Parallel Operation
If the capacity of solar cells increases, you can add an inverter without any exclusive
equipment and increase its capacity for bulky power generation.

(8) Convenience of Installation and Operation


It was designed more easily and safely to connect solar cells to the system current.
Through frontal LCS screen, it was designed to display the present condition of
converter and you can stop the operation manually.

(9) High Reliability and Over-noise


The components of the inverter were optimized and any defaults were deduced a lot. Also,
we applied durable cooling fan of square shape and realized reliability and low noise.

(10) Monitoring System (Option)


Making use of web communication module and a sensor box, we can monitor easily the
present condition and statistics of inverter’s power, radiation, temperature and
peripheral environment, making use of PC.

7
2.2 External Dimensions

2.2.1 DSP-3310K

< Old model >

< NEW MODEL>

8
2.2.2 DSP-3320K~3330K

2.2.3 DSP-3350K

9
2.2.4 DSP-33100K

2.2.5 DSP-33200K ~ DSP-33250K

10
2.3 Names and Functions of Each Part
2.3.1 DSP-3310K ~ 3350K

External Internal

① Key pad
-Key pad presents the operating condition of the inverter on the LDC screen.

② DC INPUT MCCB
-This part prevents DC of input part of a converter from photovoltaic module
contacting panel.

③ AC OUTPUT MCCB
-This device disconnects AC output part from grid system.

④ DC INPUT TERMINAL BLOCK


-This part is contacting parts connecting the inlet line to photovoltaic module
contacting panel.

⑤ GROUND TERMINAL BLOCK

11
-This contact is connected to the earth wire.

⑥ AC INPUT TERMINAL BLOCK


-This terminal bock is connected to grid series line (380Vac).

2.3.2 DSP-33100K

External Internal

① Keypad
-Keypad displays synthetically running condition of the inverter on LCD screen.

② Emergency Switch
-Emergency Switch stops the inverter by compulsion in case of emergency
situation. The inverter doesn’t re-run if the switch is turned on.

※If emergency switch is pressed during transportation, It could not operate

12
properly. Check the emergency switch.

③ DC Input MCCB 1
-DC Input MCCB 1 disconnects DC input into Booster 1 of the inverter from solar
light module contacting panel.

④ DC Input MCCB 2
-DC Input MCCB 1 disconnects DC input into Booster 2 of the inverter from
solar light module contacting panel.

⑤ AC Output MCCB
-AC Output MCCB disconnects the inverter from grid line.

⑥ DC Input Positive(+) Terminal Block


-DC Input Positive (+) Terminal Block connects positive contact among the lines
input from solar light module contacting panel.

⑦ DC Input Negative(-) Terminal Block


- DC Input Negative (-) Terminal Block connects negative contact among the lines
input from solar light module contacting panel.

⑧ Ground Terminal Block


-Ground Terminal Block is connected to the earth wire.

⑨ AC Output Terminal Block


-AC Output Terminal Block is connected to grid series line (380Vac).

13
2.3.3 DSP-33200K, DSP-33250K

External Internal

① Integral Keypad
-Integral Keypad indicates synthetically running condition of Master and Slave
Inverter on LCD screen.

② Emergency Switch
-In case emergency situation occurs, Emergency Switch stops the inverter by
compulsion. The inverter doesn’t re-run if the switch is turned on.

※If emergency switch is pressed during transportation, It could not operate


properly. Check the emergency switch.

③ Master Keypad
-Master Keypad displays running condition of Master Inverter on LCD screen.

④ Slave Keypad
-Slave Keypad displays running condition of Slave Inverter on LCD screen

14
⑤ DC Input MCCB 1
-DC Input MCCB 1 disconnects DC input into Master Inverter from solar light
module contacting panel.

⑥ DC Input MCCB 2
-DC Input MCCB 1 disconnects DC input into Slave Inverter from solar light
module contacting panel.

⑦ AC Output MCCB
-AC Output MCCB disconnects the inverter from grid series line.

⑧ DC Input Positive(+) Terminal Block


-DC Input Positive (+) Terminal Block connects positive contact among the lines
input from solar light module contacting panel.

⑨ DC Input Negative(-) Terminal Block


- DC Input Negative (-) Terminal Block connects negative contact among the lines
input from solar light module contacting panel.

⑩ Ground Busbar
-Ground Busbar is connected to the earth wire.

⑪ Monitoring Keypad MCCB


-Monitoring Keypad MCCB disconnects the power of integral keypad (220V).

⑫ Control Power MCCB


-Control Power MCCB disconnects the controlling power(3Φ 380V) such as MC and
cooling pan of the inverter.

15
3. Installation of Products

3.1 Place of Installation

Please, install the converter to the place satisfying next conditions.

1) As DSP-33 series is for outdoor product, don’t install it to outdoor space.

2) As the lifetime of inverter is affected by ambient temperature, lower the temperature

around the place where the converter is installed less than allowable temperature(-10 ~

40℃).

3) Avoid hot and humid place (Relative humidity should be less than 90%. No dewfall).

4) Install this converter to the place no vibration exists.

5) As the inverter is a high temperature heating unit, install it to non-flammable material.

6) Install the converter to let its heat emitted without a hitch, securing peripheral space.

7) Avoid the places where oil mist, flammable gas, fabric mote, dust and moisture exist.

8) Install the bolts of specified size, fixing them with a determined torque.

9) Install the converter to the place no salt exists.

3.2 Connecting Contacts (terminal bars) and Their Installation

If you uncover the cover in front on the lower part of inverter, terminal blocks exist
as below. As their composition is different from each other by their capacity, connect
them exactly according to the manual.

For the earth of converter, apply single earth constructing method.

Caution in connecting the main circuit.

In case of input power, connect positive (+) power source to the input contact (PV [+])
of the inverter, negative (-) power source to the input contact (PV [-]) and then
supply power. The inverter might be damaged by false connection.

For power input contacts and output contacts, use pressing contacts that insulating caps
are attached. Chips of wire might result in default, failure or false operation.

In case you change any wire due to improper matter, make sure if the power for the
LC(Liquid Crystal) of the keypad on the main body is turned off or not, perform wiring

16
work, please. As the internal capacity of an inverter is charged with high voltage, it is
dangerous.

To prevent electric shock, perform No.3 earth work and special No.4 earth work with the
inverter. Make sure that the resistance of earth should be less than 100 Ω.

Connect the contacts of the inverter to the exclusive terminal blocks. Don’t use a case
or sash as earth terminal.

For the earth wire, use exclusive earth wire complying with the standard. Connect the
earth contacts to the spot adjacent to the inverter.

Apply determined torque to the bolts. If they are fastened loose, it causes short or false
operation.

For the electric wires, use copper wire more than 600V, 75℃.

Place the wires according to the specification of electricity supplier or electricity


safety regulation for detailed standard.

Input & Output Contacts(Terminal Blocks) and Specification of Wires

Capacity Purpose Standard Remark


PV[+] Wiring M8 - 16SQ
PV[-] Wiring M8 - 16SQ
10kW
Earth Wiring M8 - 4SQ
AC Output Wiring M8 - 10SQ
PV[+] Wiring M8 – 35SQ
15kW
PV[-] Wiring M8 – 35SQ
~
30kW
Earth Wiring M8 – 16SQ
AC Output Wiring M8 – 25SQ
PV[+] Wiring M10 – 70SQ
40kW
PV[-] Wiring M10 – 70SQ
~
50kW
Earth Wiring M8 – 25SQ
AC Output Wiring M8 – 35SQ
PV[+] Wiring M10 – 70SQ * 2 Standard of
S50kW connecting
PV[-] Wiring M10 – 70SQ * 2 panel is
100kW
Earth Wiring M8 – 25SQ
AC Output Wiring M12 – 70SQ
PV[+] Wiring M8 – 70SQ * 4~5 Standard of
S50kW connecting
PV[-] Wiring M8 – 70SQ * 4~5 panel is
200kW
~ Earth Wiring M8 - 35SQ Over
250kW AC Output Wiring M12 - 185SQ Over
Integrated Keypad
M4 – 2.5SQ Over
Wiring

※ This wiring size could be changed according to the method of wiring


construction (Refer to IEC specification)

17
3.2.1 Wiring Diagram of DSP-3310K~3350K

Inlet
Inlet

3.2.2 Wiring Diagram of DSP-33100K

Inlet
Inlet

No. Name of Contact Explanation


Positive(+) Terminal Connect positive (PV [+]) of DC line inlet from the contacting

Block of Input Power panel.
Positive(-) Terminal Connect negative (PV [-]) of DC line inlet from the contacting

Block of Input Power panel.
③ Earth Terminal Block Connect the earth wire.

④ Terminal Block of Output of the inverter is connected to R phase of GRID series line.
Output Power
⑤ Output of the inverter is connected to S phase of GRID series line.
(3Φ3W 380V)
⑧ Output of the inverter is connected to T phase of GRID series line.

⑨ Neutral Terminal Block Output of the inverter isn’t connected to GRID series line.

18
3.2.3 DSP-33200K~33250K

3.2.3 DSP-M33200K~M33250K

If the ambient temperature of installing site could be over 40°C, please install
duct for ventilation to prevent ambient temperature from rising. There is an example
picture below.

< The example for 200kW ~ 250kW inverter >

19
Inlet

No. Name of Contact Explanation

Positive(+)
Connect positive (PV [+]) of DC line inlet from the
① Terminal Block of
contacting panel.
Input Power
Positive(-)
Connect negative (PV [-]) of DC line inlet from the
② Terminal Block of
contacting panel.
Input Power
Earth Terminal
③ Connect the earth wire.
Block
Integrated Keypad
④ Connect the power of integrated keypad(1Φ 220Vac).
Terminal Block
Output of the inverter is connected to R phase of GRID series

line.
Terminal Block
Output of the inverter is connected to S phase of GRID series
⑥ of Output Power
line.
(3Φ3W 380Vac)
Output of the inverter is connected to T phase of GRID series

line.
Neutral Terminal
⑧ Output of the inverter isn’t connected to GRID series line.
Block

20
3.3 Wiring of Web Communications Module (Monitoring)
3.3.1 Web Communications module of DSP-3310 ~ 100K

The keypad is mounted on the internal part of frontal cover. Open the frontal door and
connect RS232C/485 communications contacts to web communications module. In wiring
communications cable, be careful of not to pass the cable near the power wire, or any
error might happen for web monitoring system.

DSP-3310 ~ 100K series products support 2 communications methods such as RS232C and RS485.
Each communications methods can be converted through operating the switch. In installing
communications line, be careful of not to cut the cables of keypad.

RS485 RS232C/RS485 RS232C


Communications Converting Communications
Contacts Switch Terminal Bar

3.3.2 Web Communications module of DSP-33200 ~ 250K


DSP-33200 ~ 250K series products support only RS485 communications method. Communications
contacts are located on the rear and left side of the integrated keypad mounted on the
frontal door. As the lower contact between 2 communications contacts is a communications
contact between modules, use 485 contacts for the contact for monitoring.

RS485 Communications
Contacts
For Monitoring

RS485 Communications
Contacts
For Module

21
4. The Condition of Run and Operation
Photovoltaic inverter of DSP-33 series is the system connected to fully automate digital
control. For DSP-33 series, the power of inverter (keypad) is turned on automatically and
begins to generate its power if PV voltage becomes more 400V.)
If PV voltage becomes under 200V at set of sun, the inverter stops automatically. Also, if the
voltage charged into the equipment is discharged, the power (keypad) is turned off.

4.1 Running and Resting (Stopping)


Electrically charged current is never run on the photovoltaic inverter. Any failure might
occur due to wrong run, so follow the below procedures in operating or resting the converter.

※ Please, perform run/rest procedures, referring the name and function of each component on
Item 2.3.

4.1.1 Run

Confirming MCCB
The Condition for Control(ON)
of Wires

Only applied to 200 ~ 250kW

(1) Confirm the wiring condition for input/output.


Confirm the wiring condition after turning off the power of all the breakers. Be careful
of the polarity of DC input contacts. Any damage or fire might happen due to false
wiring of the polarities.

(2) Turn on DC MCCB (DC Breaker)


After turning on the breaker, buzzer rings and light is lit on the keypad. After all the
LEDs is lit, the breaker is turned off and PV LEDs is lit (Except for less than PV 400V)
※2 DC input breakers are mounted on 100kW ~ 250kW. Please, turn all on.

(3) Turn on the integrated keypad and controlled power breaker.


[Only 200~ 250kW series are applied.]
Integrated keypad indicates the integrated information of Master / Slave Inverter. As
controlled power breaker is used only for MC of the inverter and for the power of the
cooling pan, it is necessary component.

(4) Confirm the screen of the keypad.


The input voltage and internal temperature of the present photovoltaic system on the LCD
screen and the inverter is maintained as standby condition.

22
(5) Turn on AC MCCB (Output Breaker).
If AC MCCB is turned on, grid LED on the keypad is out of lit and operation standby
count starts (300 secs, 5 mins). At this time, if you want to run it without rest, press
[RUN] button on the keypad to run it.

(6) Confirm input/output voltage, current and amount of power generation.


The LED of operation and screen on the keypad will be display for inverter running,
press [TURN] key on the keypad to confirm the condition of generation of the inverter.
Please, see “4.2 Explanation of the Functions on the Keypad”.

4.1.2 Stop

[Stop] Button MCCM for


On the Keypad Control (Off)

Only applied to 200 ~ 250kW

(1) Rest the inverter to press “Stop” button on the keypad.


After the functions of inverter are stopped, count (300 secs, 5 mins) for re-start
begins. If you don’t want to re-run the inverter, turn off the output breaker.

(2) Turn off the AC output breaker.


It is grid connected inverter. If the power of the grid is turned off, the inverter is
of standby condition, so it does not generate power.

(3) Turn off MCCB for control [For only 200 ~ 250k series]
This function is used when you operate the inverter for a long time. You don’t need to
turn off when you leave the inverter for a while.

(4) Turn off DC breaker.


Even if DC is disconnected from the photovoltaic module, the power (keypad) isn’t
turned off in any time due to the inner charged voltage. It takes more than 1 hour for
the charged voltage to be discharged.

23
4.2 Explanation of the Functions on the Keypad
4.2.1 Outlook of Keypad

4.2.2 The Functions of Buttons on the Keypad and Indications of LED


(1) Explanation of the Functions for the Buttons on the Keypad

Key Explanation
You can get into or out from the set menu in the mode of indicating condition.
Menu You can move to the upper set mode from the lower set mode.
In setting parameters, you can move the position of cursor“_”.
You can set a menu in the set menu.
Enter You can select lower set menu.
You can save the set value of parameters in set parameters.
Direction Key
You can change the kind of set menu and condition indicated contents.
∧∨< > In setting parameters, the position of “_” cursor is changed and the values of
parameters on the position where the cursor exist increases/decreases.

Turn You can convert condition indicating mode.

If any error occurs, this function turns off alarm and“Fault”is on the screen
BZ-off
continuously.
If you put this key when any error happens, the inverter’s functions are
F-RESET
initialized.
You can re-operate the stopped inverter.
RUN If you press this button, waiting period of 300 seconds is omitted and the
inverter begins to be operated in no time.

STOP You can stop the run inverter.

24
(2) Explanation of Indicating the condition of LED
Condition
Explanation
of LED
Input condition from the module of solar cells is indicated
Solar PV
(Red LED is lit: More than 400V of PV voltage)
Operated condition of the inverter is indicated
Operation
(Green LED is lit: The inverter runs in sound).
The condition of system is indicated (Yellow LED is lit: The system is
Grid
normal).
FAULT occurs for the operation of the inverter (Red LED is lit: Error occurs).

LED Indicating the


Amount of Explanation
Generated Power
When the rate of generated power is up to 81~100%, 100% LED is lt. When the
100% LED
rate is below 90%, 100% LED flickers.
When the rate of generated power is up to 61 ~ 80%, 80% LED is lt. When the
80% LED
rate is below 70%, 80% LED flickers.
When the rate of generated power is up to 41 ~ 60%, 60% LED is lit. When
60% LED
the rate is below 50%, 60% LED flickers.
When the rate of generated power is up to 21 ~ 40%, 40% LED is lit. When
40% LED
the rate is below 30%, 40% LED flickers.
When the rate of generated power is up to 5 ~ 20%, 20% LED is lit. When
20% LED
the rate is below 10%, 20% LED flickers.

4.3 Basic Condition Indicated Modes (4 Lines)


The below screens are for DSP-33010K ~ 100K series. Refer to Item 4.4 for 200~250K
series.
4.3.1 Basically Indicated Contents
Line1. Capacity of Output Power Generation
(Capacity of AC power Generation is indicated.)
Line2. Condition of Input Solar Cells (DC Voltage / Current / Voltage)
Line3. Internally Charged Voltage and Internal Temperature
Line4. Capacity of Power Generation Accumulated Until Now

Line1. Running Condition of Inverter,


Running Mode of Inverter
Line2.
Line3. Capacity of Power Generation for the Other Day
Line4. Max. Capacity of Power Generation per a Day

Line1. Running Condition of Inverter, Present Capacity


of Power Generation, Running Mode of Inverter
Line2. 3 Phase Output Line, Frequency of System Power
Line3. Voltage of System Power (R/S/T)
Line4. Current of System Power (R/S/T)

25
4.4 Displayed Screen of 200 ~ 250k Series
200~250K applies active parallel running algorithm and only Master (low load) Inverter
is operated when the sun rises. If the rate of power generation in Master (Module 1)
Inverter is up to 70% of the rated capacity for the increased radiation, Slave Inverter
(Module 2) begins to run in parallel mode.
If the rate of power generation decreases below 30% of the rated capacity for the
decreased radiation, Slave Inverter is stopped to be standby mode.
2 keypads are mounted in the keypad responding to each module (Master, Slave) of
200~250K series.

Upper Keypad: Exclusive Keypad for Master Inverter (Module 1)


Lower Keypad: Exclusive Keypad for Slave Inverter (Module 1)

4.4.1 Basically Indicated Screen for Master Inverter


In operating Master Inverter,“M-Run”is indicated on the first low of LCD on the upper
keypad.
Line1. Capacity of Master’s Output Power Generation
(Capacity of AC power Generation is indicated.)
Line2. Condition of Input Solar Cells (DC Voltage / Current / Voltage)
Line3. Internally Charged Voltage and Internal Temperature
Line4. Capacity of Power Generation Accumulated Until Now

4.4.2 Basically Indicated Screen for Slave Inverter


In operating Slave Inverter,“Run”is indicated on the first low of LCD on the lower
keypad.
If you press “TURN” button on each pad of Master/Slave Inverter, you can confirm the
data about inverter running.
Line1. Capacity of Slave’s Output Power Generation
(Capacity of AC power Generation is indicated.)
Line2. Condition of Input Solar Cells (DC Voltage / Current / Voltage)
Line3. Internally Charged Voltage and Internal Temperature
Line4. Capacity of Power Generation Accumulated Until Now

Line1. Running Condition of Inverter,


Running Mode of Inverter
Line2.
Line3. Capacity of Power Generation for the Other Day
Line4. Max. Capacity of Power Generation per a Day

Line1. Running Condition of Inverter, Present Capacity


of Power Generation, Running Mode of Inverter
Line2. 3 Phase Output Line, Frequency of System Power
Line3. Voltage of System Power (R/S/T)
Line4. Current of System Power (R/S/T)

26
4.4.3 Screen of Integrated Keypad
Line1. Total Sum of Capacity of Master/Slave’s Present Power
Generation
Line2. Rated Capacity of Inverter
Line3. Input Condition of Solar Cells (DC Voltage / Current)
Line4. Capacity of Power Generation Accumulated Until Now

Line1. Total Sum of Capacity of Master/Slave’s Present Power Generation


Line2. Slave(Module 2)’s AC Power Output Capacity
Line3. Voltage of System Power (R/S/T)
Line4. Current of System Current (R/S/T)

Line1. Total Sum of Capacity of Master/Slave’s Present Power Generation


Line2. Rated Capacity of Slave(Module 2)
Line3. Input Condition of Slave Solar Cells (DC Voltage / Current)
Line4. Capacity of Slave’s Power Generation Accumulated Until Now

Line1. Total Sum of Capacity of Master/Slave’s Present Power Generation


Line2. Master(Module 1)’s AC Power Output Capacity
Line3. Voltage of System Power (R/S/T)
Line4. Current of System Current (R/S/T)

Line1. Total Sum of Capacity of Master/Slave’s Present Power Generation


Line2. Slave(Module 1)’s AC Power Output Capacity
Line3. Voltage of System Power (R/S/T)
Line4. Current of System Current (R/S/T)
6.

Line1. Total Sum of Capacity of Master/Slave’s Present Power Generation


Line2. 1: Capacity of Master’s Power Generation (%)
/ 2: Capacity of Slave’s Power Generation (%)
Line3. Nothing is indicated from 3 ~ 6.
Line4. Nothing is indicated from 7 ~ A.

Line1. Total Sum of Capacity of Master/Slave’s Present Power Generation


Line2. Total Sum of Capacity of Master/Slave’s Output Power Generation
Line3. Voltage of Master/Slave’s System Power (R/S/T)
Line4. Current of Master/Slave’s System Power (R/S/T)

27
5. Maintenance & Repair

5.1 Initialization & Measure against Any Error


In case the inverter is stopped due to any error, buzzer rings and error indication is
presented on the screen. At this time, press “F-RESET” key to stop the buzzer’s ringing,
examine the reason why any error occurs, remove the cause and then re-run the inverter. You
can confirm‘Fault Scan’again. 500 causes from No. 0~499 are stored and the most recent one
is No. 0. Making use of the up/down key(△, ▽) on the keypad, you can comprehend if any
parameter occurs or any error used to happen or not.

5.2 Buzzer and Fault

5.2.1 Buzzer
If any abnormal cause such as moment overload which may be the cause of failure happens, the
buzzer rings consecutively. If the moment overload is cancelled, buzzer doesn’t ring any
more.
If you press [BZ-off] button on the keypad when the buzzer rings, the buzzer doesn’t ring
any more. If you press this button again, the buzzer rings. In case any error occurs for the
condition that alarm doesn’t ring any more, the buzzer rings normally.

5.2.2 Failure
Over voltage
In case the voltage of solar cells is more than the determined voltage, stop the system of
inverter to protect the system.

5.2.3 Method to Cancelling Failure and Alarm

※In case of DSP-33200K ~ 250K series, if you want to cancel the alarm, you should reset the
entire integrated keypad and internal Master/Slave keypad.

If serious damage occurs for the inverter, the inverter indicates that any error happens on
the LCD screen and buzzer rings at this time. If you press [F-RESET] and then [BZ-off] on
the keypad to cancel the alarm and error, the alarm or error is cancelled. After the alarm
is cancelled, the converter begins run standby counts(300 secs, 5 mins). In case the alarm
is continued to ring, stop the inverter completely and then contact to the headquarters to
fix the converter.

28
5.3 Symptoms of Failure
If any error happens, indicate this error and stop running.
If any error happens, the result is indicated on the window of the keypad.

The Cause of Failure and Measured Contents

Cause
Order Indication Occurred Cause Measures
of Error
After inspecting the module of solar
If the voltage of solar
Input DC Over cells, run the inverter.
1 cells is higher than
Overvoltage voltage If re-run is impossible, ask for
the determined voltage.
service center.
After inspecting system voltage, re-
If the system voltage
Output Over run the inverter.
2 is higher than the
Overvoltage voltage If re-run is impossible, ask for
determined voltage.
service center.
Remove the cause of over-current such
Output In case the output of
Over as short, run the inverter.
3 Over- inverter is of over-
current If re-run is impossible, ask for
current current
service center.
Check the temperature sensor and
Overheating In case the temperature cable. And remove the cause of over
Over
4 of inside the inverter is heat.
heat
Converter higher than 85℃ If re-run is impossible, ask for
service center.
Confirm the condition of earth and
Error of Earth In case leaked current insulation.
5
Earth fault occurs If re-run is impossible, ask for
service center.
Check the IGBT and Control board. If
In case inverter
there is no reason, re-run the
Error of IGBT switching
6 inverter.
Element Error element and controlling
If re-run is impossible, ask for
board is out of order
service center.
Check the phase sequence. And Change
RST phase
Reverse RST phase sequence is the R to S cable.
7 sequence
Phase mismatch If re-run is impossible, ask for
mismatch
service center.
Check the ACB or signal cable to
Malfunction operate ACB.
8 MC Error Malfunction of ACB
of ACB If re-run is impossible, ask for
service center.

29
5.4 Asking for A/S

If the inverter doesn’t work normally, confirm the cause of failure.


1) Name of Model
2) Number of Manufacturing
3) Purchased Place
4) Purchased Year
5) Certification Liaison
6) Contents of Failure

30
6. Specification of Products

Name of Type: D S P-▨ ▨ ▨ ▨ K 3310 3315 3320 3325 3330

Max. Open Circuit Voltage 820 Vdc

Range of MPPT Voltage 200 ~ 820 Vdc

Input (Run) Starting Voltage 400 Vdc

Max. Input Current 30A 43A 60A 72A 80A

Method of Control Max. Power Point Tracking Control (MPPT Control)

Rated Output Capacity 10 kW 15 kW 20kW 25KW 30KW

Rated Voltage System Voltage (AC 380V ±38 V)


Perturbed Rate of
System Frequency(60Hz ±0.2 Hz)
Frequency
3 Phase & 4 Lines Type (Non-transformer Type) (Option:
Constant
Transformer)
Power Factor Above 0.95
Output Current Total Below 5%
Distorted Rate
(Current THD) Below 3% for Each Difference

Method of Control PWM METHOD


Prevention of Independent
Within 0.5 Seconds
Operation
Over-load 110%

Efficiency Above 95%


Cooling Method Forced Air-cooling Type(AC Fan)
Protective Structure IP 20
Noise of Equipment Below 60 dB
Structure
520 X 850 650 X 1400 650 X 1400 650 X 1400 650 X 1400
Outer Dimension(WxHxD)
X 385 mm X 500 mm X 500 mm X 500 mm X 500 mm

Full Weight 120 kg 140 kg 150 kg 90 kg 160 kg


Outer Interface RS 232C/RS485
Overvoltage of Input, Short of Output, Over-load, Protecting
Inverter
Protective Inverter from Overheating, Short of Fuse, Preventing DC Output
Function Preventing Independent Run, Overvoltage of System,
System
Protection of Low Voltage, Over-frequency of System
Ambient Temperature -10 ℃ ~ 40 ℃
Preserving Temperature -20 ℃ ~ 65 ℃

Applicative Ambient Humidity Relative humidity is below 90% RH(No Dewfall)


Environment Altitude & Vibration Below 1,000 m· Below 5.9m/sec²(=0.6g)
Corrosive gas, flammable gas, oil mist and dust should not
Ambient Temperature
exist.

31
Name of Type: D S P-▨ ▨ ▨ ▨ K 3350 33100

Max. Open Circuit Voltage 820 Vdc

Range of MPPT Voltage 200 ~ 820 Vdc

Input (Run) Starting Voltage 400 Vdc

Max. Input Current 150A 300A

Method of Control Max. Power Point Tracking Control (MPPT Control)

Rated Output Capacity 50 kW 100KW

Rated Voltage System Voltage (AC 380V ±38 V)


Perturbed Rate of
System Frequency(60Hz ±0.2 Hz)
Frequency
3 Phase & 4 Lines Type (Non-transformer Type) (Option:
Constant
Transformer)
Power Factor Above 0.95
Output Current Total Below 5%
Distorted Rate
(Current THD) Below 3% for Each Difference

Method of Control PWM METHOD


Prevention of Independent
Within 0.5 Seconds
Operation
Over-load 110%

Efficiency Above 95%


Cooling Method Forced Air-cooling Type(AC Fan)
Protective Structure IP 20
Noise of Equipment Below 60 dB
Structure
Outer Dimension(WxHxD) 650 X 1400 X 650 mm 1000 X 1650 X 750 mm

Full Weight 140 kg 300 kg


Outer Interface RS 232C/RS485
Overvoltage of Input, Short of Output, Over-load, Protecting
Inverter
Protective Inverter from Overheating, Short of Fuse, Preventing DC Output
Function Preventing Independent Run, Overvoltage of System,
System
Protection of Low Voltage, Over-frequency of System
Ambient Temperature -10 ℃ ~ 40 ℃
Preserving Temperature -20 ℃ ~ 65 ℃

Applicative Ambient Humidity Relative humidity is below 90% RH(No Dewfall)


Environment Altitude & Vibration Below 1,000 m· Below 5.9m/sec²(=0.6g)
Corrosive gas, flammable gas, oil mist and dust should not
Ambient Temperature
exist.

32
Name of Type: D S P-▨ ▨ ▨ ▨ K 33200 33250
Max. Open Circuit Voltage 820 Vdc

RANGE OF MPPT VOLTAGE 200 ~ 820 Vdc

Input (Run) Starting Voltage 400 Vdc

Max. Input Current 570A 720A

Method of Control Max. Power Point Tracking Control (MPPT Control)


Output Capacity of Rated
200kW 250kW
Output
Rated Voltage System Voltage (AC 380V ±38 V)
Perturbed Rate of
System Frequency (60Hz ±0.2 Hz/50Hz ±0.2 Hz)
Frequency
3 Phase & 3 Lines Type (Non-transformer Type)
Constant
(Option: Transformer)
Power Factor Above 0.95
Output
Current Total Below 5%
(Current THD) Below 3% for Each Difference

Method of Control PWM METHOD


Prevention of Independent
Within 0.5 Seconds
Operation
Over-load 100%

Efficiency Above 95%

Cooling Method Forced Air-cooling Type(AC Fan)

Protective Structure IP 20

Structure Noise of Equipment Below 60 dB

Outer Dimension(WxHxD) 1600 X 2100 X 850 mm 1600 X 2100 X 850 mm

Full Weight 950 kg 970 kg

Outer Interface RS485


Overvoltage of Input, Short of Output, Over-load, Protecting
Inverter
Protective Inverter from Overheating, Short of Fuse, Preventing DC Output
Function Preventing Independent Run, Overvoltage of System,
System
Protection of Low Voltage, Over-frequency of System
Ambient Temperature -10 ℃ ~ 50 ℃
Preserving Temperature -20 ℃ ~ 65 ℃

Applicative Ambient Humidity Relative humidity is below 90% RH(No Dewfall)


Environment
Altitude & Vibration Below 1,000 m · Below 5.9m/sec²(=0.6g)
Corrosive gas, flammable gas, oil mist and dust should not
Ambient Temperature
exist.

33
※ The scale of this product might be changed without any notice. Please, ask for the matter in purchasing our
products.

7. Quality Guaranteed
7.1 Quality Liaison

Quality Liaison

Name of Product System Connected Photovoltaic Inverter(SCPI)


Name of Model
Purchased Data
Period of QG
Within 5 years from the product purchased date
(Quality Guaranteed)
Name
Customer Address
Tel
Name
Shop Address
Tel.
• The company manufacturing this product doesn’t take a responsibility for safety
accident or failure due to the customer’s mistake or false use violating the
specifications.
• The size or outlook of this product can be changed without any notice.
• This liaison is valid only in Republic of Korea.
• As this liaison is not reissued, keep this liaison with the manual, please.

◀ Introduction of Compensatory A/S(A/S for free) ▶

If failure occurred under normally using condition within the period of quality guaranteed, your
product can be tested and fixed for free.

◀ Introduction of Non-compensatory A/S(Payment Charged A/S) ▶

If the failure of our products that you have is related to the below contents,
we will repair the product through payment charged A/S

• The product was out of order due to the customer’s intention or carelessness
• The product was out of order due to error of applied current or inferiority of
the connected product.
• Any failure occurred by natural calamity.
• In case the product was repaired or revised at the other shop, not at the designated
service center
• In case of the nameplate of Dass Tech
• In case any failure occurs after the user dismantled, repaired or replaced our products

34
• In case you replaced the component of our product because the lifetime of our product was over
• In case other person, not our designated service staff, revised or fix our products.
• In case the period of compensatory A/S is over

35
The scale of this product might be changed without any notice. Please, ask for the matter in
purchasing our products.

(A/S) Supporting Customers 043-218-5670


(FAX) 043-218-5671
(E-mail) [email protected]
Headquarters: (In Ochang Science Complex) Songdaeri 319-1,
Ochang, Cheongwon, Chuncheonbuk-do, Korea
http://www.dasstech.com
Ver 1.8

36

You might also like